CN217352845U - Steel construction factory building heel post anticorrosion base - Google Patents

Steel construction factory building heel post anticorrosion base Download PDF

Info

Publication number
CN217352845U
CN217352845U CN202220148011.4U CN202220148011U CN217352845U CN 217352845 U CN217352845 U CN 217352845U CN 202220148011 U CN202220148011 U CN 202220148011U CN 217352845 U CN217352845 U CN 217352845U
Authority
CN
China
Prior art keywords
base
coincide
steel
factory building
groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220148011.4U
Other languages
Chinese (zh)
Inventor
不公告发明人
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Yinhai Steel Structure Engineering Co ltd
Original Assignee
Jiangsu Yinhai Steel Structure Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Yinhai Steel Structure Engineering Co ltd filed Critical Jiangsu Yinhai Steel Structure Engineering Co ltd
Priority to CN202220148011.4U priority Critical patent/CN217352845U/en
Application granted granted Critical
Publication of CN217352845U publication Critical patent/CN217352845U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Reinforcement Elements For Buildings (AREA)

Abstract

The utility model discloses an anti-corrosion base of a bearing column of a steel structure factory building, which comprises a base; comprises entangled reinforcing steel bars; comprises a folding component; two the crisscross winding group that forms of entanglement reinforcing bar, two the crisscross coincide group that forms of coincide subassembly, concretely relates to steel construction factory building heel post base technical field. This steel construction factory building bearing post anticorrosion base, through setting up the base into the same mosaic structure of polylith, and the inside of base has been seted up and has been subtract heavy rib, make the base quality reduce, be convenient for base transportation and installation, the cost of steel construction factory building manufacturing has been reduced, and simultaneously, in the in-process of concatenation base on the one hand through entangling two entanglement reinforcing bars and forming the winding group together, on the other hand forms the coincide group through folding two coincide subassemblies together, then utilize the sprue gate and extend the hole and pour into a mould, can install fast, moreover, the operation is simple, the installation effectiveness of base has effectively been promoted.

Description

Steel construction factory building heel post anticorrosion base
Technical Field
The utility model belongs to the technical field of steel construction factory building heel post base, concretely relates to steel construction factory building heel post anticorrosion base.
Background
The steel structure factory building heel post is the important part of supporting the factory building, and its one end is connected with the wall or the ceiling of steel structure factory building, and the other end then passes ground and buries the base connection in the ground, and the base generally is the concrete piece, and steel structure factory building heel post is connected with the general mode with concrete placement of base.
The base quality of the bearing column of the general steel structure factory building is large, the transportation or the unloading is inconvenient, the transportation or the unloading cost is high, and the manufacturing cost of the steel structure factory building is synchronously increased.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a steel construction factory building heel post anticorrosion base to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: an anti-corrosion base for a bearing column of a steel structure workshop comprises a base; comprises entangled steel bars; comprises a folding component; two the crisscross winding group that forms of entanglement reinforcing bar, two the crisscross coincide group that forms of coincide subassembly, two the base is through winding group and coincide group cross connection.
Preferably, the sprue gate, entangle groove and coincide groove have been seted up to the inside of base, entangle the groove and set up with the coincide groove phase to phase, entangle through extending the hole intercommunication between groove and the coincide groove, the reinforcing bar setting of entangling is in entangling inslot portion, the coincide subassembly sets up in coincide inslot portion.
Preferably, the laminated assembly comprises a steel bar and a steel plate, and rough blocks are distributed on the surface walls of the steel bar and the steel plate.
Preferably, the space between the two steel bars forms a space for accommodating the two steel plates to be overlapped.
Preferably, the inside of steel sheet is seted up the opening of holding casting material.
Preferably, one side of the base is provided with a weight reduction rib.
Compared with the prior art, the utility model, following beneficial effect has:
(1) this steel construction factory building bearing post anticorrosion base, through setting up the base into the same mosaic structure of polylith, and the inside of base has been seted up and has been subtract heavy rib, make the base quality reduce, be convenient for base transportation and installation, the cost of steel construction factory building manufacturing has been reduced, and simultaneously, in the in-process of concatenation base on the one hand through entangling two entanglement reinforcing bars and forming the winding group together, on the other hand forms the coincide group through with two coincide subassemblies superpose together, then utilize the sprue gate and extend the hole and pour into a mould, can install fast, moreover, the steam generator is simple in operation, the installation effectiveness of base has effectively been promoted.
(2) This steel construction factory building heel post anticorrosion base through will entangle the reinforcing bar setting entangle inslot portion, with the coincide subassembly setting in coincide inslot portion for the reinforcing bar does not expose, avoids the inside corrosive object direct corrosion base inside steel material of ground, has promoted the corrosion resistance of base.
Drawings
Fig. 1 is an assembly view of the base of the present invention.
Fig. 2 is the assembly drawing of the entanglement reinforcement and the folding component and the base of the utility model.
Fig. 3 is a schematic structural diagram of the base of the present invention.
Fig. 4 is a schematic structural view of the winding group of the present invention.
Fig. 5 is a schematic view of the split structure of the laminated assembly of the present invention.
Fig. 6 is a schematic structural view of the overlapping group of the present invention.
In the figure: 1. a base; 11. a pouring hole; 12. an entanglement tank; 13. a laminating slot; 14. an extension hole; 2. entanglement of the steel bars; 3. a folding assembly; 31. a steel bar; 32. a steel plate; 33. coarse blocks; 34. a port; 4. a weight-reducing rib; 5. winding; 6. and (6) overlapping the groups.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-6, the present invention provides the following technical solutions: an anti-corrosion base of a bearing column of a steel structure factory building comprises a base 1; comprises an entangled steel bar 2; comprising a folding assembly 3; two entanglement reinforcing bar 2 are crisscross to form twine group 5, and two coincide subassemblies 3 are crisscross to form coincide group 6, and two bases 1 are through twining group 5 and coincide group 6 cross connection.
Further, pouring hole 11, entangle groove 12 and coincide groove 13 have been seted up to base 1's inside, entangle groove 12 and the alternate setting of coincide groove 13, entangle through extending hole 14 intercommunication between groove 12 and the coincide groove 13, entangle reinforcing bar 2 and set up inside entangling groove 12, coincide subassembly 3 sets up inside coincide groove 13.
Further, the laminated assembly 3 includes a steel bar 31 and a steel plate 32, and rough blocks 33 are distributed on the surface walls of the steel bar 31 and the steel plate 32.
Further, the spacing between the two bars 31 forms a space for accommodating the two steel plates 32 to be stacked.
Further, the steel plate 32 is provided with a through opening 34 for accommodating a casting material therein.
Further, a weight reduction rib 4 is provided at one side of the base 1.
During operation, at first take out base 1 and place the ground in, then entangle two base 1's entanglement reinforcing bar 2 together, and with 3 superpositions of coincide subassembly together, can realize two base 1's connection operation, at the in-process of 3 superpositions of coincide subassembly, two billet 31 can extrude with the steel sheet 32 on upper and lower edges, through pouring hole 11 to the inside pouring concrete of entanglement groove 12 after that, the concrete can flow to entanglement groove 12 below entanglement groove 13 and the entanglement groove 13 through extending hole 14 behind the entanglement groove, realize the pouring operation of entanglement group 5 and coincide group 6, thereby realized the pouring operation of base 1.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a steel construction factory building heel post anticorrosion base which characterized in that:
comprises a base (1);
comprises an entangled steel bar (2);
comprising a folding assembly (3);
two intertwine reinforcing bar (2) crisscross formation winding group (5), two coincide subassembly (3) are crisscross to form coincide group (6), two base (1) is through winding group (5) and coincide group (6) cross connection.
2. The anti-corrosion base for the bearing column of the steel structure factory building according to claim 1, is characterized in that: pouring hole (11), entanglement groove (12) and coincide groove (13) have been seted up to the inside of base (1), entanglement groove (12) and coincide groove (13) alternate setting, through extending hole (14) intercommunication between entanglement groove (12) and coincide groove (13), entanglement reinforcing bar (2) set up inside entanglement groove (12), coincide subassembly (3) set up inside coincide groove (13).
3. The anti-corrosion base for the bearing column of the steel structure factory building according to claim 1, is characterized in that: the folding assembly (3) comprises a steel bar (31) and a steel plate (32), and rough blocks (33) are distributed on the surface walls of the steel bar (31) and the steel plate (32).
4. The anti-corrosion base for the bearing column of the steel structure factory building according to claim 3, is characterized in that: the space between the two steel bars (31) forms a space for accommodating the two steel plates (32) to be overlapped.
5. The anti-corrosion base for the bearing column of the steel structure factory building according to claim 3, is characterized in that: the steel plate (32) is internally provided with a through opening (34) for containing pouring materials.
6. The anti-corrosion base for the bearing column of the steel structure factory building according to claim 1, is characterized in that: and a weight reduction rib (4) is arranged on one side of the base (1).
CN202220148011.4U 2022-01-20 2022-01-20 Steel construction factory building heel post anticorrosion base Active CN217352845U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220148011.4U CN217352845U (en) 2022-01-20 2022-01-20 Steel construction factory building heel post anticorrosion base

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220148011.4U CN217352845U (en) 2022-01-20 2022-01-20 Steel construction factory building heel post anticorrosion base

Publications (1)

Publication Number Publication Date
CN217352845U true CN217352845U (en) 2022-09-02

Family

ID=83043843

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220148011.4U Active CN217352845U (en) 2022-01-20 2022-01-20 Steel construction factory building heel post anticorrosion base

Country Status (1)

Country Link
CN (1) CN217352845U (en)

Similar Documents

Publication Publication Date Title
CN204919929U (en) Precast reinforced concrete coincide floor component and assembled floor that constitutes thereof
CN201574504U (en) Paper mold armoured concrete wall
CN217352845U (en) Steel construction factory building heel post anticorrosion base
CN214266032U (en) Precast concrete apron batch production mould
CN213567513U (en) Portable folded cascade superimposed sheet piling bin
CN113107108A (en) Double-steel-plate concrete composite wall with T-shaped stiffening ribs and U-shaped pull rods
CN110258885A (en) A kind of bidirectional stress truss floor support plate of green energy conservation
CN216948997U (en) Lapping structure between laminated plates
CN217711299U (en) Superimposed sheet mosaic structure
CN217000456U (en) High strength concatenation formula prestressing force superimposed sheet
CN206581456U (en) Steel construction wall component with reinforced pipe
CN206562782U (en) Glomeration builds self-tightening type block masonry wall binding apparatus
CN211873484U (en) Superimposed sheet with triangle keyway formula
CN212562150U (en) Single-face leaf plate superposed shear wall suitable for basement outer wall
CN211499312U (en) Bolt type connection structure of partially-coated concrete combined shear wall
CN218159970U (en) Transformer product core lamination frock
CN209723346U (en) A kind of firm energy-saving building laminated floor slab
CN218643857U (en) Safe in utilization's multilayer square steel construction
CN210233406U (en) Steel-wood combined structure die for prefabricated wallboard component
CN213329607U (en) Green's concrete superimposed sheet
CN215948884U (en) Concrete assembling aluminum die
CN212501548U (en) Concrete prefabricated part shelf type tray system capable of being disassembled and assembled quickly
CN219138104U (en) Assembled superimposed sheet of steel construction building convenient to installation
CN213331839U (en) Laminated plate tray and supporting leg lower end locking mechanism
KR200348321Y1 (en) Different type flange cylinder unit and With these units the cylinder storage tank which it produces.

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant