CN217229892U - Fast-assembling construction elevator guard gate - Google Patents

Fast-assembling construction elevator guard gate Download PDF

Info

Publication number
CN217229892U
CN217229892U CN202122808050.0U CN202122808050U CN217229892U CN 217229892 U CN217229892 U CN 217229892U CN 202122808050 U CN202122808050 U CN 202122808050U CN 217229892 U CN217229892 U CN 217229892U
Authority
CN
China
Prior art keywords
frame
door
construction elevator
door frame
guard gate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122808050.0U
Other languages
Chinese (zh)
Inventor
徐登峰
李志伟
索瑞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Huaye Group Co Ltd
North China Metallurgical Construction Engineering Construction Co Ltd
Original Assignee
China Huaye Group Co Ltd
North China Metallurgical Construction Engineering Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Huaye Group Co Ltd, North China Metallurgical Construction Engineering Construction Co Ltd filed Critical China Huaye Group Co Ltd
Priority to CN202122808050.0U priority Critical patent/CN217229892U/en
Application granted granted Critical
Publication of CN217229892U publication Critical patent/CN217229892U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Elevator Door Apparatuses (AREA)

Abstract

The utility model provides a fast-assembly protective door of a construction elevator, which comprises a door frame and a door leaf movably arranged in the door frame; wherein, the upper frame of the door frame is provided with a quick buckle extending upwards; the quick buckle is clamped on a framework beam above the door frame; a metal nail extending downwards is fixedly arranged on the lower side frame of the door frame; the metal peg is fixed on the frame plate of door frame below, only need set up the completion back at the steel pipe passageway between floor and construction elevator when installing this ready-package construction elevator guard gate, erect this guard gate to the reservation door opening department of passageway, then aim at the framework crossbeam and the chucking of reservation door opening top with the quick buckle on this guard gate upper portion slant, push down the ready-package guard gate again, and trample the lower frame of this guard gate until metal peg 1/2 gets into the frame plate, so accomplish the installation, the overall process only needs alone can install the completion, easy operation, the installation is quick, it is firm to fix, cycle uses, and the cost is saved.

Description

Fast-assembling construction elevator guard gate
Technical Field
The utility model relates to a building field, more specifically relates to a ready-package construction elevator guard gate.
Background
The construction crane guard gate usually is used as the wall of construction elevator and floor interface channel, and conventional guard gate adopts the mode of iron wire ligature to be connected guard gate and passageway steel pipe support body mostly, and the installation needs many people to cooperate, and installation time is long, and the installation is dangerous great to if the guard gate installation only relies on the ligature of iron wire, then the fastness is poor.
Therefore, a need exists for a quick-install protection door for a construction hoist that is quick, simple, safe, and secure to install.
SUMMERY OF THE UTILITY MODEL
In view of the above problem, the utility model aims at providing a ready-package construction elevator guard gate to it is long to solve guard gate installation time, and the installation process is dangerous great, and the installation only relies on the poor problem of iron wire ligature fastness.
The utility model provides a fast-assembling protective door of construction elevator, which comprises a door frame and a door leaf movably arranged in the door frame; wherein, the first and the second end of the pipe are connected with each other,
the upper frame of the door frame is provided with a quick buckle extending upwards;
the quick buckle is clamped on a framework cross beam above the door frame;
a metal nail extending downwards is fixedly arranged on the lower side frame of the door frame;
the metal nails are fixed on the frame plate below the door frame.
Preferably, the quick snap is an S-curve snap.
Preferably, the S-shaped curve buckle comprises two S-shaped steel plates, and the two S-shaped steel plates are symmetrically arranged on the upper frame to form an accommodating ring.
Preferably, the accommodating ring is clamped on the periphery of the framework cross beam.
Preferably, the upper part of the metal nail is welded and fixed on the lower frame.
Preferably, the lower portion of the metal nail is inserted into the shelf plate.
Preferably, the shelf board is a wooden board.
From the above description, the protection door of the fast-assembling construction elevator provided by the utility model comprises a door frame and a door leaf movably arranged in the door frame; wherein, the upper frame of the door frame is provided with a quick buckle extending upwards; the quick buckle is clamped on a framework beam above the door frame; a metal nail extending downwards is fixedly arranged on the lower side frame of the door frame; the metal nails are fixed on the frame plate below the door frame, when the protective door of the quick-mounting construction elevator is installed, the protective door (the protective door of the quick-mounting construction elevator) is carried to a floor needing to be installed only by erecting a steel pipe channel between the floor and the construction elevator, the protective door is erected to a reserved door opening of the channel, then a quick buckle on the upper portion of the protective door is obliquely upwards aligned to a framework cross beam above the reserved door opening and clamped, the protective door is slowly and vertically placed to be vertical, the quick-mounting protective door is downwards pressed, the lower frame of the protective door is trampled until the metal nails 1/2 enter the frame plate, the installation is completed, the whole process can be completed by only one person, the operation is simple, the installation is quick, the fixation is firm, the recycling is realized, and the cost is saved.
Drawings
Other objects and results of the present invention will become more apparent and more readily appreciated as the same becomes better understood by reference to the following description and appended claims, taken in conjunction with the accompanying drawings. In the drawings:
fig. 1 is a schematic front view of a protective door of a ready-to-mount construction elevator according to an embodiment of the present invention; a (c)
Fig. 2 is a schematic front view of a quick buckle of a protective door of a quick-mounting construction hoist according to an embodiment of the present invention;
fig. 3 is a schematic side view of a quick buckle of a protective door of a quick-assembly construction hoist according to an embodiment of the present invention;
fig. 4 is a schematic view of a metal nail according to an embodiment of the present invention;
wherein the reference numerals include:
1. a door frame; 2. a door leaf; 3. an upper frame; 4. quickly buckling; 5. constructing a cross beam; 6. a lower frame; 7. a metal nail; 8. a frame plate; 9. an S-shaped steel plate; 10. a containment ring;
the same reference numbers in all figures indicate similar or corresponding features or functions.
Detailed Description
The construction crane guard gate usually is used as the wall of construction elevator and floor interface channel, and conventional guard gate adopts the mode of iron wire ligature to be connected guard gate and passageway steel pipe support body mostly, and the installation needs many people to cooperate, and installation time is long, and the installation is dangerous great to if the guard gate installation only relies on the ligature of iron wire, then the fastness is poor.
To the above problem, the utility model provides a ready-package construction elevator guard gate, it is right below will combine the drawing the utility model discloses a specific embodiment carries out detailed description.
The following description of the exemplary embodiment(s) is merely illustrative in nature and is in no way intended to limit the invention, its application, or uses. Techniques and apparatus known to those of ordinary skill in the relevant art may not be discussed in detail, but are intended to be part of the specification where appropriate.
In order to illustrate the protective door of the ready-package construction elevator provided by the present invention, fig. 1 shows a schematic front view of the protective door of the ready-package construction elevator according to an embodiment of the present invention; fig. 2 shows a schematic front view of a quick buckle of a protective door of a ready-to-mount construction elevator according to an embodiment of the present invention; fig. 3 shows a schematic side view of a quick buckle of a protective door of a ready-to-mount construction hoist according to an embodiment of the present invention; fig. 4 shows a schematic view of a metal nail according to an embodiment of the invention.
As shown in fig. 1, the utility model provides a fast-assembling protective door for construction elevator, which comprises a door frame 1 and a door leaf 2 movably arranged in the door frame 1; wherein, a fast buckle 4 extending upwards is arranged on the upper frame of the door frame 1; the quick buckle 4 is clamped on a framework beam 5 above the door frame; the framework beam is usually a cross frame on a temporary channel of a newly-built floor, and is often a metal frame; the specific form of the quick buckle is not limited.
In the embodiment shown in fig. 1, 2, and 3, the form of the fast bayonet 4 is not limited specifically, and may be any buckle capable of being fastened on the framework beam, in this embodiment, the fast bayonet 4 is an S-shaped curve buckle, that is, the S-shaped curve buckle includes two S-shaped steel plates 9, and the two S-shaped steel plates 9 are symmetrically disposed on the upper frame 3 to form an accommodating ring, more specifically, one S-shaped steel plate 9 is disposed on one side of the front side of the upper frame 3, the other S-shaped steel plate 4 is disposed on one side of the back side of the upper frame 3, the two S-shaped steel plates 9 are disposed opposite to each other, so as to form an accommodating ring 10, and the accommodating ring 10 is fastened on the periphery of the framework beam 5, so that when the protective door is moved to a floor to be installed, the fast bayonet 4 is fastened on the framework beam 5 above the upper frame, and the fixing can be completed.
In the embodiment shown in fig. 1 and 4, a metal nail 7 extending downwards is fixedly arranged on the lower edge frame 6 of the doorframe; this metal peg 7 is fixed on frame plate 8 below the door frame, the upper portion welded fastening of this metal peg 7 is on lower frame 6, the lower part of metal peg 7 is inserted and is established in frame plate 8, in this embodiment, this frame plate 8 is the plank, this metal peg is the steel nail, for adapting to the frame plate thickness, and can fix the door frame simultaneously, the length of this steel nail is 1.5-3cm, the steel nail is firm and stability is stronger, so, when removing this guard gate to the floor that needs the installation, pound this metal peg 7 to the frame plate of this plank texture in, so imbed this metal peg on the frame plate, thereby it is fixed mutually with the frame plate with the lower frame of door frame, and then fix the upper bezel and the lower bezel of door frame respectively on framework crossbeam 5 and frame plate 8, so realize the fixed of door frame.
As described above, the protective door of the ready-package construction elevator shown in fig. 1, 2, 3, and 4 includes a door frame and a door leaf movably disposed in the door frame; wherein, the upper frame of the door frame is provided with a quick buckle extending upwards; the quick buckle is clamped on a framework beam above the door frame; a metal nail extending downwards is fixedly arranged on the lower frame of the doorframe; the metal nails are fixed on the frame plate below the door frame, when the protective door of the quick-assembly construction elevator is installed, the protective door (the protective door of the quick-assembly construction elevator) is carried to a floor needing to be installed only after the steel pipe channel between the floor and the construction elevator is erected, the protective door is erected to a reserved door opening of the channel, then a quick buckle on the upper portion of the protective door is obliquely upwards aligned to a framework cross beam above the reserved door opening and clamped, the protective door is slowly and vertically placed to be vertical, the quick-assembly protective door is downwards pressed, the lower frame of the protective door is trampled until the metal nails 1/2 enter the frame plate, the installation is completed in this way, the whole process can be completed by only one person, the operation is simple, the installation is quick, the fixation is firm, the recycling is realized, and the cost is saved.
The ready-to-assemble construction elevator guard door according to the present invention is described above by way of example with reference to the accompanying drawings. However, it will be appreciated by those skilled in the art that various modifications can be made to the above-described ready-to-install protection door of construction elevator without departing from the scope of the invention. Therefore, the scope of the present invention should be determined by the content of the appended claims.

Claims (7)

1. A protective door of a quick-mounting construction hoist comprises a door frame and a door leaf movably arranged in the door frame; it is characterized in that the preparation method is characterized in that,
the upper frame of the door frame is provided with a quick buckle extending upwards;
the quick buckle is clamped on a framework cross beam above the door frame;
a metal nail extending downwards is fixedly arranged on the lower side frame of the door frame;
the metal nails are fixed on the frame plate below the door frame.
2. The protective door for a ready-to-install construction elevator according to claim 1,
the quick buckle is an S-shaped curve buckle.
3. The ready-to-install construction elevator guard door of claim 2,
the S-shaped curve buckle comprises two S-shaped steel plates, and the two S-shaped steel plates are symmetrically arranged on the upper frame to form an accommodating ring.
4. The ready-to-install construction elevator guard door of claim 3,
the containing ring is clamped on the periphery of the framework cross beam.
5. The ready-to-install construction elevator guard door of claim 1,
the upper part of the metal nail is welded and fixed on the lower frame.
6. The ready-to-install construction elevator guard door of claim 5,
the lower part of the metal nail is inserted in the frame plate.
7. The ready-to-install construction elevator guard door of claim 6,
the frame plate is a wood plate.
CN202122808050.0U 2021-11-16 2021-11-16 Fast-assembling construction elevator guard gate Active CN217229892U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122808050.0U CN217229892U (en) 2021-11-16 2021-11-16 Fast-assembling construction elevator guard gate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122808050.0U CN217229892U (en) 2021-11-16 2021-11-16 Fast-assembling construction elevator guard gate

Publications (1)

Publication Number Publication Date
CN217229892U true CN217229892U (en) 2022-08-19

Family

ID=82818179

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122808050.0U Active CN217229892U (en) 2021-11-16 2021-11-16 Fast-assembling construction elevator guard gate

Country Status (1)

Country Link
CN (1) CN217229892U (en)

Similar Documents

Publication Publication Date Title
US9732534B2 (en) Fall protection guardrail
US20090159865A1 (en) Reusable temporary safety rail post
JP3446175B2 (en) Waterproof door device
US20100032235A1 (en) Safety arrangement for use in constructing a wood frame building
CN217229892U (en) Fast-assembling construction elevator guard gate
US20110278526A1 (en) Reusable temporary safety rail post and extension kit
CN210738063U (en) Movable positioning pile of overhanging bearing frame device
US3584827A (en) Concrete wall form with waler clamp assembly
US20180135330A1 (en) Methods and Systems for Providing an Accessible Fence Gate with Efficient Separability of Fencing Railing from Support Posts
KR102086713B1 (en) Banister
JP3070599U (en) Scaffold safety panel
JP2020117879A (en) Joint structure of wooden horizontal member and steel horizontal member, and receiving metal fitting
KR20150098771A (en) A post for temporary handrail
CN217602185U (en) Protection device for entrance to a cave is reserved to floor rectangle
CN210396497U (en) 180-degree spliced window
CN211873826U (en) Novel square column fixing piece
CN217458358U (en) Well crossbeam for elevator
CN220388411U (en) Auxiliary fixing frame for welding metal doors and windows
US20050210818A1 (en) Wall plate anchors, and methods of using same
US5893255A (en) Method for locating a wall form assembly on a floor of a concrete structure, and implements for use in said locating method
KR200321373Y1 (en) platform equipment for carrying materials between floors
CN212742940U (en) Multi-rope open type wall connecting box
JPS6041384Y2 (en) Pipe support device for formwork
KR200249933Y1 (en) an apparatus for connecting between architecture forms
CA2704888A1 (en) Reusable temporary safety rail post and extension kit

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant