Prior art keywords
riser
engineering construction
building engineering
connecting plug
arc
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202123076429.3U
Other languages
Chinese (zh)
Inventor
梅彬彬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202123076429.3U priority Critical patent/CN216587572U/en
Application granted granted Critical
Publication of CN216587572U publication Critical patent/CN216587572U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model relates to the technical field of scaffolds, in particular to a stable scaffold based on building engineering construction, which comprises a vertical pipe and a horizontal pipe, wherein a connecting plug tray is arranged on the surface of the vertical pipe, an arc-shaped pressure groove is arranged at the position, aligned with the connecting plug tray, of the surface of the vertical pipe, and a welding material is welded between the inner part of the arc-shaped pressure groove and an inner hole of the connecting plug tray. According to the utility model, the arc-shaped pressing groove is arranged between the surface of the vertical pipe and the connecting plug tray, and the welding flux is welded between the arc-shaped pressing groove and the connecting plug tray, so that the welding flux and the surface of the vertical pipe form an occlusion structure, the welding bearing strength between the connecting plug tray and the surface of the vertical pipe can be greatly improved, the condition that the connecting plug tray is separated from the vertical pipe is reduced, the support stability of the scaffold is ensured, the double-connecting plug tray structure forms a double-bearing structure, the bearing load of a single connecting plug tray can be effectively reduced, the bearing strength is improved, the connection gap is sealed, rainwater is prevented from invading into the pipe, and the condition that the pipe is corroded is improved.

Description

Firm type scaffold frame based on building engineering construction
Technical Field
The utility model relates to the technical field of scaffolds, in particular to a stable scaffold based on constructional engineering construction.
Background
The disk-buckle type scaffold is a direct insertion type steel pipe scaffold with a self-locking function, and is formed by vertical rods, horizontal rods, diagonal rods, an adjustable bottom support and other components, wherein the vertical rods are connected in a socket joint mode through sleeves, the horizontal rods and the diagonal rods are connected with a plug disk in a clamped mode through the connectors, the vertical rods are connected with the plug disk through wedge-shaped plugs, a geometrically-invariant structure system is formed, a buckle type steel pedal is laid on the structure system, and a safety net is hung on the outer side of the structure system and closed for external protection and decoration of structural construction.
Rely on in the dish knot formula scaffold frame use to connect the plug-in dish and bear node atress, the stability of the welding quality direct influence scaffold frame between connection plug-in dish and the pole setting, cause the atress node trouble when connecting the plug-in dish when breaking off promptly, seriously influence whole security, the pole setting generally adopts steel pipe structure, the corrosion of steel pipe material can make the steel pipe actually bear the weight of the ability reduction a lot, under the not tight condition of field management, very easily take place the template and support the unstability phenomenon, thereby can obviously observe to the outside corrosion condition of tubular product and reject, nevertheless support in the use rainwater can be through the tubular product junction invasion intraductally, cause the intraductal corrosion condition then to be difficult to discover.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the defects of the prior art in the background art and provide a stable scaffold based on construction engineering construction.
In order to achieve the purpose, the utility model adopts the following technical scheme:
the utility model provides a firm type scaffold frame based on building engineering construction, includes riser and horizontal pipe, the surface of riser is provided with connects the plug tray to riser surface alignment connects plug tray department and is provided with the arc indent, the welding has the solder between the inside of arc indent and the hole of being connected the plug tray, the equal fixedly connected with connector in both ends of horizontal pipe to be provided with the bolt between connector and the connection plug tray.
Preferably, the arc-shaped pressure grooves are arranged at equal angles along the surface of the riser.
Preferably, the connection plug boards are arranged in pairs, and the distance between the two connection plug boards arranged in pairs is matched with the thickness of the connecting head.
Preferably, the connecting end of the stand pipe is provided with a connecting rod, and the diameter of the connecting rod is matched with the inner diameter of the stand pipe.
Preferably, the surface of the stand pipe and the inside of the connecting rod are both provided with connecting holes, and a connecting bolt is arranged between the two connecting holes.
Preferably, a rubber plug is arranged between the connecting bolt and the vertical pipe, and one side of the rubber plug, which is close to the vertical pipe, is an arc-shaped surface matched with the surface of the vertical pipe.
Preferably, an end sealing ring is arranged on the surface of the connecting rod and between the ends of the upper and lower adjacent stand pipes.
The utility model has at least the following beneficial effects:
through set up the arc indent between riser surface and connection plug tray, welding solder between arc indent and connection plug tray, make solder and riser surface form the interlock structure, can promote the welding bearing strength between connection plug tray and the riser surface by a wide margin, reduce the condition that produces and break away from between connection plug tray and the riser, guarantee the support stability of scaffold, two connection plug tray structure sets up, form dual bearing structure to the connector, can effectively alleviate the atress load of single connection plug tray, promote and bear the strength of force, carry out the hole site seal through set up the end sealing washer at riser connection end and set up the plug at connective bar and riser junction, can effectively prevent that the rainwater from invading inside the riser through the connecting hole, and then improve the intraductal condition of taking place the corrosion, help prolonging the life of scaffold accessories.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings needed to be used in the description of the embodiments are briefly introduced below, and it is obvious that the drawings in the following description are some embodiments of the present invention, and it is obvious for those skilled in the art to obtain other drawings based on these drawings without creative efforts.
FIG. 1 is a front view of the structure of the present invention;
FIG. 2 is an enlarged view of a portion of the utility model at A in FIG. 1;
fig. 3 is a partial enlarged view of the utility model at B in fig. 1.
In the figure: 1. a riser; 2. a horizontal tube; 3. connecting the plug board; 4. an arc-shaped pressing groove; 5. welding flux; 6. a connector; 7. a bolt; 8. a connecting rod; 9. connecting holes; 10. a connecting bolt; 11. a rubber plug.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more apparent, the present invention is described in further detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the utility model and are not intended to limit the utility model.
Referring to fig. 1-3, a firm type scaffold frame based on building engineering construction, includes riser 1 and horizontal pipe 2, and the surface of riser 1 is provided with connects plug board 3 to riser 1 surface alignment connects plug board 3 department and is provided with arc indent 4, and the welding has solder 5 between the inside of arc indent 4 and the hole of connecting plug board 3, and the equal fixedly connected with connector 6 in both ends of horizontal pipe 2 to be provided with bolt 7 between connector 6 and the connection plug board 3.
The scheme has the following working processes:
after the scaffold is built, the atress of connecting plug board 3 passes through solder 5 and transmits for riser 1, because solder 5 in the arc indent 4 forms fore-and-aft limit structure with arc indent 4, can promote the bearing strength between connecting plug board 3 and the riser 1 by a wide margin, prevent to connect and produce the slippage between plug board 3 and the riser 1, promote support stability, plug 11 seals connecting hole 9 position between the riser 1, the end sealing washer seals the pipe end connection gap of riser 1, can effectively strengthen the scaffold in-process and prevent that the rainwater from invading intraductal ability through the hole, in order to prevent intraductal corrosion and be difficult to the problem of perceiving, guarantee the moment of inertia of tubular structure.
Further, a plurality of arc-shaped pressure grooves 4 are arranged along the surface of the stand pipe 1 at equal angles.
Furthermore, the connection plug boards 3 are arranged in pairs, the distance between the two connection plug boards 3 arranged in pairs is matched with the thickness of the connector 6, and the double-connection plug board 3 is designed to form a double-bearing part after being connected with the connector 6, so that load sharing is realized, the bearing stress of the single connection plug board 3 in use is reduced, and the double-insurance effect is achieved.
Further, the connecting end of the stand pipe 1 is provided with a connecting rod 8, and the diameter of the connecting rod 8 is matched with the inner diameter of the stand pipe 1.
Further, the surface of the stand pipe 1 and the inside of the connecting rod 8 are both provided with connecting holes 9, and a connecting bolt 10 is arranged between the two connecting holes 9.
Further, be provided with plug 11 between connecting bolt 10 and riser 1 to plug 11 is close to one side of riser 1 for the arcwall face with riser 1 surface adaptation, and plug 11 realizes the sealed of connecting hole 9 department, prevents that the rainwater from invading inside riser 1 through connecting hole 9.
Furthermore, an end sealing ring is arranged on the surface of the connecting rod 8 and between the ends of the upper vertical pipe 1 and the lower vertical pipe 1, the end sealing ring realizes sealing of a connecting gap between the upper vertical pipe 1 and the lower vertical pipe 1, and the connecting rod is automatically compressed under the action of self bearing pressure after the upper vertical pipe 1 and the lower vertical pipe 1 are connected.
The foregoing shows and describes the general principles, essential features, and advantages of the utility model. It will be understood by those skilled in the art that the present invention is not limited to the embodiments described above, which are merely illustrative of the principles of the utility model, but that various changes and modifications may be made without departing from the spirit and scope of the utility model, which fall within the scope of the utility model as claimed. The scope of the utility model is defined by the appended claims and equivalents thereof.

Claims (7)

1. The utility model provides a firm type scaffold frame based on building engineering construction, includes riser (1) and horizontal pipe (2), its characterized in that, the surface of riser (1) is provided with connects plug board (3) to riser (1) surface alignment connects plug board (3) department and is provided with arc indent (4), the welding has solder (5) between the inside of arc indent (4) and the hole of connecting plug board (3), the equal fixedly connected with connector (6) in both ends of horizontal pipe (2) to be provided with bolt (7) between connector (6) and the connection plug board (3).
2. A firm scaffold based on building engineering construction according to claim 1, characterized in that the arc-shaped indent (4) is arranged in plurality along the surface of the riser (1) at equal angles.
3. A firm type scaffold based on building engineering construction according to claim 1 characterized in that the connection spigots (3) are arranged in pairs and the spacing between two connection spigots (3) arranged in pairs matches the thickness of the connection head (6).
4. A stable scaffold based on construction engineering according to claim 1, characterized in that the connecting ends of the risers (1) are provided with connecting rods (8) and the diameter of the connecting rods (8) is matched to the inner diameter of the risers (1).
5. A firm type scaffold based on building engineering construction according to claim 4, characterized in that the surface of riser (1) and the inside of connective bar (8) are both opened with connection hole (9), and there is a connection bolt (10) between two connection holes (9).
6. A firm type scaffold based on building engineering construction according to claim 5, characterized in that a rubber plug (11) is arranged between connecting bolt (10) and riser (1), and one side of rubber plug (11) near riser (1) is an arc face adapted to the surface of riser (1).
7. A firm scaffold based on building engineering construction according to claim 4, characterized in that the surface of the connecting rod (8) and between the ends of the upper and lower adjacent risers (1) is provided with an end sealing ring.
CN202123076429.3U 2021-12-09 2021-12-09 Firm type scaffold frame based on building engineering construction Expired - Fee Related CN216587572U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202123076429.3U CN216587572U (en) 2021-12-09 2021-12-09 Firm type scaffold frame based on building engineering construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202123076429.3U CN216587572U (en) 2021-12-09 2021-12-09 Firm type scaffold frame based on building engineering construction

Publications (1)

Publication Number Publication Date
CN216587572U true CN216587572U (en) 2022-05-24

Family

ID=81610872

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202123076429.3U Expired - Fee Related CN216587572U (en) 2021-12-09 2021-12-09 Firm type scaffold frame based on building engineering construction

Country Status (1)

Country Link
CN (1) CN216587572U (en)

Similar Documents

Publication Publication Date Title
CN216587572U (en) Firm type scaffold frame based on building engineering construction
CN202324565U (en) Novel steel pipe scaffold
CN214785949U (en) Quick-assembly early-disassembly ear-shaped connecting piece for primary and secondary keels on board
CN216157091U (en) Quick-release quick-assembly scaffold
CN211338605U (en) Tower crane installation device and tower crane installation system
CN212534973U (en) Scaffold for building engineering
CN211201129U (en) Wall-attached hanging piece for attached lifting scaffold
CN102392533B (en) Steel pipe scaffold connecting piece
CN210263877U (en) Connecting structure of building outer wall scaffold
CN204059927U (en) Disc type scaffold
CN218714998U (en) Non-through-wall drawknot device for external wall scaffold
CN203866819U (en) Steel pipe pile lock mouth structure
CN113431313A (en) External frame structure and construction method thereof
CN209855215U (en) Safe type combination formula scaffold frame
CN207878917U (en) A kind of construction scaffold
CN110485633A (en) A kind of steel core concrete column fast joint structure and method
CN211421599U (en) Quick connection structure of steel core concrete column
CN207017630U (en) Anti-loose scaffold
CN205975585U (en) Novel precast concrete connecting elements
CN215367239U (en) Reinforcing steel bar fastener for tubular pile connecting structure
CN211898320U (en) Easily-butted ground wall reinforcement cage
CN218952775U (en) Universal dish is detained
CN211622526U (en) Attached cantilever beam
CN215631479U (en) External frame structure
CN215167943U (en) Scaffold structure, scaffold joint and quick installation self-locking type shaping scaffold

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee