CN216819253U - Be used for disposable pre-buried crane span structure transition festival piece - Google Patents
Be used for disposable pre-buried crane span structure transition festival piece Download PDFInfo
- Publication number
- CN216819253U CN216819253U CN202122460257.3U CN202122460257U CN216819253U CN 216819253 U CN216819253 U CN 216819253U CN 202122460257 U CN202122460257 U CN 202122460257U CN 216819253 U CN216819253 U CN 216819253U
- Authority
- CN
- China
- Prior art keywords
- connecting plate
- shaped
- bridge
- shaped holes
- waist
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model discloses a bridge transition joint piece for one-time pre-embedding, which comprises two connecting plates, wherein each connecting plate is provided with a long strip-shaped waist-shaped hole and a row of small waist-shaped holes, the two connecting plates are respectively fixed on the opposite inner walls of an upper-layer bridge through first fastening bolts penetrating the corresponding long strip-shaped waist-shaped holes, the long strip-shaped waist-shaped holes of each connecting plate can adjustably and vertically move along the corresponding first fastening bolts, so that the first fastening bolts are positioned at the tops of the corresponding long strip-shaped waist-shaped holes, the bottoms of the connecting plates slide downwards to be pulled out of the bottom of the upper-layer bridge, and the small waist-shaped holes of the pull-out parts of the connecting plates are fixed on the adjacent lower-layer bridge through second fastening bolts penetrating the connecting plates. The transition joint piece is simple in form and can effectively play a role in connecting the bridge.
Description
Technical Field
The utility model relates to the field of building electromechanical installation engineering, which is mainly used for connecting a direct-buried bridge frame with a bridge frame.
Background
At present, bridge holes are reserved in the conventional method of an electric well in the electric pre-buried stage, the method of replacing the original reserved holes with a direct-buried bridge is proposed at present, but the method has the problem that the connection is not easy after concrete pouring is completed.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide an accessory which is convenient to install, can be used for embedding various bridges and is beneficial to connection between the embedded bridges.
The utility model solves the technical problems through the following technical scheme:
the utility model provides a bridge transition joint piece for one-time pre-embedding, which is characterized by comprising two connecting plates, wherein each connecting plate is provided with a long strip-shaped waist-shaped hole and a row of small waist-shaped holes, the two connecting plates are respectively fixed on the opposite inner walls of an upper-layer bridge through first fastening bolts penetrating the corresponding long strip-shaped waist-shaped holes, the long strip-shaped waist-shaped holes of each connecting plate can adjustably and vertically move along the corresponding first fastening bolts, so that the first fastening bolts are positioned at the tops of the corresponding long strip-shaped waist-shaped holes, the bottoms of the connecting plates slide downwards to be pulled out of the bottom of the upper-layer bridge, and the small waist-shaped holes of the pull-out parts of the connecting plates are fixed on the adjacent lower-layer bridge through second fastening bolts penetrating the connecting plates.
Preferably, the number of the small waist-shaped holes in one row is four, the four small waist-shaped holes are vertically arranged, and the small waist-shaped holes are arranged in parallel with the strip-shaped waist-shaped holes.
Preferably, the thickness of the connecting plate is 1 mm.
Preferably, the upper layer bridge frame and the lower layer bridge frame both have the size of 200mm in length and 100mm in width, and the size of the connecting plate has the size of 180mm in length and 60mm in width.
On the basis of the common knowledge in the field, the above preferred conditions can be combined randomly to obtain the preferred embodiments of the utility model.
The positive progress effects of the utility model are as follows:
the transition joint piece is simple in form and can effectively play a role in connecting the bridge. After the concrete is cast and the template is removed, the transition section slides downwards and is pulled out for connection and fixation before the bridge frame is installed. The bridge pre-embedding construction method is suitable for bridge pre-embedding construction of a floor slab, and the phenomenon that the bridge cannot be connected after the bridge is pre-embedded in a concrete structure can be effectively solved.
Drawings
Fig. 1 is a schematic structural view of a bridge transition piece according to a preferred embodiment of the present invention.
Fig. 2 is a schematic drawing illustrating a structure of pulling out the connection plate according to the preferred embodiment of the present invention.
FIG. 3 is a schematic structural diagram of the connection plate connecting the upper and lower layer bridges according to the preferred embodiment of the present invention.
Detailed Description
In order to make the objects, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are some, but not all, embodiments of the present invention. All other embodiments, which can be obtained by a person skilled in the art without any inventive step based on the embodiments of the present invention, are within the scope of the present invention.
As shown in fig. 1-3, the present embodiment provides a bridge transition piece for one-off pre-embedding, which comprises two connecting plates 1, wherein each connecting plate 1 is provided with a strip-shaped waist-shaped hole 2 and four small waist-shaped holes 3 which are vertically arranged, the small waist-shaped holes 3 are arranged in parallel with the strip waist-shaped holes 2, two connecting plates 1 are respectively fixed on the opposite inner walls of the upper layer bridge frame 5 through first fastening bolts 4 penetrating the corresponding strip waist-shaped holes 2, the strip waist-shaped hole 2 of each connecting plate 1 can adjustably and vertically move along the corresponding first fastening bolt 4, so that the first fastening bolt 4 is positioned at the top of the corresponding elongated kidney-shaped hole 2, the bottom of the connecting plate 1 slides downwards to be pulled out of the bottom of the upper layer bridge frame 5, the small kidney-shaped hole 3 of the pull-out part of the connecting plate 1 is fixed on the adjacent lower layer bridge frame 7 through a second fastening bolt 6.
In the stage of field structure construction, the size of a corresponding bridge transition joint piece is determined according to the size of a bridge, the sizes of the upper-layer bridge 5 and the lower-layer bridge 7 are both 200mm in length and 100mm in width, the size of the connecting plate 1 is 180mm in length and 60mm in width, and the thickness of the connecting plate 1 is 1 mm.
The matched connecting plate is manufactured according to the specification and the material of the bridge, the connecting plate is used for fixing and connecting the internal connection between the bridge and the bridge, the connecting plate is connected with the bridge through bolts for reserving 1mm, the connecting plate can slide after the template is detached conveniently, and the phenomenon that the bridge cannot be connected after the concrete structure is embedded can be effectively solved.
The construction mode of the transition joint piece is similar to that of a reserved sleeve, and the difference is that the transition joint piece needs to be prevented from being extruded to deform in the concrete solidification process, and fillers such as foam and the like can be filled in the transition joint piece, so that the integral stress performance of the transition joint piece is enhanced.
After the template is removed after the structure construction is finished, the connecting plate in the transition piece is drawn out to serve as a transition bridge for connecting the upper layer bridge frame and the lower layer bridge frame.
While specific embodiments of the utility model have been described above, it will be appreciated by those skilled in the art that these are by way of example only, and that the scope of the utility model is defined by the appended claims. Various changes and modifications to these embodiments may be made by those skilled in the art without departing from the spirit and scope of the utility model, and these changes and modifications are within the scope of the utility model.
Claims (4)
1. The utility model provides a be used for disposable pre-buried crane span structure transition section spare, its characterized in that, it includes two connecting plates, each a rectangular shape waist type hole and a list little waist type hole have all been seted up on the connecting plate, two the connecting plate is fixed on the relative inner wall of upper crane span structure through the first fastening bolt who wears to establish corresponding rectangular shape waist type hole respectively, each the rectangular shape waist type hole of connecting plate all vertically moves along the adjustable regulation of corresponding first fastening bolt to make first fastening bolt be located the top of the rectangular shape waist type hole that corresponds, and the bottom gliding of connecting plate pulls out the bottom of upper crane span structure, the little waist type hole of the part of pulling out of connecting plate is fixed on adjacent lower floor crane span structure through the second fastening bolt who wears to establish.
2. The bridge transition piece for disposable pre-burying as claimed in claim 1, wherein the number of the small kidney-shaped holes in one row is four, four small kidney-shaped holes are vertically arranged, and the small kidney-shaped holes are arranged in parallel with the long strip-shaped kidney-shaped holes.
3. The bridge transition piece for disposable pre-burying of claim 1, wherein the thickness of said connecting plate is 1 mm.
4. The bridge transition piece for disposable pre-burying of claim 1, wherein the dimensions of the upper and lower bridges are 200mm in length and 100mm in width, and the dimensions of the connecting plate are 180mm in length and 60mm in width.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202122460257.3U CN216819253U (en) | 2021-10-13 | 2021-10-13 | Be used for disposable pre-buried crane span structure transition festival piece |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202122460257.3U CN216819253U (en) | 2021-10-13 | 2021-10-13 | Be used for disposable pre-buried crane span structure transition festival piece |
Publications (1)
Publication Number | Publication Date |
---|---|
CN216819253U true CN216819253U (en) | 2022-06-24 |
Family
ID=82039355
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202122460257.3U Active CN216819253U (en) | 2021-10-13 | 2021-10-13 | Be used for disposable pre-buried crane span structure transition festival piece |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN216819253U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115149471A (en) * | 2022-07-08 | 2022-10-04 | 上海外高桥造船有限公司 | Assembled cable trough includes its boats and ships |
-
2021
- 2021-10-13 CN CN202122460257.3U patent/CN216819253U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115149471A (en) * | 2022-07-08 | 2022-10-04 | 上海外高桥造船有限公司 | Assembled cable trough includes its boats and ships |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104631512B (en) | Hang modulus method after-pouring band beam-slab construction method | |
CN207582764U (en) | A kind of close spelling laminated floor slab connecting joint structure of end fluting | |
CN104631674B (en) | Composite floor slab and construction method thereof | |
CN216819253U (en) | Be used for disposable pre-buried crane span structure transition festival piece | |
CN207812741U (en) | Pre-manufactured steel structure overlapped shear wall | |
CN109797969B (en) | Construction method of post-cast strip tool type advanced formwork lifting system | |
CN212295248U (en) | Prefabricated building member | |
CN103741944B (en) | Fixation kit, template system containing this fixation kit and body of wall casting method | |
CN207582763U (en) | Two-way close spelling laminated floor slab connecting joint structure with groove type embedded part | |
CN210032569U (en) | Hanging die structure for assembled laminated slab | |
CN105256923B (en) | Light gauge steel partition wall keel fixed connector | |
CN207920083U (en) | Hot-water heating casing during typical floor pours reserves positioning device | |
CN213062942U (en) | Close rib roof beam mould shell fixing device for construction | |
CN106499064A (en) | A kind of precast reinforced concrete structure method of attachment | |
CN216076318U (en) | Reinforcing device for aluminum alloy reverse ridge template | |
CN206267520U (en) | A kind of self-supporting post-cast strip is poured with hanging mould | |
CN107938902A (en) | Two-way close spelling laminated floor slab connecting joint structure and installation method with groove type embedded part | |
CN211817287U (en) | GBF honeycomb core plate construction auxiliary device | |
CN210263910U (en) | Cast-in-place slab of superimposed sheet takes die block board | |
CN212802504U (en) | Deformation joint double-shear wall template system | |
CN113882570A (en) | Prefabricated base plate with removable ribs and production method of laminated slab | |
CN212271596U (en) | Sinking type hanging mould structure of toilet | |
CN211173100U (en) | From area detachable hangs mould finished product and wears floor sleeve pipe | |
CN111021598A (en) | Connecting structure of double-sided superposed shear wall without ribs on four sides and construction method thereof | |
CN215594904U (en) | Be used for anti-bank one-time pouring fashioned template frock of bathroom caisson |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |