CN217419728U - Can week rotary attached steel construction elevator basis - Google Patents

Can week rotary attached steel construction elevator basis Download PDF

Info

Publication number
CN217419728U
CN217419728U CN202220802830.6U CN202220802830U CN217419728U CN 217419728 U CN217419728 U CN 217419728U CN 202220802830 U CN202220802830 U CN 202220802830U CN 217419728 U CN217419728 U CN 217419728U
Authority
CN
China
Prior art keywords
wall
steel
construction elevator
foundation
triangular supports
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220802830.6U
Other languages
Chinese (zh)
Inventor
李宁
宋诗银
邱鑫
伊赟
李珺
蔡屯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Communications Engineering Group Co Ltd
Original Assignee
China Construction Communications Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Communications Engineering Group Co Ltd filed Critical China Construction Communications Engineering Group Co Ltd
Priority to CN202220802830.6U priority Critical patent/CN217419728U/en
Application granted granted Critical
Publication of CN217419728U publication Critical patent/CN217419728U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

The utility model relates to a can week and rotate attached to formula steel construction elevator basis, including setting up the wall built-in fitting that attaches on the outer wall structure of underground, the outer wall structure of underground is connected with the triangular supports frame more than two side by side through attaching the wall built-in fitting, is connected with even roof beam between the triangular supports frame, is provided with a plurality of fossil fragments on the triangular supports frame top surface, and the fossil fragments are put on the shelf and are equipped with the steel sheet, and the steel sheet passes through U type bolt-up. Adopt members such as triangular supports frame, even roof beam, fossil fragments, steel sheet, U type bolt, through bolted connection equipment to form complete, independent atress framework, the rethread attaches the wall built-in fitting and installs on the basement exterior wall is structural, will construct the elevator and set up on this atress framework, on construction elevator load transmits elevator foundation steel structure, and then transmits to the basement structure on the wall.

Description

Can week and change attached to formula steel construction elevator basis
Technical Field
The utility model relates to a basic technical field of construction elevator, concretely relates to can turnover attached steel construction elevator basis is an attached steel construction elevator basis that can turnover that is applicable to the construction elevator and is located basement outer wall one side backfill region.
Background
Along with the development of the construction industry, the construction elevator is widely applied, and the solid and reliable foundation is the guarantee that the subsequent safe and efficient operation of the construction elevator improves the construction efficiency. When the construction elevator is arranged on one side of the basement outer wall fertilizer groove, the construction elevator foundation is arranged on backfill soil of the basement outer wall, stability of the construction elevator foundation is difficult to guarantee due to the influence of uneven settlement of the backfill soil, and great potential safety hazards are brought to the use of the construction elevator. In order to solve the problems, the foundation of the construction elevator must be effectively attached to an underground outdoor wall structure so as to eliminate the potential safety hazard caused by the uneven settlement of backfill soil to the use of the construction elevator. Traditional attached construction elevator basis adopts reinforced concrete structure construction, need carry out construction elevator foundation structure's construction in step in basement structure work progress promptly, adopts this mode construction elevator basis, is the field operation, and its operation is loaded down with trivial details, and the construction period is long, must occupy the field operation face and other construction resources for a long time, seriously restricts basement structure's overall construction progress. Simultaneously reinforced concrete structure construction elevator basis takes root on basement structure bottom plate, so its structural dimension need combine basement structural feature independent design, can't accomplish the construction standardization, and reinforced concrete structure construction elevator basis engineering volume is big, with high costs, is abandoned after the later stage finishes using promptly, belongs to disposable input, unable turnover, must lead to the fact very big wasting of resources. The utility model discloses a chinese utility model patent "an outdoor construction elevator foundation reinforcing apparatus", publication No. CN206616602U, it includes building outer wall, indoor reinforced concrete floor, original soil layer, I-steel and construction elevator foundation, be the backfill between building outer wall and the original soil layer, the building outer wall has seted up the mounting hole, has pour the concrete cushion on the original soil layer, pre-buried a plurality of round steel on the concrete cushion, the root of mounting hole, the upper surface of indoor reinforced concrete floor and the upper surface of concrete cushion all lie in same horizontal plane; one end of the I-shaped steel penetrates through the mounting hole and is fixedly mounted on the indoor reinforced concrete floor slab, the other end of the I-shaped steel is fixedly mounted on the concrete cushion layer through round steel, and the construction elevator foundation is placed on the I-shaped steel. The utility model adopts the I-shaped steel to support the construction elevator foundation, has simple operation and convenient construction, can effectively avoid the construction elevator foundation from generating uneven settlement, and has good safety effect; the practicability is a reinforcing mechanism provided aiming at uneven settlement of backfill soil of the outer wall of the basement, but the reinforcing mechanism is still an improvement on the original process, only can reduce the condition of even settlement of the foundation of the industrial elevator, and still does not solve the fundamental problem, so that the operation process is further complicated and the construction period is prolonged due to the addition of the reinforcing device; although the chinese utility model discloses a "a construction elevator foundation construction method of bearing in basement roof", publication No. CN111411643A includes the following steps: cleaning a top plate of the basement; the basement structure is reinforced; manufacturing and installing a profile steel support for constructing a basic stress structure of the elevator; installing a construction elevator foundation stress structure on a top plate of the basement, wherein a construction elevator foundation installation area is positioned on the stress structure; sealing the installation area of the construction elevator foundation; pre-burying a foundation embedded part of a construction elevator; erecting a template and arranging ribs in the installation area, and pouring concrete to form a construction elevator foundation; and (5) installing a construction elevator. The utility model has the advantages that: the utility model discloses consolidate basement structure will be under construction elevator basic design structural at shaped steel, utilizes shaped steel structure will be under construction elevator load and successively transmit for basement roof integrated configuration component and vertical structural component, has avoided the interference to basement installation and construction during the elevator use of being under construction, and its adoption is to the reinforcement of structure, has saved the back of the building and has supported isotructure, still relies on basement structure, can not realize the technical purpose of independent support.
SUMMERY OF THE UTILITY MODEL
The utility model provides a can turnover attached steel construction elevator basis that independently realizes bearing.
The utility model discloses a concrete technical scheme is: the utility model provides a can week and rotate attached to formula steel construction elevator basis, is including setting up the wall built-in fitting that attaches on the basement exterior wall structure, the basement exterior wall structure is connected with the triangular supports frame more than two side by side through attaching the wall built-in fitting, be connected with even roof beam between the triangular supports frame, be provided with a plurality of fossil fragments on the triangular supports frame top surface, the fossil fragments are put on the shelf and are equipped with the steel sheet, the steel sheet passes through U type bolt-up.
Further, it is preferred that the tripod is provided with threely, including two tripod I to and set up tripod II between two tripod I.
