CN216819253U - Be used for disposable pre-buried crane span structure transition festival piece - Google Patents

Be used for disposable pre-buried crane span structure transition festival piece Download PDF

Info

Publication number
CN216819253U
CN216819253U CN202122460257.3U CN202122460257U CN216819253U CN 216819253 U CN216819253 U CN 216819253U CN 202122460257 U CN202122460257 U CN 202122460257U CN 216819253 U CN216819253 U CN 216819253U
Authority
CN
China
Prior art keywords
connecting plate
shaped
bridge
shaped holes
waist
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122460257.3U
Other languages
Chinese (zh)
Inventor
余陶正
余志扬
徐超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Construction No 2 Group Co Ltd
Original Assignee
Shanghai Construction No 2 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Construction No 2 Group Co Ltd filed Critical Shanghai Construction No 2 Group Co Ltd
Priority to CN202122460257.3U priority Critical patent/CN216819253U/en
Application granted granted Critical
Publication of CN216819253U publication Critical patent/CN216819253U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a bridge transition joint piece for one-time pre-embedding, which comprises two connecting plates, wherein each connecting plate is provided with a long strip-shaped waist-shaped hole and a row of small waist-shaped holes, the two connecting plates are respectively fixed on the opposite inner walls of an upper-layer bridge through first fastening bolts penetrating the corresponding long strip-shaped waist-shaped holes, the long strip-shaped waist-shaped holes of each connecting plate can adjustably and vertically move along the corresponding first fastening bolts, so that the first fastening bolts are positioned at the tops of the corresponding long strip-shaped waist-shaped holes, the bottoms of the connecting plates slide downwards to be pulled out of the bottom of the upper-layer bridge, and the small waist-shaped holes of the pull-out parts of the connecting plates are fixed on the adjacent lower-layer bridge through second fastening bolts penetrating the connecting plates. The transition joint piece is simple in form and can effectively play a role in connecting the bridge.

Description

Be used for disposable pre-buried crane span structure transition festival piece
Technical Field
The utility model relates to the field of building electromechanical installation engineering, which is mainly used for connecting a direct-buried bridge frame with a bridge frame.
Background
At present, bridge holes are reserved in the conventional method of an electric well in the electric pre-buried stage, the method of replacing the original reserved holes with a direct-buried bridge is proposed at present, but the method has the problem that the connection is not easy after concrete pouring is completed.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide an accessory which is convenient to install, can be used for embedding various bridges and is beneficial to connection between the embedded bridges.
The utility model solves the technical problems through the following technical scheme:
the utility model provides a bridge transition joint piece for one-time pre-embedding, which is characterized by comprising two connecting plates, wherein each connecting plate is provided with a long strip-shaped waist-shaped hole and a row of small waist-shaped holes, the two connecting plates are respectively fixed on the opposite inner walls of an upper-layer bridge through first fastening bolts penetrating the corresponding long strip-shaped waist-shaped holes, the long strip-shaped waist-shaped holes of each connecting plate can adjustably and vertically move along the corresponding first fastening bolts, so that the first fastening bolts are positioned at the tops of the corresponding long strip-shaped waist-shaped holes, the bottoms of the connecting plates slide downwards to be pulled out of the bottom of the upper-layer bridge, and the small waist-shaped holes of the pull-out parts of the connecting plates are fixed on the adjacent lower-layer bridge through second fastening bolts penetrating the connecting plates.
Preferably, the number of the small waist-shaped holes in one row is four, the four small waist-shaped holes are vertically arranged, and the small waist-shaped holes are arranged in parallel with the strip-shaped waist-shaped holes.
Preferably, the thickness of the connecting plate is 1 mm.
Preferably, the upper layer bridge frame and the lower layer bridge frame both have the size of 200mm in length and 100mm in width, and the size of the connecting plate has the size of 180mm in length and 60mm in width.
On the basis of the common knowledge in the field, the above preferred conditions can be combined randomly to obtain the preferred embodiments of the utility model.
The positive progress effects of the utility model are as follows:
the transition joint piece is simple in form and can effectively play a role in connecting the bridge. After the concrete is cast and the template is removed, the transition section slides downwards and is pulled out for connection and fixation before the bridge frame is installed. The bridge pre-embedding construction method is suitable for bridge pre-embedding construction of a floor slab, and the phenomenon that the bridge cannot be connected after the bridge is pre-embedded in a concrete structure can be effectively solved.
Drawings
Fig. 1 is a schematic structural view of a bridge transition piece according to a preferred embodiment of the present invention.
Fig. 2 is a schematic drawing illustrating a structure of pulling out the connection plate according to the preferred embodiment of the present invention.
FIG. 3 is a schematic structural diagram of the connection plate connecting the upper and lower layer bridges according to the preferred embodiment of the present invention.
Detailed Description
In order to make the objects, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are some, but not all, embodiments of the present invention. All other embodiments, which can be obtained by a person skilled in the art without any inventive step based on the embodiments of the present invention, are within the scope of the present invention.
As shown in fig. 1-3, the present embodiment provides a bridge transition piece for one-off pre-embedding, which comprises two connecting plates 1, wherein each connecting plate 1 is provided with a strip-shaped waist-shaped hole 2 and four small waist-shaped holes 3 which are vertically arranged, the small waist-shaped holes 3 are arranged in parallel with the strip waist-shaped holes 2, two connecting plates 1 are respectively fixed on the opposite inner walls of the upper layer bridge frame 5 through first fastening bolts 4 penetrating the corresponding strip waist-shaped holes 2, the strip waist-shaped hole 2 of each connecting plate 1 can adjustably and vertically move along the corresponding first fastening bolt 4, so that the first fastening bolt 4 is positioned at the top of the corresponding elongated kidney-shaped hole 2, the bottom of the connecting plate 1 slides downwards to be pulled out of the bottom of the upper layer bridge frame 5, the small kidney-shaped hole 3 of the pull-out part of the connecting plate 1 is fixed on the adjacent lower layer bridge frame 7 through a second fastening bolt 6.
In the stage of field structure construction, the size of a corresponding bridge transition joint piece is determined according to the size of a bridge, the sizes of the upper-layer bridge 5 and the lower-layer bridge 7 are both 200mm in length and 100mm in width, the size of the connecting plate 1 is 180mm in length and 60mm in width, and the thickness of the connecting plate 1 is 1 mm.
The matched connecting plate is manufactured according to the specification and the material of the bridge, the connecting plate is used for fixing and connecting the internal connection between the bridge and the bridge, the connecting plate is connected with the bridge through bolts for reserving 1mm, the connecting plate can slide after the template is detached conveniently, and the phenomenon that the bridge cannot be connected after the concrete structure is embedded can be effectively solved.
The construction mode of the transition joint piece is similar to that of a reserved sleeve, and the difference is that the transition joint piece needs to be prevented from being extruded to deform in the concrete solidification process, and fillers such as foam and the like can be filled in the transition joint piece, so that the integral stress performance of the transition joint piece is enhanced.
After the template is removed after the structure construction is finished, the connecting plate in the transition piece is drawn out to serve as a transition bridge for connecting the upper layer bridge frame and the lower layer bridge frame.
While specific embodiments of the utility model have been described above, it will be appreciated by those skilled in the art that these are by way of example only, and that the scope of the utility model is defined by the appended claims. Various changes and modifications to these embodiments may be made by those skilled in the art without departing from the spirit and scope of the utility model, and these changes and modifications are within the scope of the utility model.

Claims (4)

1. The utility model provides a be used for disposable pre-buried crane span structure transition section spare, its characterized in that, it includes two connecting plates, each a rectangular shape waist type hole and a list little waist type hole have all been seted up on the connecting plate, two the connecting plate is fixed on the relative inner wall of upper crane span structure through the first fastening bolt who wears to establish corresponding rectangular shape waist type hole respectively, each the rectangular shape waist type hole of connecting plate all vertically moves along the adjustable regulation of corresponding first fastening bolt to make first fastening bolt be located the top of the rectangular shape waist type hole that corresponds, and the bottom gliding of connecting plate pulls out the bottom of upper crane span structure, the little waist type hole of the part of pulling out of connecting plate is fixed on adjacent lower floor crane span structure through the second fastening bolt who wears to establish.
2. The bridge transition piece for disposable pre-burying as claimed in claim 1, wherein the number of the small kidney-shaped holes in one row is four, four small kidney-shaped holes are vertically arranged, and the small kidney-shaped holes are arranged in parallel with the long strip-shaped kidney-shaped holes.
3. The bridge transition piece for disposable pre-burying of claim 1, wherein the thickness of said connecting plate is 1 mm.
4. The bridge transition piece for disposable pre-burying of claim 1, wherein the dimensions of the upper and lower bridges are 200mm in length and 100mm in width, and the dimensions of the connecting plate are 180mm in length and 60mm in width.
CN202122460257.3U 2021-10-13 2021-10-13 Be used for disposable pre-buried crane span structure transition festival piece Active CN216819253U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122460257.3U CN216819253U (en) 2021-10-13 2021-10-13 Be used for disposable pre-buried crane span structure transition festival piece

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122460257.3U CN216819253U (en) 2021-10-13 2021-10-13 Be used for disposable pre-buried crane span structure transition festival piece

Publications (1)

Publication Number Publication Date
CN216819253U true CN216819253U (en) 2022-06-24

Family

ID=82039355

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122460257.3U Active CN216819253U (en) 2021-10-13 2021-10-13 Be used for disposable pre-buried crane span structure transition festival piece

Country Status (1)

Country Link
CN (1) CN216819253U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115149471A (en) * 2022-07-08 2022-10-04 上海外高桥造船有限公司 Assembled cable trough includes its boats and ships

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115149471A (en) * 2022-07-08 2022-10-04 上海外高桥造船有限公司 Assembled cable trough includes its boats and ships

Similar Documents

Publication Publication Date Title
CN104631512B (en) Hang modulus method after-pouring band beam-slab construction method
CN207582764U (en) A kind of close spelling laminated floor slab connecting joint structure of end fluting
CN104631674B (en) Composite floor slab and construction method thereof
CN216819253U (en) Be used for disposable pre-buried crane span structure transition festival piece
CN207812741U (en) Pre-manufactured steel structure overlapped shear wall
CN109797969B (en) Construction method of post-cast strip tool type advanced formwork lifting system
CN212295248U (en) Prefabricated building member
CN103741944B (en) Fixation kit, template system containing this fixation kit and body of wall casting method
CN207582763U (en) Two-way close spelling laminated floor slab connecting joint structure with groove type embedded part
CN210032569U (en) Hanging die structure for assembled laminated slab
CN105256923B (en) Light gauge steel partition wall keel fixed connector
CN207920083U (en) Hot-water heating casing during typical floor pours reserves positioning device
CN213062942U (en) Close rib roof beam mould shell fixing device for construction
CN106499064A (en) A kind of precast reinforced concrete structure method of attachment
CN216076318U (en) Reinforcing device for aluminum alloy reverse ridge template
CN206267520U (en) A kind of self-supporting post-cast strip is poured with hanging mould
CN107938902A (en) Two-way close spelling laminated floor slab connecting joint structure and installation method with groove type embedded part
CN211817287U (en) GBF honeycomb core plate construction auxiliary device
CN210263910U (en) Cast-in-place slab of superimposed sheet takes die block board
CN212802504U (en) Deformation joint double-shear wall template system
CN113882570A (en) Prefabricated base plate with removable ribs and production method of laminated slab
CN212271596U (en) Sinking type hanging mould structure of toilet
CN211173100U (en) From area detachable hangs mould finished product and wears floor sleeve pipe
CN111021598A (en) Connecting structure of double-sided superposed shear wall without ribs on four sides and construction method thereof
CN215594904U (en) Be used for anti-bank one-time pouring fashioned template frock of bathroom caisson

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant