CN217308058U - Deep foundation pit operation integration intelligent machine - Google Patents

Deep foundation pit operation integration intelligent machine Download PDF

Info

Publication number
CN217308058U
CN217308058U CN202220889647.4U CN202220889647U CN217308058U CN 217308058 U CN217308058 U CN 217308058U CN 202220889647 U CN202220889647 U CN 202220889647U CN 217308058 U CN217308058 U CN 217308058U
Authority
CN
China
Prior art keywords
box body
foundation pit
intelligent machine
deep foundation
pit operation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202220889647.4U
Other languages
Chinese (zh)
Inventor
李建
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Runcai Construction Engineering Co Ltd
Original Assignee
Guangdong Runcai Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Runcai Construction Engineering Co Ltd filed Critical Guangdong Runcai Construction Engineering Co Ltd
Priority to CN202220889647.4U priority Critical patent/CN217308058U/en
Application granted granted Critical
Publication of CN217308058U publication Critical patent/CN217308058U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model discloses a deep foundation pit operation integrated intelligent machine, which comprises an outer box body and an intelligent machine body, wherein the front end of the outer box body is provided with a box door, the bottom end of the outer box body is fixedly connected with a bottom box body, four sides inside the outer box body are provided with clamping plates, the clamping plates are fixedly connected with a telescopic rod, the other end of the telescopic rod is fixedly connected with the outer box body, and the outer side of the telescopic rod is sleeved with a damping spring, the staff of being convenient for operates intelligent quick-witted body.

Description

Deep foundation pit operation integration intelligent machine
Technical Field
The utility model relates to an electric power deep basal pit operation technical field, concretely relates to deep basal pit operation integration intelligent machine.
Background
The deep foundation pit is an engineering with the excavation depth of more than 5 meters (including 5 meters) or the excavation depth of less than 5 meters, but particularly complex geological conditions, surrounding environments and underground pipelines, and the foundation pit engineering mainly comprises foundation pit supporting system design and construction and earthwork excavation and is a system engineering with strong comprehensiveness. The method requires geotechnical engineering and structural engineering technicians to be closely matched, the foundation pit engineering is to excavate an underground space from the ground downwards, a vertical retaining enclosure structure is generally arranged around a deep foundation pit, and the enclosure structure is generally a plate (pile) wall structure with a certain insertion depth below the foundation of an excavation surface; the plate (pile) wall has cantilever type, single-support type and multi-support type.
When the existing integrated intelligent machine for deep foundation pit operation is used, the intelligent machine is generally exposed outside, falls on the ground, and is easily damaged. Therefore, the technical personnel in the field provide an integrated intelligent machine for deep foundation pit operation to solve the problems in the background technology.
SUMMERY OF THE UTILITY MODEL
In order to solve the technical problem, the utility model provides a deep basal pit operation integration intelligence machine, including outer box and intelligent quick-witted body, the front end of outer box is equipped with the chamber door, outer box bottom fixed connection bottom box, and outer internal portion four sides department is equipped with splint, splint fixed connection telescopic link, the other end fixed connection outer box of telescopic link, telescopic link outside cover are equipped with damping spring.
Preferably: the bottom box lower extreme is equipped with the opening, and the bottom box inboard is equipped with bearing structure, and the inside symmetry of bottom box is equipped with four supporting legs.
Preferably: the supporting structure is kept away from to the supporting leg one end is passed through the articulated bottom box of sliding seat, and the supporting leg is close to sliding seat department and has seted up the jack.
Preferably: the four corners of bottom box installs sliding connection's inserted bar, and the one end fixedly connected with stopper that the inserted bar is close to the sliding seat, and the inserted bar is located and overlaps and be equipped with the spring in the department between bottom box and the stopper.
Preferably: the supporting structure comprises a supporting plate, and a handle is installed at the bottom end of the supporting plate.
Preferably, the following components: the upper end of the supporting plate is fixedly connected with a movable rod, and a movable sleeve is sleeved at the upper end of the movable rod.
Preferably, the following components: the movable rod is rotatably connected with a movable sleeve, and the movable sleeve is fixedly connected with the inner wall of the bottom box body.
The utility model discloses a technological effect and advantage:
1. the utility model discloses in, utilize outer box to play the effect of protection to the intelligent quick-witted body, splint, telescopic link and damping spring set up in the outside of intelligent quick-witted body, can play absorbing effect.
2. The utility model discloses in, rotate the handle and drive the backup pad and rotate 90 for backup pad and supporting leg separation, outside pulling movable rod, the spring is extruded by the stopper, and the supporting leg rotates 90 to the outside, loosens the movable rod, and under the effect of spring, the movable rod inserts in the jack, fixes the supporting leg, utilizes the supporting leg to play the effect of support, and the staff of being convenient for operates the intelligent quick-witted body.
Drawings
Fig. 1 is a schematic structural diagram of an integrated intelligent machine for deep foundation pit operation provided in an embodiment of the present application;
fig. 2 is a schematic structural diagram of an outer box body in the deep foundation pit operation integrated intelligent machine provided by the embodiment of the application;
fig. 3 is a schematic structural diagram of a bottom box in the deep foundation pit operation integrated intelligent machine provided in the embodiment of the present application;
fig. 4 is a schematic structural diagram of a use state of a bottom box in the deep foundation pit operation integrated intelligent machine provided by the embodiment of the application;
fig. 5 is a schematic structural diagram of a support structure in the deep foundation pit operation integrated intelligent machine provided in the embodiment of the present application;
in the figure: 1. outer box, 2, chamber door, 3, bottom box, 4, intelligent quick-witted body, 5, splint, 6, telescopic link, 7, damping spring, 8, bearing structure, 801, handle, 802, backup pad, 803, movable rod, 804, movable sleeve, 9, supporting leg, 901, jack, 10, sliding seat, 11, inserted bar, 12, stopper, 13, spring.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings and specific embodiments. The embodiments of the present invention have been presented for purposes of illustration and description, and are not intended to be exhaustive or limited to the invention in the form disclosed. Many modifications and variations will be apparent to those of ordinary skill in the art. The embodiment was chosen and described in order to best explain the principles of the invention and the practical application, and to enable others of ordinary skill in the art to understand the invention for various embodiments with various modifications as are suited to the particular use contemplated.
Please refer to fig. 1-2, in this embodiment, an integrated intelligent machine for deep foundation pit operation is provided, which includes an outer box 1 and an intelligent machine body 4, wherein a box door 2 is disposed at the front end of the outer box 1, the bottom end of the outer box 1 is fixedly connected to a bottom box 3, four sides inside the outer box 1 are provided with clamp plates 5, the clamp plates 5 are fixedly connected to a telescopic rod 6, the other end of the telescopic rod 6 is fixedly connected to the outer box 1, and a damping spring 7 is sleeved outside the telescopic rod 6.
Please refer to fig. 3-4, the lower end of the bottom box 3 is provided with an opening, the inner side of the bottom box 3 is provided with a supporting structure 8, four supporting legs 9 are symmetrically arranged inside the bottom box 3, one end of the supporting leg 9 far away from the supporting structure 8 is hinged to the bottom box 3 through a movable seat 10, a jack 901 is arranged at a position where the supporting leg 9 is close to the movable seat 10, an inserting rod 11 of sliding connection is installed at four corners of the bottom box 3, a limiting block 12 is fixedly connected to one end of the inserting rod 11 close to the movable seat 10, and a spring 13 is sleeved on the inserting rod 11 between the bottom box 3 and the limiting block 12.
Referring to fig. 3 and 5, the supporting structure 8 includes a supporting plate 802, a handle 801 is mounted at a bottom end of the supporting plate 802, a movable rod 803 is fixedly connected to an upper end of the supporting plate 802, a movable sleeve 804 is sleeved on an upper end of the movable rod 803, the movable rod 803 is rotatably connected to the movable sleeve 804, and the movable sleeve 804 is fixedly connected to an inner wall of the bottom box 3.
The utility model discloses a theory of operation is:
during the use, open chamber door 2, expose intelligent quick-witted body 4, utilize outer box 1 to play the effect of protection to intelligent quick-witted body 4, splint 5, telescopic link 6 and damping spring 7 set up the outside at intelligent quick-witted body 4, can play absorbing effect, prevent that outer box 1 from dropping, lead to intelligent quick-witted body 4 to damage, turning handle 801 drives backup pad 802 and rotates 90, make backup pad 802 and supporting leg 9 separate, outside pulling movable rod 803, spring 13 is extrudeed by stopper 12, supporting leg 9 rotates 90 to the outside, loosen movable rod 803, under the effect of spring 13, movable rod 803 inserts in the jack 901, it is fixed with supporting leg 9, utilize supporting leg 9 to play the effect of support, the staff of being convenient for operates intelligent quick-witted body 4.
It is obvious that the described embodiments are only some of the embodiments of the present invention, and not all of them. Based on the embodiments in the present disclosure, all other embodiments obtained by a person of ordinary skill in the art and related fields without creative efforts shall fall within the protection scope of the present disclosure. The structures, devices, and methods of operation of the present invention, not specifically described and illustrated, are generally practiced by those of ordinary skill in the art without specific recitation or limitation.

Claims (7)

1. The utility model provides a deep basal pit operation integration intelligent machine, includes outer box (1) and intelligent quick-witted body (4), its characterized in that, the front end of outer box (1) is equipped with chamber door (2), outer box (1) bottom fixed connection bottom box (3), and the inside four sides department of outer box (1) is equipped with splint (5), splint (5) fixed connection telescopic link (6), other end fixed connection outer box (1) of telescopic link (6), and telescopic link (6) outside cover is equipped with damping spring (7).
2. The deep foundation pit operation integrated intelligent machine according to claim 1, wherein the lower end of the bottom box body (3) is provided with an opening, the inner side of the bottom box body (3) is provided with a support structure (8), and four support legs (9) are symmetrically arranged inside the bottom box body (3).
3. The deep foundation pit operation integrated intelligent machine according to claim 2, wherein one end of the support leg (9) far away from the support structure (8) is hinged with the bottom box body (3) through a movable seat (10), and the jack (901) is formed in the position, close to the movable seat (10), of the support leg (9).
4. The integrated intelligent machine for deep foundation pit operation according to claim 1, wherein an inserted rod (11) in sliding connection is installed at four corners of the bottom box body (3), a limiting block (12) is fixedly connected to one end, close to the movable seat (10), of the inserted rod (11), and a spring (13) is sleeved between the bottom box body (3) and the limiting block (12) of the inserted rod (11).
5. The deep foundation pit operation integrated intelligent machine according to claim 2, wherein the supporting structure (8) comprises a supporting plate (802), and a handle (801) is installed at the bottom end of the supporting plate (802).
6. The deep foundation pit operation integrated intelligent machine according to claim 5, wherein a movable rod (803) is fixedly connected to the upper end of the supporting plate (802), and a movable sleeve (804) is sleeved on the upper end of the movable rod (803).
7. The deep foundation pit operation integrated intelligent machine according to claim 6, wherein the movable rod (803) is rotatably connected with a movable sleeve (804), and the movable sleeve (804) is fixedly connected with the inner wall of the bottom box body (3).
CN202220889647.4U 2022-04-18 2022-04-18 Deep foundation pit operation integration intelligent machine Expired - Fee Related CN217308058U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220889647.4U CN217308058U (en) 2022-04-18 2022-04-18 Deep foundation pit operation integration intelligent machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220889647.4U CN217308058U (en) 2022-04-18 2022-04-18 Deep foundation pit operation integration intelligent machine

Publications (1)

Publication Number Publication Date
CN217308058U true CN217308058U (en) 2022-08-26

Family

ID=82915219

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220889647.4U Expired - Fee Related CN217308058U (en) 2022-04-18 2022-04-18 Deep foundation pit operation integration intelligent machine

Country Status (1)

Country Link
CN (1) CN217308058U (en)

Similar Documents

Publication Publication Date Title
CN217308058U (en) Deep foundation pit operation integration intelligent machine
CN115122292A (en) Auxiliary tool box for maintenance
CN109252809A (en) A kind of 10KV electric power transmission line foundation excavation device
CN218861586U (en) A antidetonation type building pile for building engineering
CN212983879U (en) Support reinforced structure in deep foundation pit enclosure
CN214783973U (en) Stacking type inner supporting structure for foundation pit supporting
CN215928939U (en) Supplementary mapping device of three-dimensional topography in city
CN203731040U (en) Turnover structure used for underground cabinet
CN211783461U (en) Surveying and mapping ruler for geological surveying and mapping
CN212742686U (en) Silt cleaning device for hydraulic engineering
CN212500471U (en) Power equipment moving mechanism
CN209432478U (en) A kind of heavy metal content in soil sample detecting integrated device
CN219586787U (en) Portable deep foundation pit monitoring device
CN206136507U (en) Outdoor rack generator oil expenses machine interface arrangement
CN216976048U (en) Hydraulic engineering is with water pipe strutting arrangement who has joint protective structure
CN206750551U (en) A kind of damp-proof type strong-motion instrument carrying case
CN213749153U (en) Ground detects uses sampling device convenient to carry
CN220117231U (en) Safety support device for deep foundation pit
CN220503934U (en) Tubular pile grouting waterproof curtain structure
CN213597058U (en) Inclinometer for foundation pit monitoring
CN220953448U (en) Deep foundation pit supporting component
CN216235866U (en) Elevating gear is used in electromechanical installation
CN220414264U (en) Temporary supporting device for trench excavation
CN214116665U (en) Drainage construction tool falls in narrow space deep basal pit part
CN220924980U (en) Case is deposited in farmland construction soil collection

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220826