Further, preferably, still include soleplate, still be provided with on the steel sheet soleplate.
Further, preferably, the wall-attached embedded part comprises a thick steel plate, and a plurality of bolts are vertically arranged on the thick steel plate.
Further, preferably, two wall-attached embedded parts are arranged on the underground outdoor wall structure corresponding to the triangular support frame I, and three wall-attached embedded parts are arranged on the underground outdoor wall structure corresponding to the triangular support frame II.
Further, preferably, the keel is made of H-shaped steel and is arranged parallel to the surface of the basement exterior wall structure.
Further, preferably, after the two ends of the U-shaped bolt penetrate through the through holes of the steel plate, the U-shaped bolt sequentially penetrates through the keel and the triangular support frame and then is screwed and fixed by the anchoring plate and the double nuts.
Simultaneously the utility model also discloses an above-mentioned application method that can week rotary attached steel construction elevator basis, including following step:
1) the wall-attached embedded part is embedded on the underground outdoor wall structure.
2) The triangular support frame is installed and erected.
3) And the keel and the steel plate are laid and fixed.
4) And (4) supporting a foundation slab and pouring concrete.
5) And maintaining and constructing the elevator installation.
6) And (5) quickly disassembling the steel structure construction elevator foundation after the construction is completed.
Further, in the step 1), the basement exterior wall structure is structurally reinforced by reinforcing steel bars or arranging hidden beams.
Further, during the reinforcement of soleplate in step 4), the reinforcing bar needs to carry out spot welding with the steel sheet, need to adopt the reinforcing bar drag hook to carry out effective drawknot between reinforcing bar end muscle and the gluten simultaneously, and the steel sheet of decorative pattern is as the die block board, concrete placement shaping soleplate.
The utility model has the advantages that: adopt members such as triangular supports frame, even roof beam, fossil fragments, steel sheet, U type bolt, through bolted connection equipment to form complete, independent atress framework, the rethread attaches the wall built-in fitting and installs on the basement exterior wall is structural, will construct the elevator and set up on this atress framework, on construction elevator load transmits elevator foundation steel structure, and then transmits to the basement structure on the wall.
The elevator foundation has the advantages of reasonable design, industrial production, high standardization degree, no need of occupying the construction period of an engineering main body structure, convenience and quickness in mounting and dismounting, turnover and reutilization, low cost, high construction efficiency and high reliability, and can effectively avoid the problems of high construction cost, long construction period, low standardization degree, incapability of turnover and reutilization and the like of the traditional concrete structure elevator foundation.
Drawings
Fig. 1 is a schematic plan view of the attachable steel structure construction elevator foundation, in which the steel plate and the concrete bottom plate are removed;
fig. 2 is a front view of the attached steel structure construction elevator foundation of the present invention, wherein the triangular support frame ii is not shown;
FIG. 3 is a cross-sectional view A-A of FIG. 1;
FIG. 4 is a schematic structural view of a wall-attached embedded part;
FIG. 5 is a schematic view of a screw hole of an embedded part of a wall attached to a triangular support frame;
fig. 6 is a schematic view of a U-bolt.
In the upper diagram: 10A-underground outdoor wall structure, 1-wall-attached embedded part, 101-wall-attached embedded part I, 102-wall-attached embedded part II, 103-wall-attached embedded part III, 104-wall-attached embedded part IV, 105-wall-attached embedded part V, 106-thick steel plate, 107-bolt, 2-triangular support frame, 201-triangular support frame I, 202-triangular support frame II, 3-foundation bottom plate, 4-coupling beam, 5-keel, 6-steel plate, 7-U-shaped bolt, 801-section steel I, 802-section steel II, 803-section steel III and 804-section steel IV.
Detailed Description
In order to make the technical problems and technical solutions solved by the present invention more clearly understood, the present invention is described in further detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are for purposes of illustration only and are not intended to limit the invention.
In the description of the present invention, it is to be understood that the terms "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", and the like indicate orientations or positional relationships based on those shown in the drawings, and are merely for convenience of description of the present invention, and do not indicate or imply that the device or element so referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
In the description of the present invention, it should also be noted that, unless explicitly stated or limited otherwise, the terms "disposed," "mounted," and "connected" are to be construed broadly, and may for example be fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
The first embodiment is as follows:
as shown in fig. 1 to 3, a can week rotary attached steel structure construction elevator basis, including setting up attaching wall built-in fitting 1 on the outdoor wall structure 10A of underground, outdoor wall structure 10A is connected with 2 threely of triangular supports through attaching wall built-in fitting 1 side by side, is two triangular supports I201 respectively to and set up triangular supports II 202 between two triangular supports I201.
The wall-attached embedded part 1 comprises a thick steel plate 106 with the thickness of 20mm, a plurality of bolts 107 are vertically arranged on the thick steel plate 106, as shown in fig. 4, the thick steel plate 106 with the thickness of 20mm and the bolts 107M 30 are welded to form the wall-attached embedded part 1, the number of the wall-attached embedded part 1 can be increased or decreased according to the load of a construction elevator, as shown in fig. 1 to 3, the wall-attached embedded part 1 is distributed according to the adhesion points of a triangular support frame I201 and a triangular support frame II 202, two triangular support frames I201 are respectively and fixedly connected through a wall-attached embedded part I101 at the upper side and a wall-attached embedded part II 102 at the lower side, the wall-attached embedded part I101 adopts 2 rows of 2 bolts 107 in the middle of the thick steel plate 106, the two sides adopt the structures of 1 row of 4 bolts 107 in the middle of the thick steel plate 106, and the wall-attached embedded part II 102 adopts the structures of 2 rows of 4 bolts 107 in the middle of the thick steel plate 106, and the two sides of 1 row of 2 bolts 107; and the triangular support frame II 202 that is located in the middle adopts the three built-in fitting 1 fastening connection design of attaching the wall from top to bottom, be the built-in fitting III 103 that attaches the wall of upside respectively, the built-in fitting IV 104 that attaches the wall in the middle, and the built-in fitting V105 that attaches the wall from the downside, attach the built-in fitting III 103 and take 2 bolts 107 in the middle on the thick steel plate 106, both sides then 2 are listed as 4 bolt 107's structure respectively, and attach the built-in fitting IV 104, attach the built-in fitting V105 and take 2 bolts 107 in the middle on the thick steel plate 106, both sides then 2 are listed as 2 bolt 107's structure respectively, attach the structure adjustment of wall built-in fitting 1 and be the technical staff in the field and can make conventional selection according to the point of application, load adaptability, the structure adjustment of doing is all in the technical principle of the utility model.
The two triangular support frames I201 comprise transverse H-shaped section steel I801 with the specification of 400 multiplied by 250 multiplied by 20, vertical H-shaped section steel II 802 with the specification of 320 multiplied by 150 multiplied by 20 and diagonal bracing H-shaped section steel III 803 with the specification of 360 multiplied by 150 multiplied by 20, the section steel I801, the section steel II 802 and the section steel III 803 are welded into a right-angled triangular frame body, one end of the section steel I801, which is close to the basement outer wall structure 10A, is welded with a 400mm multiplied by 150mm steel plate which is used as a connecting plate with the wall-attached embedded part I101, a through hole is correspondingly arranged on the connecting plate by a bolt 107, the end is flush with one side edge of the vertical section steel II 802, which is close to the basement outer wall structure 10A, the vertical section steel II 802 is arranged at a position corresponding to a bolt of the wall-attached embedded part II 102, a hole is directly arranged on the flange to be used as a bolt hole connected with the wall-attached embedded part II 102, and a steel plate can be welded as a connecting plate, then punching holes on the steel plate and the flange to be used as bolt connecting holes, please refer to fig. 5; the connecting positions of the wall-attached embedded part I101, the wall-attached embedded part II 102 and the triangular support frame I201 are shown in FIG. 2 and are respectively the end part of the section steel I801 and two positions on the section steel II 802 close to the bottom end of the section steel III 803.
As shown in FIG. 3, an I-shaped section steel IV 804 with the diagonal bracing of 360 × 150 × 20 × 20 is additionally arranged on the triangular support II 202 on the basis of the structure of the triangular support I201, namely a double diagonal bracing structure is adopted, three-point wall-attached embedded parts 1 are adopted for connection, one end of the section steel I801 close to the basement outer wall structure 10A is welded with a steel plate with the thickness of 400mm × 150mm × 20mm as a connecting plate with a wall-attached embedded part III 103, through holes are correspondingly formed in the connecting plate by bolts 107, the end is flush with one side edge of the vertical section steel II 802 close to the basement outer wall structure 10A, the vertical section steel II 802 is arranged at the positions corresponding to the bolts IV 104 and V105 of the wall-attached embedded part V105, namely, holes are directly formed in the flange as bolt holes for connecting the wall-attached embedded part IV 104 and the wall-attached embedded part 105, and the triangular support II 202 is respectively arranged at the end part 801 of the transverse section steel I, And wall-attached embedded parts III 103, wall-attached embedded parts IV 104 and wall-attached embedded parts V105 are arranged at the bottom ends of the inclined strut section steel III 803 and the section steel IV 804.
Two I201 of triangular supports to and II 202 tops of triangular supports should be parallel, adopt 2+ 1's design in this embodiment of course, also can adopt the design of three I201 of triangular supports, or the design of three II 202 of triangular supports, or the design of two I201 of triangular supports, or the design of two II 202 of triangular supports, it is the replacement of equal technique, and the adjustment of doing is all within the technical principle of the utility model.
As shown in figure 1, connecting beams 4 are connected between triangular support frames 2, the connecting beams 4 are I-shaped steel with the specification of 320 x 150 x 20, two ends of the I-shaped steel are respectively welded with 400 x 150 x 20 steel plates, 6 bolt holes are respectively formed in the steel plates, bolt holes are also formed in corresponding positions of transverse section steel I801 webs of the triangular support frames 2, the transverse section steel I801 webs are connected through M27 double-nut bolts during installation, installation and disassembly are convenient, and turnover is achieved. Even roof beam 4 is including the even roof beam 4 in I201 of triangular supports frame, II 202 middle parts of angle bracing frame to and the even roof beam 4 of horizontal connection in I201 of triangular supports frame, II 202 outside positions of angle bracing frame, make whole steel construction form stable whole with I201 of triangular supports frame, II 202 monolithic connection of angle bracing frame through even roof beam 4.
Be provided with 4 strip-type steel joists 5 on I201 of triangular supports, II 202 top surfaces of angle brace frame, fossil fragments 5 are the I-shaped steel of 100 x 80 x 8 x 6 specification, and after I201 of triangular supports, II 202 of angle brace frame and even roof beam 4 installation were accomplished, steel joists 5 transversely evenly arranged in triangular supports girder steel top with 600mm interval. The elevator standard knot and the lower triangular steel beam have the functions of bearing up and down, bearing and distributing loads transmitted by the elevator standard knot, and transmitting the loads to the lower triangular steel beam.
The steel plate 6 is erected on the keel 5, the steel plate 6 is a steel plate with a thickness of 10mm, and the steel plate is placed above the steel keel 5 and used as a pouring bottom die of the foundation slab 3, so that the foundation slab 3 is convenient to pour.
In order to enable the steel plate 6, the keel 5 and the triangular support frame 2 to form a stable whole, the steel plate 6, the keel 5 and the triangular support frame 2 are connected and fixed on a section steel beam of the triangular support frame 2 by adopting a U-shaped bolt 7 with the length of M16 being 680mm, as shown in figure 6, two ends of the U-shaped bolt 7 are firstly screwed and fixed by adopting an anchoring plate with the length of 10mm and double nuts, namely two ends of the U-shaped bolt 7 penetrate through a through hole of the steel plate 6 and then sequentially penetrate through the keel 5 and the triangular support frame 2 and then are screwed and fixed by adopting the anchoring plate and the double nuts, and for facilitating subsequent turnover disassembly, a screw penetrating surface range of the U-shaped bolt 7 can be sleeved by adopting PVC sleeves, namely PVC sleeves can be sleeved at an elbow of the U-shaped bolt 7, so that the U-shaped bolt 7 is prevented from being kneaded and bonded with the poured concrete foundation slab 3 and is not convenient for the anchoring plate and double nuts to be screwed or loosened; the steel plate 6 is also provided with a foundation slab 3.
Triangular supports I201, angle brace II 202, even roof beam 4, fossil fragments 5, steel sheet 6, U type bolt 7, above-mentioned component passes through bolted connection equipment and forms complete atress framework, constitutes an elevator basic steel structure, and the rethread attaches 1 on the basement exterior wall structure through attaching the wall built-in fitting, forms the basic main atress framework of construction elevator, will construct the elevator and set up on this atress framework, will construct the elevator load transmission to elevator basic steel structure, and then transmit to the basement structure on the wall.
The second implementation:
the use method of the reversible attached steel structure construction elevator foundation comprises the following steps:
1) the wall-attached embedded part 1 on the basement outer wall structure 10A is embedded: in the construction process of the basement structure, the wall-attached embedded parts 1 of the steel structure foundation are buried in the basement outer wall structure 10A according to the design positions of the wall-attached embedded parts 1. The wall-attached embedded part 1 and the structural outer wall need to have enough strength so as to meet the requirement of load transmission of the later-stage construction elevator; if necessary, the basement outer wall structure can be locally reinforced by reinforcing steel bars or arranging hidden beams.
Meanwhile, each part of the construction elevator foundation with the turnover attachment type steel structure needs to be designed according to the load requirement of the corresponding construction elevator, the overall structural strength of the construction elevator needs to meet the load transmission requirement of the construction elevator, the foundation steel structure needs to be processed and produced in a factory for ensuring the processing and welding quality among each component of the foundation steel structure, the material, specification, size, welding seam and the like of each component of the foundation steel structure need to meet the requirement of design drawing, after each component of the foundation steel structure is processed, the inspection and the welding seam detection need to be carried out, the detection is qualified, and the construction site can be transported to be installed after the antirust paint is coated.
2) The triangular support frame 2 is installed and erected: the field installation of the triangular support frame 2 and the connecting beam 4 needs to be carried out by a team with professional construction qualification of steel structures, and the line is paid out according to the positioning of a construction elevator before construction so as to ensure the accuracy of the installation position of an elevator foundation. Meanwhile, safety protection measures need to be made in the construction process, the field connection and installation of all components of the elevator basic steel structure must meet the requirements of design drawings, and the installation quality of bolt connection friction surfaces and the bolt screwing degree among the components are respectively checked by not less than 10%.
3) And (3) laying and fixing the keel 5 and the steel plate 6: after keel 5 is transversely and evenly arranged on the triangular support frame steel beam, U-shaped bolts 7 are adopted to fasten steel plates 6, keel 5 and triangular support frame 2, so that a stable whole is formed.
4) And (3) erecting and pouring concrete on the foundation slab: during soleplate 3's reinforcement, the reinforcing bar needs to carry out spot welding with steel sheet 6, need adopt the reinforcing bar drag hook to carry out effective drawknot simultaneously between reinforcing bar end muscle and the gluten, and the steel sheet 6 of decorative pattern is as die block board, concrete placement shaping soleplate 3.
5) Maintenance and construction elevator installation: after the pouring of the concrete of the foundation slab 3 is completed, concrete curing is required, and after the strength of the concrete reaches the allowable strength, the construction elevator can be installed.
6) The steel construction elevator basis is disassembled fast after the engineering completion: after the construction elevator is used and the elevator is dismantled, the dismantling work of the turnover attachment type steel structure construction elevator foundation can be carried out, only the U-shaped bolt 7 needs to be dismantled during dismantling, after the foundation bottom plate 3 and the steel plate 6 are dismantled, the bolts and the nuts on the parts such as the attached wall embedded part 1, the triangular support frame 2 and the connecting beam 4 are dismantled, the whole integral structure of the turnover attachment type steel structure construction elevator foundation can be dismantled into various components, the follow-up project is prepared for turnover use, and the steps can be realized again by only reconfiguring a new steel plate 6 and the U-shaped bolt 7 when the elevator is used next time.
The present invention has been described in detail with reference to the specific and preferred embodiments, but it should be understood by those skilled in the art that the present invention is not limited to the embodiments described above, and any modifications, equivalents and substitutions made within the spirit and principle of the present invention should be included within the scope of the present invention.

Claims (7)

1. The utility model provides a can week and change attached to formula steel construction elevator basis, its characterized in that, including setting up attaches wall built-in fitting (1) on secret outdoor wall structure (10A), secret outdoor wall structure (10A) is connected with triangular supports (2) more than two side by side through attaching wall built-in fitting (1), be connected with even roof beam (4) between triangular supports (2), be provided with a plurality of fossil fragments (5) on triangular supports (2) top surface, fossil fragments (5) are put on the shelf and are equipped with steel sheet (6), steel sheet (6) are fastened through U type bolt (7).
2. The adhesion type steel structure construction elevator foundation capable of rotating in the circumferential direction as claimed in claim 1, wherein the number of the triangular supports (2) is three, including two triangular supports I (201), and a triangular support II (202) arranged between the two triangular supports I (201).
3. The adhesion type steel structure construction elevator foundation capable of rotating in a circumferential direction as claimed in claim 1, further comprising a foundation slab (3), wherein the foundation slab (3) is further disposed on the steel plate (6).
4. The rotary attachment type steel structure construction elevator foundation as claimed in claim 1, wherein the wall-attached embedded part (1) comprises a thick steel plate (106), and a plurality of bolts (107) are vertically arranged on the thick steel plate (106).
5. The rotary attachment type steel structure construction elevator foundation as claimed in claim 3, wherein two wall-attached embedded parts (1) are arranged on the basement outer wall structure (10A) corresponding to the triangular support frame I (201), and three wall-attached embedded parts (1) are arranged on the basement outer wall structure (10A) corresponding to the triangular support frame II (202).
6. The rotary attached steel structure construction elevator foundation as claimed in claim 1, wherein the keel (5) is made of H-shaped steel and is disposed parallel to the surface of the basement exterior wall structure (10A).
7. The adhesion type steel structure construction elevator foundation capable of rotating in the circumferential direction as claimed in claim 1, wherein two ends of the U-shaped bolt (7) penetrate through holes of the steel plate (6) and then penetrate through the keel (5) and the triangular support frame (2) in sequence and then are screwed and fixed by the anchoring plate and the double nuts.
CN202220802830.6U 2022-04-08 2022-04-08 Can week rotary attached steel construction elevator basis Active CN217419728U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220802830.6U CN217419728U (en) 2022-04-08 2022-04-08 Can week rotary attached steel construction elevator basis

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220802830.6U CN217419728U (en) 2022-04-08 2022-04-08 Can week rotary attached steel construction elevator basis

Publications (1)

Publication Number Publication Date
CN217419728U true CN217419728U (en) 2022-09-13

Family

ID=83183838

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220802830.6U Active CN217419728U (en) 2022-04-08 2022-04-08 Can week rotary attached steel construction elevator basis

Country Status (1)

Country Link
CN (1) CN217419728U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114673191A (en) * 2022-04-08 2022-06-28 中建交通建设集团有限公司 Attached steel structure construction elevator foundation capable of rotating in week and using method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114673191A (en) * 2022-04-08 2022-06-28 中建交通建设集团有限公司 Attached steel structure construction elevator foundation capable of rotating in week and using method thereof

Similar Documents

Publication Publication Date Title
CN105569358A (en) Construction method of special-shaped curved surface roof with large span and multiple curvatures
AU2013212529B2 (en) Automated formwork climbing system
CN217419728U (en) Can week rotary attached steel construction elevator basis
CN201714061U (en) Firmly strengthened large-sized scaffold supporting system
CN114673191A (en) Attached steel structure construction elevator foundation capable of rotating in week and using method thereof
CN212866842U (en) Frame structure type building scaffold
CN110424601B (en) Concrete pouring anti-floating device for composite floor slab with fabricated structure and implementation method
CN112049415A (en) Construction method of cornice formwork
CN106703073A (en) Supporting-free steel beam foundation of super-high-rise construction elevator and construction method of supporting-free steel beam foundation
CN209907886U (en) Adjustable assembled stair construction platform
CN115853287A (en) Forward and reverse combined construction method for large-span roof building in narrow site
CN214062433U (en) Temporary supporting structure of assembled steel structure
CN212802449U (en) Non-pre-buried cantilever steel beam
CN210482635U (en) Concrete pillar reinforcing structure at lower part of shock insulation support
CN103615058A (en) Constraint steel plate structure of super high-rise steel plate concrete shear wall and construction method thereof
CN207194414U (en) A kind of foundation-free steel platform for temporary support
CN208039004U (en) Suitable for the UHPC prefabricated panel trestles under strong corrosive environment
CN207905459U (en) A kind of steel truss and column base plate bolt fastening structure
CN219993240U (en) Construction elevator basis side direction device that returns top
CN217840891U (en) High-altitude large-span steel frame supporting platform
CN217629974U (en) Supporting connection node and support replacing structure for foundation pit supporting
CN214575473U (en) Portable equipment removes operation platform
CN210263565U (en) Additional building type floor slab in later period of decoration
CN219261361U (en) Temporary connection device for I-steel main beam and yoke beam
CN220450682U (en) Temporary construction support based on new bridge tie beam

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant