CN216245645U CN202122234640.7U CN202122234640U CN216245645U CN 216245645 U CN216245645 U CN 216245645U CN 202122234640 U CN202122234640 U CN 202122234640U CN 216245645 U CN216245645 U CN 216245645U
Authority
CN
China
Prior art keywords
tower
pipe
square frame
tower body
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122234640.7U
Other languages
Chinese (zh)
Inventor
王杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou Qingfeng Environmental Protection Technology Research Institute Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202122234640.7U priority Critical patent/CN216245645U/en
Application granted granted Critical
Publication of CN216245645U publication Critical patent/CN216245645U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Heat-Exchange Devices With Radiators And Conduit Assemblies (AREA)

Abstract

The utility model discloses a high-efficiency cooling tower, in particular to the technical field of cooling towers, which comprises a tower body; a positive and negative motor is arranged on the right side of the top of the tower body; when the screw sleeve moves downwards along the screw rod, the screw sleeve can simultaneously drive the square frame to move downwards in a lump and scrape the scale on the inner wall of the tower body and collect the scale at the bottom of the tower body, when the bottom of the square frame is close to the bottom of the tower body, the mixed dust and the scale are covered into the frame groove, the inlet and the outlet respectively correspond to the positions of the liquid inlet pipe and the liquid outlet pipe, the first valve at the top of the liquid inlet pipe is opened and externally connected with a water source, the water source can be guided into the frame groove through the inlet after being guided out through the liquid inlet pipe, and the first valve at the top of the liquid outlet pipe is opened.

Description

High-efficient cooling tower
Technical Field
The utility model relates to the technical field of cooling towers, in particular to an efficient cooling tower.
Background
The cooling tower is a device for dissipating waste heat generated in industry or refrigeration air conditioners by utilizing the contact of water and air through the evaporation effect, and is mainly applied to the fields of air conditioner cooling systems, refrigeration series, injection molding, leather making, foaming, power generation, steam turbines, aluminum profile processing, air compressors, industrial water cooling and the like.
After the existing cooling tower is used for a long time, a large amount of scale can be accumulated on the inner wall of the cooling tower, in order to not influence the use of the cooling tower, the scale on the inner wall of the cooling tower needs to be cleaned regularly, but the cleaned scale is inconvenient to be intensively treated, and the treatment effect of the scale is poor; meanwhile, impurities brought into the cooling tower by air are accumulated at the bottom of the cooling tower and are inconvenient to clean.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a high-efficiency cooling tower, which solves the problem that impurities and water scales accumulated at the bottom of the existing high-efficiency cooling tower are inconvenient to clean.
The technical scheme adopted by the utility model for solving the technical problems is as follows: an efficient cooling tower comprises a tower body;
positive and negative motor is installed on body of the tower top right side, the inside square frame that is provided with of body of the tower, just the frame groove has been seted up to the square frame bottom, import and export have been seted up respectively to the square frame left and right sides, just square frame inner wall right side is fixed with the screw rod cover, be provided with the screw rod that runs through the square frame in the body of the tower, the inside bottom mounting of body of the tower has the toper screen panel, just row's mouth has been link up at toper screen panel top, the side is fixed with feed liquor pipe and drain pipe in the embedding respectively about body of the tower outer wall below, just equal flange joint in feed liquor pipe and drain pipe top has valve one.
Further, it is fixed with rather than the communicating play chimney in inside to run through in the middle of the body of the tower top, just body of the tower bottom embedding is fixed with rather than the communicating fluid-discharge tube in inside, fluid-discharge tube right side flange joint has valve two, the fan is installed to body of the tower left side top, just both ends all are fixed with the tuber pipe about the fan, and the right side the tuber pipe runs through to in the body of the tower and communicates with each other rather than.
Furthermore, a water pump is installed on the left side of the top of the tower body, water pipes are fixed to the upper end and the lower end of the water pump, the water pipes below the water pump penetrate through the tower body and are communicated with the tower body, a liquid spraying pipe communicated with the water pipes is connected to the bottom of the water pipes below the water pipe, and a plurality of nozzles communicated with the liquid spraying pipe are embedded into the bottom of the liquid spraying pipe.
Furthermore, the discharge port corresponds to and is communicated with the discharge pipe.
Furthermore, the screw penetrates through the screw sleeve and is in threaded connection with the screw sleeve, and the top end of the screw penetrates through the top of the tower body and is fixed with the power end of the positive and negative motor.
Furthermore, import and export correspond with feed liquor pipe and drain pipe position respectively, feed liquor pipe and drain pipe all communicate with each other with the tower body is inside, import and export all communicate with each other with the frame groove, the square frame outer wall all leans on with tower body inner wall periphery all around.
Compared with the prior art, the utility model has the following beneficial effects:
when the screw rod sleeve moves downwards along the screw rod, the screw rod sleeve can simultaneously drive the square frame to move downwards together with the screw rod and scrape scale on the inner wall of the tower body, the scale is scraped and then collected together with dust at the bottom of the tower body, when the bottom of the square frame is close to the bottom of the tower body, the dust and scale collected at the bottom of the tower body and close to the periphery of the conical mesh enclosure are covered into the frame groove, the inlet and the outlet respectively correspond to the positions of the liquid inlet pipe and the liquid outlet pipe, the first valve at the top of the liquid inlet pipe is opened and is externally connected with a water source, the water source is led out through the liquid inlet pipe and then is led into the frame groove, the first valve at the top of the liquid outlet pipe is opened, and along with the impact of the water source, the scale and the dust in the frame groove can be discharged together with the water source through the outlet and finally discharged through the liquid outlet pipe, so that a user can conveniently treat the dust accumulated on the inner wall and the bottom of the tower body, the problem of the accumulational impurity in its bottom and incrustation scale of current high-efficient cooling tower of being not convenient for clear up is solved.
Drawings
FIG. 1 is an overall schematic view of the present invention;
FIG. 2 is a schematic top view of the conical mesh enclosure of the present invention;
FIG. 3 is a bottom schematic view of a block of the present invention.
In the figure: 1-tower body, 2-fan, 3-air pipe, 4-water pump, 5-water pipe, 6-liquid spraying pipe, 7-air outlet cylinder, 8-positive and negative motor, 9-screw, 10-screw sleeve, 11-square frame, 12-liquid inlet pipe, 13-valve I, 14-liquid outlet pipe, 15-liquid outlet pipe, 16-valve II, 17-conical mesh enclosure, 18-discharge port, 19-frame groove, 20-inlet, 21-outlet.
Detailed Description
Referring to fig. 1-3, the present invention provides a technical solution: an efficient cooling tower comprises a tower body 1;
positive and negative motor 8 is installed on 1 top right side of body of the tower, 1 inside square frame 11 that is provided with of body of the tower, just frame groove 19 has been seted up to square frame 11 bottom, import 20 and export 21 have been seted up respectively to the 11 left and right sides of square frame, just 11 inner wall right sides of square frame are fixed with screw rod cover 10, be provided with in the body of the tower and run through the screw rod 9 of square frame 11, 1 inside bottom mounting of body of the tower has toper screen panel 17, just row's of having run through mouth 18 in toper screen panel 17 top, the side is fixed with feed liquor pipe 12 and drain pipe 14 in the embedding respectively about 1 outer wall below of the body of the tower, just equal flange joint in feed liquor pipe 12 and the 14 tops of drain pipe has valve 13.
An air outlet cylinder 7 communicated with the interior of the tower body 1 penetrates through the middle of the top of the tower body 1, a liquid discharge pipe 15 communicated with the interior of the tower body 1 is embedded and fixed at the bottom of the tower body 1, a second valve 16 is connected to the right side of the liquid discharge pipe 15 in a flange mode, a fan 2 is installed above the left side of the tower body 1, air pipes 3 are fixed to the left end and the right end of the fan 2, and the air pipe 3 on the right side penetrates into the tower body 1 and is communicated with the tower body;
a water pump 4 is installed on the left side of the top of the tower body 1, water pipes 5 are fixed at the upper end and the lower end of the water pump 4, the lower water pipe 5 penetrates through the tower body 1 and is communicated with the tower body, a liquid spraying pipe 6 communicated with the lower water pipe 5 is connected to the bottom of the lower water pipe 5, and a plurality of nozzles communicated with the liquid spraying pipe 6 are embedded into the bottom of the liquid spraying pipe 6;
when the cooling operation is carried out, the fan is externally connected to the power supply and started, meanwhile, the left air pipe 3 is externally connected with hot air to be processed, then the hot air is discharged into the tower body 1 through the right air pipe 3, then the upper water pipe 5 is externally connected with cold water, the water pump 4 is externally connected to the power supply and started, the water pump 4 can be used for pumping the water from the upper water pipe 5 after being started, then the water is discharged into the liquid spraying pipe 6 through the lower water pipe 5, then the water is uniformly discharged through the nozzle and is fully contacted with the hot air, the cooling efficiency is high, the hot air can be discharged through the air outlet cylinder 7 after being cooled, then the valve II 16 is opened, the cooling water stored at the bottom of the tower body 1 is collected into the liquid discharge pipe 15 through the conical mesh enclosure 17 and the discharge port 18 and then discharged, and part of the foreign dust in the cooling water can be filtered by the conical mesh enclosure 17 and collected at the bottom of the tower body 1 and close to the periphery of the conical mesh enclosure 17, another part of the dust will be discharged directly from the drain pipe 15 along with the cooling water;
the discharge port 18 corresponds to and is communicated with the discharge pipe 15;
the screw 9 penetrates through the screw sleeve 10 and is in threaded connection with the screw sleeve, and the top end of the screw 9 penetrates through the top of the tower body 1 and is fixed with the power end of the positive and negative motor 8;
the inlet 20 and the outlet 21 correspond to the liquid inlet pipe 12 and the liquid outlet pipe 14 respectively, the liquid inlet pipe 12 and the liquid outlet pipe 14 are communicated with the inside of the tower body 1, the inlet 20 and the outlet 21 are communicated with the frame groove 19, and the periphery of the outer wall of the square frame 11 is leaned against the periphery of the inner wall of the tower body 1;
when the inner wall and the bottom of the tower body 1 need to be cleaned, the positive and negative motor 8 is externally connected to a power supply and started, when the positive and negative motor 8 is started and drives the screw rod 9 to rotate forwards, the screw rod sleeve 10 moves downwards along the screw rod 9 and simultaneously drives the frame 11 to move downwards together and scrape scale on the inner wall of the tower body 1, the scale is collected at the bottom of the tower body 1 together with the dust after being scraped, when the bottom of the frame 11 is abutted against the bottom of the tower body 1, the dust and the scale collected at the bottom of the tower body 1 and near the periphery of the conical net cover 17 are covered into the frame groove 19, the inlet 20 and the outlet 21 respectively correspond to the positions of the liquid inlet pipe 12 and the liquid outlet pipe 14, the valve I13 at the top of the liquid inlet pipe 12 is opened and the liquid inlet pipe 12 is externally connected, the water source is guided out through the liquid inlet pipe 12 and then can be guided into the frame groove 19 through the inlet 20, and the valve I13 at the top of the liquid outlet pipe 14 is opened, along with the impact of the water source, the scale and the dust in the frame groove 19 can be discharged together with the water source through the outlet 21 and finally through the liquid outlet pipe 14, so that the user can conveniently treat the dust accumulated on the inner wall and the bottom of the tower body 1.

Claims (6)

1. An efficient cooling tower, includes body of the tower (1), its characterized in that:
positive and negative motor (8) are installed on body of the tower (1) top right side, body of the tower (1) inside is provided with square frame (11), just frame groove (19) have been seted up to square frame (11) bottom, import (20) and export (21) have been seted up respectively to square frame (11) left and right sides, just square frame (11) inner wall right side is fixed with screw rod cover (10), be provided with in body of the tower (1) and run through screw rod (9) of square frame (11), the inside bottom mounting of body of the tower (1) has toper screen panel (17), just row mouth (18) have been run through at toper screen panel (17) top, the side is fixed with feed liquor pipe (12) and drain pipe (14) respectively to imbed about body of the outer wall below, just equal flange joint in feed liquor pipe (12) and drain pipe (14) top has valve (13).
2. A high efficiency cooling tower as defined in claim 1, wherein: run through in the middle of body of the tower (1) top and be fixed with rather than communicating play chimney (7) of inside, just body of the tower (1) bottom embedding is fixed with rather than communicating fluid-discharge tube (15) of inside, fluid-discharge tube (15) right side flange joint has valve two (16), fan (2) are installed to body of the tower (1) left side top, just both ends all are fixed with tuber pipe (3) about fan (2), and the right side tuber pipe (3) run through to body of the tower (1) in and communicate with each other with it.
3. A high efficiency cooling tower as defined in claim 1, wherein: the tower is characterized in that a water pump (4) is installed on the left side of the top of the tower body (1), water pipes (5) are fixed at the upper end and the lower end of the water pump (4), the water pipes (5) below penetrate into the tower body (1) and are communicated with the tower body, the water pipes (5) below are connected with the bottom of the water pipes (5) and are communicated with a liquid spraying pipe (6), and a plurality of nozzles communicated with the liquid spraying pipe (6) are embedded into the bottom of the liquid spraying pipe (6).
4. A high efficiency cooling tower as defined in claim 2, wherein: the discharge port (18) is corresponding to and communicated with the discharge pipe (15).
5. A high efficiency cooling tower as defined in claim 1, wherein: the screw (9) penetrates through the screw sleeve (10) and is in threaded connection with the screw, and the top end of the screw (9) penetrates through the top of the tower body (1) and is fixed with the power end of the positive and negative motor (8).
6. A high efficiency cooling tower as defined in claim 1, wherein: import (20) and export (21) correspond with feed liquor pipe (12) and drain pipe (14) position respectively, feed liquor pipe (12) and drain pipe (14) all communicate with each other with body of the tower (1) is inside, import (20) and export (21) all communicate with each other with frame groove (19), all lean on with body of the tower (1) inner wall periphery all around square frame (11).
CN202122234640.7U 2021-09-15 2021-09-15 High-efficient cooling tower Active CN216245645U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122234640.7U CN216245645U (en) 2021-09-15 2021-09-15 High-efficient cooling tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122234640.7U CN216245645U (en) 2021-09-15 2021-09-15 High-efficient cooling tower

Publications (1)

Publication Number Publication Date
CN216245645U true CN216245645U (en) 2022-04-08

Family

ID=80983679

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122234640.7U Active CN216245645U (en) 2021-09-15 2021-09-15 High-efficient cooling tower

Country Status (1)

Country Link
CN (1) CN216245645U (en)

Similar Documents

Publication Publication Date Title
CN208758278U (en) A kind of silicon wafer cleaner
CN216245645U (en) High-efficient cooling tower
CN201446099U (en) Air conditioning dynamic fog-washing sterilizing machine
CN109048462A (en) A kind of cutter device for building with spraying function
CN109908675B (en) Cooling circulation and deodorization system of vacuum equipment
CN106422625A (en) Industrial gas high-efficiency dedusting and humidifying device
CN210385293U (en) Energy-efficient low temperature plasma purifier
CN204902070U (en) Integral type of cooling down - disinfect evaporation air conditioner
CN204582839U (en) A kind of comminutor emission-control equipment
CN210434289U (en) Environmental protection chemical waste gas treatment device
CN210186784U (en) Sludge treatment waste gas spray rinsing device and deep heat exchanger cleaning system
CN206810003U (en) New waste gas purifying column
CN213221020U (en) Tubular gas condenser with scraping blade cleaning device
CN217449469U (en) Water film dust collector
CN221222885U (en) Refrigerating device of industrial air conditioner with purifying structure
CN221244617U (en) Acid mist absorbing and purifying device for hot galvanizing
CN2203760Y (en) Closed cycle flowing thermostatic air purifying room
CN220298112U (en) Waste gas collection type gold stamping equipment
CN219462939U (en) Washing tower waste gas entry heat sink
CN209662920U (en) A kind of reverse-flow exhaust gas washing tower
CN221302077U (en) Small-circulation chemical cleaning device for heat exchanger
CN219415819U (en) Heat exchange structure capable of recycling heat energy
CN218545341U (en) Molecular sieve activated gas heating device
CN214287375U (en) Tail gas absorption device for plastic processing equipment
CN218066009U (en) Novel countercurrent closed cooling tower with high air duct

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20221110

Address after: 1-5-10, Building 1, Guizhou Science City, No. 3491, Baijin Avenue, Shawen Town, Guiyang National Hi tech Industrial Development Zone, 550,081, Guizhou

Patentee after: Guizhou Qingfeng Environmental Protection Technology Research Institute Co.,Ltd.

Address before: 408500 building 4, Boneng garden, No. 21, Jianshe East Road, Wulong District, Chongqing

Patentee before: Wang Jie