CN216196496U - Movable operation platform for installing steel structure wall panel - Google Patents
Movable operation platform for installing steel structure wall panel Download PDFInfo
- Publication number
- CN216196496U CN216196496U CN202122610545.2U CN202122610545U CN216196496U CN 216196496 U CN216196496 U CN 216196496U CN 202122610545 U CN202122610545 U CN 202122610545U CN 216196496 U CN216196496 U CN 216196496U
- Authority
- CN
- China
- Prior art keywords
- platform
- wall panel
- steel structure
- structure wall
- directional
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model relates to a mobile operation platform for mounting a steel structure wall panel, which comprises a platform frame, wherein one side of the platform frame is provided with a crawling ladder, more than two layers of auxiliary platforms for constructors to work are arranged in the platform frame along the height direction, and the top and the lower part of the platform frame close to one side of the steel structure wall panel are respectively provided with a directional wheel and a directional trundle, wherein the directional wheel is longitudinally arranged and is connected with a driving mechanism arranged on the platform frame, the driving mechanism drives the directional wheel to rotate, and the directional wheel is arranged in a web plate of the steel structure wall panel; the directional caster wheels are transversely supported on the steel structure wall panel. Utilize actuating mechanism to drive the directive wheel and rotate for moving operation platform and including construction operation personnel move forward simultaneously, the hoist engine is installed at platform frame top and is used for hoist and mount shingle nail, thereby reduces shingle nail operation platform and frequently dismantles, moves and hoist and mount mechanical use, reduces construction cost, improves shingle nail installation effectiveness.
Description
Technical Field
The utility model relates to auxiliary equipment for mounting a steel structure wall panel, in particular to a movable operation platform for mounting the steel structure wall panel.
Background
At the present stage, the construction of the fabricated steel structure is developed rapidly, and the metal outer enclosure structure is used as an important component of the fabricated steel structure and is very popular in application. For example, in the line project special for Tianjin Nangang Port iron logistics Limited liability company, the dust canopy is the most core building, a double-span portal steel frame light steel structure is adopted, the interval length is 983m, the span is 32.6m and 31.9m, the axial distance is 9.0m, the cornice height is 14.0m, and the total building area is 63890 square meters. The vertical surface from the ground to the cornice is respectively provided with 3m high-altitude building blocks, 7m high-0.8 mm thick vertical overlock color steel plates, 2.5m high dust screens and a reserved space on the uppermost layer from bottom to top to be used as an air vent. The gable wall from the ground to the cornice is 3m high-altitude building blocks from bottom to top, and the upper surface of the gable wall is a vertical serging color steel plate with the thickness of 0.8 mm. The wall color steel plate is YX 75-210-840, and the wall purline is H250 multiplied by 200 multiplied by 6 multiplied by 8. Among above-mentioned project and the similar project, all there is the shingle nail installation area big, highly high, the big characteristics of safe risk.
The traditional installation method adopts a common hanging ladder, and after each wall panel is installed and fixed, construction workers need to frequently move the hanging ladder at high altitude. Because hang ladder weight great, cause easily when the operation personnel remove to hang safety risk such as ladder toppling.
Disclosure of Invention
The utility model aims to provide a movable operation platform for mounting a steel structure wall panel, which reduces frequent movement of the wall panel operation platform and improves the mounting efficiency of the wall panel under the condition of ensuring the operation safety of operators.
In order to solve the technical problems, the utility model adopts the technical scheme that: a mobile operation platform for mounting a steel structure wall panel comprises a platform frame, wherein one side of the platform frame is provided with a crawling ladder, more than two layers of auxiliary platforms for constructors to work are arranged in the platform frame along the height direction, and the top and the lower part of the platform frame close to one side of the steel structure wall panel are respectively provided with a directional wheel and a directional trundle, wherein the directional wheel is longitudinally arranged and is connected with a driving mechanism arranged on the platform frame, the driving mechanism drives the directional wheel to rotate, and the directional wheel is arranged in a web plate of the steel structure wall panel; the directional caster wheels are transversely supported on the steel structure wall panel.
Furthermore, the platform frame is a three-dimensional frame structure with a rectangular cross section, and comprises four vertical rods and transverse rods transversely connected between the adjacent vertical rods.
Further, the bottom of keeping away from two pole settings of steel construction shingle nail one side all is provided with the cylinder, the cylinder is connected with the fixed air compressor who sets up on the platform frame.
Further, the bottom of the cylinder is provided with a supporting steel plate.
Further, the bottoms of the two vertical rods close to one side of the steel structure wall panel are suspended in the air relative to the ground.
Further, a winch is installed at the top of the platform frame.
Further, two orientation wheels are symmetrically mounted on top of the platform frame.
Further, the driving mechanism comprises a speed reducer and a belt pulley, and the speed reducer is connected with the belt pulley through a belt; the belt pulley is arranged close to the directional wheel and connected with the directional wheel shaft.
Further, the auxiliary platform comprises a platform panel, and the platform panel is arranged on the cross rod at intervals.
Furthermore, the auxiliary platform also comprises foot blocking plates vertically arranged on the periphery of the platform panel.
Compared with the prior art, the utility model utilizes the driving mechanism to drive the directional wheel to rotate, so that the movable operating platform comprises construction operators to move forwards at the same time, and the top of the platform frame is provided with the winch for hoisting the wall panel, thereby reducing the frequent disassembly and movement of the wall panel operating platform and the use of hoisting machinery, lowering the construction cost and improving the installation efficiency of the wall panel. The utility model is particularly suitable for the installation of the steel structure wall panel of the large-area industrial factory building.
Drawings
The accompanying drawings, which are incorporated in and constitute a part of this application, illustrate exemplary embodiments of the utility model and, together with the description, serve to explain the utility model and not to limit the utility model.
Fig. 1 is a front view of a mobile operator platform according to the present invention.
Fig. 2 is a side view of the mobile operator station of the present invention.
In the figure, 1-directional wheel, 2-directional caster wheel, 3-vertical rod, 4-cross rod, 5-cylinder, 6-air compressor, 7-winch, 8-speed reducer, 9-belt pulley, 10-control box, 11-step and 12-ladder vertical rod.
In actual use, the mobile operation platform in fig. 1 and 2 is vertically placed.
Detailed Description
In order that those skilled in the art will better understand the present invention, a more complete and complete description of the present invention is provided below in conjunction with the accompanying drawings and embodiments. In addition, the features of the embodiments and examples in the present application may be combined with each other without conflict.
As shown in fig. 1 and 2, a mobile operation platform for installation of a steel structure wall panel according to a typical embodiment of the present invention includes a platform frame, a ladder is disposed on one side of the platform frame, two or more layers of auxiliary platforms for workers to work are disposed in the platform frame along a height direction, a directional wheel 1 and a directional caster 2 are disposed at the top and the lower portion of the platform frame near one side of the steel structure wall panel, respectively, wherein the directional wheel 1 is disposed longitudinally, the directional wheel 1 is connected to a driving mechanism disposed on the platform frame, the driving mechanism drives the directional wheel 1 to rotate, and the directional wheel 1 is disposed in a web plate of the steel structure wall panel; the directional caster 2 is transversely supported to the steel structural wall panel.
The size of the mobile operation platform can be manufactured on site according to the type of the wall panel, the distance between purlines, the installation height of the wall panel and the like. The directional wheel 1 is placed in the purlin web for bear the load of moving operation platform, utilize actuating mechanism to drive directional wheel 1 and rotate, make to move operation platform including the simultaneous forward movement of construction operation personnel. Directional truckle 2 welds in the operation platform pole setting through the landing leg to ensure directional truckle 2 and paste the shingle nail, so that the lower part can slide smoothly when operation platform moves as a whole.
In order to ensure the stability of the operation platform during integral translation, the two directional wheels 1 are symmetrically arranged on the top of the platform frame. Two directional casters 2 are symmetrically installed at the lower portion of the platform frame.
In a specific embodiment, the platform frame is a three-dimensional frame structure with a rectangular cross section, and the platform frame comprises four vertical uprights 3 and a cross bar 4 transversely connected between the adjacent uprights 3. The directional caster 2 is welded to the upright 3 of the operating platform by means of legs.
In the preferred embodiment, the bottom of two vertical rods 3 far away from one side of the steel structure wall panel is provided with a cylinder 5, and the cylinder 5 is connected with an air compressor 6 fixedly arranged on the platform frame. In this embodiment, two air cylinders 5 are installed at the bottom of the mobile operation platform, and the stroke thereof can be controlled by compressed air supplied from an air compressor 6. On one hand, the cylinder 5 can adjust the overall verticality of the mobile operating platform; on the other hand, the load of the mobile operation platform and the construction worker is transmitted to the ground. In a preferred embodiment, the bottom of the cylinder 5 is provided with a supporting steel plate.
In the preferred embodiment, the bottoms of the two uprights 3 adjacent one side of the steel structural wall panel are suspended from the ground. The cylinder atress of two pole setting bottoms of keeping away from steel construction shingle nail one side is utilized for operation platform closely laminates to steel construction shingle nail one side.
In the preferred embodiment, a hoist 7 is mounted on the top of the platform frame for hoisting the shingle. The hoist engine's lifting height can adjust according to the wallboard mounting height, sets up two couples on the wire rope that hoist engine 7 is connected, and during hoist and mount shingle nail, a couple rises to rise, and another couple descends, can improve the operating efficiency.
In the present embodiment, the driving mechanism includes a speed reducer 8 and a belt pulley 9, and the speed reducer 8 and the belt pulley 9 are connected by a belt; the belt pulley 9 is arranged close to the orienting wheel 1 and is connected with the orienting wheel 1 through a shaft. Utilize speed reducer 8 to drive belt pulley 9, belt pulley 9 drives directional wheel 1 and rotates to make the removal operation platform include that construction operation personnel move forward simultaneously.
A control box 10 is arranged in the platform frame, and the operation of the air compressor 6, the winch 7 and the speed reducer 8 can be controlled through a travel switch.
In this embodiment, the auxiliary platform includes a platform panel, and the platform panel and the foot blocking plates around the platform panel are arranged on the cross rod at intervals. The ladder stand pole setting 12 is arranged on one side of the platform frame, and the ladder stand pole setting and the platform frame are transversely installed between the pole setting close to one side of the steel structure wall panel and are marked with the steps 11 to form the ladder. The cylinder 5 is also arranged at the bottom of the ladder stand rod 12.
The claimed invention is further illustrated by the following relatively specific examples.
The upright rods 3 and the cross rods 4 of the mobile operating platform are welded by adopting galvanized square tubes with the specification of 60 multiplied by 2, the steps 11 are welded by adopting galvanized round steel with the specification of A20, the longitudinal distance between the steps 11 is 200mm, and the overall size of the mobile operating platform is 1.5 multiplied by 0.6 multiplied by 14m (length multiplied by width multiplied by height).
Set up a fixed auxiliary platform on the frame platform of every purlin below 600mm position of steel construction, auxiliary platform is used for construction operation personnel fixed shingle nail, and every auxiliary platform arranges a construction operation personnel. In order to avoid the striking of objects, a pattern steel plate and a foot baffle plate are paved on the platform.
Remove operation platform installation distance wall 300mm, the unsettled 100mm of the inboard landing leg that is close to the wall, two auxiliary cylinder 5 of outside landing leg installation, the stroke of cylinder 5 should not be less than 500mm to at 5 terminal welding two 150mm steel sheets of cylinder, increase the bearing capacity, when operation platform removed, the accessible was adjusted compressed air and is adjusted the stroke of cylinder.
A small air compressor 6 is arranged on an auxiliary platform at the position 1m of the mobile operation platform, the model of the air compressor 6 is 750W-10L, the air displacement is 40L/min, and the pressure is 0.8 MPa. An air compressor 6 provides compressed air to the cylinders of the legs.
Respectively install a directional truckle 2 in operation platform 2m department both sides, the landing leg of fixed directional truckle 2 welds on operation platform's pole setting 3 to ensure that directional truckle 3 is pasting the wall, so that the lower part can slide smoothly when operation platform moving as a whole.
A small-sized winch 7 is arranged on one side of the position 14m of the mobile operation platform, and the lifting height is 13 m. Two hooks are arranged on the steel wire rope, and when the wall panel is hoisted, one hook is lifted, and the other hook is descended.
A speed reducer 8 is arranged on the other side of the 14m position of the mobile operation platform, and an orientation wheel 1 and a belt pulley 9 are respectively arranged on two sides of the 12.5m position, wherein the orientation wheel 1 is placed in a web plate of the purlin and can bear the load of the mobile operation platform. The directional wheel 1 is connected with the belt pulley 9 through a shaft, and the belt pulley 9 is connected with the speed reducer 8 through a belt. When the speed reducer 8 is started, the speed reducer 8 drives the belt pulley through the belt, so that the mobile operation platform moves forwards.
A control box 10 is arranged at a position 14m of the mobile operation platform, wires of the air compressor 6, the winch 7 and the speed reducer 8 are connected with the control box 10, and the air compressor 6, the small winch 7 and the speed reducer 8 are controlled to operate through a travel switch.
The scope of the utility model is not limited to the above embodiments, and various modifications and changes may be made by those skilled in the art, and any modifications, improvements and equivalents within the spirit and principle of the utility model should be included in the scope of the utility model.
Claims (10)
1. The utility model provides a remove operation platform for installation of steel construction shingle nail which characterized in that: the steel structure wall panel construction platform comprises a platform frame, wherein a crawling ladder is arranged on one side of the platform frame, more than two layers of auxiliary platforms for constructors to work are arranged in the platform frame along the height direction, and a directional wheel and a directional trundle are respectively arranged at the top and the lower part of the platform frame close to one side of the steel structure wall panel, wherein the directional wheel is longitudinally arranged and is connected with a driving mechanism arranged on the platform frame, the driving mechanism drives the directional wheel to rotate, and the directional wheel is arranged in a web plate of the steel structure wall panel; the directional caster wheels are transversely supported on the steel structure wall panel.
2. The mobile operation platform for installation of a steel structure wall panel according to claim 1, wherein: the platform frame is a three-dimensional frame structure with a rectangular cross section and comprises four vertical rods and transverse rods transversely connected between the adjacent vertical rods.
3. The mobile operation platform for installation of a steel structure wall panel according to claim 1 or 2, wherein: keep away from the bottom of two pole settings of steel construction shingle nail one side and all be provided with the cylinder, the cylinder is connected with the fixed air compressor who sets up on the platform frame.
4. The mobile operation platform for installation of a steel structure wall panel according to claim 3, wherein: and a supporting steel plate is arranged at the bottom of the cylinder.
5. The mobile operation platform for installation of a steel structure wall panel according to claim 4, wherein: the bottoms of the two vertical rods close to one side of the steel structure wall panel are suspended in the air relative to the ground.
6. The mobile operations platform for installation of steel structural wall panels as claimed in claim 1, 2, 4 or 5, wherein: the top of the platform frame is provided with a winch.
7. The mobile operation platform for installation of a steel structure wall panel according to claim 6, wherein: two directional wheels are symmetrically arranged on the top of the platform frame.
8. The mobile operation platform for installation of a steel structure wall panel according to claim 7, wherein: the driving mechanism comprises a speed reducer and a belt pulley, and the speed reducer is connected with the belt pulley through a belt; the belt pulley is arranged close to the directional wheel and connected with the directional wheel shaft.
9. The mobile operation platform for installation of a steel structure wall panel according to claim 2, wherein: the auxiliary platform comprises a platform panel, and the platform panel is arranged on the cross rod at intervals.
10. The mobile operations platform for installation of a steel structural shingle according to claim 9, wherein: the auxiliary platform further comprises foot blocking plates vertically arranged on the periphery of the platform panel.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202122610545.2U CN216196496U (en) | 2021-10-28 | 2021-10-28 | Movable operation platform for installing steel structure wall panel |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202122610545.2U CN216196496U (en) | 2021-10-28 | 2021-10-28 | Movable operation platform for installing steel structure wall panel |
Publications (1)
Publication Number | Publication Date |
---|---|
CN216196496U true CN216196496U (en) | 2022-04-05 |
Family
ID=80892592
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202122610545.2U Active CN216196496U (en) | 2021-10-28 | 2021-10-28 | Movable operation platform for installing steel structure wall panel |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN216196496U (en) |
-
2021
- 2021-10-28 CN CN202122610545.2U patent/CN216196496U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109826411B (en) | Climbing frame for building and operation method thereof | |
CN105668428A (en) | Lifting transportation device suitable for being mounted on window | |
CN104831623B (en) | A kind of across pier suspension bracket self-propelling device | |
CN114436134A (en) | Glass vertical hoisting in-place tool capable of being flexibly adjusted and displaced in multiple directions and use method | |
CN216196496U (en) | Movable operation platform for installing steel structure wall panel | |
JP2014001561A (en) | Demolition method and demolition auxiliary device | |
CN100526197C (en) | Bottom lifting tower crane | |
WO2023184882A1 (en) | Material lifting device | |
CN113982239A (en) | Steel structure wall panel installation construction method | |
JP2014047479A (en) | Method for lifting demolishing heavy machine to building to be demolished | |
CN106744404A (en) | Method for hoisting mill housing by using movable tower | |
JP6646220B2 (en) | Construction method of suspended steel frame for suspended ceiling | |
JPH06263369A (en) | Elevator | |
CN213569241U (en) | Vertical lifting device | |
CN113175222B (en) | Method for installing embedded prefabricated external wall panel component | |
CN205312917U (en) | Portable jack -up hoist and mount transportation equipment | |
CN212832684U (en) | Self-propelled combined lifting multifunctional aerial work platform truck | |
CN202170231U (en) | Mobile pulling bar | |
CN218403412U (en) | A pipeline hoist device for interior space | |
JP2010150039A (en) | Crane girder replacing method and crane girder replacing device | |
JP3073384B2 (en) | Exterior wall unit mounting device | |
CN213445893U (en) | Vertical lifting device for small-space heavy object | |
JP2008063873A (en) | Transfer mechanism of ceiling and execution method | |
CN220365277U (en) | Device for assisting in translation of hanging basket | |
CN217867879U (en) | Tool trolley for hoisting curtain wall glass |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |