CN217215810U - Adjustable cable testing bridge funnel of assembled based on BIM - Google Patents
Adjustable cable testing bridge funnel of assembled based on BIM Download PDFInfo
- Publication number
- CN217215810U CN217215810U CN202220930536.3U CN202220930536U CN217215810U CN 217215810 U CN217215810 U CN 217215810U CN 202220930536 U CN202220930536 U CN 202220930536U CN 217215810 U CN217215810 U CN 217215810U
- Authority
- CN
- China
- Prior art keywords
- section
- funnel
- bim
- adjustable cable
- bridge
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model discloses an adjustable cable testing bridge funnel of assembled based on BIM, include: connecting segment and flexible section, connecting segment one end connection slot type crane span structure, the other end is pegged graft with flexible section to link to each other with flexible section, the one end that the connecting segment was kept away from to flexible section links to each other with the switch board. The utility model discloses can save the time that the producer measured scene and pattern design, avoid the influence of each professional cross construction of job site, guarantee that the funnel is assembled on-the-spot and can not influence construction period.
Description
Technical Field
The utility model belongs to the technical field of building engineering, more specifically the adjustable cable testing bridge funnel of assembled that says so relates to a based on BIM.
Background
The current construction situation of the engineering electrical engineering is as follows: in the engineering field construction stage, a large quantity of bridge straight pipe sections with standard sizes and lengths and galvanized steel plates and other raw materials are purchased from manufacturers and are firstly processed on site. The corresponding cable bridge funnel needs the following main processes: a distribution cabinet is installed on a construction site; installing a cable bridge for laying cables; measuring the installation space from the bridge frame to the distribution cabinet by a field construction team, and designing the style and the size of the funnel; a manufacturer produces and transports the bridge funnel; and finally, assembling on site.
The on-site electromechanical installation comprises a plurality of professions such as water supply and drainage, electricity, heating, fire fighting and the like, a plurality of participating units are used for cross construction, the communication efficiency of each participating unit on the site is low, the construction is not cooperative, the working procedures are disordered, the working period of laying the electric bridge frame and the cable on the site is greatly prolonged, and the production and transportation period of the customized bridge frame funnel is as long as one month. Once a scheme is changed, the processes of field measurement, purchase, production, transportation and the like need to be carried out again, and the cost of design change is overlarge.
Therefore, how to provide a prefabricated adjustable cable tray funnel based on BIM is a problem that needs to be solved by those skilled in the art.
SUMMERY OF THE UTILITY MODEL
In view of this, the utility model provides an adjustable cable testing bridge funnel of assembled based on BIM can save the time that the producer measured scene and pattern design, has avoided the influence of each professional cross construction of job site, has guaranteed that the funnel is assembled on the spot and can not influence construction period.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
an assembled adjustable cable testing bridge funnel based on BIM, includes: the connecting section is connected with the groove type bridge, the other end of the connecting section is connected with the telescopic section in an inserting mode, the telescopic section is connected with the power distribution cabinet, and one end, far away from the connecting section, of the telescopic section is connected with the power distribution cabinet.
Furthermore, the connecting section comprises an oblique section and a straight section, the oblique section is connected with the groove type bridge, one end of the straight section is connected with the oblique section, and the other end of the straight section is connected with the telescopic section in an inserting mode.
Furthermore, a plurality of rows of bolt holes I are formed in the straight section, and a plurality of rows of bolt holes II corresponding to the bolt holes I are formed in the telescopic section; the first bolt hole and the second bolt hole are connected through bolts.
Furthermore, one end, far away from the connecting section, of the groove type bridge is installed on a wall body, and the wall body is installed in a wall-separating ditch of the underground layer top plate.
Furthermore, a plurality of cables are laid in the groove type bridge.
The beneficial effects of the utility model reside in that:
the utility model discloses with this crane span structure funnel design for can assembling the telescopic structure in the vertical direction, can save the time that the producer measured scene and pattern design from this, avoided the influence of each professional cross construction of job site, guaranteed that the funnel is assembled on the scene and can not influence construction period.
Drawings
In order to more clearly illustrate the novel embodiments or the technical solutions in the prior art of the present invention, the drawings used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to the provided drawings without creative efforts.
Fig. 1 is a schematic structural diagram of the present invention.
Fig. 2 is the utility model discloses with the mounting structure schematic diagram of switch board.
Fig. 3 is a schematic view of the installation structure of the present invention.
Wherein, in the figure,
1-a connecting segment; 2-a telescopic section; 3-a trough type bridge frame; 4-a power distribution cabinet; 5-an oblique section; 6-straight line segment; 7-bolt; 8, a wall body; 9-underground layer top plate; 10-separating wall ditch; 11-a cable.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely in the following embodiments of the present invention, and obviously, the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, the utility model provides an adjustable cable testing bridge funnel of assembled based on BIM includes: connecting segment 1 and flexible section 2, connecting segment 1 one end connecting slot formula crane span structure 3, the other end with flexible section 2 is pegged graft, and with flexible section 2 links to each other, flexible section 2 is kept away from the one end of connecting segment 1 links to each other with switch board 4.
In this embodiment, the connecting section 1 includes an oblique section 5 and a straight section 6, the oblique section 5 is connected to the groove type bridge frame 3, one end of the straight section 6 is connected to the oblique section 5, and the other end is connected to the telescopic section 2 in an inserting manner, so that the length in the vertical direction can be adjusted conveniently. The straight line section 6 and the telescopic section 2 are inserted in a mode that the straight line section 6 is inserted into the telescopic section 2, or the telescopic section 2 is inserted into the straight line section 6. In this embodiment, the linear section 6 is inserted into the telescopic section 2.
In this embodiment, the straight section 6 is provided with a plurality of rows of first bolt holes, and the telescopic section 2 is provided with a plurality of rows of second bolt holes corresponding to the first bolt holes; the first bolt hole is connected with the second bolt hole through a bolt 7.
In this embodiment, one end of the groove type bridge 3, which is far away from the connecting section 1, is installed on a wall 8, and the wall 8 is installed in a wall-separating trench 10 of an underground layer top plate 9.
In this embodiment, a plurality of cables 11 are laid in the trough bridge 3.
The method comprises the steps of performing typesetting work on a power supply and distribution room at the initial stage of an electromechanical installation project by utilizing a BIM technology, determining the transverse length L1 of a bridge funnel according to a BIM typesetting scheme, and manufacturing the bridge funnel in the longitudinal direction into a length-adjustable form. The layout chart and the processing chart are handed over to a manufacturer, and the bridge hoppers with the same number as the power distribution cabinet 4 are customized. Wherein the bridge hopper is secured to the fixed straight section 6 by means of three rows M10 of bolts 7 to the adjustable telescoping section 2. The telescopic section 2 is reserved with at least two rows of bolt holes for subsequent length adjustment.
When the whole bridge funnel needs to be stretched, the bolts 7 are preliminarily fixed at the positions of the bolt holes two in the lower row, and the bolts 7 are firmly fixed and are finally screwed until the length is adjusted to be a proper length.
The crane span structure funnel can be connected bolt 7 up removal to distribution box cabinet length overlength, with the bolt hole two of leaning on the row, and it is firm and carry out the final twist process with bolt 7 fixed until length adjustment to suitable length.
The BIM technology is utilized to determine the transverse length of the field installation space and the cable bridge funnel, so that the time for measuring field and style design by a manufacturer is saved, and the construction period is accelerated. The bridge hopper is designed to be assembled into a telescopic structure in the vertical direction. The influence of professional construction such as structure is received to the electric bridge engineering job site of avoiding, has guaranteed that the construction period can not be influenced in bridge funnel field assembly. The closed bridge frame funnel can prevent the cable 11 coated with plastic from being exposed, reduce faults and prevent factors such as liquid leakage from polluting the cable 11 on site.
Finally, it should be noted that: the above embodiments are only used to illustrate the technical solution of the present invention, and not to limit it; although the present invention has been described in detail with reference to the foregoing embodiments, it should be understood by those skilled in the art that: the technical solutions described in the foregoing embodiments may still be modified, or some technical features may be equivalently replaced; such modifications and substitutions do not depart from the spirit and scope of the present invention in its corresponding aspects.
Claims (5)
1. An adjustable cable testing bridge funnel of assembled based on BIM, its characterized in that includes: the connecting section is connected with the groove type bridge, the other end of the connecting section is connected with the telescopic section in an inserting mode, the telescopic section is connected with the power distribution cabinet, and one end, far away from the connecting section, of the telescopic section is connected with the power distribution cabinet.
2. The BIM-based assembly type adjustable cable tray funnel as claimed in claim 1, wherein the connection section comprises an inclined section and a straight section, the inclined section is connected with the trough tray, one end of the straight section is connected with the inclined section, and the other end of the straight section is connected with the telescopic section in an inserting manner.
3. The BIM-based assembly type adjustable cable bridge hopper as claimed in claim 2, wherein the straight section is provided with a plurality of rows of first bolt holes, and the telescopic section is provided with a plurality of rows of second bolt holes corresponding to the first bolt holes; the first bolt hole and the second bolt hole are connected through bolts.
4. The BIM-based fabricated adjustable cable tray funnel of claim 1, wherein an end of the trough tray remote from the connecting section is mounted on a wall mounted in an off-wall trench of a subsurface layer ceiling.
5. The BIM-based assembled adjustable cable tray funnel of claim 1, wherein a plurality of cables are routed within the trough.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202220930536.3U CN217215810U (en) | 2022-04-21 | 2022-04-21 | Adjustable cable testing bridge funnel of assembled based on BIM |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202220930536.3U CN217215810U (en) | 2022-04-21 | 2022-04-21 | Adjustable cable testing bridge funnel of assembled based on BIM |
Publications (1)
Publication Number | Publication Date |
---|---|
CN217215810U true CN217215810U (en) | 2022-08-16 |
Family
ID=82773456
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202220930536.3U Active CN217215810U (en) | 2022-04-21 | 2022-04-21 | Adjustable cable testing bridge funnel of assembled based on BIM |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN217215810U (en) |
-
2022
- 2022-04-21 CN CN202220930536.3U patent/CN217215810U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110469048B (en) | Wiring method for assembled wall | |
CN106786266A (en) | Prefabrication and assembly construction steel house cable and wire laying system and its construction method | |
CN102518310B (en) | Construction method of photoelectric curtain wall of glass film | |
CN217215810U (en) | Adjustable cable testing bridge funnel of assembled based on BIM | |
CN106992488B (en) | A kind of assembled shaped steel cable tray | |
CN206313397U (en) | Prefabrication and assembly construction steel house cable and wire laying system | |
CN202373945U (en) | Shallow buried type ground electric cable tray system | |
CN205901217U (en) | Regularization electric wiring cross box | |
CN215631014U (en) | Wall block with slotted hole | |
CN202513512U (en) | Hidden laying construction structure for muff-coupling fastening-type galvanized steel conduit | |
CN205921344U (en) | Cable pit assembly structure and assembled cable pit | |
CN219371966U (en) | Assembled electrical prefabricated conduit | |
CN218070880U (en) | Anti-oxidation and anti-corrosion cable bridge | |
CN215580142U (en) | Prefabricated formula ground wiring wire casing | |
CN206346311U (en) | Steel-structure box roof frame | |
CN214013754U (en) | Width-adjustable cable bridge | |
CN217115566U (en) | Novel prefabricated wire and cable row pipe connector | |
CN212162462U (en) | Floor-following mounting device for temporary floor power utilization for construction site | |
CN210111565U (en) | Wire outlet structure of box transformer substation arranged above basement | |
CN211956084U (en) | Camera and projecting lamp aggregate erection device | |
CN217984465U (en) | Assembled combined material ground cable trench | |
CN214124774U (en) | Cable connection pipeline structure between wind generating set and box-type transformer | |
CN215681649U (en) | Combined groove type cable bridge | |
CN220927930U (en) | Modularized prefabricated high-low cabinet foundation base | |
CN213521047U (en) | Wiring device for intelligent building installation engineering |