CN217301877U - Fixing device is used in frozen soil foundation ditch pipeline construction - Google Patents

Fixing device is used in frozen soil foundation ditch pipeline construction Download PDF

Info

Publication number
CN217301877U
CN217301877U CN202220441140.2U CN202220441140U CN217301877U CN 217301877 U CN217301877 U CN 217301877U CN 202220441140 U CN202220441140 U CN 202220441140U CN 217301877 U CN217301877 U CN 217301877U
Authority
CN
China
Prior art keywords
fixed
clamp
frozen soil
fixing device
soil foundation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220441140.2U
Other languages
Chinese (zh)
Inventor
高峰
李新平
王云鹏
许朋飞
舒艳辉
彭辉
白梁臣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Roadbridge Group Co Ltd
Original Assignee
PowerChina Roadbridge Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Roadbridge Group Co Ltd filed Critical PowerChina Roadbridge Group Co Ltd
Priority to CN202220441140.2U priority Critical patent/CN217301877U/en
Application granted granted Critical
Publication of CN217301877U publication Critical patent/CN217301877U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sewage (AREA)

Abstract

The utility model provides a fixing device is used in frozen soil foundation ditch pipeline construction, including elevating platform, 2 individual fixed establishment and 2 fixed clamps, 2 the fixed establishment bottom is all fixed to the elevating platform, and 2 individual fixed establishment symmetries set up, and a fixed clamp of connection all can be dismantled to every fixed establishment's one end, and fixed clamp is used for the fixed pipeline of treating welding construction. Frozen soil foundation ditch fixing device for pipeline construction simple structure, reasonable in design realizes treating the accurate construction of the pipeline of welding construction through fixed establishment and fixed clamp, uses manpower sparingly, through setting up the anti-freeze coating, protective apparatus, extension equipment practical life reduces construction cost, improves enterprise economic efficiency, easily promotes.

Description

Fixing device is used in frozen soil foundation ditch pipeline construction
Technical Field
The utility model belongs to the technical field of the pipeline construction equipment, especially, relate to a frozen soil foundation ditch fixing device for pipeline construction.
Background
At present, the municipal road engineering has long length, relates to various characteristics of more construction roads, complex working conditions, cold construction areas, obvious freezing and thawing effects and the like, and how to ensure the construction quality and summarize the construction experience so as to guide the construction of similar projects and generate better social and economic benefits is very important
At present, the laying of pipeline is mainly through digging a hole on ground, buries the pipeline in the foundation ditch on ground, and to the pipeline, the pipeline has flow big, anticorrosive characteristic, and consequently, the pipe diameter of pipeline is great, causes bulky, the characteristics that the quality is heavy, because the pipe diameter of pipeline is great, the quality is heavy, and the operation degree of difficulty is big when causing the laying construction of pipeline, and the pipeline is difficult to accurately place in the foundation ditch.
SUMMERY OF THE UTILITY MODEL
In view of this, the utility model aims at providing a fixing device is used in frozen soil foundation ditch pipeline construction to solve the not enough of prior art.
In order to achieve the above purpose, the technical scheme of the utility model is realized like this:
the utility model provides a fixing device is used in frozen soil foundation ditch pipeline construction, includes elevating platform, 2 fixed establishment and 2 fixed clamps, 2 the fixed establishment bottom all is fixed to the elevating platform, and 2 fixed establishment symmetries set up, and a fixed clamp of all detachable connections in every fixed establishment's one end, and fixed clamp is used for the fixed pipeline of treating welding construction, fixed establishment signal connection is to the controller.
And the anti-freezing layer is used for protecting the lifting platform, the fixing mechanism and the fixed hoop.
Further, the elevating platform includes pedestal, crane and handle, the crane is L shape structure, crane one side installation handle, crane top installation pedestal.
Further, fixed establishment includes fixing base, fixed cylinder, slide and 2 slide rails, the fixing base bottom is fixed to the pedestal, and fixing base top one side is fixed to fixed cylinder one side, and fixed cylinder opposite side fixed connection is to slide one side, and the slide opposite side can be dismantled and be connected to fixed clamp, and slide bottom both sides are through 2 slide rails of a slider sliding connection respectively, fixed cylinder signal connection is to the controller.
Further, fixed clamp includes the clamp body, the clamp body is the arc wall structure, and the thread groove has been seted up at clamp body top, the thread groove uses with the slide cooperation.
Further, the controller is a PLC, the type of the controller is IPC-610L, and the type of the fixed cylinder is SDA40X 45.
Compared with the prior art, frozen soil foundation ditch fixing device for pipeline construction have following advantage:
(1) frozen soil foundation ditch fixing device for pipeline construction simple structure, reasonable in design realizes treating the accurate construction of welding the pipeline of construction through fixed establishment and fixed clamp, uses manpower sparingly, through setting up the anti-icing coating, protective apparatus, extension equipment utility life reduces construction cost, improves enterprise economic efficiency, easily promotes.
Drawings
The accompanying drawings, which form a part hereof, are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention and together with the description serve to explain the invention without undue limitation. In the drawings:
fig. 1 is a front view of an overall structure according to an embodiment of the present invention;
fig. 2 is a schematic view of a fixing mechanism according to an embodiment of the present invention;
fig. 3 is a schematic view of a fixing clip according to an embodiment of the present invention;
fig. 4 is a schematic view of an elevating platform according to an embodiment of the present invention.
Description of reference numerals:
1. a lifting platform; 11. a pedestal; 12. a lifting frame; 13. a handle; 2. a fixing mechanism; 21. a fixed seat; 22. fixing the air cylinder; 23. a slide plate; 24. a slide rail; 3. fixing a clamp; 31. a clamp body; 311. a thread groove.
Detailed Description
It should be noted that, in the present invention, the embodiments and features of the embodiments may be combined with each other without conflict.
In the description of the present invention, it is to be understood that the terms "center", "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", and the like, indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are used merely for convenience of description and for simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention. Furthermore, the terms "first," "second," and the like are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or to implicitly indicate a number of the indicated technical features. Thus, a feature defined as "first," "second," etc. may explicitly or implicitly include one or more of that feature. In the description of the present invention, "a plurality" means two or more unless otherwise specified.
In the description of the present invention, it should be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "connected" and "connected" are to be construed broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood by those of ordinary skill in the art through specific situations.
The present invention will be described in detail below with reference to the accompanying drawings in conjunction with embodiments.
As shown in fig. 1 to 4, fixing device is used in frozen soil foundation ditch pipeline construction, including elevating platform 1, 2 fixed establishment 2 and 2 fixed clamp 3, 2 all fixed to elevating platform 1 in 2 bottoms of fixed establishment, and 2 the symmetrical setting of fixed establishment 2, a fixed clamp 3 of all detachable connection of one end of every fixed establishment 2, fixed clamp 3 is used for the fixed pipeline of treating welding construction, 2 signal connection of fixed establishment is to the controller. This fixing device is used in frozen soil foundation ditch pipeline construction, simple structure, reasonable in design realizes treating the accurate construction of the pipeline of welding construction through fixed establishment 2 and fixed clamp 3, uses manpower sparingly, through setting up the anti-freeze layer, protective apparatus, extension equipment practical life reduces construction cost, improves enterprise economic efficiency, easily promotes.
The anti-freezing device is characterized by further comprising a plurality of anti-freezing layers, wherein one anti-freezing layer is pasted on the outer walls of the lifting platform 1, the fixing mechanism 2 and the fixing hoop 3, the anti-freezing layers are used for protecting the lifting platform 1, the fixing mechanism 2 and the fixing hoop 3, and the service lives of the lifting platform 1, the fixing mechanism 2 and the fixing hoop 3 are prolonged.
Elevating platform 1 includes pedestal 11, crane 12 and handle 13, crane 12 is L shape structure, crane 12 side-mounting handle 13, crane 12 top installation pedestal 11, in this embodiment, install current lifting screw under pedestal 11, the staff can drive lifting screw through manual shaking handle 12 and go up and down, thereby make pedestal 11 go up and down, thereby reach the purpose of adjusting 11 heights of pedestal according to actual construction conditions, in other embodiments, the staff also can install current electric lifting screw under pedestal 11, as long as can reach lifting pedestal 11 the function can, in addition, the staff can also install the universal wheel in crane 12 bottom, be convenient for like this promote elevating platform 1, adjust elevating platform 1's position then.
Fixing mechanism 2 includes fixing base 21, fixed cylinder 22, slide 23 and 2 slide rails 24, fixing base 21 bottom is fixed to pedestal 11, and fixing base 21 top one side is fixed to fixed cylinder 22 one side, and fixed cylinder 22 opposite side fixed connection is to slide 23 one side, and slide 23 opposite side can be dismantled and is connected to fixed clamp 3, and slide 23 bottom both sides are respectively through a slider sliding connection to 2 slide rails 24, fixed cylinder 22 signal connection to controller. In this embodiment, the staff can be through the loop wheel machine with treating the pipeline hoist and mount of being under construction to pedestal 11 on, thereby fixed mechanism 2 is close to the pipeline through the fixed cylinder 22 of drive 2 fixed clamps 3 of drive, and then makes 2 fixed clamps 3 only joint to the pipeline to make things convenient for the pipeline to weld or fix in the foundation ditch. In other embodiments, a position sensor may be mounted on the pedestal 11, and the controller may control the fixing cylinder 22 to stop working when two fixing clamps 3 are detected to touch each other.
Fixed clamp 3 includes clamp body 31, clamp body 31 is the arc wall structure, and thread groove 311 has been seted up at clamp body 31 top, thread groove 311 uses with slide 23 cooperation, and when the in-service use, the staff links together thread groove 311 and slide 23's clamping screw, can fix fixed clamp 3 on slide 23, and the ring structure is constituteed to two clamp bodies 31, just so can tightly clamp to treating the pipeline of being under construction through the promotion of stationary cylinder 22.
The controller is PLC, the model of controller is IPC-610L, the model of stationary cylinder 22 is SDA40X45, and when in actual use, the controller outside is equipped with the touch-sensitive screen, and the model of touch-sensitive screen is ZB00000003, and the staff is through having the touch-sensitive screen control controller to operate.
Frozen soil foundation ditch fixing device for pipeline construction's theory of operation:
when in actual use (the telescopic link of fixed cylinder 22 all is in the state of shortening under initial condition), the staff pushes away elevating platform 1 behind the appointed work position of foundation ditch, reuse loop wheel machine hoists the pipeline respectively to elevating platform 1, the staff then manually starts the touch-sensitive screen, the staff controls fixed cylinder 22 of controller control to begin work on the touch-sensitive screen, thereby fixed cylinder 22's telescopic link extension is close to 2 fixed clamps 3 to the pipeline (can install a sensor that targets in place on elevating platform 1, just can be through controller control fixed cylinder 22 stop work after detecting 2 fixed clamps 3 and touch together, also can be on the controller control 2 fixed cylinder 22's operating time in advance, thereby make 2 fixed clamps accurate butt joint together, then fix and treat the construction pipeline, can carry out follow-up construction operation.
The above description is only for the preferred embodiment of the present invention, and should not be taken as limiting the invention, and any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (6)

1. Fixing device is used in frozen soil foundation ditch pipeline construction, its characterized in that: including elevating platform (1), 2 fixed establishment (2) and 2 fixed clamps (3), 2 fixed establishment (2) bottom all is fixed to elevating platform (1), and 2 fixed establishment (2) symmetry sets up, and the one end of every fixed establishment (2) all can be dismantled and connect a fixed clamp (3), and fixed clamp (3) are used for the fixed pipeline of treating welding construction, fixed establishment (2) signal connection is to the controller.
2. The fixing device for frozen soil foundation pit pipeline construction according to claim 1, characterized in that: the anti-freezing device is characterized by further comprising a plurality of anti-freezing layers, wherein the anti-freezing layers are adhered to the outer walls of the lifting platform (1), the fixing mechanism (2) and the fixing clamp (3), and are used for protecting the lifting platform (1), the fixing mechanism (2) and the fixing clamp (3).
3. The fixing device for frozen soil foundation pit pipeline construction according to claim 1, characterized in that: elevating platform (1) includes pedestal (11), crane (12) and handle (13), crane (12) are L shape structure, crane (12) one side installation handle (13), crane (12) top installation pedestal (11).
4. The fixing device for frozen soil foundation pit pipeline construction according to claim 3, characterized in that: fixed establishment (2) are including fixing base (21), fixed cylinder (22), slide (23) and 2 slide rail (24), fixing base (21) bottom is fixed to pedestal (11), and fixing base (21) top one side is fixed to fixed cylinder (22) one side, and fixed cylinder (22) opposite side fixed connection is to slide (23) one side, and slide (23) opposite side can be dismantled and be connected to fixed clamp (3), and slide (23) bottom both sides are respectively through a slider sliding connection to 2 slide rail (24), fixed cylinder (22) signal connection to controller.
5. The fixing device for frozen soil foundation pit pipeline construction according to claim 4, characterized in that: fixed clamp (3) include clamp body (31), clamp body (31) are the arc wall structure, and thread groove (311) have been seted up at clamp body (31) top, thread groove (311) are used with slide (23) cooperation.
6. The fixing device for frozen soil foundation pit pipeline construction according to claim 4, characterized in that: the controller is a PLC, the type of the controller is IPC-610L, and the type of the fixed cylinder (22) is SDA40X 45.
CN202220441140.2U 2022-03-01 2022-03-01 Fixing device is used in frozen soil foundation ditch pipeline construction Active CN217301877U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220441140.2U CN217301877U (en) 2022-03-01 2022-03-01 Fixing device is used in frozen soil foundation ditch pipeline construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220441140.2U CN217301877U (en) 2022-03-01 2022-03-01 Fixing device is used in frozen soil foundation ditch pipeline construction

Publications (1)

Publication Number Publication Date
CN217301877U true CN217301877U (en) 2022-08-26

Family

ID=82934442

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220441140.2U Active CN217301877U (en) 2022-03-01 2022-03-01 Fixing device is used in frozen soil foundation ditch pipeline construction

Country Status (1)

Country Link
CN (1) CN217301877U (en)

Similar Documents

Publication Publication Date Title
CN202733170U (en) Pipeline mounting machine
CN217301877U (en) Fixing device is used in frozen soil foundation ditch pipeline construction
CN208816844U (en) A kind of underground water seal cave depot Shaft bank pipe-supporting device
CN208034022U (en) A kind of nozzle for Large Diameter Pipeline steel pipe and nozzle docking facilities
CN109205481A (en) The outer lifting device of transformer of household portable
CN215635728U (en) Factory high-position pipeline leak repairing device
CN203890904U (en) Assembly construction platform equipment for steel pipe sheets of large-diameter corrugated steel pipe culvert
CN207621485U (en) A kind of prestressed concrete pipe mounting device
CN203391822U (en) Storage and transportation device of wind driven generator foundation ring
CN105416349A (en) Device for transporting telegraph poles
CN215215042U (en) Inner pipe-penetrating pushing moving mechanism
CN208980209U (en) The outer lifting device of transformer of household portable
WO2022237021A1 (en) Device and method for quickly penetrating linear fresnel ultra-long distance heat collection vacuum tube
CN110726005B (en) System and method for installing field buried pipeline
CN206829183U (en) A kind of city piping lane using porous pre-buried channel flow mounting system
CN111472783A (en) Shield tunneling machine split initial lengthened pipeline extending device and application method
CN220376089U (en) Utility tunnel hoist and mount positioner
CN221272765U (en) Railway pipeline transportation fixing device
CN218024940U (en) Tool for hoisting concrete pipeline
CN216190587U (en) Outdoor maintenance crane
CN213356663U (en) Portable hoisting moving platform
CN213512369U (en) High strength electric power piping lane tube coupling splicing apparatus
CN214733845U (en) Municipal works pipeline installation is with lifting device
CN212668969U (en) Hoisting device
CN214925581U (en) Novel prefabricated T roof beam roof board ligature rack

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant