CN216922038U - Pile foundation water mill bores construction equipment - Google Patents

Pile foundation water mill bores construction equipment Download PDF

Info

Publication number
CN216922038U
CN216922038U CN202220666481.XU CN202220666481U CN216922038U CN 216922038 U CN216922038 U CN 216922038U CN 202220666481 U CN202220666481 U CN 202220666481U CN 216922038 U CN216922038 U CN 216922038U
Authority
CN
China
Prior art keywords
guide rail
rail main
main part
gear
motor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220666481.XU
Other languages
Chinese (zh)
Inventor
王兴全
孙晋烽
李东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Xinzhongneng Construction Engineering Co ltd
Original Assignee
Sichuan Xinzhongneng Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Xinzhongneng Construction Engineering Co ltd filed Critical Sichuan Xinzhongneng Construction Engineering Co ltd
Priority to CN202220666481.XU priority Critical patent/CN216922038U/en
Application granted granted Critical
Publication of CN216922038U publication Critical patent/CN216922038U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Earth Drilling (AREA)

Abstract

The application relates to the technical field of constructional engineering, in particular to a pile foundation water mill drill construction device. This application includes the guide rail main part, the surface of guide rail main part is provided with stop device, stop device includes two fixed blocks, fixed block fixed mounting is on the surface of guide rail main part, two rotate between the fixed block and install the double-screw bolt, the fixed surface of guide rail main part installs first motor, the output fixed mounting of first motor second motor has first gear, the fixed surface of double-screw bolt installs the second gear, first gear and second gear meshing, the outer surface thread of double-screw bolt installs the seat that goes up and down, the surface at the guide rail main part is established to the seat cover that goes up and down, the fixed surface of seat that goes up and down installs the second motor, the output fixed mounting of second motor has the drilling rod. The problem of welded terrazzo bore section of thick bamboo change very inconvenient, influence the construction is solved.

Description

Pile foundation water mill bores construction equipment
Technical Field
The application relates to the technical field of constructional engineering, especially, relate to pile foundation wet grinding bores construction equipment.
Background
Because urban development puts forward very high requirement to the super high-rise basis, lead to partial building pile foundation to require to use the terrazzo to bore the construction, terrazzo bores a section of thick bamboo and installs on the lift seat surface of guide rail through the welding usually, because terrazzo bores a section of thick bamboo and takes place the damage easily after long-time to need to change, but welded terrazzo bores a section of thick bamboo and changes very inconveniently, influences the construction.
SUMMERY OF THE UTILITY MODEL
The purpose of this application is in order to solve and to have welded terrazzo to bore a section of thick bamboo among the prior art and change very inconveniently, influence the shortcoming of construction, and the pile foundation terrazzo that provides bores construction equipment.
In order to achieve the purpose, the following technical scheme is adopted in the application: pile foundation water mill bores construction equipment, including the guide rail main part, the surface of guide rail main part is provided with stop device, stop device includes two fixed blocks, fixed block fixed mounting is on the surface of guide rail main part, two rotate between the fixed block and install the double-screw bolt, the fixed surface of guide rail main part installs first motor, the output fixed mounting of first motor has first gear, the fixed surface of double-screw bolt installs the second gear, first gear and second gear meshing, the outer surface screw thread of double-screw bolt installs the lift seat, the lift seat cover is established on the surface of guide rail main part, the fixed surface of lift seat installs the second motor, the output fixed mounting of second motor has the drilling rod, the free end fixed mounting of drilling rod has the casing, the outer surface screw thread of casing installs a plurality of first screw rods, a plurality of the connector is installed in the free end centre gripping of first screw rod, the free end fixed mounting of connector has a brill section of thick bamboo.
The effect that above-mentioned part reaches is: when the water mill drilling construction is carried out, firstly, a drill bit is aligned to a specified position, then, by starting a first motor, the first motor drives a first gear to rotate, the first gear drives a second gear to rotate, the second gear drives a stud to rotate, the stud drives a threaded sleeve to move, the threaded sleeve drives a lifting seat to move, the lifting seat drives a second motor to move, the second motor drives a drill rod to move, the drill rod drives a connector to move, the connector drives a drill barrel to move, meanwhile, by starting the second motor, the second motor drives the drill rod to rotate, the drill rod drives the connector to rotate, the connector drives the drill barrel to rotate, the pile foundation can be drilled through the rotation and the movement of the drill barrel, after the drill barrel is used for a long time, when the drill barrel is replaced, the connector at one end of the drill barrel can be inserted into the shell, and then, the connector is inserted into the connector by rotating a plurality of first screw threads, thereby can install a section of thick bamboo, very convenient, a plurality of first screw rods increase the stability when boring a section of thick bamboo and using simultaneously.
Preferably, an oil tank is fixedly mounted on the outer surface of the guide rail main body, and the first gear and the second gear are located inside the oil tank.
The effect that above-mentioned part reaches is: can lubricate first gear and second gear through the oil tank, improve the life of first gear and second gear.
Preferably, the surface of the first screw rod is rotatably provided with a push plate, and a telescopic rod is fixedly arranged between the push plate and the shell.
The effect that above-mentioned part reaches is: can increase the pressurization area of first screw rod to the connector through the push pedal, increase the stability of connector, can carry on spacingly to the push pedal through the telescopic link, avoid the push pedal to take place the skew.
Preferably, the cross section of the push plate is arc-shaped, and the surface of the push plate close to the connector is fixedly provided with an anti-slip pad.
The effect that above-mentioned part reaches is: the connectors of different models are convenient to fix through the circular-arc push plate, and the connector and the shell are connected more stably through the non-slip mat.
Preferably, the number of the first screw rods is six, and a first handle is fixedly arranged on the surface, far away from the shell, of the first screw rods.
The effect that above-mentioned part reaches is: make to be connected more closely between connector and the casing through six first screw rods, can carry on spacingly to first screw rod through the first in command.
Preferably, the guide rail main part is close to the one end of boring a section of thick bamboo and rotates and install the mounting panel, the surface of mounting panel is provided with auxiliary device, auxiliary device includes electric putter, electric putter rotates the upper surface of installing at the mounting panel, electric putter's free end rotates installs the slider, the spout has all been seted up to the both sides of guide rail main part, the slider slidable mounting of electric putter free end is in the spout that guide rail main part side was seted up.
The effect that above-mentioned part reaches is: when the angle of guide rail main part need be adjusted to the construction time, at first through starting electric putter, electric putter drives the slider and slides in the spout of guide rail main part side to make the inclination of guide rail main part obtain changing, when being convenient for construct the demand of different angles according to actual conditions, need not just can change the construction inclination who bores a section of thick bamboo through the mode of rewelding, just so through change the error that causes when having reduced the construction well.
Preferably, the surface of the mounting plate is provided with a sliding rod in a sliding mode, the upper surface of the sliding rod is fixedly provided with a circular plate, the free end of the sliding rod is fixedly provided with a bottom plate, and a spring is fixedly arranged between the bottom plate and the mounting plate.
The effect that above-mentioned part reaches is: through the elasticity effect of spring, can cushion the guide rail main part, cause constantly vibrations during surface construction, influence the stability of water grinding drill, can fix a position the mounting panel through the slide bar for the mounting panel installation is more convenient.
Preferably, the surface thread of bottom plate installs the second screw rod, the second screw rod is provided with four, the one end fixed mounting that the second screw rod is close to the mounting panel has the second handle.
The effect that above-mentioned part reaches is: can be connected bottom plate and ground through the second screw rod, increase the stability when the terrazzo is bored and is under construction, can carry on spacingly to the second screw rod through the second handle.
In view of the above, it is desirable to provide,
in this application, when carrying out the terrazzo and bore construction, at first through aim at the assigned position with the drill bit, then through starting first motor, first motor drives first gear revolve, first gear drives second gear revolve, the double-screw bolt is transferred to the second gear and is rotated, the double-screw bolt drives the thread bush and removes, the thread bush drives the lift seat and removes, the lift seat drives the second motor and removes, the second motor drives the drilling rod and removes, the drilling rod drives the connector and removes, the connector drives the drill pipe and removes, simultaneously through starting the second motor, the second motor drives the drilling rod and rotates, the drilling rod drives the connector and rotates, the connector drives the drill pipe and rotates, rotation and removal through the drill pipe, thereby can beat the pile foundation.
After boring a section of thick bamboo and using for a long time, when boring a section of thick bamboo and changing, can insert the inside of establishing the casing through the connector with boring a section of thick bamboo one end this moment, then insert the inside of establishing the connector through rotating a plurality of first screw rod screw threads to can install a section of thick bamboo, it is very convenient to bore, and a plurality of first screw rods increase the stability when boring a section of thick bamboo and using simultaneously.
Drawings
FIG. 1 is a schematic perspective view of the present application;
FIG. 2 is an enlarged view of a portion of FIG. 1 of the present application;
FIG. 3 is an enlarged view of the spacing device of the present application;
FIG. 4 is an enlarged view taken at A of FIG. 1 of the present application;
fig. 5 is an enlarged view of the auxiliary device of the present application.
Illustration of the drawings: 1. a guide rail main body; 2. a lifting seat; 3. a second motor; 4. drilling a rod; 5. a limiting device; 501. a first motor; 502. a fixed block; 503. an oil tank; 504. a first gear; 505. a second gear; 506. a stud; 507. pushing the plate; 508. a telescopic rod; 509. a first screw; 510. a first handle; 511. a housing; 6. a connector; 7. drilling a barrel; 8. an auxiliary device; 81. a chute; 82. a slider; 83. an electric push rod; 84. a circular plate; 85. a slide bar; 86. a spring; 87. a base plate; 88. a second screw; 89. a second handle; 9. and (7) mounting the plate.
Detailed Description
Referring to fig. 1, the present application provides a technical solution: pile foundation water mill bores construction equipment, including guide rail main part 1, guide rail main part 1's surface is provided with stop device 5, can install boring a section of thick bamboo 7 through stop device 5, and guide rail main part 1 rotates near the one end of boring a section of thick bamboo 7 and installs mounting panel 9, and the surface of mounting panel 9 is provided with auxiliary device 8, and when being convenient for construct the demand of different angles according to actual conditions, the construction inclination who bores a section of thick bamboo 7 changes.
Referring to fig. 1, 2 and 3, in the present embodiment: the limiting device 5 comprises two fixing blocks 502, the fixing blocks 502 are fixedly arranged on the surface of the guide rail main body 1, a stud 506 is rotatably arranged between the two fixing blocks 502, a first motor 501 is fixedly arranged on the surface of the guide rail main body 1, a first gear 504 is fixedly arranged at the output end of the first motor 501, a second gear 505 is fixedly arranged on the outer surface of the stud 506, the first gear 504 is meshed with the second gear 505, a lifting seat 2 is arranged on the outer surface of the stud 506 in a threaded manner, the lifting seat 2 is sleeved on the surface of the guide rail main body 1, the first motor 501 drives the first gear 504 to rotate by starting the first motor 501, the first gear 504 drives the second gear 505 to rotate, the second gear 505 transfers the stud 506 to rotate, the stud 506 drives the lifting seat 2 to move, the lifting seat 2 drives the second motor 3 to move, the second motor 3 drives the drill rod 4 to move, and the drill rod 4 drives the connector 6 to move, the connecting head 6 drives the drill barrel 7 to move.
Referring to fig. 1, 2 and 3, a second motor 3 is fixedly installed on the surface of a lifting seat 2, a drill rod 4 is fixedly installed at the output end of the second motor 3, the second motor 3 drives the drill rod 4 to rotate by starting the second motor 3, the drill rod 4 drives a connector 6 to rotate, the connector 6 drives a drill barrel 7 to rotate, and the drill barrel 7 rotates and moves so as to be capable of driving a pile foundation, a shell 511 is fixedly installed at the free end of the drill rod 4, a plurality of first screws 509 are installed on the outer surface threads of the shell 511, the connector 6 is installed at the free end of the first screws 509 in a clamping manner, the drill barrel 7 is fixedly installed at the free end of the connector 6, when the drill barrel 7 is replaced, the connector 6 at one end of the drill barrel 7 can be inserted into the shell 511, and then inserted into the interior of the drill barrel 6 by rotating the threads of the first screws 509, so that the drill barrel 7 can be installed, it is very convenient, and a plurality of first screws 509 increase the stability of the drill barrel 7 during use.
Referring to fig. 1, 2 and 3, an oil tank 503 is fixedly installed on the outer surface of the guide rail main body 1, the first gear 504 and the second gear 505 are located inside the oil tank 503, the first gear 504 and the second gear 505 can be lubricated through the oil tank 503, the service lives of the first gear 504 and the second gear 505 are prolonged, a push plate 507 is rotatably installed on the surface of the first screw 509, the pressurizing area of the first screw 509 on the connector 6 can be increased through the push plate 507, the stability of the connector 6 is increased, an expansion link 508 is fixedly installed between the push plate 507 and the housing 511, the push plate 507 can be limited through the expansion link 508, and the push plate 507 is prevented from deviating. The cross-section of push pedal 507 is circular-arc, be convenient for fix the connector 6 of different models through circular-arc push pedal 507, push pedal 507 is close to the fixed surface of connector 6 and has the slipmat, it is more stable to make to be connected between connector 6 and the casing 511 through the slipmat, first screw rod 509 is provided with six, it is inseparabler to make to be connected between connector 6 and the casing 511 through six first screw rod 509, the fixed surface that casing 511 was kept away from to first screw rod 509 has the first in command 510, can carry on spacingly to first screw rod 509 through the first in command 510.
Referring to fig. 1, 4 and 5, in the present embodiment: auxiliary device 8 includes electric putter 83, electric putter 83 rotates the upper surface of installing at mounting panel 9, electric putter 83's free end rotates installs slider 82, spout 81 has all been seted up to the both sides of guide rail main part 1, slider 82 slidable mounting of electric putter 83 free end is in the spout 81 of seting up to guide rail main part 1 side, when the angle to guide rail main part 1 need be adjusted when being under construction, at first through starting electric putter 83, electric putter 83 drives slider 82 and slides in the spout 81 of guide rail main part 1 side, thereby make the inclination of guide rail main part 1 obtain changing, when being convenient for construct the demand of different angles according to actual conditions, need not just can change the construction inclination of a brill section of thick bamboo 7 through the mode of rewelding, just so reduce the error that causes when constructing well through little change.
The surperficial slip of mounting panel 9 is run through there is slide bar 85, can fix a position mounting panel 9 through slide bar 85, it is more convenient to make mounting panel 9 install, slide bar 85's last fixed surface installs plectane 84, slide bar 85's free end fixed mounting has bottom plate 87, fixed mounting has spring 86 between bottom plate 87 and the mounting panel 9, elastic action through spring 86, can cushion guide rail main part 1, cause vibrations constantly during surface construction, influence the stability of abrasive water brill, second screw rod 88 is installed to bottom plate 87's surface thread, second screw rod 88 is provided with four, can be connected bottom plate 87 and ground through second screw rod 88, increase the stability during abrasive water brill construction, second screw rod 88 is close to the one end fixed mounting of mounting panel 9 has second handle 89, can carry on spacingly to second screw rod 88 through second handle 89.
In the working principle, during the water mill drilling construction, firstly, a drill bit is aligned to a designated position, then, by starting the first motor 501, the first motor 501 drives the first gear 504 to rotate, the first gear 504 drives the second gear 505 to rotate, the second gear 505 transfers the stud 506 to rotate, the stud 506 drives the threaded sleeve to move, the threaded sleeve drives the lifting seat 2 to move, the lifting seat 2 drives the second motor 3 to move, the second motor 3 drives the drill rod 4 to move, the drill rod 4 drives the connector 6 to move, the connector 6 drives the drill barrel 7 to move, meanwhile, by starting the second motor 3, the second motor 3 drives the drill rod 4 to rotate, the drill rod 4 drives the connector 6 to rotate, the connector 6 drives the drill barrel 7 to rotate, and by the rotation and movement of the drill barrel 7, the pile foundation can be drilled, when the drill barrel 7 is replaced after the drill barrel 7 is used for a long time, at the connector 6 at one end of the drill barrel 7 can be inserted into the shell 511, then insert through rotating a plurality of first screw rod 509 screw threads and establish the inside at connector 6 to can install drill barrel 7, it is very convenient, a plurality of first screw rod 509 increase the stability when drill barrel 7 uses simultaneously.
When the angle of guide rail main part 1 need be adjusted to the construction time, at first through starting electric putter 83, electric putter 83 drives slider 82 and slides in the spout 81 of guide rail main part 1 side to make the inclination of guide rail main part 1 obtain changing, when being convenient for construct the demand of different angles according to actual conditions, need not just can change the construction inclination of a drill section of thick bamboo 7 through the mode of welding again, just so through the error that causes when little change has reduced the construction well.

Claims (8)

1. Pile foundation wet grinding bores construction equipment, including guide rail main part (1), its characterized in that: the outer surface of guide rail main part (1) is provided with stop device (5), stop device (5) includes two fixed blocks (502), fixed block (502) fixed mounting is on the surface of guide rail main part (1), two double-screw bolt (506) is installed in rotating between fixed block (502), the fixed surface of guide rail main part (1) installs first motor (501), the output fixed mounting of first motor (501) has first gear (504), the fixed surface of double-screw bolt (506) installs second gear (505), first gear (504) and second gear (505) meshing, lift seat (2) are installed to the surface screw thread of double-screw bolt (506), lift seat (2) cover is established on the surface of guide rail main part (1), the fixed surface of lift seat (2) installs second motor (3), the output fixed mounting of second motor (3) has drilling rod (4), the free end fixed mounting of drilling rod (4) has casing (511), a plurality of first screw rods (509), a plurality of are installed to the surface screw thread of casing (511) the free end centre gripping of first screw rod (509) has connector (6), the free end fixed mounting of connector (6) bores a section of thick bamboo (7).
2. The pile foundation water mill drill construction device of claim 1, characterized in that: an oil tank (503) is fixedly mounted on the outer surface of the guide rail main body (1), and the first gear (504) and the second gear (505) are located inside the oil tank (503).
3. The pile foundation water mill drill construction device of claim 1, characterized in that: the surface of first screw rod (509) rotates and installs push pedal (507), fixed mounting has telescopic link (508) between push pedal (507) and casing (511).
4. The pile foundation water mill drill construction device of claim 3, characterized in that: the cross-section of push pedal (507) is circular-arc, push pedal (507) is close to the fixed surface of connector (6) and is installed the slipmat.
5. The pile foundation water mill drill construction device of claim 3, characterized in that: six first screws (509) are arranged, and a first handle (510) is fixedly mounted on the surface, far away from the shell (511), of each first screw (509).
6. The pile foundation water mill drill construction device of claim 1, characterized in that: guide rail main part (1) is close to the one end rotation of boring a section of thick bamboo (7) and installs mounting panel (9), the surface of mounting panel (9) is provided with auxiliary device (8), auxiliary device (8) include electric putter (83), electric putter (83) rotate and install the upper surface at mounting panel (9), slider (82) are installed in the free end rotation of electric putter (83), spout (81) have all been seted up to the both sides of guide rail main part (1), slider (82) slidable mounting of electric putter (83) free end is in spout (81) that guide rail main part (1) side was seted up.
7. The pile foundation water mill drill construction device of claim 6, characterized in that: the surface of mounting panel (9) slides and runs through slide bar (85), the last fixed surface of slide bar (85) installs plectane (84), the free end fixed mounting of slide bar (85) has bottom plate (87), fixed mounting has spring (86) between bottom plate (87) and mounting panel (9).
8. The pile foundation water mill drill construction device of claim 7, characterized in that: the surface thread of bottom plate (87) installs second screw rod (88), second screw rod (88) are provided with four, second screw rod (88) are close to the one end fixed mounting of mounting panel (9) has second handle (89).
CN202220666481.XU 2022-03-25 2022-03-25 Pile foundation water mill bores construction equipment Active CN216922038U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220666481.XU CN216922038U (en) 2022-03-25 2022-03-25 Pile foundation water mill bores construction equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220666481.XU CN216922038U (en) 2022-03-25 2022-03-25 Pile foundation water mill bores construction equipment

Publications (1)

Publication Number Publication Date
CN216922038U true CN216922038U (en) 2022-07-08

Family

ID=82229274

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220666481.XU Active CN216922038U (en) 2022-03-25 2022-03-25 Pile foundation water mill bores construction equipment

Country Status (1)

Country Link
CN (1) CN216922038U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115653500A (en) * 2022-12-29 2023-01-31 陕西晖煌建筑劳务有限公司 Traffic engineering construction drilling equipment

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115653500A (en) * 2022-12-29 2023-01-31 陕西晖煌建筑劳务有限公司 Traffic engineering construction drilling equipment

Similar Documents

Publication Publication Date Title
CN216922038U (en) Pile foundation water mill bores construction equipment
CN101839112B (en) Adjusting device of frame pillar drilling machine
CN211258490U (en) Miniaturized multi-functional drilling rig
CN201080788Y (en) Drill stand
CN110700282B (en) Side wall supporting device for foundation engineering construction
CN201705213U (en) Adjusting device of column type drilling machine
CN210239579U (en) Pneumatic frame column type drilling machine
CN218759696U (en) Portable drilling device for geotechnical engineering investigation
CN211573380U (en) Drilling equipment for coal mine tunneling operation
CN215979200U (en) Oil-water well oil layer fixed-point deep penetration horizontal drilling device with adjustable size
CN217331692U (en) Multifunctional sampling device for environmental monitoring
CN216446859U (en) Frame column type pneumatic drilling machine with strong impact capacity
CN110535072A (en) No-dig technique electric power cable lays pipe lining device and electric power cable laying method
CN214186443U (en) Grinding apparatus for inner hole machining
CN212420828U (en) Petroleum drill pipe rust cleaning device
CN212690075U (en) Supporting device for coal mining
CN221389025U (en) Pipeline perforating device for water conservancy construction
CN220645858U (en) Geological drilling drill rod
CN219864891U (en) Rotary drilling machine drill bit convenient to replace
CN219316905U (en) Drilling inclination preventing device
CN220113716U (en) Fixing device of drilling machine
CN220487486U (en) Core drilling device
CN220118068U (en) Synchronous telescopic mechanism of multi-unit deep well drilling machine
CN217602690U (en) Colliery stock drilling depth stop device
CN221220459U (en) Drilling device for geological exploration

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant