CN216791202U - Surveying and mapping paying-off equipment for building construction - Google Patents

Surveying and mapping paying-off equipment for building construction Download PDF

Info

Publication number
CN216791202U
CN216791202U CN202122908259.4U CN202122908259U CN216791202U CN 216791202 U CN216791202 U CN 216791202U CN 202122908259 U CN202122908259 U CN 202122908259U CN 216791202 U CN216791202 U CN 216791202U
Authority
CN
China
Prior art keywords
fixedly connected
box body
box
surveying
bearing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN202122908259.4U
Other languages
Chinese (zh)
Inventor
周启华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningxia Xinmai Construction Engineering Co ltd
Original Assignee
Ningxia Xinmai Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningxia Xinmai Construction Engineering Co ltd filed Critical Ningxia Xinmai Construction Engineering Co ltd
Priority to CN202122908259.4U priority Critical patent/CN216791202U/en
Application granted granted Critical
Publication of CN216791202U publication Critical patent/CN216791202U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Monitoring And Testing Of Nuclear Reactors (AREA)

Abstract

The utility model discloses surveying and mapping measurement paying-off equipment for building construction, which comprises a box body, wherein the front side of the box body and the back side of the box body are fixedly connected with first bearing seats, the inner side walls of the two first bearing seats are fixedly embedded with first bearings, the front side of the box body is fixedly connected with a first fixing frame, the inner side wall of the first fixing frame is fixedly connected with a wire collecting motor, the front end of a wire collecting roller and the rear end of the wire collecting roller respectively penetrate through the box body and are fixedly connected with inner rings of the two bearings, and the front end of the wire collecting roller is fixedly connected with the output end of the wire collecting shaft motor. This equipment has solved construction and has measured unwrapping wire equipment manual operation with the survey and drawing through increasing two receipts line motors, increases a mouth of decontaminating through business turn over line mouth, has solved construction and has seen debris such as earth on the survey and drawing surveying unwrapping wire equipment use back cotton rope, deposits after the use and appears the high altitude easily and drop and do not have a suitable portable mode scheduling problem.

Description

Surveying and mapping paying-off equipment for building construction
Technical Field
The utility model belongs to the technical field of construction surveying and mapping measuring tools, and particularly relates to surveying and mapping paying-off equipment for building construction.
Background
In recent years, the building construction industry is strongly developed and always is the mainstream of economic development of people, people can not construct buildings (houses) in life, and people still construct the buildings in all cities and rural areas at every moment and every moment, but the professional surveying and mapping pay-off equipment for building construction still has the following problems:
1. people's construction is built the room and is constantly increased, the room is built in the construction throughout in recent years very much, so it can not leave suitable construction survey and drawing measurement unwrapping wire equipment, construction survey unwrapping wire is generally outdoor, the environment such as field and high altitude is gone on, present construction survey and drawing measurement unwrapping wire equipment operation mode for the construction is backward, most manual operation during the unwrapping wire, cause the inefficiency, debris such as earth can appear on the survey and drawing measurement unwrapping wire equipment for the construction use back cotton rope, the winding displacement function when receiving the line is influenced, and can shorten construction survey and drawing measurement unwrapping wire equipment for the construction life.
2. At present surveying and mapping surveying and laying equipment for building construction generally works at high altitude, falls at high altitude when using or depositing after using easily, does not have a suitable carrying mode, carries inconveniently, therefore for solving above problem, we provide surveying and mapping surveying and laying equipment for building construction.
SUMMERY OF THE UTILITY MODEL
The utility model provides a surveying and mapping measurement paying-off device for building construction, which aims to solve the problems that the operation mode is backward to cause low efficiency, sundries such as soil and the like can appear on a cord after use to influence the wire arranging function during wire winding, the service life of the surveying and mapping measurement paying-off device for building construction can be shortened, high altitude falling is easy to occur during storage after use or use, a proper carrying mode is not available, carrying is inconvenient, and the like.
The utility model is realized in such a way, the surveying and mapping measurement pay-off equipment for building construction comprises a box body, wherein the front surface of the box body and the back surface of the box body are fixedly connected with first bearing seats, the inner side walls of the two first bearing seats are fixedly embedded with first bearings, the front surface of the box body is fixedly connected with a first fixing frame, the inner side wall of the first fixing frame is fixedly connected with a take-up shaft motor, a take-up roller is arranged in the box body, the front end of the take-up roller and the rear end of the take-up roller respectively penetrate through the box body and are fixedly connected with the inner rings of the two bearings, the front end of the take-up roller is fixedly connected with the output end of the take-up shaft motor, the outer surface of the take-up roller is fixedly connected with two baffles, the front surface of the box body and the back surface of the box body are fixedly connected with second bearing seats, and the inner side walls of the two second bearing seats are fixedly embedded with second bearings, the front surface of the box body is fixedly connected with a second fixing frame.
The utility model discloses a wire arranging wheel, including box, the inside wall fixedly connected with winding displacement motor of second mount, the inside of box is equipped with the lead screw, the front end of lead screw and the rear end of lead screw run through the box respectively and with the inner circle fixed connection of two second bearings, the front end of lead screw and the output fixed connection of winding displacement motor, the surface cover of lead screw is equipped with the winding displacement wheel, the surface cover of lead screw is equipped with two spacing dishes.
The inside wall fixedly connected with two third bearing frames of box, two the inner wall of third bearing frame all is fixed to inlay has two third bearings, two the fixed common fixedly connected with of inner circle of third bearing rises the tight axle.
The square hole has been seted up to the left surface of box, the inner wall in square hole is inlayed and is had the mouth of decontaminating, box left surface fixedly connected with pilot lamp.
The right flank fixedly connected with fixing base of box, the inner wall of fixing base articulates through the pin has the handle.
The bottom surface fixedly connected with two sets of stabilizer blades of box, every the equal fixedly connected with in bottom of stabilizer blade is from the sucking disc.
Compared with the prior art, the utility model has the beneficial effects that: this equipment is through increasing two receipts spool motors, the manual operation of surveying and mapping measurement unwrapping wire equipment for construction has been solved, cause the inefficiency phenomenon, technology lagging phenomenon, increase a mouth of decontaminating through business turn over mouth, debris such as earth can appear on the survey and mapping measurement unwrapping wire equipment for construction use back cotton rope have been solved, winding displacement function and the corruption cotton rope when receiving the line are taken in the influence, and can shorten the life of survey and mapping measurement unwrapping wire equipment for construction, automatic sucking disc has been installed through four stabilizer blades of survey and mapping measurement unwrapping wire equipment bottom for construction and the right flank has increased the handle and has solved when using or use to deposit easily appear the high altitude and drop and do not have a suitable portable mode scheduling problem after the use.
Drawings
FIG. 1 is a schematic perspective view of the case of the present invention;
FIG. 2 is a front view of the housing of the present invention;
FIG. 3 is a top view of the housing of the present invention;
FIG. 4 is a left side view of the housing of the present invention;
FIG. 5 is a partial cross-sectional view of the case of the present invention;
FIG. 6 is a partial cross-sectional view of the housing of the present invention.
In the figure: 1. a box body; 2. a self-sucking disc; 3. a handle; 4. a pin; 5. a fixed seat; 6. a first fixing frame; 7. a take-up shaft motor; 8. a first bearing housing; 9. a second bearing housing; 10. a lead screw; 11. a support leg; 12. an indicator light; 13. a soft plastic part; 14. a wire take-up roller; 15. a baffle plate; 16. a limiting disc; 17. a wire arranging motor; 18. a wire arrangement wheel; 19. a tensioning shaft; 20. a tension wheel; 21. a third bearing seat; 22. a third bearing; 23. a second fixing frame; 24. a square hole; 25. a dirt cleaning nozzle; 26. a second bearing; 27. a fixed shaft; 28. a first bearing.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more apparent, the present invention is described in further detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the utility model and are not intended to limit the utility model.
In the description of the present invention, it is to be understood that the terms "length", "width", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", and the like indicate orientations or positional relationships based on those shown in the drawings, and are only for convenience of description and simplicity of description, but do not indicate or imply that the referred devices or elements must have a specific orientation, be constructed in a specific orientation, and be operated, and therefore, are not to be construed as limiting the present invention, and in the description of the present invention, "plurality" means two or more unless specifically defined otherwise.
Referring to fig. 1-6, a surveying and mapping measurement pay-off device for building construction comprises a box body 1, wherein the front surface of the box body 1 and the back surface of the box body 1 are fixedly connected with first bearing seats 8, the inner side walls of the two first bearing seats 8 are fixedly embedded with first bearings 28, the front surface of the box body 1 is fixedly connected with a first fixing frame 6, the inner side wall of the first fixing frame 6 is fixedly connected with a take-up shaft motor 7, a take-up roller 14 is arranged inside the box body 1, the front end of the take-up roller 14 and the rear end of the take-up roller 14 respectively penetrate through the box body 1 and are fixedly connected with the inner rings of the two bearings, the front end of the take-up roller 14 is fixedly connected with the output end of the take-up shaft motor 7, the outer surface of the take-up roller 14 is fixedly connected with two baffles 15, the front surface of the box body 1 and the back surface of the box body 1 are fixedly connected with second bearing seats 9, the inner side walls of the two second bearing seats 9 are fixedly embedded with second bearings 26, the front surface of the box body 1 is fixedly connected with a second fixing frame 23.
The utility model discloses in, inside wall fixedly connected with winding displacement motor 17 through second mount 23, the inside of box 1 is equipped with lead screw 10, lead screw 10's front end and lead screw 10's rear end run through box 1 respectively and with two second bearing 26's inner circle fixed connection, lead screw 10's front end and winding displacement motor 17's output end fixed connection, lead screw 10's surface cover is equipped with winding wheel 18, lead screw 10's surface cover is equipped with two spacing dishes 16, the surveying and mapping survey unwrapping wire equipment for the construction is at unwrapping wire or receipts line in-process has been solved, the cotton rope can not the line ball winding scheduling problem, two third bearing frame 21 of box 1's inside wall fixedly connected with, two third bearing frame 21's the equal fixed two third bearing frame 22 that inlay of inner wall, the fixed common fixedly connected with tight axle 19 that rises of inner circle of two third bearing frame 22, the condition of the line that does not have the line ball that rises and produce when having solved unwrapping wire or receiving the line.
Square hole 24 has been seted up to the left surface of box 1, the inner wall of square hole 24 is inlayed and is had the mouth of decontaminating 25, when receiving the line, online dust, earth passes through the mouth of decontaminating 25, the dust, earth is kept apart outside box 1, in order to avoid line winding back dust, influence line's life such as earth corruption, 1 left surface fixedly connected with pilot lamp 12 of box, right flank fixedly connected with fixing base 5 through box 1, the inner wall of fixing base 5 articulates through pin 4 has handle 3 to have solved construction with surveying and mapping measurement unwrapping wire equipment's convenient to carry, two sets of stabilizer blades 11 of bottom surface fixedly connected with of box 1, the equal fixedly connected with in bottom of every stabilizer blade 11 has solved construction from sucking disc 2 and has measured the unwrapping wire equipment with surveying and mapping and has deposited conveniently, box 1 can fall from the high altitude when avoiding depositing, cause box 1 to follow bad and pound the phenomenon of hindering the people.
The working principle of the utility model is as follows: when in use, firstly, the box body 1 of the surveying and mapping measurement pay-off equipment for building construction is placed on a plane to be measured, the self-sucking discs 2 on the four support legs 11 are sucked together to prevent the box body 1 from shaking or falling from a high place, then the take-up shaft motor 7 fixed on the first fixing frame 6 is started, the take-up shaft motor 7 rotates through the first bearing 28 to take up the wire, the take-up roller 14 rotates to take up the wire, the wire arranging motor 17 fixed on the second fixing frame 23 is opened through the first bearing 28 to drive the wire arranging wheel 18 on the lead screw 10, the wire arranging wheel 18 slides back and forth along the lead screw 10 under the positive transmission and reverse rotation of the wire arranging motor 17 to prevent the wire pressing line from causing the unavailable use of the surveying and mapping measurement pay-off equipment for building construction, the wire arranging wheel 18 penetrates through the fixing shaft 27, two end faces of the fixing shaft 27 are fixedly arranged on the front and rear inner walls of the box body 1, the tension wheel 20 slides axially along the tension shaft 19 to rotate circumferentially to tension the wire, the winding of the thread rope is prevented, the thread rope passes through the dirt cleaning nozzle 25 arranged on the soft plastic part 13 (when the thread rope passes through the dirt cleaning nozzle 25, the dirt cleaning nozzle 25 tightly clamps the thread rope to enable dust, and impurities are isolated outside the box body 1) to clean the dust and the impurities, so that the problem that the winding function and the corrosion of the thread rope are influenced when the thread rope is wound is solved, the working efficiency is improved, and the technical process is improved.
The present invention is not limited to the above preferred embodiments, and any modifications, equivalent substitutions and improvements made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (6)

1. The utility model provides a construction is with surveying and mapping measurement unwrapping wire equipment, includes box (1), its characterized in that: the wire winding device is characterized in that the front of the box body (1) and the back of the box body (1) are fixedly connected with first bearing seats (8), the inner side walls of the two first bearing seats (8) are fixedly inlaid with first bearings (28), the front of the box body (1) is fixedly connected with a first fixing frame (6), the inner side wall of the first fixing frame (6) is fixedly connected with a wire winding shaft motor (7), a wire winding roller (14) is arranged inside the box body (1), the front end of the wire winding roller (14) and the rear end of the wire winding roller (14) respectively penetrate through the box body (1) and are fixedly connected with inner rings of the two bearings, the front end of the wire winding roller (14) is fixedly connected with the output end of the wire winding shaft motor (7), the outer surface of the wire winding roller (14) is fixedly connected with two baffles (15), the front of the box body (1) and the back of the box body (1) are fixedly connected with a second bearing seat (9), and a second bearing (26) is fixedly embedded in the inner side wall of the second bearing seat (9), and a second fixing frame (23) is fixedly connected to the front side of the box body (1).
2. The surveying and mapping line-laying apparatus for building construction according to claim 1, wherein: the inside wall fixedly connected with winding displacement motor (17) of second mount (23), the inside of box (1) is equipped with lead screw (10), the front end of lead screw (10) and the rear end of lead screw (10) run through box (1) respectively and with the inner circle fixed connection of two second bearings (26), the front end of lead screw (10) and the output fixed connection of winding displacement motor (17), the surface cover of lead screw (10) is equipped with winding displacement wheel (18), the surface cover of lead screw (10) is equipped with two spacing dishes (16).
3. The surveying and mapping line-laying apparatus for building construction according to claim 1, wherein: the utility model discloses a box, including box (1), the inner wall of box (1) is fixedly connected with two third bearing (21), two the inner wall of third bearing (21) is all fixed to be inlayed and is had two third bearings (22), two the fixed common fixedly connected with of inner circle of third bearing (22) rises tight axle (19).
4. The surveying and mapping line-laying apparatus for building construction according to claim 1, wherein: square hole (24) have been seted up to the left surface of box (1), the inner wall of square hole (24) is inlayed and is had trash cleaning mouth (25), box (1) left surface fixedly connected with pilot lamp (12).
5. The surveying and mapping line-laying apparatus for building construction according to claim 1, wherein: the right flank fixedly connected with fixing base (5) of box (1), the inner wall of fixing base (5) articulates through pin (4) has handle (3).
6. The surveying and mapping line-laying apparatus for building construction according to claim 1, wherein: the bottom surface fixedly connected with two sets of stabilizer blades (11) of box (1), every the equal fixedly connected with in bottom of stabilizer blade (11) is from sucking disc (2).
CN202122908259.4U 2021-11-20 2021-11-20 Surveying and mapping paying-off equipment for building construction Withdrawn - After Issue CN216791202U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122908259.4U CN216791202U (en) 2021-11-20 2021-11-20 Surveying and mapping paying-off equipment for building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122908259.4U CN216791202U (en) 2021-11-20 2021-11-20 Surveying and mapping paying-off equipment for building construction

Publications (1)

Publication Number Publication Date
CN216791202U true CN216791202U (en) 2022-06-21

Family

ID=82005524

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122908259.4U Withdrawn - After Issue CN216791202U (en) 2021-11-20 2021-11-20 Surveying and mapping paying-off equipment for building construction

Country Status (1)

Country Link
CN (1) CN216791202U (en)

Similar Documents

Publication Publication Date Title
CN203619467U (en) Surface cleaning device
CN216791202U (en) Surveying and mapping paying-off equipment for building construction
CN207502019U (en) A kind of measuring device for level of reservoir
CN211452358U (en) Multifunctional construction engineering management measuring device
CN201744904U (en) Metope putty dedusting sander
CN213209622U (en) Sampling device for water resource management
CN211049285U (en) Automatic dust-absorbing door mat
CN208636448U (en) A kind of monitoring device of geological disaster
CN211081077U (en) Pay-off for building engineering
CN217686981U (en) Portable measuring rope gauge for measuring work
CN221233535U (en) Fill electric pile cable storage device
CN217059287U (en) Portable sewage treatment pipeline detection device
CN215180144U (en) Groundwater quality of water real-time supervision equipment
CN217032514U (en) Building foundation verticality detection device
CN209961292U (en) Detector for detecting underground water level for hydraulic engineering management
CN219064990U (en) Water resource sampler for hydraulic engineering
CN210445601U (en) Soybean belt cleaning device
CN216020774U (en) Plastic shell of household dust collector
CN215984569U (en) Tool simply matched with plumb bob to measure verticality of template
CN214749164U (en) Sampling device for sewage treatment tank
CN213402251U (en) Thread burying device for water conservancy and hydropower engineering
CN213239571U (en) Portable marine survey is with adopting hydrophone
CN217980451U (en) Water well water level measuring device
CN221264906U (en) Novel fishing device
CN211155526U (en) Suspension type glass curtain wall cleaning device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20220621

Effective date of abandoning: 20230831

AV01 Patent right actively abandoned

Granted publication date: 20220621

Effective date of abandoning: 20230831

AV01 Patent right actively abandoned
AV01 Patent right actively abandoned