CN217198212U - Building material handling device for building engineering - Google Patents

Building material handling device for building engineering Download PDF

Info

Publication number
CN217198212U
CN217198212U CN202123320350.0U CN202123320350U CN217198212U CN 217198212 U CN217198212 U CN 217198212U CN 202123320350 U CN202123320350 U CN 202123320350U CN 217198212 U CN217198212 U CN 217198212U
Authority
CN
China
Prior art keywords
wall body
groove
bracing piece
still
seted
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202123320350.0U
Other languages
Chinese (zh)
Inventor
侯方泰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202123320350.0U priority Critical patent/CN217198212U/en
Application granted granted Critical
Publication of CN217198212U publication Critical patent/CN217198212U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a building material handling device for building engineering, comprising a base plate, be equipped with the gyro wheel on the wall body all around of bottom plate bottom respectively, be equipped with the handle frame on the wall body of bottom plate one side, first spout has been seted up respectively in handle frame front end and the rear end wall body, still be equipped with the side bearer on handle frame front end and the rear end wall body respectively, the side bearer includes fender rod, first bracing piece and second bracing piece, two first draw-in grooves have still been seted up respectively in bottom plate top front end and the rear end wall body. A building material handling device for building engineering, relate to building material handling equipment technical field, through collapsible side bearer setting of accomodating and expanding, can be convenient for expand it when transporting some building materials, and then be convenient for protect the material of transportation, in addition, the setting of the second bracing piece of a scalable regulation and second connecting rod is convenient for further strengthen fixedly to the fender rod.

Description

Building material handling device for building engineering
Technical Field
The utility model relates to a building material handling equipment technical field, in particular to building material handling device for building engineering.
Background
The building construction refers to production activities in the engineering construction implementation stage, is the construction process of various buildings, and also can be a process of changing various lines on design drawings into real objects at a designated place, various building materials need to be transported to each construction unit in a short distance in the construction process, and part of the building materials are transported by using transportation devices such as a trolley, but most of the bearing plates of the trolley are open, so that the materials are easy to fall off from the bearing plates when the part of the materials are transported.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a building material handling device for building engineering can effectively solve the problem in the background art.
In order to achieve the above purpose, the utility model adopts the technical proposal that:
the utility model provides a building material handling device for building engineering, includes the bottom plate, be equipped with the gyro wheel on the wall body all around of bottom plate bottom respectively, be equipped with the handle frame on the wall body of bottom plate one side, first spout has been seted up respectively in handle frame front end and the rear end wall body, still be equipped with the side bearer on handle frame front end and the rear end wall body respectively, the side bearer includes fender rod, first bracing piece and second bracing piece, two first draw-in grooves have still been seted up respectively in bottom plate top front end and the rear end wall body, still seted up first accomodating the groove in the wall body of bottom plate top one side.
Preferably, two the protective rod is to respectively fixed mounting have first fixed axle to a lateral wall body, it has the slider still to fixed mounting on the first fixed axle lateral wall body, first fixed axle alternates through the slider and installs in first spout, the second spout has still been seted up in the protective rod wall body, in the second spout respectively fixed mounting have first stopper in the front and back end both sides wall body.
Preferably, still respectively fixed mounting has the second fixed axle on first bracing piece front end and the rear end top wall body, second fixed axle slidable mounting is in the second spout, just first bracing piece top wall body passes through second fixed axle slidable mounting in the second spout, the second has still been seted up in the first bracing piece side top wall body and has been accomodate the groove, the second is accomodate the inslot and is equipped with the head rod.
Preferably, a first telescopic groove is formed in a wall body at the bottom of the first supporting rod, second clamping grooves are further formed in wall bodies located at two side positions of the first telescopic groove at the bottom of the first supporting rod respectively, a magnetic clamping block is further arranged at the bottom of the first supporting rod, a telescopic block is fixedly mounted on a wall body at the top of the magnetic clamping block, the telescopic block is installed in the first telescopic groove in an inserting mode, a compression spring is fixedly connected between a wall body at the top of the telescopic block and the wall body at the top of the first telescopic groove, and limiting columns are further fixedly mounted on wall bodies located at two side positions of the telescopic block at the top of the magnetic clamping block respectively.
Preferably, the front end wall body and the rear end wall body on one side of the first connecting rod are respectively and fixedly provided with a third fixing shaft, the third fixing shafts are rotatably arranged in the rotating grooves in the second accommodating grooves, and the first connecting rod is movably arranged in the second accommodating grooves through the third fixing shafts.
Preferably, there is a fourth fixed axle respectively fixed mounting on the wall body of second bracing piece both sides below, the fourth fixed axle rotates and installs in the first rotation groove of accomodating inslot one side, the flexible groove of second has still been seted up in the second bracing piece wall body, still be equipped with the second connecting rod on the wall body of second bracing piece top, fixed mounting has the telescopic link on the wall body of second connecting rod bottom, fixed mounting has the second stopper on the wall body of telescopic link bottom, just the telescopic link alternates through the second stopper and installs in the flexible inslot of second, the third draw-in groove has still been seted up in the wall body of second bracing piece top one side, the third draw-in groove card dress is on the corresponding protective bar body of rod one side.
Compared with the prior art, the utility model discloses following beneficial effect has:
a building material handling device for building engineering, set up through collapsible side bearer of accomodating and expanding, can be convenient for expand it when transporting some building materials, and then be convenient for protect the material of transportation, in addition, the second bracing piece of a scalable regulation and the setting of second connecting rod are convenient for further strengthen fixedly to the fender rod.
Drawings
FIG. 1 is a schematic view of the main structure of the present invention;
FIG. 2 is an exploded view of the main structure of the present invention;
FIG. 3 is an enlarged view taken at A in FIG. 2;
FIG. 4 is an enlarged view at B in FIG. 2;
fig. 5 is a sectional view of the second support rod structure of the present invention.
In the figure: 1. a base plate; 2. a roller; 3. a handle frame; 4. a first chute; 5. a side frame; 6. a guard bar; 7. a first support bar; 8. a second support bar; 9. a first receiving groove; 10. a first card slot; 11. a first fixed shaft; 12. a slider; 13. a second chute; 14. a first stopper; 15. a second fixed shaft; 16. a second receiving groove; 17. a first connecting rod; 18. a third fixed shaft; 19. a first telescopic slot; 20. a second card slot; 21. a magnetic fixture block; 22. a telescopic block; 23. a limiting column; 24. a compression spring; 25. a fourth fixed shaft; 26. a second telescopic slot; 27. a second connecting rod; 28. a telescopic rod; 29. a second limiting block; 30. a third card slot.
Detailed Description
In order to make the technical means, creation features, achievement purposes and functions of the present invention easy to understand, the present invention is further described below with reference to the following embodiments.
As shown in fig. 1-5, the utility model provides a pair of building material handling device for building engineering, including bottom plate 1, be equipped with gyro wheel 2 on the wall body all around bottom plate 1 respectively, be equipped with handle frame 3 on the wall body of bottom plate 1 side, seted up first spout 4 in 3 front ends of handle frame and the rear end wall body respectively, still be equipped with side bearer 5 on 3 front ends of handle frame and the rear end wall body respectively, side bearer 5 includes guard bar 6, first bracing piece 7 and second bracing piece 8, still seted up two first draw-in grooves 10 in 1 top front ends of bottom plate and the rear end wall body respectively, still seted up first accomodating groove 9 in 1 top one side wall body of bottom plate.
Two protection rods 6 are respectively fixedly provided with a first fixing shaft 11 on a lateral wall body, a sliding block 12 is further fixedly arranged on a lateral wall body of the first fixing shaft 11, the first fixing shaft 11 is installed in the first sliding groove 4 in a penetrating mode through the sliding block 12, a second sliding groove 13 is further formed in the wall body of the protection rods 6, and first limiting blocks 14 are respectively fixedly arranged in the wall body of the front end and the wall body of the rear end in the second sliding groove 13.
Still fixed mounting respectively has second fixed axle 15 on first bracing piece 7 front end and the rear end upper wall body, and second fixed axle 15 slidable mounting is in second spout 13, and first bracing piece 7 upper wall body passes through second fixed axle 15 slidable mounting in second spout 13, has still seted up the second in the first bracing piece 7 side upper wall body and has accomodate the groove 16, is equipped with first connecting rod 17 in the second accomodates the groove 16.
First flexible groove 19 has been seted up in the wall body of 7 bottoms of first bracing piece, second draw-in groove 20 has still been seted up respectively in the wall body that is located first flexible groove 19 both sides position to 7 bottoms of first bracing piece, first bracing piece 7 bottoms still is equipped with magnetism fixture block 21, fixed mounting has flexible piece 22 on the wall body of magnetism fixture block 21 top, flexible piece 22 alternates to be installed in first flexible groove 19, fixedly connected with compression spring 24 between flexible piece 22 top wall body and the first flexible inslot 19 top wall body, still respectively fixed mounting has spacing post 23 at the top of magnetism fixture block 21 on the wall body that is located flexible piece 22 both sides position.
A third fixing shaft 18 is fixedly mounted on a front and rear end wall body of one side of the first connecting rod 17, the third fixing shaft 18 is rotatably mounted in a rotating groove in the second accommodating groove 16, and the first connecting rod 17 is movably mounted in the second accommodating groove 16 through the third fixing shaft 18.
Respectively fixed mounting has a fourth fixed axle 25 on the wall body of 8 both sides below of second bracing piece, fourth fixed axle 25 rotates and installs in the rotation groove of first storage tank 9 in one side, the flexible groove 26 of second has still been seted up in the 8 wall bodies of second bracing piece, still be equipped with second connecting rod 27 on the 8 top wall bodies of second bracing piece, fixed mounting has telescopic link 28 on the wall body of second connecting rod 27 bottom, fixed mounting has second stopper 29 on the wall body of telescopic link 28 bottom, and telescopic link 28 alternates through second stopper 29 and install in the flexible groove 26 of second, third draw-in groove 30 has still been seted up in the wall body of one side of second connecting rod 27 top, third draw-in groove 30 clamps on the 6 side of the pole bodies of corresponding protective rod.
It should be noted that, the utility model relates to a building material handling device for building engineering, when using, at first, guard bar 6 drives first fixed axle 11 and slider 12 and stimulates downwards in first spout 4, and then make guard bar 6 drive first fixed axle 11 and move to first spout 4 bottom wall body, afterwards, use first fixed axle 11 as the axle center to rotate ninety degrees to one side with guard bar 6, afterwards, with two first bracing piece 7 one end downwardly pulling respectively in the internal second spout 13 of guard bar 6 wall, and then make two first bracing pieces 7 hang in second spout 13 through the second fixed axle 15 of top wall body, afterwards, move two first bracing pieces 7 to one side through second fixed axle 15 on wall body on second spout 13 separately, afterwards, with the magnetic fixture block 21 of first bracing piece 7 bottom wall body stimulates downwards, and then make the spacing post 23 of magnetic fixture block 21 top both sides follow the second bracing piece 7 bottom second wall body of second side wall body The clamping grooves 20 are separated, so that the compression spring 24 presses the telescopic block 22, so that the telescopic block 22 drives the magnetic clamping block 21 to be clamped into the corresponding first clamping groove 10 at the top of the bottom plate 1, so as to support the guard bar 6, then, the two second connecting rods 27 in the first accommodating groove 9 are respectively pulled to one side for ninety degrees, so that the second connecting rods 27 drive the second supporting rod 8 to rotate in the rotating groove of the inner wall of the first accommodating groove 9 by ninety degrees by taking the fourth fixing shaft 25 as an axis through the telescopic rods 28, then, the second connecting rods 27 are pulled upwards, so that the second connecting rods 27 are clamped on one end wall body of the guard bar 6 through the magnetism of the inner wall of the third clamping groove 30, then, the first connecting rods 17 in the second accommodating groove 16 at one side of the two first supporting rods 7 are unfolded in the rotating groove of the inner wall of the second accommodating groove 16 by taking the third fixing shaft 18 as an axis, subsequently, the side frame 5 on the rear end wall body of the handle frame 3 is operated in the same manner as described above.
The basic principles and the main features of the invention and the advantages of the invention have been shown and described above. It should be understood by those skilled in the art that the present invention is not limited to the above embodiments, and the above embodiments and descriptions are only illustrative of the principles of the present invention, and that various changes and modifications may be made without departing from the spirit and scope of the present invention, and all such changes and modifications fall within the scope of the present invention as claimed. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (6)

1. A building material handling device for building engineering which characterized in that: including bottom plate (1), be equipped with gyro wheel (2) on the wall body all around bottom plate (1), be equipped with handle frame (3) on bottom plate (1) a lateral wall body, first spout (4) have been seted up respectively in handle frame (3) front end and the rear end wall body, still be equipped with side bearer (5) on handle frame (3) front end and the rear end wall body respectively, side bearer (5) are including guard bar (6), first bracing piece (7) and second bracing piece (8), still seted up two first draw-in grooves (10) respectively in bottom plate (1) top front end and the rear end wall body, first groove (9) of accomodating have still been seted up in bottom plate (1) top lateral wall body.
2. The construction material handling device for construction engineering according to claim 1, wherein: two guard bar (6) to respectively fixed mounting have first fixed axle (11) to a lateral wall body on, it has slider (12) to go back fixed mounting on a lateral wall body of first fixed axle (11), first fixed axle (11) alternate through slider (12) and install in first spout (4), second spout (13) have still been seted up in guard bar (6) wall body, in second spout (13) front and back end both sides wall body respectively fixed mounting have first stopper (14).
3. The construction material handling device for construction engineering according to claim 2, wherein: still respectively fixed mounting have second fixed axle (15) on first bracing piece (7) front end and the rear end top wall body, second fixed axle (15) slidable mounting is in second spout (13), just first bracing piece (7) top wall body passes through second fixed axle (15) slidable mounting in second spout (13), first bracing piece (7) one side top wall body has still been seted up the second and has been accomodate groove (16), be equipped with head rod (17) in the second is accomodate groove (16).
4. The construction material handling device for construction engineering according to claim 3, wherein: first flexible groove (19) have been seted up in first bracing piece (7) bottom wall body, second draw-in groove (20) have still been seted up respectively in the wall body that is located first flexible groove (19) both sides position in first bracing piece (7) bottom, first bracing piece (7) bottom still is equipped with magnetism fixture block (21), fixed mounting has flexible piece (22) on magnetism fixture block (21) top wall body, flexible piece (22) alternate and install in first flexible groove (19), fixedly connected with compression spring (24) between flexible piece (22) top wall body and the first flexible groove (19) interior top wall body, still respectively fixed mounting have spacing post (23) at magnetism fixture block (21) top on the wall body that is located flexible piece (22) both sides position.
5. The construction material handling device for construction engineering according to claim 4, wherein: and the front end wall body and the rear end wall body on one side of the first connecting rod (17) are respectively and fixedly provided with a third fixing shaft (18), the third fixing shafts (18) are rotatably arranged in the rotating grooves in the second accommodating grooves (16), and the first connecting rod (17) is movably arranged in the second accommodating grooves (16) through the third fixing shafts (18).
6. The construction material handling device for construction engineering according to claim 5, wherein: a fourth fixed shaft (25) is respectively and fixedly arranged on the lower wall bodies at the two sides of the second supporting rod (8), the fourth fixed shaft (25) is rotatably arranged in a rotating groove at one side in the first accommodating groove (9), a second telescopic groove (26) is also arranged in the wall body of the second supporting rod (8), a second connecting rod (27) is also arranged on the top wall body of the second supporting rod (8), a telescopic rod (28) is fixedly arranged on the bottom wall body of the second connecting rod (27), a second limiting block (29) is fixedly arranged on the bottom wall body of the telescopic rod (28), and the telescopic rod (28) is inserted and installed in the second telescopic groove (26) through a second limit block (29), a third clamping groove (30) is also arranged in the wall body at one side above the second connecting rod (27), the third clamping groove (30) is clamped on the rod body on one side of the corresponding protective rod (6).
CN202123320350.0U 2021-12-27 2021-12-27 Building material handling device for building engineering Active CN217198212U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202123320350.0U CN217198212U (en) 2021-12-27 2021-12-27 Building material handling device for building engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202123320350.0U CN217198212U (en) 2021-12-27 2021-12-27 Building material handling device for building engineering

Publications (1)

Publication Number Publication Date
CN217198212U true CN217198212U (en) 2022-08-16

Family

ID=82784426

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202123320350.0U Active CN217198212U (en) 2021-12-27 2021-12-27 Building material handling device for building engineering

Country Status (1)

Country Link
CN (1) CN217198212U (en)

Similar Documents

Publication Publication Date Title
CN201816969U (en) Adjustable card box
CN204323906U (en) A kind of water sample sample bottle Turnover Box
CN217198212U (en) Building material handling device for building engineering
CN211506858U (en) Portable colleges and universities show teaching device
CN206645227U (en) A kind of solar panels transport support
CN211014829U (en) Metallographic microscope with portable detachable support
CN205157957U (en) Outdoor photographic arrangement of rotatable formula
CN207003327U (en) A kind of highway isolated column being moved easily
CN214786471U (en) Auxiliary device for street lamp upright stanchion
CN204169523U (en) A kind of specialized economic management showing stand
CN108030209A (en) A kind of Labor-saving pull rod case for expanding luggage carrier
CN210790935U (en) Device of putting of accurate die cavity mould
CN113368479A (en) Movable counterweight volleyball post
CN112171625A (en) Assembled loading bearing device for building construction and use method
CN206924364U (en) The special basketball stands of physical education
CN207542958U (en) The quick tipper of stator
CN207174430U (en) A kind of pseudo-classic brick production conveying arrangement
CN206342133U (en) A kind of outdoor sketch from life easel
CN207725916U (en) A kind of vehicle right and left gusset grillage
CN216843981U (en) Exhibition room multimedia display equipment
CN217100025U (en) Transportation handling device
CN214152358U (en) Garden engineering planning information display device
CN214494127U (en) Case is preserved with commodity circulation to earthquake
CN213324460U (en) Glass transports frame
CN216545796U (en) Mobile charging pile

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant