CN216303060U - Hoisting platform for construction of steel structure transformer substation - Google Patents

Hoisting platform for construction of steel structure transformer substation Download PDF

Info

Publication number
CN216303060U
CN216303060U CN202123066339.6U CN202123066339U CN216303060U CN 216303060 U CN216303060 U CN 216303060U CN 202123066339 U CN202123066339 U CN 202123066339U CN 216303060 U CN216303060 U CN 216303060U
Authority
CN
China
Prior art keywords
hoisting
connecting plates
construction
steel structure
fixedly connected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202123066339.6U
Other languages
Chinese (zh)
Inventor
刘勣
张彩宏
曾传魁
权鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Shouye Engineering Design Consultation Co ltd
Original Assignee
Chongqing Shouye Engineering Design Consultation Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Shouye Engineering Design Consultation Co ltd filed Critical Chongqing Shouye Engineering Design Consultation Co ltd
Priority to CN202123066339.6U priority Critical patent/CN216303060U/en
Application granted granted Critical
Publication of CN216303060U publication Critical patent/CN216303060U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to the technical field of transformer substation construction, in particular to a hoisting platform for steel structure transformer substation construction, which comprises a hoisting support, a hoisting device, a hoisting rope, a hoisting hook, a fixing mechanism and a steel structure body, wherein the hoisting device is connected to the hoisting support, the hoisting rope is connected to the lower end of the hoisting device, the hoisting hook is fixedly connected to the lower end of the hoisting rope, the fixing mechanism is hung at the lower end of the hoisting hook, the steel structure body is fixed in the fixing mechanism, and the fixing mechanism is used for hoisting the steel structure body under the hoisting hook. This hoisting platform for construction of steel construction transformer substation can fix the steel construction fast conveniently, then conveniently get up the steel construction hoist and mount, and at the in-process of hoist and mount, the steel construction possesses fine stability moreover.

Description

Hoisting platform for construction of steel structure transformer substation
Technical Field
The utility model relates to the technical field of transformer substation construction, in particular to a hoisting platform for steel structure transformer substation construction.
Background
In the in-process of transformer substation's construction, often need hoist construction with the steel construction, and at present, the girder steel of steel construction transformer substation all generally adopts earlier to install on the steel column with welded mode after the bolted connection fastening, but lift by crane the back at the girder steel, constructor often need finely tune the girder steel position aloft with the hand, so that aim at the bolt hole, and follow-up bolt-up and weldment work, and constructor often utilizes the crane to hang through forms such as hanging flower basket and accomplish above-mentioned operation aloft, but, adopt the mode that the hanging flower basket hoisted the steel construction, can make the steel construction relatively poor at the in-process stability of hoist and mount, there is very big potential safety hazard, and, also, it is inconvenient to fix the steel construction. Therefore, the hoisting platform for the construction of the steel structure transformer substation is provided.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the defects that a steel structure is inconvenient to fix and hoist and the stability of the steel structure is poor in the hoisting process in the prior art, and provides a hoisting platform for the construction of a steel structure transformer substation.
In order to achieve the purpose, the utility model adopts the following technical scheme:
the design is a hoisting platform for construction of a steel structure transformer substation, which comprises a hoisting support, a hoisting device, a hoisting rope, a hoisting hook, a fixing mechanism and a steel structure body, wherein the hoisting device is connected to the hoisting support, the hoisting rope is connected to the lower end of the hoisting device, the hoisting hook is fixedly connected to the lower end of the hoisting rope, the fixing mechanism is hung at the lower end of the hoisting hook, the steel structure body is fixed to the fixing mechanism, and the fixing mechanism is used for hoisting the steel structure body under the hoisting hook.
Preferably, fixed establishment includes rings, connecting block, two first connecting plates, two second connecting plates, two buffer gear and locking mechanism, rings hang and establish the lower extreme of couple lifts by crane, connecting block fixed connection is in the rings lower extreme, two first connecting plate upper end articulates respectively the both sides of connecting block lower extreme, and two for relative setting, two between the first connecting plate second connecting plate fixed connection respectively is two first connecting plate lower extreme, two buffer gear fixed connection respectively is two relative one side of second connecting plate, and two for relative setting between the buffer gear, steel construction body presss from both sides and establishes two between the buffer gear, locking mechanism connects two between the first connecting plate.
Preferably, buffer gear includes a plurality of springs and splint, and is a plurality of the equal fixed connection of spring is in second connecting plate one side, splint fixed connection is in a plurality of the one end of spring.
Preferably, the locking mechanism comprises two third connecting plates, two fastening plates and a fastening bolt, the upper ends of the two third connecting plates are respectively hinged to the opposite sides of the two first connecting plates, the two fastening plates are respectively and fixedly connected to the lower ends of the two third connecting plates, and the fastening bolt is fixedly connected between the two fastening plates.
Preferably, the lower ends of the two second connecting plates are fixedly connected with a plurality of toothed blocks respectively.
The hoisting platform for the construction of the steel structure transformer substation provided by the utility model has the beneficial effects that: when the hoisting device is started to enable the hoisting rope and the hoisting hook to ascend, the hoisting rope and the hoisting hook can drive the fixing mechanism to ascend, when the fixing mechanism is in ascending trend, the two second connecting plates can respectively drive the two buffer mechanisms to clamp the steel structure body, at the moment, the two fastening plates can be fastened by screwing the fastening bolts, the two third connecting plates can be close to each other, then the two third connecting plates can respectively drive the two first connecting plates to be close to each other, the two first connecting plates can respectively drive the two second connecting plates to be close to each other, then the two second connecting plates can respectively drive the two buffer mechanisms to clamp and fix the steel structure body again, and therefore the effect of locking the steel structure body can be achieved, and then, in the process of ascending the hoisting rope and the hoisting hook, the steel structure body can be lifted up through the fixing mechanism, so that the hoisting process of the steel structure body can be carried out. Therefore, through this design, not only can be fast conveniently press from both sides the steel construction tightly fixed, made things convenient for the hoist and mount process of steel construction, moreover, under locking mechanism's effect, can reach the effect of locking steel construction fast, strengthened the steadiness of steel construction greatly.
Drawings
Fig. 1 is a schematic structural diagram of a hoisting platform for construction of a steel structure transformer substation provided by the utility model.
Fig. 2 is a schematic structural view of the fixing mechanism in fig. 1.
Fig. 3 is a bottom view of a portion of the structure of fig. 2.
In the figure: the lifting device comprises a lifting support 1, a lifting device 2, a lifting rope 3, a lifting hook 4, a fixing mechanism 5, a lifting ring 501, a connecting block 502, a first connecting plate 503, a second connecting plate 504, a spring 505, a clamping plate 506, a third connecting plate 507, a fastening plate 508, a fastening bolt 509, a tooth-shaped block 510 and a steel structure body 6.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments.
Example 1
Referring to fig. 1-3, a lifting platform for construction of a steel structure transformer substation comprises a lifting support 1, a lifting device 2, a lifting rope 3, a lifting hook 4, a fixing mechanism 5 and a steel structure body 6, wherein the lifting device 2 is connected to the lifting support 1, the lifting rope 3 is connected to the lower end of the lifting device 2, the lifting hook 4 is fixedly connected to the lower end of the lifting rope 3, the fixing mechanism 5 is hung at the lower end of the lifting hook 4, the steel structure body 6 is fixed in the fixing mechanism 5, the fixing mechanism 5 is used for lifting the steel structure body 6 under the lifting hook 4, the lifting device 2 adopts a common lifting device in the prior art, when in use, the steel structure is fixed through the fixing mechanism 5, then the fixing mechanism 5 is hung on the lifting hook 4, then, the lifting device 2 is started, the fixing mechanism 5 can be lifted through the lifting rope 3 and the lifting hook 4, the fixing mechanism 5 can lift the steel structure, so that the hoisting process of the steel structure can be carried out.
The fixing mechanism 5 comprises a hanging ring 501, a connecting block 502, two first connecting plates 503, two second connecting plates 504, two buffer mechanisms and a locking mechanism, the hanging ring 501 is hung at the lower end of the lifting hook 4, the connecting block 502 is fixedly connected at the lower end of the hanging ring 501, the upper ends of the two first connecting plates 503 are respectively hinged at two sides of the lower end of the connecting block 502, the two first connecting plates 503 are oppositely arranged, the two second connecting plates 504 are respectively fixedly connected at the lower ends of the two first connecting plates 503, the lower ends of the two second connecting plates 504 are respectively and fixedly connected with a plurality of toothed blocks 510, through the arrangement of the toothed blocks 510, the plurality of toothed blocks 510 are all downwards inclined towards the steel structure body 6, moreover, the end parts of the toothed blocks 510 are all designed into a conical structure, in the process of fixing the steel structure body 6 through the fixing mechanism 5, the end parts of the plurality of toothed blocks 510 can be more easily clamped to a part of the lower end of the steel structure body 6, thereby, the steel structure body 6 can be fixed more easily, and the steel structure body 6 can be hoisted more easily and conveniently.
The two buffer mechanisms are respectively and fixedly connected to the opposite sides of the two second connecting plates 504, the two buffer mechanisms are oppositely arranged, the steel structure body 6 is clamped between the two buffer mechanisms, the locking mechanism is connected between the two first connecting plates 503, the locking mechanism comprises two third connecting plates 507, two fastening plates 508 and fastening bolts 509, the upper ends of the two third connecting plates 507 are respectively hinged to the opposite sides of the two first connecting plates 503, the two fastening plates 508 are respectively and fixedly connected to the lower ends of the two third connecting plates 507, the fastening bolts 509 are fixedly connected between the two fastening plates 508, when the lifting device 2 is started to enable the lifting rope 3 and the lifting hook 4 to ascend, the lifting rope 3 and the lifting hook 4 can drive the fixing mechanism 5 to ascend, when the fixing mechanism 5 shows an ascending trend, the two second connecting plates 504 can respectively drive the two buffer mechanisms to clamp the steel structure body 6, at this moment, fastening bolt 509 is screwed up again, it fastens between two mounting plates 508 to make, it is close to each other to make two third connecting plates 507, then, two first connecting plates 503 will be taken respectively to be close to each other for two third connecting plates 507, two first connecting plates 503 will be taken respectively two second connecting plates 504 and be close to each other, then, two second connecting plates 504 will be taken two buffer gear respectively and press from both sides steel structure body 6 tightly once more fixedly, thereby can reach the effect of locking steel structure body 6, then, in-process that lifting rope 3 and lifting hook 4 rise, can take steel structure body 6 to rise through fixed establishment 5, thereby can carry out steel structure body 6's hoist and mount process.
Example 2
Referring to fig. 1-2, as another preferred embodiment of the present invention, the difference from embodiment 1 is that the damping mechanism includes a plurality of springs 505 and a clamp plate 506, the plurality of springs 505 are all fixedly connected to the second connecting plate 504 side, the clamp plate 506 is fixedly connected to one end of the plurality of springs 505, and by the arrangement of the plurality of springs 505 and the clamp plate 506, in the process of clamping and fixing the steel structure body 6, under the action of the springs 505, not only the damping effect on the steel structure body 6 can be effectively achieved, but also the stability of the clamping and fixing structure of the steel structure body 6 can be further enhanced.
The above description is only for the preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art should be considered to be within the technical scope of the present invention, and equivalent alternatives or modifications according to the technical solution of the present invention and the inventive concept thereof should be covered by the scope of the present invention.

Claims (5)

1. The utility model provides a steel construction transformer substation construction is with hoist and mount platform, includes hoisting support (1), hoisting accessory (2), lifting rope (3), lifts by crane couple (4), fixed establishment (5) and steel construction body (6), hoisting accessory (2) are connected on hoisting support (1), lifting rope (3) are connected the lower extreme of hoisting accessory (2), it is in to lift by crane couple (4) fixed connection the lower extreme of lifting rope (3), its characterized in that, fixed establishment (5) are hung and are established the lower extreme of lifting hook (4), steel construction body (6) are fixed among fixed establishment (5), fixed establishment (5) are used for with steel construction body (6) are hung under lifting hook (4).
2. The hoisting platform for the construction of the steel structure transformer substation of claim 1, wherein the fixing mechanism (5) comprises a hoisting ring (501), a connecting block (502), two first connecting plates (503), two second connecting plates (504), two buffering mechanisms and a locking mechanism, the hoisting ring (501) is hung at the lower end of the hoisting hook (4), the connecting block (502) is fixedly connected at the lower end of the hoisting ring (501), the upper ends of the two first connecting plates (503) are respectively hinged at two sides of the lower end of the connecting block (502), the two first connecting plates (503) are oppositely arranged, the two second connecting plates (504) are respectively fixedly connected at the lower ends of the two first connecting plates (503), the two buffering mechanisms are respectively fixedly connected at one opposite sides of the two second connecting plates (504), the two buffer mechanisms are oppositely arranged, the steel structure body (6) is clamped between the two buffer mechanisms, and the locking mechanism is connected between the two first connecting plates (503).
3. The hoisting platform for construction of a steel structural substation according to claim 2, wherein the buffer mechanism comprises a plurality of springs (505) and a clamping plate (506), the plurality of springs (505) are fixedly connected to one side of the second connecting plate (504), and the clamping plate (506) is fixedly connected to one end of the plurality of springs (505).
4. The hoisting platform for construction of the steel structure transformer substation of claim 2, wherein the locking mechanism comprises two third connecting plates (507), two fastening plates (508) and a fastening bolt (509), the upper ends of the two third connecting plates (507) are respectively hinged on the opposite sides of the two first connecting plates (503), the two fastening plates (508) are respectively and fixedly connected at the lower ends of the two third connecting plates (507), and the fastening bolt (509) is fixedly connected between the two fastening plates (508).
5. The hoisting platform for the construction of the steel structure transformer substation of claim 2, wherein the lower ends of the two second connecting plates (504) are fixedly connected with a plurality of toothed blocks (510) respectively.
CN202123066339.6U 2021-12-08 2021-12-08 Hoisting platform for construction of steel structure transformer substation Active CN216303060U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202123066339.6U CN216303060U (en) 2021-12-08 2021-12-08 Hoisting platform for construction of steel structure transformer substation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202123066339.6U CN216303060U (en) 2021-12-08 2021-12-08 Hoisting platform for construction of steel structure transformer substation

Publications (1)

Publication Number Publication Date
CN216303060U true CN216303060U (en) 2022-04-15

Family

ID=81084836

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202123066339.6U Active CN216303060U (en) 2021-12-08 2021-12-08 Hoisting platform for construction of steel structure transformer substation

Country Status (1)

Country Link
CN (1) CN216303060U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115339999A (en) * 2022-08-12 2022-11-15 国网江苏省电力有限公司灌南县供电分公司 Hoisting accessory of transformer substation

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115339999A (en) * 2022-08-12 2022-11-15 国网江苏省电力有限公司灌南县供电分公司 Hoisting accessory of transformer substation

Similar Documents

Publication Publication Date Title
CN216303060U (en) Hoisting platform for construction of steel structure transformer substation
CN212503731U (en) Boiler installation overhead hoist
CN217201659U (en) Bailey frame hoisting device
CN110626933A (en) Segmental beam hanger
CN212832351U (en) Hoisting tool for installing reactor supporting beam
CN210884874U (en) Installation hoist for high-speed tunnel fan
CN211812991U (en) Lifting beam capable of adjusting self balance
CN210366647U (en) A a gallows structure assembly for electromechanical device installation
CN210558996U (en) Assembled building model platform double-limb column lifting appliance
CN217201631U (en) High stability is tower crane for tubular product
CN218364060U (en) Tool for crankshaft machining
CN2088103U (en) Hook disengagement-preventing clamper for cranes
CN220950831U (en) Special lifting sling for rubber sleeve
CN212334355U (en) Hoisting clamp for cylindrical steel ingot
CN218491250U (en) Automatic adjust focus's hoist well
CN221370220U (en) Hoisting tool
CN108100857A (en) A kind of special hanger of nuclear power plant's concrete barrel shape disposal container
CN212076219U (en) Transfer device is used in production of square chopsticks
CN209740501U (en) Special flexible belt sliding type 90-degree overturning lifting appliance for medium and large motors
CN213679468U (en) A carry thing frock for building engineering lifting device
CN218860112U (en) Lifting suspension device
CN215287661U (en) Heavy-calibre steel pipe overhead hoist
CN214217890U (en) High-stability frame lifting appliance for multiple vehicle types
CN213865075U (en) Box girder hoisting fixture
CN217201595U (en) Detachable lifting appliance and device for lifting and turning over steel truss girder

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant