CN216785557U - Air pipe installation elevator for air conditioner installation - Google Patents

Air pipe installation elevator for air conditioner installation Download PDF

Info

Publication number
CN216785557U
CN216785557U CN202220472584.2U CN202220472584U CN216785557U CN 216785557 U CN216785557 U CN 216785557U CN 202220472584 U CN202220472584 U CN 202220472584U CN 216785557 U CN216785557 U CN 216785557U
Authority
CN
China
Prior art keywords
ring
grip ring
air conditioner
air
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220472584.2U
Other languages
Chinese (zh)
Inventor
陈飞
朱艳霞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengzhou Antong Electromechanical Equipment Co ltd
Original Assignee
Zhengzhou Antong Electromechanical Equipment Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou Antong Electromechanical Equipment Co ltd filed Critical Zhengzhou Antong Electromechanical Equipment Co ltd
Priority to CN202220472584.2U priority Critical patent/CN216785557U/en
Application granted granted Critical
Publication of CN216785557U publication Critical patent/CN216785557U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model belongs to the technical field of the technique of air conditioner installation and specifically relates to a tuber pipe installation lifting machine is used in air conditioner installation, and it includes the support, is equipped with on the support and is half circular shape grip ring and the lifting unit who is used for driving the grip ring and goes up and down, is equipped with the breach that sets up on the grip ring, and the inboard of grip ring is equipped with a plurality of clamp plates that are used for compressing tightly the tuber pipe on the interior diapire of grip ring, is equipped with the spacing post that wears to locate the grip ring along the grip ring radial sliding on the clamp plate. This application can improve the stability of tuber pipe in the promotion in-process.

Description

Air pipe installation elevator for air conditioner installation
Technical Field
The application relates to the technical field of air conditioner installation, in particular to an air pipe installation elevator for air conditioner installation.
Background
The air pipe installation project on the central air conditioner is an important part in the central air conditioner installation project, the air pipe is generally positioned at the upper part of a house and has a higher distance from the ground, and the whole air pipe consists of a plurality of sections. When installing the central air conditioner, workers need to transport the air duct to the installation position, and the distance between the general position and the ground is high, so that the air duct is usually installed by means of a hoist.
Present hoist can promote the tuber pipe to required position high-efficiently, but, the hoist is when promoting the tuber pipe, and the tuber pipe lacks location clamping device, rolls from the hoist and drops if receiving external force influence suddenly extremely easily at the in-process that rises to cause the injury to below operation workman, have had certain potential safety hazard, consequently need improve.
Disclosure of Invention
In order to improve the stability of tuber pipe in the lift process, this application provides an air conditioner installation is with tuber pipe installation lifting machine.
The application provides a pair of tuber pipe installation lifting machine is used in air conditioner installation adopts following technical scheme: the utility model provides an air conditioner installation is with tuber pipe installation lifting machine, includes the support, is equipped with on the support and is half circular shape grip ring and the lifting unit who is used for driving the grip ring and goes up and down, is equipped with the breach that sets up on the grip ring, and the inboard of grip ring is equipped with a plurality of clamp plates that are used for compressing tightly the tuber pipe on the interior diapire of grip ring, is equipped with on the clamp plate along the spacing post that the grip ring radial sliding wore to locate the grip ring.
Optionally, the limiting column is connected to the clamping ring through a spring.
Optionally, the clamping ring is sequentially arranged on the bracket along the axis of the clamping ring.
Optionally, each row of limiting columns sequentially arranged along the axis of the clamping ring are connected through the same connecting rod.
Optionally, the limiting column is sleeved with an elastic ring, the clamping ring is provided with a plurality of penetrating grooves for the corresponding limiting column to penetrate through in a sliding manner, and the wall of each penetrating groove is provided with a clamping groove for the elastic ring to be embedded.
Optionally, a plurality of elastic strips for abutting against the outer wall of the air supply pipe are arranged on the inner wall of the clamping ring.
Optionally, the lifting assembly comprises a motor and a plurality of vertical rods which are mounted on the support, the lifting assembly is rotatably connected to a winding roller and a rotating roller of the support, an output shaft of the motor is connected to the winding roller, the winding roller is connected to the clamping ring through a pull rope bypassing the rotating roller, the rotating roller is located above the winding roller and the clamping ring, and a plurality of lantern rings which are sleeved with the corresponding vertical rods in a sliding mode are mounted on the clamping ring.
Optionally, a plurality of rollers are mounted at the bottom of the bracket.
To sum up, the application comprises the following beneficial technical effects:
1. the air pipe can penetrate through the notch and is embedded into the inner side of the clamping ring, and the spring enables the pressing plate on the limiting column to tightly press the air pipe on the elastic strip, so that the stability of the air pipe in the clamping ring is improved;
2. workers can enable the pressing plates in the same row to slide away from the axis of the clamping ring by pulling the connecting rod, so that the elastic rings on the limiting columns in the same row can be embedded into the corresponding clamping grooves, and the air pipes can be conveniently taken and placed on the inner sides of the clamping rings;
3. the workman passes through the control motor, can be so that the wind-up roll rolling or unreel the stay cord, and the stay cord will drive the live-rollers rotatory to make the slip of the lantern ring on the grip ring on the montant, thereby realized the stable lift of grip ring, so that the workman transports the tuber pipe to mounted position.
Drawings
FIG. 1 is a schematic diagram of the overall structure in the embodiment of the present application;
FIG. 2 is a schematic structural view showing two clamp rings in the embodiment of the present application;
fig. 3 is a schematic sectional view showing a clamp ring in the embodiment of the present application.
Reference numerals: 1. a support; 11. a roller; 2. a clamp ring; 21. a notch; 22. an elastic strip; 23. pressing a plate; 24. a limiting column; 25. a groove is arranged in a penetrating way; 26. a spring; 27. an elastic ring; 28. a clamping groove; 29. a connecting rod; 3. a lifting assembly; 31. a motor; 32. a vertical rod; 33. a wind-up roll; 34. a rotating roller; 35. pulling a rope; 36. a collar.
Detailed Description
The present application is described in further detail below with reference to figures 1-3.
The embodiment of the application discloses air pipe installation lifting machine for air conditioner installation. As shown in figure 1, an air conditioner installation is with tuber pipe installation lifting machine, including support 1, be equipped with on support 1 and be the semicircular grip ring 2 and be used for driving the lifting unit 3 that grip ring 2 goes up and down, be equipped with the breach 21 that sets up on grip ring 2, the tuber pipe can pass breach 21 and imbed the inboard of grip ring 2, has realized preliminary spacing to the tuber pipe.
A plurality of clamping rings 2 are sequentially arranged on the bracket 1 along the axis of the clamping rings, so that the air pipe can be placed on the inner sides of the clamping rings 2, and the stability of the air pipe is improved; install the elastic strip 22 that a plurality of confession tuber pipe outer walls contradict on the inner wall of grip ring 2, elastic strip 22 is along the axial extension of grip ring 2 for place at the difficult rocking of 2 inboard tuber pipes of grip ring.
As shown in fig. 1 to 3, a plurality of pressing plates 23 are disposed on the inner side of the clamping ring 2, and in this embodiment, two pressing plates 23 are disposed on each clamping ring 2; the clamp plate 23 is far away from one side of the axis of the clamping ring 2 and is provided with a limiting column 24, the clamping ring 2 is provided with a plurality of penetrating grooves 25 radially extending along the clamping ring 2, and the limiting column 24 slides to penetrate through the penetrating grooves 25, so that the limiting column 24 can only slide radially along the clamping ring 2.
One end of the limiting column 24, which is far away from the axis of the clamping ring 2, is connected to the outer wall of the clamping ring 2 through a spring 26, and the spring 26 causes a pressing plate 23 on the limiting column 24 to press the air pipe on the elastic strip 22, so that the stability of the air pipe in the clamping ring 2 is improved.
The cover is equipped with elastic ring 27 on the spacing post 24, is equipped with joint groove 28 on the cell wall of wearing to establish groove 25, and the axis in the grip ring 2 is kept away from with spacing post 24 pulling to the workman for elastic ring 27 joint is when joint in joint groove 28, and spacing post 24 will be spacing fixed, so that the workman takes out the tuber pipe from grip ring 2 is inboard or puts into the inboard of grip ring 2 with the tuber pipe.
As shown in fig. 1 and 2, each row of the limiting columns 24 sequentially arranged along the axis of the clamping ring 2 are connected through the same connecting rod 29, and a worker can make the pressing plates 23 in the same row slide away from the axis of the clamping ring 2 by pulling the connecting rod 29, so that the elastic rings 27 on the limiting columns 24 in the same row can be embedded into the corresponding clamping grooves 28, and the air duct can be conveniently taken and placed.
Lifting unit 3 is including installing motor 31 and a plurality of montant 32 on support 1, rotating and connecting in wind-up roll 33 and the live-rollers 34 of support 1, and the output shaft of motor 31 is connected in wind-up roll 33, and wind-up roll 33 is connected in grip ring 2 through the stay cord 35 of walking around live-rollers 34, and live-rollers 34 are located wind-up roll 33 and grip ring 2's top, installs a plurality of slip covers on the grip ring 2 and establish the lantern ring 36 on corresponding montant 32. The workman can be through control motor 31 so that wind-up roll 33 rolling or unreel stay cord 35, and stay cord 35 will drive the live-rollers 34 rotatory to make the slip of the lantern ring 36 on the grip ring 2 on montant 32, thereby realized the stable lift of grip ring 2, so that the workman transports the tuber pipe to the mounted position.
A plurality of rollers 11 are installed at the bottom of the bracket 1, which facilitates the movement of the bracket 1, so that a worker can transport the air pipe to a designated position through the bracket 1.
The implementation principle of the air pipe installation hoisting machine for air conditioner installation in the embodiment of the application is as follows: in the lifting process of the air pipe, a worker can penetrate the air pipe through the notch 21 and be embedded into the inner side of the clamping ring 2, then the worker can push the connecting rod 29, the elastic ring 27 is separated from the clamping groove 28, the spring 26 enables the pressing plate 23 on the limiting column 24 to press the air pipe on the elastic strip 22, and the stability of the air pipe in the clamping ring 2 is improved.
The workman passes through motor 31 afterwards and drives wind-up roll 33 rotatory for wind-up roll 33 rolling stay cord 35, stay cord 35 will drive the live-rollers 34 rotatory, and make lantern ring 36 on the grip ring 2 go up smooth on montant 32, grip ring 2 will drive the tuber pipe and stably rise, so that the workman transports the tuber pipe to the mounted position.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (8)

1. The utility model provides an air conditioner installation is with tuber pipe installation lifting machine which characterized in that: including support (1), be equipped with on support (1) and be half circular shape grip ring (2) and be used for driving lifting unit (3) that grip ring (2) go up and down, be equipped with breach (21) that set up on grip ring (2), the inboard of grip ring (2) is equipped with a plurality of clamp plates (23) that are used for compressing tightly the tuber pipe on the inner bottom wall of grip ring (2), is equipped with on clamp plate (23) and wears to locate spacing post (24) of grip ring (2) along grip ring (2) radial sliding.
2. The air pipe installation elevator for installing the air conditioner as claimed in claim 1, wherein: the limiting column (24) is connected to the clamping ring (2) through a spring (26).
3. The air pipe installation elevator for air conditioner installation according to claim 1, characterized in that: the clamping rings (2) are sequentially arranged on the support (1) along the axis of the clamping rings.
4. The air pipe installation elevator for air conditioner installation according to claim 3, characterized in that: the limiting columns (24) which are sequentially arranged along the axis of the clamping ring (2) in each row are connected through the same connecting rod (29).
5. The air pipe installation elevator for air conditioner installation according to claim 1, characterized in that: the limiting post (24) is sleeved with an elastic ring (27), a plurality of penetrating grooves (25) for the corresponding limiting post (24) to penetrate in a sliding mode are formed in the clamping ring (2), and clamping grooves (28) for the elastic ring (27) to be embedded are formed in the groove walls of the penetrating grooves (25).
6. The air pipe installation elevator for air conditioner installation according to claim 1, characterized in that: and a plurality of elastic strips (22) which are abutted against the outer wall of the air supply pipe are arranged on the inner wall of the clamping ring (2).
7. The air pipe installation elevator for air conditioner installation according to claim 1, characterized in that: lifting unit (3) including installing motor (31) and a plurality of montant (32) on support (1), rotate and connect in wind-up roll (33) and rotor (34) of support (1), the output shaft of motor (31) is connected in wind-up roll (33), wind-up roll (33) are connected in grip ring (2) through stay cord (35) of walking around rotor (34), rotor (34) are located the top of wind-up roll (33) and grip ring (2), it establishes lantern ring (36) on corresponding montant (32) to install a plurality of slip covers on grip ring (2).
8. The air pipe installation elevator for air conditioner installation according to claim 1, characterized in that: the bottom of the support (1) is provided with a plurality of rollers (11).
CN202220472584.2U 2022-03-04 2022-03-04 Air pipe installation elevator for air conditioner installation Active CN216785557U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220472584.2U CN216785557U (en) 2022-03-04 2022-03-04 Air pipe installation elevator for air conditioner installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220472584.2U CN216785557U (en) 2022-03-04 2022-03-04 Air pipe installation elevator for air conditioner installation

Publications (1)

Publication Number Publication Date
CN216785557U true CN216785557U (en) 2022-06-21

Family

ID=82000186

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220472584.2U Active CN216785557U (en) 2022-03-04 2022-03-04 Air pipe installation elevator for air conditioner installation

Country Status (1)

Country Link
CN (1) CN216785557U (en)

Similar Documents

Publication Publication Date Title
CN202016765U (en) Double-position recoiling machine for PVC (polyvinyl chloride) artificial leather floorboard
CN216785557U (en) Air pipe installation elevator for air conditioner installation
CN211473588U (en) Intelligent robot for high pole construction of power transmission wire pole
CN204802945U (en) Lift is demolishd to chimney
CN109980861B (en) Generator maintenance robot
CN205802642U (en) Electric cable wrapping machine
CN213532763U (en) Rubber cutting machine is used in production of rubber sealing rod
CN205953120U (en) Semi -automatic sizing material plait mill
CN110451306A (en) The feeding cart used suitable for cutting machine
CN202857591U (en) Hauling machine with rubber ring traction wheel
CN213741802U (en) Energy-conserving curtain of architectural decoration
CN201887609U (en) Piece sorting machine
CN205571068U (en) Thin -wall plate material edge rolling equipment
CN211895862U (en) Conveying frame for building
CN210312904U (en) Cable take-up machine
CN202163576U (en) Antifriction device for pull and placement of multi-strand different-directional steel wire rope set
CN111017611A (en) PVC electric adhesive tape and production equipment thereof
CN204689539U (en) There is the shipment jacking system of air bag rib
CN221253373U (en) Cable laying device for narrow space
CN210620126U (en) Portable steel wire rope unwinding device
CN214693040U (en) Fixed polyurethane steel wire rope changes to device
CN211469065U (en) Movable lifting device for packaging bag roll film
CN220502493U (en) Motor lifting device of sampling machine
CN221434590U (en) Color steel tile extrusion molding device
CN210029530U (en) Cable recovery device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant