CN216866040U - Electrolytic steel plate mounting buckle - Google Patents

Electrolytic steel plate mounting buckle Download PDF

Info

Publication number
CN216866040U
CN216866040U CN202122876513.7U CN202122876513U CN216866040U CN 216866040 U CN216866040 U CN 216866040U CN 202122876513 U CN202122876513 U CN 202122876513U CN 216866040 U CN216866040 U CN 216866040U
Authority
CN
China
Prior art keywords
piece
steel plate
electrolytic steel
rotating rod
clamping
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122876513.7U
Other languages
Chinese (zh)
Inventor
郭辉
曹新社
韦锋
李卓
王科攀
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xi'an Junhui Hospital Construction Co ltd
Original Assignee
Xi'an Junhui Hospital Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xi'an Junhui Hospital Construction Co ltd filed Critical Xi'an Junhui Hospital Construction Co ltd
Priority to CN202122876513.7U priority Critical patent/CN216866040U/en
Application granted granted Critical
Publication of CN216866040U publication Critical patent/CN216866040U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Connection Of Plates (AREA)

Abstract

The utility model relates to an electrolytic steel plate installation buckle, relate to construction technical field, it is including two at least mount pads and two at least installation component that are used for installing electrolytic steel plate, two at least installation component set up along electrolytic steel plate's length direction interval, an installation component includes that the symmetry sets up two installed parts on the mount pad, the installed part includes joint spare, connection piece and spacing piece, joint spare one end is connected with the connection piece, the connection piece is kept away from joint spare one end and is connected with spacing piece, spacing piece all is located same one side of connection piece with joint spare, the joint spare is close to the one side and the laminating of electrolytic steel plate of connection piece, spacing piece is close to the one side and the mount pad laminating of connection piece. The method has the effect of improving the welding quality and the construction efficiency of the electrolytic steel plate.

Description

Electrolytic steel plate mounting buckle
Technical Field
The application relates to the technical field of building construction, in particular to an electrolytic steel plate mounting buckle.
Background
At present, the installation electrolytic steel plate is often connected with an installation object through a welding mode, and the electrolytic steel plate can be fixed after welding.
In the related art, when the electrolytic steel plate is installed, the installation position of the electrolytic steel plate must be manually adjusted in advance before welding, the electrolytic steel plate is aligned with the installation part and then welded, and after welding, if the electrolytic steel plate is inclined, the adjustment cannot be performed, and a plurality of operators are required to install the electrolytic steel plate together.
In view of the above-mentioned related art, the inventors believe that the electrolytic steel sheet is prone to tilt during installation, the welding quality and construction efficiency of the electrolytic steel sheet are low, and potential safety hazards are likely to occur.
SUMMERY OF THE UTILITY MODEL
In order to improve electrolytic steel plate's welding quality and efficiency of construction, this application provides an electrolytic steel plate installation buckle.
The application provides an electrolytic steel plate installation buckle adopts following technical scheme:
the utility model provides an electrolytic steel plate installation buckle, including two at least mount pads and two at least installation component that are used for installing electrolytic steel plate, two at least installation component set up along electrolytic steel plate's length direction interval, an installation component includes two installed parts of symmetry setting on the mount pad, the installed part includes joint spare, connection piece and spacing piece, joint spare one end is connected with the connection piece, the connection piece is kept away from joint spare one end and is connected with spacing piece, spacing piece all is located same one side of connection piece with joint spare, the joint spare is close to the one side and the laminating of electrolytic steel plate of connection piece, spacing piece is close to the one side and the mount pad laminating of connection piece.
Optionally, the clamping piece comprises a first clamping piece and a second clamping piece, one end of the second clamping piece is connected with the connecting piece, the other end of the second clamping piece is connected with the first clamping piece, an included angle is formed between the first clamping piece and the second clamping piece, and the included angle is an obtuse angle.
Optionally, an included angle is formed between the second clamping sheet and the connecting sheet, and the included angle is a right angle.
Optionally, an included angle is formed between the connecting sheet and the limiting sheet, and the included angle is a right angle.
Optionally, one end of the connecting piece, which is close to the first clamping piece, is connected with a magnetic sheet.
Optionally, two all be provided with the fastener between the installed part, the fastener includes spliced pole, installation piece and supports the piece, and the installation piece is located between two installed parts, and spliced pole one end is connected with the roof, and the other end is connected with the installation piece, supports the piece and connects in installation piece below, supports tight one end and an installed part butt, the other end and another installed part butt.
Optionally, the abutting part comprises a first rotating rod and a second rotating rod, the first rotating rod and the second rotating rod are both rotatably connected with the installation piece, the first rotating rod is in threaded connection with the second rotating rod, the axes of the first rotating rod and the second rotating rod are both parallel to the surface of the roof, one end of the first rotating rod, far away from the second rotating rod, is abutted to one connecting piece, and one end of the second rotating rod, far away from the first rotating rod, is abutted to another connecting piece.
Optionally, one end, far away from the second clamping piece, of the first clamping piece is provided with a reverse inclined plane.
In summary, the present application includes at least one of the following beneficial technical effects:
1. by arranging the plurality of mounting pieces, before welding the electrolytic steel plate, the electrolytic steel plate is pre-fixed by using the plurality of mounting pieces, the clamping piece is clamped with the electrolytic steel plate, one surface, close to the connecting piece, of the clamping piece is attached to the electrolytic steel plate, the limiting piece is clamped with the mounting seat, one surface, close to the connecting piece, of the limiting piece is attached to the mounting seat, the limiting piece is connected with the clamping piece through the connecting piece, the clamping piece, the connecting piece and the limiting piece are enclosed to form a clamping area capable of clamping the electrolytic steel plate and the mounting seat, and after pre-positioning is carried out on the electrolytic steel plate, the electrolytic steel plate is welded, so that the welding quality and the construction efficiency of the electrolytic steel plate are improved;
2. through setting up the fastener, the fastener is located between two installed parts that the symmetry set up, fills the clearance between two installed parts, and the fastener supports the both ends of tight piece and carries out the butt to two connection pieces that the symmetry set up respectively including supporting the piece, improves the stability of electrolytic steel board and mount pad.
Drawings
FIG. 1 is a schematic structural diagram of an electrolytic steel plate mounting buckle according to an embodiment of the present application.
FIG. 2 is a partial schematic view of an electrolytic steel plate mounting buckle according to an embodiment of the present disclosure.
FIG. 3 is a schematic structural diagram of an electrolytic steel plate mounting buckle at another view angle according to an embodiment of the present application.
Description of reference numerals: 1. a mounting seat; 2. mounting the component; 21. a mounting member; 211. a clamping piece; 2111. a first clip piece; 2112. a second clip piece; 212. connecting sheets; 213. a limiting sheet; 214. a clamping area; 215. a magnetic sheet; 22. a fastener; 221. connecting columns; 222. mounting a sheet; 223. an abutting piece; 2231. a first rotating lever; 2232. a second rotating rod.
Detailed Description
The present application is described in further detail below with reference to figures 1-3.
The embodiment of the application discloses an electrolytic steel plate mounting buckle.
Referring to fig. 1 and 2, an electrolytic steel plate mounting buckle comprises two mounting bases 1 and at least two mounting components 2, the mounting bases 1 are fixedly connected with a roof through bolts, in this embodiment, three mounting components 2 are provided, the three mounting components 2 are arranged at equal intervals along the length direction of an electrolytic steel plate, one mounting component 2 comprises two symmetrically arranged mounting components 21, each mounting component 21 comprises a clamping piece 211, a connecting piece 212 and a limiting piece 213, one end of the clamping piece 211 is welded with the connecting piece 212, the end of the connecting piece 212 far away from the clamping piece 211 is welded with the limiting piece 213, the limiting piece 213 and the clamping piece 211 are both positioned at the same side of the connecting piece 212, an included angle is formed between the connecting piece 212 and the limiting piece 213, the included angle is a right angle, and the clamping piece 211, the connecting piece 212 and the limiting piece 213 are enclosed to form a clamping area 214 capable of clamping the electrolytic steel plate and the mounting seat 1.
Referring to fig. 2, the clamping member 211 includes a first clamping piece 2111 and a second clamping piece 2112, one end of the second clamping piece 2112 is welded to the connection piece 212, the other end of the second clamping piece 2111 is welded to the first clamping piece 2112, an included angle is formed between the second clamping piece 2112 and the connection piece 212, the included angle is a right angle, the included angle is formed between the first clamping piece 2111 and the second clamping piece 2112, the included angle is 135 ° in this embodiment, an inverted slope is provided at one end of the first clamping piece 2111, which is far away from the second clamping piece 2112, when a gap into which the first clamping piece 2111 extends is small, the first clamping piece 2111 can conveniently extend into the electrolytic steel plate, so that the second clamping piece 2112 can be attached to the electrolytic steel plate, thereby fixing the electrolytic steel plate, and a magnetic sheet 215 is bonded at one end of the connection piece 212, which is close to the first clamping piece 2111. When fixing electrolytic steel plate on mount pad 1, first joint piece 2111 is close to the one end butt of first joint piece 2111 with electrolytic steel plate, thereby carry on spacingly to electrolytic steel plate, the one side that second joint piece 2112 is close to connection piece 212 is close to the one side laminating of second joint piece 2112 with electrolytic steel plate, spacing piece 213 is close to the one side of connection piece 212 and the one end laminating that mount pad 1 is close to spacing piece 213, magnetic sheet 215 and mount pad 1 and the laminating of electrolytic steel plate, improve the stability of installed part 21 and mount pad 1 and electrolytic steel plate, make installed part 21 fix on mount pad 1 and electrolytic steel plate, fix mount pad 1 and electrolytic steel plate simultaneously, be convenient for weld electrolytic steel plate on mount pad 1, improve electrolytic steel plate's welding quality and efficiency of construction.
Meanwhile, referring to fig. 1 and 2, the fastening pieces 22 are arranged between the two symmetrically-arranged installation pieces 21, each fastening piece 22 comprises a connecting column 221, an installation piece 222 and a fastening piece 223, each installation piece 222 is rectangular, each installation piece 222 is located between the two installation pieces 21, one end of each connecting column 221 is fixedly connected with the roof through an expansion bolt, the other end of each connecting column 221 penetrates through the installation piece 222 and is in threaded connection with the installation piece 222, and the upper surface and the lower surface of each installation piece 222 are fixedly connected through nuts.
Referring to fig. 2 and 3, the fastening member 223 includes a first rotating rod 2231 and a second rotating rod 2232, the first rotating rod 2231 and the second rotating rod 2232 are both located below the mounting piece 222 and are rotatably connected to the mounting seat 1 through the fixing seat, meanwhile, the diameter of the first rotating rod 2231 is larger than that of the second rotating rod 2232, an external thread is disposed at one end of the second rotating rod 2232 close to the first rotating rod 2231, and the second rotating rod 2232 is in threaded connection with the first rotating rod 2231. When supporting tightly two installed parts 21, rotate second dwang 2232 or first dwang 2231, make first dwang 2231 and second dwang 2232 can remove along the length direction of installation piece 222, one end and a connection piece 212 butt of keeping away from second dwang 2232 until first dwang 2231, the one end and another connection piece 212 butt of keeping away from first dwang 2231 are kept away from to second dwang 2232, accomplish supporting tightly two installed parts 21, improve the stability of installed part 21 on mount pad 1 and electrolytic steel plate, thereby improve the welding quality and the efficiency of construction of electrolytic steel plate.
The implementation principle of the electrolytic steel plate mounting buckle in the embodiment of the application is as follows: before welding the electrolytic steel plate, the electrolytic steel plate is placed below the mounting seat 1, the mounting piece 21 is used for fixing the electrolytic steel plate on the mounting seat 1, when the electrolytic steel plate is fixed, the mounting piece 21 is buckled at the inner sides of the electrolytic steel plate and the mounting seat 1, so that the electrolytic steel plate and the mounting seat 1 are positioned in the clamping area 214, the mounting piece 21 is adjusted, one surface, close to the connecting piece 212, of the second clamping piece 2112 is attached to one surface, close to the second clamping piece 2112, of the electrolytic steel plate, and one surface, close to the connecting piece 212, of the limiting piece 213 is attached to one end, close to the limiting piece 213, of the mounting seat 1; rotate second dwang 2232 or first dwang 2231 for first dwang 2231 and second dwang 2232 can remove along the length direction of installation piece 222, one end and a connection piece 212 butt of keeping away from second dwang 2232 until first dwang 2231, the one end and another connection piece 212 butt of keeping away from first dwang 2231 are kept away from to second dwang 2232, accomplish the support tight to two installed part 21, improve the stability of installed part 21 on mount pad 1 and electrolytic steel plate, after carrying out the pre-fixing with electrolytic steel plate and mount pad 1, weld electrolytic steel plate and mount pad 1 again, thereby improve electrolytic steel plate's welding quality and efficiency of construction.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (8)

1. The utility model provides an electrolysis steel sheet installation buckle which characterized in that: including two at least mount pads (1) and two at least installation component (2) that are used for installing electrolytic steel plate, the length direction interval setting of electrolytic steel plate is followed in two at least installation component (2), an installation component (2) sets up two installed parts (21) on mount pad (1) including the symmetry, installed part (21) are including joint spare (211), connection piece (212) and spacing piece (213), joint spare (211) one end is connected with connection piece (212), connection piece (212) are kept away from joint spare (211) one end and are connected with spacing piece (213), spacing piece (213) all are located same one side of connection piece (212) with joint spare (211), joint spare (211) are close to the one side and the electrolytic steel plate laminating of connection piece (212), spacing piece (213) are close to the one side and the mount pad (1) laminating of connection piece (212).
2. The electrolytic steel plate mounting clip according to claim 1, wherein: the clamping piece (211) comprises a first clamping piece (2111) and a second clamping piece (2112), one end of the second clamping piece (2112) is connected with the connecting piece (212), the other end of the second clamping piece is connected with the first clamping piece (2111), an included angle is formed between the first clamping piece (2111) and the second clamping piece (2112), and the included angle is an obtuse angle.
3. The electrolytic steel plate mounting clip according to claim 2, wherein: an included angle is formed between the second clamping sheet (2112) and the connecting sheet (212), and the included angle is a right angle.
4. The electrolytic steel plate mounting buckle according to claim 1, wherein: an included angle is formed between the connecting piece (212) and the limiting piece (213) and is a right angle.
5. The electrolytic steel plate mounting clip according to claim 2, wherein: one end of the connecting piece (212) close to the first clamping piece (2111) is connected with a magnetic sheet (215).
6. The electrolytic steel plate mounting clip according to claim 1, wherein: two all be provided with fastener (22) between installed part (21), fastener (22) are including spliced pole (221), installation piece (222) and support tight piece (223), and installation piece (222) are located between two installed part (21), and spliced pole (221) one end is connected with the roof, and the other end is connected with installation piece (222), supports that tight piece (223) are connected in installation piece (222) below, supports tight piece (223) one end and an installed part (21) butt, the other end and another installed part (21) butt.
7. The electrolytic steel plate mounting clip of claim 6, wherein: the abutting piece (223) comprises a first rotating rod (2231) and a second rotating rod (2232), the first rotating rod (2231) and the second rotating rod (2232) are both rotationally connected with the installation piece (222), the first rotating rod (2231) is in threaded connection with the second rotating rod (2232), the axes of the first rotating rod (2231) and the second rotating rod (2232) are parallel to the surface of the roof, one end of the first rotating rod (2231) far away from the second rotating rod (2232) is abutted to one connecting piece (212), and one end of the second rotating rod (2232) far away from the first rotating rod (2231) is abutted to another connecting piece (212).
8. The electrolytic steel plate mounting clip according to claim 2, wherein: an inverted inclined surface is arranged at one end, away from the second clamping sheet (2112), of the first clamping sheet (2111).
CN202122876513.7U 2021-11-22 2021-11-22 Electrolytic steel plate mounting buckle Active CN216866040U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122876513.7U CN216866040U (en) 2021-11-22 2021-11-22 Electrolytic steel plate mounting buckle

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122876513.7U CN216866040U (en) 2021-11-22 2021-11-22 Electrolytic steel plate mounting buckle

Publications (1)

Publication Number Publication Date
CN216866040U true CN216866040U (en) 2022-07-01

Family

ID=82128353

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122876513.7U Active CN216866040U (en) 2021-11-22 2021-11-22 Electrolytic steel plate mounting buckle

Country Status (1)

Country Link
CN (1) CN216866040U (en)

Similar Documents

Publication Publication Date Title
JP3382206B2 (en) Mounting structure of solar cell module
JP5457285B2 (en) Solar panel mounting base
CN111576982A (en) Device and method for reinforcing angle steel of power transmission tower
CN113585479A (en) Beam column structure for super-large span steel structure building and construction method thereof
CN216866040U (en) Electrolytic steel plate mounting buckle
CN103248272B (en) Component bracket structure
CN212239882U (en) Clamping device for building welding
CN213421059U (en) Steel structure fastening support suitable for boiler
CN212428044U (en) Attachment device for integral lifting scaffold on steel beam
CN210677510U (en) Clamp for welding T-shaped joint by flux sheet constrained arc welding
CN211229736U (en) Reinforcing device for angle steel of main column of angle steel tower
CN217167165U (en) Temporary supporting device for steel box girder partition plate
CN203250759U (en) Assembly support structure
CN212388963U (en) Vertical rod positioning structure
CN216807810U (en) Assembled can have enough to meet need many sizes composite beam support steel corbel
CN211143464U (en) A purlin handing-over structure that is used for support of assembled purlin and contains this support
CN212866373U (en) Large-size connecting plate mounting assembly for beam column node
CN212178070U (en) Cable tower pump pipe counterfort fixing device
CN212169455U (en) Auxiliary tool for welding steel structure in air
CN218509004U (en) I-steel anchor clamps and I-steel connection structure
CN211201110U (en) Overhanging type scaffold
CN220539329U (en) Wall connecting assembly for fixing ladder cage
CN212641219U (en) Adjustable simple top support device for temporarily fixing steel box girder
CN218016758U (en) Clamping platform for welding side wings and end part bridging pieces of square pipes
CN209969893U (en) Flatness control device for machining steel roof beam flange plate

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant