CN217079867U - Frame concatenation type bamboo steel corridor frame - Google Patents

Frame concatenation type bamboo steel corridor frame Download PDF

Info

Publication number
CN217079867U
CN217079867U CN202220620821.5U CN202220620821U CN217079867U CN 217079867 U CN217079867 U CN 217079867U CN 202220620821 U CN202220620821 U CN 202220620821U CN 217079867 U CN217079867 U CN 217079867U
Authority
CN
China
Prior art keywords
frame
rod
fixing
frames
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220620821.5U
Other languages
Chinese (zh)
Inventor
黎思源
岳玉芬
黄静
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Institute Of Landscape And Traditional Architectural Design And Research Co ltd
Original Assignee
Beijing Institute Of Landscape And Traditional Architectural Design And Research Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Institute Of Landscape And Traditional Architectural Design And Research Co ltd filed Critical Beijing Institute Of Landscape And Traditional Architectural Design And Research Co ltd
Priority to CN202220620821.5U priority Critical patent/CN217079867U/en
Application granted granted Critical
Publication of CN217079867U publication Critical patent/CN217079867U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Tents Or Canopies (AREA)

Abstract

The utility model relates to a frame splicing type bamboo steel gallery frame, belonging to the technical field of garden landscape, comprising a plurality of gallery frame frames, wherein the gallery frame frames are arranged along the length direction of a path, each gallery frame comprises a plurality of beam frames and a plurality of connecting pieces, the connecting pieces are positioned between two adjacent beam frames, the two ends of each connecting piece are respectively and fixedly provided with an inserting plate, the end part of each beam frame is provided with an inserting groove which is matched with the inserting plate in an inserting way, the side wall of each beam frame is provided with an inserting hole in a penetrating way, the inserting hole is communicated with the inserting groove, the inserting plate is provided with a through hole in a penetrating way, the inserting plate is inserted into the inserting groove, the inserting hole is communicated with the through hole, and the inserting hole arranged at the same position of each gallery frame is positioned on a straight line, wear to be equipped with the connecting rod in the spliced eye, the connecting rod runs through all corridor frame frames in proper order and is fixed with the corridor frame in the outside, and this application has the effect that improves steel corridor frame and builds the efficiency of construction.

Description

Frame concatenation type bamboo steel corridor frame
Technical Field
The utility model belongs to the technical field of landscape's technique and specifically relates to a frame concatenation type bamboo steel corridor frame is related to.
Background
With the development of times, the technical level of the garden landscape is continuously improved, and the beauty, the ecology and the environmental protection are more closely integrated.
In landscape construction, often can build the steel corridor frame along the length of road, can increase landscape road's aesthetic property on the one hand, on the other hand can also supply the visitor to play and have a rest. The existing steel gallery frame is constructed by adopting beam frames, and the beam frames are fixed in a welding mode.
Aiming at the related technologies, the inventor thinks that the mode of constructing the steel gallery frame by welding needs a worker to weld the joint of each beam frame, and the welding mode is complicated, so that the defect of long construction period of constructing the steel gallery frame exists.
SUMMERY OF THE UTILITY MODEL
In order to improve the efficiency of construction that steel corridor frame was built, this application provides a frame concatenation type bamboo steel corridor frame.
The application provides a frame concatenation type bamboo steel corridor frame adopts following technical scheme:
the utility model provides a frame concatenation type bamboo steel gallery frame, including a plurality of gallery frame, gallery frame is arranged along the length direction on route, every gallery frame all includes a plurality of roof beam structures and a plurality of connecting piece, the connecting piece is located between two adjacent roof beam structures, the both ends of connecting piece all have set firmly the plugboard, the inserting groove with plugboard grafting adaptation is seted up to the tip of roof beam structure, the spliced eye has been seted up in running through of the lateral wall of roof beam structure, spliced eye and inserting groove intercommunication, the plugboard runs through and has seted up the via hole, the plugboard inserts in the spliced eye, the spliced eye is linked together with the via hole, and the spliced eye that every gallery frame was seted up at same position is located a straight line, wear to be equipped with the connecting rod in the spliced eye, the connecting rod runs through all gallery frames in proper order and is fixed with the gallery frame in the outside.
Through adopting above-mentioned technical scheme, be located between the adjacent roof beam structure with the connecting piece, make the plugboard insert to the inserting groove in to make through-hole and via hole align, set up a plurality of rack frames and arrange along the length direction on route with same mode, then pass every rack frame in plughole and through-hole with the connecting rod, it is fixed with the rack frame in both ends and the outside of connecting rod again. Through above structure, adopted the mode of concatenation to build the corridor frame, this easy operation, convenient, swift to the corridor frame construction efficiency's effect has been improved to the realization.
Optionally, the beam frame side wall located above the gallery frame penetrates through the plurality of through holes, the through holes formed in the same position of each gallery frame are located on the same straight line, reinforcing rods penetrate through the through holes, and the reinforcing rods sequentially penetrate through all the gallery frames and are fixed with the gallery frame on the outermost side.
Through adopting above-mentioned technical scheme, pass every corridor frame in proper order with the stiffening rod in the through-hole to fix the both ends of stiffening rod and the corridor frame in the outside, thereby realized the effect of consolidating for the corridor frame.
Optionally, a first rain shield is arranged between two adjacent connecting pieces at the top of the gallery frame along the arrangement direction of the gallery frame; a first fixing component is arranged between the first rain baffle and the connecting rod; and a second rain baffle is arranged between two adjacent beam frames above along the arrangement direction of the rack frames, and a second fixing assembly is arranged between the second rain baffle and the reinforcing rod.
Through adopting above-mentioned technical scheme, install first weather shield and second weather shield between adjacent rack frame, played good effect of keeping off the rain, can provide the place of taking shelter from the rain for the visitor.
Optionally, the first fixing assembly comprises a first fixing rod and a first fixing sleeve, the connecting rod penetrates through a first through hole for the first fixing rod to penetrate through, one end of the first fixing rod is fixedly connected with the first rain baffle, the other end of the first fixing rod penetrates through the connecting rod from the first through hole and is inserted into the first fixing sleeve, the top end of the first fixing sleeve is abutted to the side wall of the connecting rod, the first fixing rod deviates from the side wall of one end of the first rain baffle and is provided with a first clamping groove, the inner wall of the first fixing sleeve is provided with a first accommodating groove, and the first accommodating groove is provided with a first clamping block matched with the first clamping groove in a clamping mode and a first spring used for popping out the first clamping block from the first accommodating groove.
Through adopting above-mentioned technical scheme, when installing first weather shield, make first dead lever pass the connecting rod and insert to first fixed cover in, first fixture block is first taken in to first accomodating the inslot, when first accomodating groove and first draw-in groove align, first spring pops out first fixture block, makes first fixture block be located first accomodating between groove and the first draw-in groove, again because the top and the connecting rod butt of first fixed cover to the installation of first weather shield has been realized fixed.
Optionally, a first slide bar is arranged on the side wall of the first fixing sleeve in a penetrating mode, the first slide bar is connected with the first fixing sleeve in a sliding mode, one end of the first slide bar penetrates through the first spring and is fixedly connected with the first clamping block, the other end of the first slide bar extends out of the first fixing sleeve, the first slide bar is fixedly provided with a first limiting plate outside the first fixing sleeve, the outer wall of the first fixing sleeve is rotatably connected with a first rotating piece, and when the first clamping block is located in the first accommodating groove, the first rotating piece is abutted to one side, close to the first fixing sleeve, of the first limiting plate.
Through adopting above-mentioned technical scheme, when first weather shield needs to be changed, the staff can outwards stimulate first slide bar, makes first slide bar drive first fixture block income to first accomodating inslot, then rotates first rotating member again, makes first rotating member and first limiting plate butt, prevents first slide bar to sliding in the first fixed cover to first fixture block can't remove, in order to make things convenient for the staff to dismantle first weather shield and follow the change.
Optionally, the second fixing assembly comprises a second fixing rod and a second fixing sleeve, the reinforcing rod penetrates through a second perforation which is formed in the second fixing rod and is used for the second fixing rod to penetrate through, one end of the second fixing rod is fixedly connected with the second rain baffle, the other end of the second fixing rod penetrates through the reinforcing rod from the second perforation and is inserted into the second fixing sleeve, the top end of the second fixing sleeve is abutted to the side wall of the reinforcing rod, the second fixing rod deviates from one end of the second rain baffle and is formed in a second clamping groove, the inner wall of the second fixing sleeve is formed in a second accommodating groove, and a second clamping block matched with the second clamping groove in a clamping mode and a second spring used for ejecting the second clamping block from the second accommodating groove are arranged in the second accommodating groove.
Through adopting above-mentioned technical scheme, when installing second weather shield, make the second dead lever pass the anchor strut and make and insert to the fixed cover of second, the second fixture block is taken in earlier to the second and is accomodate the inslot, when the second was accomodate groove and second draw-in groove and was aligned, the second spring popped out the second fixture block, makes the second fixture block be located the second and accomodates between groove and the second draw-in groove, again because the top and the anchor strut butt of the fixed cover of second to the installation to the second baffle has been realized fixedly.
Optionally, a second slide bar penetrates through the side wall of the second fixing sleeve, the second slide bar is connected with the second fixing sleeve in a sliding mode, one end of the second slide bar penetrates through a second spring and is fixedly connected with a second clamping block, the other end of the second slide bar extends out of the second fixing sleeve, a second limiting plate is fixedly arranged outside the second fixing sleeve by the second slide bar, the outer wall of the second fixing sleeve rotates and is connected with a second rotating piece, and when the second clamping block is located in the second accommodating groove, the second rotating piece is abutted to one side, close to the second fixing sleeve, of the second limiting plate.
Through adopting above-mentioned technical scheme, when needs change second weather shield, the staff can outwards stimulate the second slide bar, makes the second slide bar drive the second fixture block and accomodate the inslot to the second, then rotates the second again, makes the second rotate piece and second limiting plate butt, prevents the second slide bar to slide in the fixed cover of second to the unable removal of second fixture block, in order to make things convenient for the staff to dismantle second weather shield and with trading.
Optionally, the circumferential side walls of the first rain baffle and the second rain baffle are fixedly provided with sealing gaskets.
By adopting the technical scheme, the method has the advantages that,
optionally, the sealing gasket improves the sealing performance between the first baffle and the second baffle, so that rainwater is not easy to permeate from a connected gap.
In summary, the present application includes at least one of the following beneficial technical effects:
1. the gallery frame comprises a plurality of beam frames and a plurality of connecting pieces, and the beam frames and the connecting pieces are connected in an inserting manner, so that the construction efficiency of the gallery frame construction is improved;
2. set up first weather shield between the top connecting piece, set up second weather shield between the roof beam structure at top, can play good rain effect of keeping off, provide the place of taking shelter from the rain for the visitor.
Drawings
FIG. 1 is a schematic structural diagram of a frame splicing type bamboo steel gallery frame according to an embodiment of the present application;
FIG. 2 is a fragmentary schematic view of an embodiment of the present application to illustrate beam and link structure;
fig. 3 is a sectional view of a structure embodying the first weather shield and the first fixing member in an embodiment of the present application;
FIG. 4 is an enlarged partial schematic view of portion A of FIG. 3;
fig. 5 is a sectional view showing a structure of a second rain guard and a second fixing member in the embodiment of the present application;
fig. 6 is a partially enlarged schematic view of a portion B in fig. 5.
In the figure, 1, a gallery frame; 2. a beam frame; 21. inserting grooves; 22. inserting holes; 23. a through hole; 3. a connecting member; 31. a plugboard; 311. a via hole; 4. a connecting rod; 41. a first perforation; 5. a reinforcing rod; 51. a second perforation; 6. a first rain shield; 7. a second rain guard; 8. a first fixed component; 81. a first fixing lever; 811. a first card slot; 82. a first fixing sleeve; 821. a first receiving groove; 822. a first clamping block; 823. a first spring; 824. a first slide bar; 825. a first limit plate; 826. a first rotating member; 9. a second fixed component; 91. a second fixing bar; 911. a second card slot; 92. a second fixing sleeve; 921. a second receiving groove; 922. a second fixture block; 923. a second spring; 924. a second slide bar; 925. a second limiting plate; 926. a second rotating member; 10. and a gasket.
Detailed Description
The present application is described in further detail below with reference to figures 1-6.
The embodiment of the application discloses frame concatenation type bamboo steel corridor frame.
Referring to fig. 1, a frame concatenation type bamboo steel corridor frame includes a plurality of corridor frame 1, corridor frame 1 is along the even interval arrangement in the length direction on route, and corridor frame 1 bottom both ends are fixed with ground through the mode of dreading the soil mixture and pouring.
Referring to fig. 1 and 2, each rack frame 1 includes a plurality of beam frames 2 and a plurality of link members 3; the link 3 is located between two adjacent beam frames 2. Inserting grooves 21 are formed in the two ends of the beam frame 2 along the length direction of the beam frame, the connecting pieces 3 are of arc-shaped structures, inserting plates 31 are fixedly arranged at the two ends of the connecting pieces 3, and the inserting plates 31 are in inserting fit with the inserting grooves 21. The side wall of the end part of the beam frame 2 is provided with a plug hole 22 in a penetrating way, the plug hole 22 is communicated with the plug groove 21, and the side wall of the plug board 31 is provided with a through hole 311 in a penetrating way. When the inserting plate 31 is inserted into the inserting groove 21, the inserting hole 22 and the through hole 311 are communicated with each other. The plug holes 22 and the via holes 311 at the same position of each rack frame 1 are located on the same straight line. A plurality of connecting rods 4 penetrate among the gallery frame frames 1, and the connecting rods 4 sequentially penetrate through each gallery frame 1 from the insertion holes 22 and the through holes 311 to enable the beam frame 2 and the connecting piece 3 to be fixed. The circumference lateral wall processing at connecting rod 4 both ends has helicitic texture, and the both ends threaded connection of connecting rod 4 has the nut, through the outer wall butt of nut and outermost side corridor frame 1, has realized the fixed between corridor frame 1 and the connecting rod 4. Through above structure, this corridor frame has adopted the mode of concatenation to build, and this mode easy operation, convenience, swift to the efficiency of construction that corridor frame was built has been improved.
The lateral wall that is located 1 top roof beam structure 2 of rack frame runs through and has seted up through-hole 23, the through-hole 23 of 2 same positions of every roof beam structure is in a straight line, wear to be equipped with anchor strut 5 in through-hole 23, anchor strut 5 runs through all rack frames 1, the circumference lateral wall processing at anchor strut 5 both ends has helicitic texture and threaded connection to have the nut, rotate the outer wall butt that the nut made nut and outside rack frame 1, thereby realized fixing between rack frame 1 and the anchor strut 5, and then played the reinforcing effect and improved its structural strength for this rack.
Referring to fig. 1, a first rain baffle 6 is arranged between the connecting pieces 3 at the tops of the adjacent rack frames 1, and the first rain baffle 6 has an arc structure and has the same radian as the connecting pieces 3; a second rain baffle 7 is arranged between the beam frames 2 above the adjacent rack frames 1. The first rain baffle 6 and the second rain baffle 7 are additionally arranged above the corridor frame 1, so that a good rain shielding effect is achieved, and a rain sheltering place is provided for tourists.
Referring to fig. 3 and 4, a first fixing assembly 8 for fixing the first weather shield 6 and the connecting rod 4 is provided therebetween. The first fixing assembly 8 includes a first fixing rod 81 and a first fixing sleeve 82. The top of the first fixing sleeve 82 is a cambered surface and is tightly attached to the outer wall of the connecting rod 4. The first fixing rod 81 is fixedly connected with the bottom of the first rain baffle 6, the connecting rod 4 is provided with a first through hole 41 for the first fixing rod 81 to pass through, and the first fixing rod 81 passes through the first through hole 41 and then is in plug-in fit with the first fixing sleeve 82. First dead lever 81 deviates from the lateral wall of first weather shield 6 one end and has seted up first draw-in groove 811, first groove 821 has been seted up to the inner wall of first fixed cover 82, first groove 821 of accomodating is provided with first fixture block 822 and first spring 823 in the groove 821, the one end and the first fixed cover 82 fixed connection of first spring 823, the other end and the first fixture block 822 fixed connection of first spring 823, first fixture block 822 is the trapezium structure, the one end that first fixture block 822 deviates from first spring 823 is the ascending inclined plane of slope.
When the first weather shield 6 of installation, pass connecting rod 4 and insert to first fixed cover 82 with first dead lever 81, first fixture block 822 takes in earlier to first accomodating in the groove 821, when first draw-in groove 811 aligns with first accomodating groove 821, first spring 823 pops out first fixture block 822, makes first fixture block 822 joint first accomodating between groove 821 and first draw-in groove 811, first fixed cover 82 top and connecting rod 4 butt to it is fixed to have realized the installation of first weather shield 6.
The first fixing sleeve 82 is provided with a first sliding rod 824 in a penetrating manner, one end of the first sliding rod 824 passes through a first spring 823 and is fixedly connected with a first clamping block 822, the other end of the first sliding rod 824 extends out of the first fixing sleeve 82 and is fixedly connected with a first limiting plate 825, and the outer wall of the first fixing sleeve 82 is rotatably connected with a first rotating member 826. The first rotating member 826 can abut against a side of the first stopper plate 825 close to the first fixing sleeve 82. When the first rain baffle 6 needs to be replaced, a worker can pull the first sliding rod 824 to enable the first clamping block 822 to be received into the first receiving groove 821, then rotate the first rotating member 826 to enable the first rotating member 826 to abut against the first limiting plate 825, the first clamping block 822 cannot be ejected out, the first fixing sleeve 82 is taken down, and then the first rain baffle 6 can be detached and replaced.
Referring to fig. 5 and 6, a second fixing assembly 9 for fixing the second rain blocking plate 7 and the reinforcing rod 5 is provided therebetween. The second fixing assembly 9 includes a second fixing rod 91 and a second fixing sleeve 92. The top of the second fixing sleeve 92 is a cambered surface and is tightly attached to the outer wall of the reinforcing rod 5. The second fixing rod 91 is fixedly connected with the bottom of the second rain baffle 7, the reinforcing rod 5 penetrates through a second through hole 51 through which the second fixing rod 91 passes, and the second fixing rod 91 passes through the second through hole 51 and then is in splicing fit with the second fixing sleeve 92. Second draw-in groove 911 has been seted up to the lateral wall that second dead lever 91 deviates from 7 one end of second weather shield, the groove 921 has been accomodate to the second has been seted up to the inner wall of the fixed cover 92 of second, the groove 921 is accomodate to the second, be provided with second fixture block 922 and second spring 923 in the groove 921 is accomodate to the second, the one end and the fixed cover 92 fixed connection of second spring 923, the other end and the second fixture block 922 fixed connection of second spring 923, second fixture block 922 is the trapezium structure, the one end that second fixture block 922 deviates from second spring 923 is the ascending inclined plane of slope.
When installation second weather shield 7, pass anchor strut 5 with second dead lever 91 and insert to the fixed cover 92 of second, second fixture block 922 is taken in earlier and is accomodate the groove 921 to the second, when the groove 921 is accomodate with the second to second draw-in groove 911 aligns, second spring 923 pops out second fixture block 922, makes second fixture block 922 joint accomodate between groove 921 and the second draw-in groove 911 at the second, the fixed cover 92 top of second and anchor strut 5 butt to it is fixed to have realized the installation of second weather shield 7.
The second fixed sleeve 92 is provided with a second sliding rod 924 in a penetrating manner, one end of the second sliding rod 924 passes through a second spring 923 and is fixedly connected with a second clamping block 922, the other end of the second sliding rod 924 extends out of the second fixed sleeve 92 and is fixedly connected with a second limiting plate 925, and the outer wall of the second fixed sleeve 92 is rotatably connected with a second rotating part 926. The second rotating member 926 can abut against a side of the second limiting plate 925 close to the second fixing sleeve 92. When needs are changed second weather shield 7, the staff can stimulate first slide bar 824, makes second fixture block 922 take in to second accomodate the inslot 921, then rotates second rotation piece 926, makes second rotation piece 926 and second limiting plate 925 butt, and second fixture block 922 can't pop out, takes off the fixed cover 92 of second again, then alright change second weather shield 7.
Referring to fig. 1, the circumferential side walls of the first rain baffle 6 and the second rain baffle 7 are both fixedly provided with a gasket 10. Used for improving the sealing performance and preventing rainwater from permeating from the top of the gallery frame.
The implementation principle of the frame splicing type bamboo steel gallery frame of the embodiment of the application is as follows: insert the plugboard 31 at 3 both ends of connecting piece and constitute gallery frame 1 in the inserting groove 21 of roof beam structure 2, then reuse connecting rod 4 and anchor strut 5 pass through gallery frame 1 and consolidate, install first weather shield 6 and second weather shield 7 in the top of gallery frame 1 again, fix first weather shield 6 with first fixed subassembly 8, 9 second weather shields 7 of the fixed subassembly of second are fixed to the work of buildding of gallery frame has been accomplished. Through above structure, the corridor frame adopts the mode completion of concatenation, and this mode is simple, convenient, swift to the efficiency of construction that the corridor frame was built has been improved.
The embodiments of the present invention are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereby, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (8)

1. The utility model provides a frame concatenation type bamboo steel corridor frame which characterized in that: comprises a plurality of rack frames (1), the rack frames (1) are arranged along the length direction of a path, each rack frame (1) comprises a plurality of beam frames (2) and a plurality of connecting pieces (3), the connecting pieces (3) are positioned between two adjacent beam frames (2), insertion plates (31) are fixedly arranged at the two ends of the connecting pieces (3), insertion grooves (21) which are in insertion fit with the insertion plates (31) are arranged at the end parts of the beam frames (2), insertion holes (22) are formed in the side walls of the beam frames (2) in a penetrating way, the insertion holes (22) are communicated with the insertion grooves (21), via holes (311) are formed in the insertion plates (31) in a penetrating way, the insertion plates (31) are inserted into the insertion grooves (21), the insertion holes (22) are communicated with the via holes (311), the insertion holes (22) formed in the same position of each rack frame (1) are positioned on a straight line, connecting rods (4) are arranged in the insertion holes (22) in a penetrating way, the connecting rods (4) sequentially penetrate through all the rack frames (1) and are fixed with the rack frame (1) on the outermost side.
2. The frame-spliced bamboo steel gallery according to claim 1, wherein: be located roof beam structure (2) lateral wall of rack frame (1) top runs through and has seted up a plurality of through-holes (23), and through-hole (23) that every rack frame (1) same position was seted up are in a straight line, wear to be equipped with stiffener (5) in through-hole (23), and stiffener (5) pass all rack frames (1) in proper order and are fixed with rack frame (1) in the outside.
3. The frame-spliced bamboo steel gallery according to claim 2, wherein: along the arrangement direction of the rack frames (1), a first rain baffle (6) is arranged between two adjacent connecting pieces (3) at the top of the rack frames (1); a first fixing component (8) is arranged between the first rain baffle (6) and the connecting rod (4); along gallery frame (1) direction of arrangement is provided with second weather shield (7) between two roof beam framves (2) adjacent lieing in the top, is provided with the fixed subassembly of second (9) between second weather shield (7) and anchor strut (5).
4. The frame-spliced bamboo steel gallery according to claim 3, wherein: the first fixing component (8) comprises a first fixing rod (81) and a first fixing sleeve (82), a first through hole (41) for the first fixing rod (81) to pass through is formed in the connecting rod (4), one end of the first fixing rod (81) is fixedly connected with the first rain baffle (6), the other end of the first fixing rod (81) passes through the connecting rod (4) from the first through hole (41) and is inserted into the first fixing sleeve (82), the top end of the first fixing sleeve (82) is abutted against the side wall of the connecting rod (4), a first clamping groove (811) is formed in the side wall of one end, away from the first rain baffle (6), of the first fixing rod (81), a first accommodating groove (821) is formed in the inner wall of the first fixing sleeve (82), a first clamping block (822) matched with the first clamping groove (811) in a clamping mode and a first spring (823) used for ejecting the first clamping block (822) from the first accommodating groove (821) are arranged in the first accommodating groove (821).
5. The frame-spliced bamboo steel gallery according to claim 4, wherein: the side wall of the first fixed sleeve (82) is provided with a first sliding rod (824) in a penetrating mode, the first sliding rod (824) is connected with the first fixed sleeve (82) in a sliding mode, one end of the first sliding rod (824) penetrates through a first spring (823) to be fixedly connected with a first clamping block (822), the other end of the first sliding rod (824) extends out of the first fixed sleeve (82) in a penetrating mode, a first limiting plate (825) is fixedly arranged outside the first fixed sleeve (82) through the first sliding rod (824), the outer wall of the first fixed sleeve (82) is rotatably connected with a first rotating piece (826), when the first clamping block (822) is located in the first accommodating groove (821), the first rotating piece (826) is abutted to one side, close to the first fixed sleeve (82), of the first limiting plate (825).
6. The frame-spliced bamboo steel gallery according to claim 3, wherein: the second fixing component (9) comprises a second fixing rod (91) and a second fixing sleeve (92), a second through hole (51) for the second fixing rod (91) to pass through is formed in the reinforcing rod (5), one end of the second fixing rod (91) is fixedly connected with the second rain baffle (7), the other end of the second fixing rod (91) passes through the reinforcing rod (5) from the second through hole (51) and is inserted into the second fixing sleeve (92), the top end of the second fixing sleeve (92) is abutted against the side wall of the reinforcing rod (5), a second clamping groove (911) is formed in the side wall of one end, away from the second rain baffle (7), of the second fixing rod (91), a second accommodating groove (921) is formed in the inner wall of the second fixing sleeve (92), a second clamping block (922) matched with the second clamping groove (911) in a clamping mode and a second spring (923) used for popping up the second clamping block (922) from the second accommodating groove (921) are arranged in the second accommodating groove (921).
7. The frame-spliced bamboo steel gallery of claim 6, wherein: the lateral wall of second fixed cover (92) is worn to be equipped with second slide bar (924), second slide bar (924) and second fixed cover (92) sliding connection, second spring (923) and second fixture block (922) fixed connection are passed to the one end of second slide bar (924), the other end of second slide bar (924) stretches out from second fixed cover (92) inside, second slide bar (924) have set firmly second limiting plate (925) outside second fixed cover (92), the outer wall of second fixed cover (92) rotates and is connected with second rotation piece (926), when second fixture block (922) is located the second and accomodates groove (921), second rotation piece (926) and second limiting plate (925) are close to the one side butt of second fixed cover (92).
8. The frame splicing type bamboo steel gallery according to claim 3, wherein: and sealing gaskets (10) are fixedly arranged on the circumferential side walls of the first rain baffle (6) and the second rain baffle (7).
CN202220620821.5U 2022-03-21 2022-03-21 Frame concatenation type bamboo steel corridor frame Active CN217079867U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220620821.5U CN217079867U (en) 2022-03-21 2022-03-21 Frame concatenation type bamboo steel corridor frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220620821.5U CN217079867U (en) 2022-03-21 2022-03-21 Frame concatenation type bamboo steel corridor frame

Publications (1)

Publication Number Publication Date
CN217079867U true CN217079867U (en) 2022-07-29

Family

ID=82550281

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220620821.5U Active CN217079867U (en) 2022-03-21 2022-03-21 Frame concatenation type bamboo steel corridor frame

Country Status (1)

Country Link
CN (1) CN217079867U (en)

Similar Documents

Publication Publication Date Title
CN112095803B (en) Prefabricated house and construction method thereof
CN217079867U (en) Frame concatenation type bamboo steel corridor frame
CN101025069B (en) Combined wood-face steel-core anti-theft door frame and mounting method
CN208738759U (en) Cable for coal cutter clamping plate
CN210959675U (en) Planting big-arch shelter convenient to equipment
CN209795605U (en) Novel semitrailer upright post reinforcing structure
CN214246739U (en) Assembled steel structure bearing structure
CN215759090U (en) Slope protection protector for civil engineering
KR102145015B1 (en) Grating and Grating Manufacturing Method
CN210370671U (en) Tenon shield segment and tenon shield segment with tenon joint
CN205662857U (en) Modular highway railway wind -break wall
CN202249121U (en) Motor home tent
CN209011840U (en) A kind of hybrid fiber concrete heavy caliber metro shield section of jurisdiction
CN215669983U (en) Be applied to dirty basket of hanging of cutting of prefabricated assembled rainwater limit well
CN209313777U (en) A kind of waterproof bracket of photovoltaic module
CN219365660U (en) Construction coaming for engineering
CN214541444U (en) Indicating boundary pile for canal legacy protection
CN115012526B (en) Light steel structure beam column node assembled connection structure
CN211596476U (en) Salt baffle
CN210075131U (en) Ground installation photovoltaic support with spiral ground stake
CN212835205U (en) Side guard for sanitation sprinkler
CN217792125U (en) Detachable wooden seat leg structure and seat
CN220667155U (en) Beam connection structure for wood tent
CN221098093U (en) Spliced forest grass video monitoring station
CN211524238U (en) Concatenation formula bicycle shed with prevent wind effect

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant