revetment
plant box
river course
mounting hole
groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220136409.6U
Other languages
Chinese (zh)
Inventor
郝文豪
牛艺霖
李少华
李晓通
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Luyu Water Conservancy Engineering Co ltd
Original Assignee
Henan Luyu Water Conservancy Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Luyu Water Conservancy Engineering Co ltd filed Critical Henan Luyu Water Conservancy Engineering Co ltd
Priority to CN202220136409.6U priority Critical patent/CN216739460U/en
Application granted granted Critical
Publication of CN216739460U publication Critical patent/CN216739460U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

The application relates to the technical field of river revetment reinforcement, in particular to a river revetment reinforcement structure, which comprises a reinforcement plate arranged on the surface of a revetment, wherein a plurality of mounting holes are formed in the reinforcement plate, a plant box is embedded in the mounting holes in a rotating mode, one end of the plant box is arranged in an open mode, and the other end of the plant box is used for abutting against the surface of the revetment; install the joint piece on the outer wall of plant box, be equipped with on the pore wall of mounting hole and supply the joint piece to slide to inlay the spout of establishing and supply the joint piece to rotate to inlay the groove of establishing, the spout is the same with the extending direction of mounting hole and runs through in one side that the gusset plate deviates from in the revetment surface, inlays to establish the groove and is the arc setting and communicates in the spout towards the one end on revetment surface. This application can reduce the ecological disordered's of river course the condition and take place under the circumstances of guaranteeing river course revetment structural strength.

Description

River course revetment reinforced structure
Technical Field
The utility model belongs to the technical field of the reinforced (rfd) technique of river course revetment and specifically relates to a river course revetment reinforced structure is related to.
Background
The revetment is a facility which is built at the edge of a water body and at the junction of land, and is firm by processing the revetment by engineering measures so as to avoid being damaged by various natural factors and human factors and protect the water body in the landscape garden. In order to enhance the flood control capability of the river channel and improve the safety and stability of the river channel revetment, the revetment of the river channel is generally required to be reinforced.
At present, construction teams often directly make river revetments into concrete and pour integrally, though the soil loss of the river course has been avoided like this for the structural strength of river course satisfies the requirement. However, the river revetment covered with concrete is not suitable for biological growth, is not beneficial to constructing a stable and harmonious biosphere, can deteriorate water quality over time, and even causes ecological disorder of the whole river, so that improvement is needed.
SUMMERY OF THE UTILITY MODEL
In order under the condition of guaranteeing river course revetment structural strength, reduce the ecological disordered condition of river course and take place, this application provides river course revetment reinforced structure.
The application provides a river course revetment reinforced structure adopts following technical scheme: the riverway revetment reinforcing structure comprises a reinforcing plate arranged on the revetment surface, wherein a plurality of mounting holes are formed in the reinforcing plate, plant boxes are rotatably embedded in the mounting holes, one ends of the plant boxes are arranged in an open manner, and the other ends of the plant boxes are used for abutting against the revetment surface; install the joint piece on the outer wall of plant box, be equipped with on the pore wall of mounting hole and supply the joint piece to slide to inlay the spout of establishing and supply the joint piece to rotate to inlay the groove of establishing, the spout is the same with the extending direction of mounting hole and runs through in one side that the gusset plate deviates from in the revetment surface, inlays to establish the groove and is the arc setting and communicates in the spout towards the one end on revetment surface.
Optionally, the groove wall of the embedding groove is provided with an elastic bulge, and the clamping block is provided with a clamping groove for the elastic bulge to rotate for clamping.
Optionally, the outer wall of the plant box is provided with a handle, and when the plant box is embedded in the mounting hole, the handle is located outside the mounting hole.
Optionally, the outer wall of the plant box is provided with two handles, one of the handles is provided with a finger hole, and the other handle is provided with three finger holes.
Optionally, when one end of the plant box embedded in the mounting hole abuts against the revetment surface, the handle abuts against one side of the reinforcing plate far away from the revetment surface.
Optionally, when the joint piece rotates to inlay and establishes to inlaying and establish the inslot, the joint piece will be located the downside of plant box.
Optionally, one of the plant box towards the revetment surface is served and is equipped with the spine that is used for inserting in the revetment, and the spine is the coaxial line setting with the plant box.
Optionally, one end of the plant box facing the revetment surface is provided with a plurality of root hair holes.
To sum up, the application comprises the following beneficial technical effects:
1. the plant box can be embedded into the mounting hole in a sliding manner, workers can plant soil-fixing plants in the plant box, and root hairs of the soil-fixing plants can penetrate through the root hair holes and are pricked into the revetment, so that the water and soil loss of the revetment and the ecological disorder of the river channel are effectively reduced;
2. when the plant box is embedded into the mounting hole, the clamping block is embedded into the sliding groove in a sliding mode, workers can rotate the plant box to enable the clamping block to be clamped into the embedding groove in a rotating mode, the plant box is fixed in the mounting hole in a clamped mode, and the stability of the plant box is improved;
3. the thumb on the right hand of the worker can be inserted into the finger hole of one of the handles, and the three fingers positioned in the middle on the right hand of the worker can be inserted into the three finger holes of the other handle, so that the worker can rotate the plant box in the mounting hole, and the plant box is convenient to disassemble and assemble;
4. when the joint piece rotates the joint to inlay and establishes the inslot, the elastic bulge with the joint at the joint inslot for the joint piece is difficult to be broken away from inlaying and establishing the inslot, has improved the stability of plant box in the mounting hole.
Drawings
FIG. 1 is a schematic diagram of the overall structure in the embodiment of the present application;
FIG. 2 is a schematic sectional view of the whole of the embodiment of the present application;
FIG. 3 is an enlarged partial schematic view at A in FIG. 2;
FIG. 4 is a schematic structural view showing a plant box and a mounting hole in an embodiment of the present application;
fig. 5 is a schematic diagram showing the structure of the plant box in the embodiment of the present application.
Reference numerals: 1. a reinforcing plate; 11. mounting holes; 12. a chute; 13. embedding a groove; 14. an elastic bulge; 2. a plant box; 21. root hair holes; 22. pricking with a sharp point; 23. a clamping block; 24. a clamping groove; 25. a handle; 251. a finger hole.
Detailed Description
The present application is described in further detail below with reference to figures 1-5.
The embodiment of the application discloses river course revetment reinforced structure. As shown in fig. 1 and 2, river course revetment reinforced structure is including installing gusset plate 1 on the revetment surface, and gusset plate 1 is kept away from and is equipped with a plurality of mounting holes 11 that are netted arranging on one side of revetment surface, and mounting holes 11 run through in one side of gusset plate 1 towards the revetment surface.
As shown in fig. 2 and 3, the plant box 2 is embedded in the mounting hole 11, the end of the plant box 2 far away from the surface of the revetment is open, and the end of the plant box 2 facing the surface of the revetment is abutted against the surface of the revetment and is provided with a plurality of root hair holes 21. Workers can plant soil-fixing plants in the plant box 2, and root hairs of the soil-fixing plants can penetrate through the root hair holes 21 and prick into the revetment, so that water and soil loss of the revetment and ecological disorder of a river channel are effectively reduced.
As shown in fig. 5, plant box 2 is fixed with spine 22 towards one of revetment surface one end, and spine 22 is the coaxial line setting with plant box 2, and when the tip of plant box 2 was laminated in the revetment surface, spine 22 can pierce the revetment in, has improved the stability of plant box 2 on the revetment.
As shown in fig. 2 to 5, a clamping block 23 is installed on the outer wall of the plant box 2, a sliding groove 12 and an embedding groove 13 are arranged on the hole wall of the installation hole 11, the sliding groove 12 and the installation hole 11 extend in the same direction and penetrate through one side of the reinforcing plate 1, which is far away from the revetment surface, and the clamping block 23 is slidably embedded in the sliding groove 12; the embedding groove 13 is arc-shaped and is communicated with one end of the sliding groove 12 facing to the revetment surface, and the clamping block 23 can be rotationally clamped in the embedding groove 13.
When the plant box 2 is inserted into the mounting hole 11, the clamping block 23 is slidably inserted into the chute 12; when the tip of plant box 2 was laminated in the revetment surface, the rotatable plant box of workman 2 for 23 rotatory joint of joint piece inlay establishes in the groove 13, and plant box 2 will be fixed in mounting hole 11 by the joint this moment, have improved the stability of plant box 2.
It is worth to say that, when the joint piece 23 rotates to set up in the groove 13, the joint piece 23 will be located the downside of plant box 2, and joint piece 23 will stabilize the joint because of self gravity and set up in the groove 13 at this moment for plant box 2 is difficult for breaking away from in the mounting hole 11 and drops.
Be fixed with two handles 25 on the outer wall of plant box 2, when plant box 2 inlayed and establish in mounting hole 11, handle 25 will be located the outside of mounting hole 11 and contradict in reinforcing plate 1 one side of keeping away from the revetment surface, realized spacing to plant box 2 position.
One of the handles 25 is provided with a finger hole 251, and a thumb of a worker can be inserted into the finger hole 251; the other handle 25 is provided with three finger holes 251, and three fingers in the middle of the palm of the worker can be inserted into the three finger holes 251, so that the worker can rotate the plant box 2 in the mounting hole 11, and the plant box 2 can be conveniently dismounted.
Inlay the groove wall of establishing groove 13 and install elastic bulge 14, be equipped with joint groove 24 on joint piece 23, when joint piece 23 rotated the joint and arrived to inlay and establish the inslot 13, elastic bulge 14 will be the joint in joint groove 24 for joint piece 23 is difficult to break away from in inlaying groove 13, has improved the stability of plant box 2 in mounting hole 11.
The implementation principle of the river course revetment reinforced structure of the embodiment of the application is as follows: a worker can insert the plant box 2 into the mounting hole 11 and rotate the plant box 2 through the handle 25, so that the clamping block 23 is rotationally clamped into the embedding groove 13, and the elastic bulge 14 is clamped in the clamping groove 24, so that the plant box 2 is limited and fixed in the mounting hole 11; then, workers can plant soil-fixing plants in the plant box 2, and root hairs of the soil-fixing plants can penetrate through the root hair holes 21 and prick into the revetment, so that water and soil loss of the revetment and ecological disorder of the river channel are effectively reduced.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (8)

1. River course revetment reinforced structure, its characterized in that: the plant revetment structure comprises a reinforcing plate (1) arranged on the revetment surface, wherein a plurality of mounting holes (11) are formed in the reinforcing plate (1), a plant box (2) is rotatably embedded in the mounting holes (11), one end of the plant box (2) is arranged in an open manner, and the other end of the plant box (2) is used for abutting against the revetment surface; install joint piece (23) on the outer wall of plant box (2), be equipped with on the pore wall of mounting hole (11) and supply joint piece (23) to slide and inlay spout (12) of establishing and supply joint piece (23) to rotate and inlay that establish and establish groove (13), spout (12) are the same with the extending direction of mounting hole (11) and run through in gusset plate (1) and deviate from in one side on the revetment surface, inlay and establish groove (13) and be the arc setting and communicate in spout (12) towards the one end on revetment surface.
2. The river course revetment reinforced structure of claim 1, wherein: the groove wall of the embedding groove (13) is provided with an elastic bulge (14), and the clamping block (23) is provided with a clamping groove (24) for the elastic bulge (14) to rotate and clamp.
3. The river course revetment reinforced structure of claim 1, wherein: be equipped with handle (25) on the outer wall of plant box (2), when plant box (2) inlays and establishes in mounting hole (11), handle (25) are located the outside of mounting hole (11).
4. The river course revetment reinforced structure of claim 3, wherein: the outer wall of the plant box (2) of the handles (25) is provided with two, one of the handles (25) is provided with a finger hole (251), and the other handle (25) is provided with three finger holes (251).
5. The river course revetment reinforced structure of claim 3, wherein: when one end of the plant box (2) embedded in the mounting hole (11) is abutted against the revetment surface, the handle (25) is abutted against one side of the reinforcing plate (1) far away from the revetment surface.
6. The river course revetment reinforced structure of claim 1, wherein: when the clamping block (23) is rotatably embedded in the embedding groove (13), the clamping block (23) is positioned at the lower side of the plant box (2).
7. The river course revetment strengthening structure of claim 1, wherein: plant box (2) are equipped with spike (22) that are used for inserting in the revetment towards one of revetment surface, spike (22) are the coaxial line setting with plant box (2).
8. The river course revetment reinforced structure of claim 1, wherein: one end of the plant box (2) facing the revetment surface is provided with a plurality of root hair holes (21).
CN202220136409.6U 2022-01-17 2022-01-17 River course revetment reinforced structure Active CN216739460U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220136409.6U CN216739460U (en) 2022-01-17 2022-01-17 River course revetment reinforced structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220136409.6U CN216739460U (en) 2022-01-17 2022-01-17 River course revetment reinforced structure

Publications (1)

Publication Number Publication Date
CN216739460U true CN216739460U (en) 2022-06-14

Family

ID=81914911

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220136409.6U Active CN216739460U (en) 2022-01-17 2022-01-17 River course revetment reinforced structure

Country Status (1)

Country Link
CN (1) CN216739460U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114875849A (en) * 2022-06-15 2022-08-09 江苏省交通工程集团有限公司 River channel revetment reinforcing device and reinforcing method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114875849A (en) * 2022-06-15 2022-08-09 江苏省交通工程集团有限公司 River channel revetment reinforcing device and reinforcing method thereof
CN114875849B (en) * 2022-06-15 2024-02-20 江苏省交通工程集团有限公司 River course revetment reinforcing device and reinforcing method thereof

Similar Documents

Publication Publication Date Title
CN216739460U (en) River course revetment reinforced structure
CN205584710U (en) Multifunctional folding shovel
CN210328463U (en) Gardens ditching device with consolidate irrigation canals and ditches function
CN210959388U (en) Multifunctional garden shovel
CN211090498U (en) Garden shovel
CN204131916U (en) A kind of multi-functional eave tile spade
CN205017922U (en) Cut in dual -purpose gardens
CN205667184U (en) A kind of lifting device of Garden Engineering
CN204498693U (en) A kind of simple and easy non-irrigated lotus root excavates device
CN203872703U (en) Tree root digging knife
CN103782675A (en) One-handle multi-tip soil deep loosening shovel
CN205883855U (en) Gardens multi -functional instrument shovel
CN204157342U (en) One back and forth cuts root rejuvenation special saw Shi Qiegen cutter
CN206611775U (en) A kind of lotus rhizome excavates device
CN207766833U (en) A kind of Chinese prickly ash plantation digging apparatus
CN212696568U (en) Adjustable view flower planting device
CN207836616U (en) Greening installation for road and bridge
CN204968351U (en) Multi -functional gardens rake
CN220486603U (en) Adjustable groove slope-cutting bucket
CN204634357U (en) A kind of portable fertilizer apparatus
CN203924151U (en) Scissors shovel is excavated in a kind of bar hole
CN204482441U (en) A kind of multiplex function garden shovel
CN205755487U (en) A kind of strawberry cultivating device
CN204697487U (en) Ridge buster
CN205030212U (en) Adjustable multi -functional horticulture saw