CN217104546U - Grass planting brick for ecological garden construction - Google Patents

Grass planting brick for ecological garden construction Download PDF

Info

Publication number
CN217104546U
CN217104546U CN202220751721.6U CN202220751721U CN217104546U CN 217104546 U CN217104546 U CN 217104546U CN 202220751721 U CN202220751721 U CN 202220751721U CN 217104546 U CN217104546 U CN 217104546U
Authority
CN
China
Prior art keywords
brick
fragment
grass planting
hole
grass
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220751721.6U
Other languages
Chinese (zh)
Inventor
卞兴金
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Xinyang Building Materials Co ltd
Original Assignee
Wuhan Xinyang Building Materials Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Xinyang Building Materials Co ltd filed Critical Wuhan Xinyang Building Materials Co ltd
Priority to CN202220751721.6U priority Critical patent/CN217104546U/en
Application granted granted Critical
Publication of CN217104546U publication Critical patent/CN217104546U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model discloses an ecological garden construction is with grass planting brick, including the fragment of brick, the centre of fragment of brick is provided with first grass planting hole, and the four corners department of fragment of brick is provided with second grass planting hole, and the top of fragment of brick is provided with prevents the moss layer. The utility model discloses a set up on the fragment of brick top and prevent the moss layer, prevent and treat the numerous and diverse of moss, keep the fragment of brick top clean and tidy, avoid the pedestrian to walk and appear the smooth situation of falling on the fragment of brick, at the side of fragment of brick and bottom parcel reinforcing net, reduce collision between the fragment of brick and car and roll and the damage that receives, prolong the life of fragment of brick. Set up first cotton and the second cotton and the cotton core strip that absorbs water, can draw more moisture, and the limbers passes through the spillway hole and first grass planting hole and second grass planting hole intercommunication for grass planting moisture in the fragment of brick is sufficient, and catchment time is long, does benefit to the growth of planting grass and breeds.

Description

Grass planting brick for ecological garden construction
Technical Field
The utility model relates to a grass planting brick technical field specifically is a grass planting brick is used in ecological garden construction.
Background
The grass planting brick is made of concrete, river sand, pigment and other excellent materials through vibration pressing by a high-pressure brick machine, is completely baking-free, meets the requirement of environmental protection production, has strong pressure resistance through scientific system maintenance, has good stability when being laid on the ground, has wide greening area, can withstand rolling of pedestrians and vehicles without being damaged, and is widely used.
Present ecological garden construction is with grass planting brick, the water-collecting ability of fragment of brick is not high, and the downthehole grass planting of grass planting in the fragment of brick receives the arid easily, and moisture is not enough, and in addition, the moss can be multiplied on the top of fragment of brick, and is comparatively smooth, and the walking is unsafe, and simultaneously, the fragment damage can appear in the fragment of brick through the car roll with the mutual collision between the fragment of brick, shortens the life of fragment of brick.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide an ecological garden construction is with grass planting brick to the moss can be multiplied on the top of solving the fragment of brick, and is comparatively smooth, and the walking is unsafe, and simultaneously, the fragment damage can appear in the fragment of brick through the car roll with the mutual collision between the fragment of brick, shortens the problem of the life's of fragment of brick use.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides an ecological garden construction is with grass planting brick, includes the fragment of brick, the centre of fragment of brick is provided with first grass planting hole, the four corners department of fragment of brick is provided with second grass planting hole, the top of fragment of brick is provided with prevents the moss layer.
Preferably, the first grass planting holes are circular hole structures, first absorbent cotton is adhered to the inner surfaces of the first grass planting holes, and the first absorbent cotton is of a circular ring-shaped structure.
Preferably, the second grass planting hole is of an arc-shaped structure, the second water absorption cotton is adhered to the inner surface of the second grass planting hole, and the second water absorption cotton is of an arc-shaped structure.
Preferably, the four sides of the brick are provided with taking and placing grooves, the taking and placing grooves are of rectangular structures, and the depth of the taking and placing grooves is equal to the thickness of the brick.
Preferably, the surface of the brick is provided with a limber hole, the limber hole is positioned around the first grass planting hole, and the depth of the limber hole is equal to the thickness of the brick.
Preferably, the inside of the limber hole is filled with a cotton core strip, the top end of the cotton core strip does not protrude out of the limber hole, the side surface of the limber hole is provided with an overflow hole, and the overflow hole is communicated with the first grass planting hole.
Preferably, the bottom end of fragment of brick is fixed with the reference column, all parcel have the reinforcing net around the fragment of brick and bottom, the top of fragment of brick is arc protruding structure.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model prevents the proliferation of moss by arranging the moss-preventing layer on the top end of the arc-shaped convex brick, keeps the top end of the brick clean and tidy, and avoids the slipping situation of pedestrians on the brick; simultaneously, the side and the bottom parcel reinforcing net of fragment of brick reduce collision between the fragment of brick and the car roll and the damage that receives, prolong the life of fragment of brick.
2. The utility model discloses it absorbs water cotton and the second cotton that absorbs water to set up respectively in first grass planting hole and second grass planting downthehole portion to fill cotton core strip inside the limbers, so, can draw more moisture, and the limbers passes through the spillway hole and first grass planting hole and second grass planting hole intercommunication, makes the grass planting moisture in the fragment of brick sufficient, and catchment time is long, does benefit to the growth of grass planting and breeds.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention;
fig. 2 is a sectional view taken along the line a-a of fig. 1 according to the present invention;
FIG. 3 is a schematic view of the reinforcement mesh of FIG. 1 according to the present invention;
fig. 4 is a schematic view of the brick laying structure of fig. 1 according to the present invention.
In the figure: 1. a brick block; 2. a first grass planting hole; 3. a cotton core strip; 4. a water through hole; 5. a taking and placing groove; 6. a second grass planting hole; 7. first absorbent cotton; 8. second absorbent cotton; 9. a positioning column; 10. reinforcing the net; 11. an overflow hole; 12. a moss-preventing layer.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Example 1
Referring to fig. 1, 2 and 3, the grass planting brick for ecological garden construction shown in the figure comprises a brick 1, a first grass planting hole 2 is formed in the middle of the brick 1, second grass planting holes 6 are formed in four corners of the brick 1, an anti-moss layer 12 is arranged at the top end of the brick 1, and the anti-moss layer 12 is made of organic silicon plastics and coated on the surface of the brick 1.
A positioning column 9 is fixed at the bottom end of the brick 1, and the positioning column 9 is inserted into the ground to keep the stable laying of the brick 1; the periphery and the bottom ends of the bricks 1 are respectively wrapped with a reinforcing net 10, and the reinforcing net 10 adopts two layers of mesh cloth, so that the growth of grass planting is not blocked, and the damage to the bricks 1 is reduced; the top of fragment of brick 1 is arc protruding structure, improves fragment of brick 1 bulk strength.
This ecological garden construction is with grass planting brick, during the use: set up on the bellied 1 top of fragment of brick of arc and prevent moss layer 12, the numerous and diverse of prevention and cure moss keeps 1 top of fragment of brick clean and tidy, avoids the pedestrian to walk and appear the smooth situation on fragment of brick 1.
Meanwhile, the side surfaces and the bottom ends of the bricks 1 are wrapped with the reinforcing nets 10, so that the collision among the bricks 1 and the damage caused by rolling of an automobile are reduced, and the service life of the bricks 1 is prolonged.
Example 2
Referring to fig. 1, 2 and 4, in this embodiment, the grass planting brick for ecological garden construction in example 1 is further described, and includes a brick 1, a first grass planting hole 2 is disposed in the middle of the brick 1, second grass planting holes 6 are disposed at four corners of the brick 1, and a moss preventing layer 12 is disposed on the top end of the brick 1.
The first grass planting hole 2 is in a circular hole structure, first absorbent cotton 7 is adhered to the inner surface of the first grass planting hole 2, and the first absorbent cotton 7 is in a circular structure; the second hole 6 of planting grass is the fourth circular arc structure, and the cotton 8 that absorbs water of second has been pasted to the internal surface in second hole 6 of planting grass, and the cotton 8 that absorbs water of second is the fourth circular arc structure, and four fragment of brick 1 lay the back, and second hole 6 of planting grass forms the circular port.
The four sides of fragment of brick 1 are opened and are had and get and put groove 5, get and put groove 5 and be the rectangle structure, get the degree of depth that puts groove 5 and fragment of brick 1's thickness and equal, appear damaging the back at single fragment of brick 1, conveniently use the thin strip shovel to insert and get and put groove 5, shovel fragment of brick 1, change.
The surface of the brick 1 is provided with a limber hole 4, the limber hole 4 is positioned around the first grass planting hole 2, and the depth of the limber hole 4 is equal to the thickness of the brick 1; the inner part of the water through hole 4 is filled with a cotton core strip 3, and the top end of the cotton core strip 3 does not protrude out of the water through hole 4; the side surface of the limber hole 4 is provided with an overflow hole 11, and the overflow hole 11 is communicated with the first grass planting hole 2 and the second grass planting hole 6.
In this embodiment, set up first cotton 7 and the second cotton 8 that absorbs water respectively in first grass planting hole 2 and second grass planting hole 6 insides to fill cotton core strip 3 in limbers 4 is inside, so, can draw more moisture, and limbers 4 pass through spillway hole 11 and first grass planting hole 2 and second grass planting hole 6 intercommunication, make the grass planting moisture in fragment of brick 1 sufficient, catchment is long, does benefit to the growth of planting grass and breeds.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. The utility model provides an ecological garden construction is with grass planting brick which characterized in that includes: the brick block comprises a brick block (1), wherein a first grass planting hole (2) is formed in the middle of the brick block (1), second grass planting holes (6) are formed in four corners of the brick block (1), and a moss preventing layer (12) is arranged on the top end of the brick block (1).
2. The grass planting brick for ecological garden construction according to claim 1, characterized in that: first grass planting hole (2) are the circular port structure, first cotton (7) that absorb water is pasted to the internal surface in first grass planting hole (2), first cotton (7) that absorb water is the ring column structure.
3. The grass planting brick for ecological garden construction according to claim 1, characterized in that: the second hole of planting grass (6) is the arc structure, the cotton (8) that absorbs water of second has been pasted to the internal surface in second hole of planting grass (6), the cotton (8) that absorbs water of second is the arc structure.
4. The grass planting brick for ecological garden construction according to claim 1, characterized in that: the brick taking and placing device is characterized in that taking and placing grooves (5) are formed in four side faces of the brick (1), the taking and placing grooves (5) are of a rectangular structure, and the depth of the taking and placing grooves (5) is equal to the thickness of the brick (1).
5. The grass planting brick for ecological garden construction according to claim 1, characterized in that: the surface of fragment of brick (1) is provided with limbers (4), limbers (4) are located around first grass planting hole (2), the degree of depth and the thickness of fragment of brick (1) of limbers (4) are equal.
6. The grass planting brick for ecological garden construction according to claim 5, characterized in that: the cotton core strips (3) are filled in the water through holes (4), the top ends of the cotton core strips (3) do not protrude out of the water through holes (4), overflow holes (11) are formed in the side faces of the water through holes (4), and the overflow holes (11) are communicated with the first grass planting holes (2).
7. The grass planting brick for ecological garden construction according to claim 1, characterized in that: the bottom end of fragment of brick (1) is fixed with reference column (9), all parcel around fragment of brick (1) and bottom have reinforcing net (10), the top of fragment of brick (1) is arc protruding structure.
CN202220751721.6U 2022-03-31 2022-03-31 Grass planting brick for ecological garden construction Active CN217104546U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220751721.6U CN217104546U (en) 2022-03-31 2022-03-31 Grass planting brick for ecological garden construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220751721.6U CN217104546U (en) 2022-03-31 2022-03-31 Grass planting brick for ecological garden construction

Publications (1)

Publication Number Publication Date
CN217104546U true CN217104546U (en) 2022-08-02

Family

ID=82578047

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220751721.6U Active CN217104546U (en) 2022-03-31 2022-03-31 Grass planting brick for ecological garden construction

Country Status (1)

Country Link
CN (1) CN217104546U (en)

Similar Documents

Publication Publication Date Title
CN204738197U (en) Graphite alkene polymer combined material geogrid
CN217104546U (en) Grass planting brick for ecological garden construction
CN207109486U (en) A kind of water circulation dedusting greening road
CN207277700U (en) A kind of roof rain water garden basis
CN210049047U (en) Urban construction paved road surface
CN206655512U (en) A kind of ecological forest shade parking lot
CN211421148U (en) Road slope protection device with water storage function
CN207891129U (en) A kind of river artificial ecologic island
CN216475844U (en) Concatenation formula environmental protection ecological brick
CN210226425U (en) Rocky desertification area administers with irrigation pipe laying device
CN211773361U (en) Ecological bank protection stone in dysmorphism river course and by bank protection that its concatenation formed
CN219568916U (en) Cement blanket with multilayer composite structure
CN216688874U (en) Concatenation formula grass planting brick
CN214090213U (en) Green belt drainage structure for garden design
CN204590431U (en) A kind of novel slope greening structure
CN219670987U (en) Gap water permeable brick and water permeable brick module
CN107366310A (en) The spraying waterproof construction method of underground storage groove
CN211898534U (en) Retaining wall structure for civil construction
CN214938917U (en) Transverse grid type grass planting brick
CN215858652U (en) Plant roofing system
CN211736070U (en) Waterproof structure of planted roof deformation joint
CN210177300U (en) Well word grass brick
CN212688674U (en) Ecological bridge isolation belt
JP4331880B2 (en) Three-dimensional network and method for producing the same
CN217073601U (en) Anti-skid composite geotextile

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant