CN216194118U - Hanging basket structure for bridge construction - Google Patents

Hanging basket structure for bridge construction Download PDF

Info

Publication number
CN216194118U
CN216194118U CN202122348892.2U CN202122348892U CN216194118U CN 216194118 U CN216194118 U CN 216194118U CN 202122348892 U CN202122348892 U CN 202122348892U CN 216194118 U CN216194118 U CN 216194118U
Authority
CN
China
Prior art keywords
hanging basket
bridge
bridge construction
base
connecting strip
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122348892.2U
Other languages
Chinese (zh)
Inventor
安建华
王长银
卓为
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kunming Yinqiao Steel Mould Co ltd
Original Assignee
Kunming Yinqiao Steel Mould Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kunming Yinqiao Steel Mould Co ltd filed Critical Kunming Yinqiao Steel Mould Co ltd
Priority to CN202122348892.2U priority Critical patent/CN216194118U/en
Application granted granted Critical
Publication of CN216194118U publication Critical patent/CN216194118U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a hanging basket structure for bridge construction, which comprises a bridge body, a sliding rail group and a hanging basket frame, wherein the sliding rail group is arranged on the bridge body; the sliding track group comprises two sliding tracks which are arranged in parallel; the sliding track is arranged along the extension direction of the bridge deck; the bottom of the bridge body is provided with a hanging basket frame; the hanging basket frame comprises a hanging basket base; two ends of the hanging basket base are provided with first connecting strips; the first connecting strip is horizontally arranged, and the bottom of the first connecting strip is fixedly connected with the cradle base. This application hang basket structure need not frequent dismouting, it is convenient to remove, labour saving and time saving has reduced the safety risk that manual operation brought, sturdy structure suits to use in the bridge construction.

Description

Hanging basket structure for bridge construction
Technical Field
The utility model relates to the technical field of bridge construction, in particular to a hanging basket structure for bridge construction.
Background
The hanging basket is the main equipment in cantilever construction, and can be divided into 4 types of truss type, inclined pull type, section steel type and mixed type according to the structural form. Comprehensively comparing the characteristics and the weight of the hanging baskets in various forms, the types of steel adopted, the construction process and the like according to the construction process requirements of the concrete cantilever and the requirements of design drawings on the hanging baskets; hanging basket design principle: the hanging basket has the advantages of light dead weight, simple structure, firmness, stability, convenience in forward movement and assembly and disassembly, strong reusability, small deformation after stress and the like, and the space under the hanging basket is sufficient, so that a large construction operation surface can be provided, and the construction operation of the steel bar formwork is facilitated.
In the bridge construction, hang the basket and be comparatively general auxiliary operation instrument, present string basket lacks certain fixed measure and safeguard measure, has certain potential safety hazard, based on above reason, needs to improve string basket structure to improve its security.
Disclosure of Invention
The utility model aims to provide a hanging basket structure for bridge construction, which aims to solve the problems in the prior art.
In order to solve the technical problems, the utility model adopts the following technical scheme:
a hanging basket structure for bridge construction comprises a bridge body 1, a sliding track group and a hanging basket frame 2;
the sliding track group comprises two sliding tracks 3 which are arranged in parallel; the sliding track 3 is arranged along the extension direction of the bridge deck;
the bottom of the bridge body 1 is provided with a hanging basket frame 2; the hanging basket frame 2 comprises a hanging basket base 4; two ends of the cradle base 4 are provided with first connecting strips 5; the first connecting strip 5 is horizontally arranged, and the bottom of the first connecting strip is fixedly connected with the cradle base 4;
the top of the first connecting strip 5 is provided with a second connecting strip 6; the second connecting strip 6 is arranged into an L-shaped structure and comprises a vertical section and a horizontal section; the bottom of the vertical section is fixedly connected with the top of the first connecting strip 5; the top of the vertical section is provided with a horizontal section; a slide block 7 is arranged at the inner side of the horizontal section; the slide block 7 is matched with the slide rail 3;
the first connecting strips 5 are respectively arranged on two sides of the bridge body 1;
a template 8 is movably arranged between the bridge body 1 and the cradle base 4;
during the operation, slider 7 moves along sliding rail 3 under the drive effect, has the gap between bridge body 1 and the string basket base 4, can not influence the motion of whole device, and slider 7 drives the end of whole string basket frame 2 motion to the bridge, carries out operation on next step.
Further, a support pillar 9 is movably arranged at the top of the bridge body 1; the top of the supporting column 9 is connected with a pulling machine 10; a lifting steel wire 11 is connected and arranged on the lifting machine 10; the lifting steel wire 11 is connected with the first connecting bar 5. And the lifting steel wire 11 is tightened up through the action of the lifting machine 10, so that the whole hanging basket base 4 is driven to be attached to the hanging basket base 4 paved with the template 8, and then pouring is carried out.
Furthermore, an auxiliary supporting rod 12 is rotatably connected to the first connecting bar 5; the bottom of the auxiliary supporting rod 12 is rotatably connected with the first connecting strip 5; the edge of the template 8 is provided with a limit strip 13; the tail end of the auxiliary supporting rod 12 is abutted against the limiting strip 13.
Further, the auxiliary supporting rod 12 is a telescopic rod.
Further, an operation corridor 14 is arranged below the front end of the cradle base 4; guard railings 15 are arranged around the operation corridor 14; a plurality of fixed connecting rods 16 are arranged on the operation corridor 14; the top of the fixed connecting rod 16 is connected with the cradle base 4.
Further, the supporting column 9 is arranged to be an L-shaped structure, and a horizontal section 17 is arranged outwards at the top of the supporting column 9; the drawing machine 10 is disposed on the horizontal section 17.
Further, the second connecting strips 6 are provided with a plurality of groups.
Compared with the prior art, the utility model has at least one of the following beneficial effects:
the utility model discloses a hanging basket structure for bridge construction, which comprises the following specific operation steps:
when the device is to be moved, the sliding block 7 moves along the sliding rail 3 under the driving action, a gap exists between the bridge body 1 and the cradle base 4, the movement of the whole device cannot be influenced, and the sliding block 7 drives the whole cradle frame 2 to move to the end of the bridge for the next operation;
when pouring operation is to be carried out, the lifting steel wire 11 is tightened up through the action of the lifting machine 10, the whole hanging basket base 4 is driven to be attached to the hanging basket base 4 paved with the template 8, and then pouring is carried out. After the casting is completed, the lifting wires 11 are released, and the device continues to move forward in preparation for the next casting round.
This application hang basket structure need not frequent dismouting, it is convenient to remove, labour saving and time saving has reduced the safety risk that manual operation brought, sturdy structure suits to use in the bridge construction.
Drawings
Fig. 1 is a schematic structural view of a pouring state of the utility model.
Fig. 2 is a schematic diagram of a moving state structure according to the present invention.
In the figure:
a bridge body 1; a hanging basket frame 2; a slide rail 3; a cradle base 4; a first connecting bar 5; a second connecting strip 6; a slider 7; a template 8; a support column 9; a drawing machine 10; lifting the steel wire 11; an auxiliary strut 12; a limit strip 13; a working corridor 14; a guard rail 15; a fixed link 16; a horizontal section 17.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more apparent, the present invention is described in further detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the utility model and are not intended to limit the utility model.
As shown in the figure:
example 1:
a hanging basket structure for bridge construction comprises a bridge body 1, a sliding track group and a hanging basket frame 2;
the sliding track group comprises two sliding tracks 3 which are arranged in parallel; the sliding track 3 is arranged along the extension direction of the bridge deck;
the bottom of the bridge body 1 is provided with a hanging basket frame 2; the hanging basket frame 2 comprises a hanging basket base 4; two ends of the cradle base 4 are provided with first connecting strips 5; the first connecting strip 5 is horizontally arranged, and the bottom of the first connecting strip is fixedly connected with the cradle base 4;
the top of the first connecting strip 5 is provided with a second connecting strip 6; the second connecting strip 6 is arranged into an L-shaped structure and comprises a vertical section and a horizontal section; the bottom of the vertical section is fixedly connected with the top of the first connecting strip 5; the top of the vertical section is provided with a horizontal section; a slide block 7 is arranged at the inner side of the horizontal section; the slide block 7 is matched with the slide rail 3;
the first connecting strips 5 are respectively arranged on two sides of the bridge body 1;
a template 8 is movably arranged between the bridge body 1 and the cradle base 4;
during the operation, slider 7 moves along sliding rail 3 under the drive effect, has the gap between bridge body 1 and the string basket base 4, can not influence the motion of whole device, and slider 7 drives the end of whole string basket frame 2 motion to the bridge, carries out operation on next step.
Example 2:
on the basis of example 1:
a support pillar 9 is movably arranged at the top of the bridge body 1; the top of the supporting column 9 is connected with a pulling machine 10; a lifting steel wire 11 is connected and arranged on the lifting machine 10; the lifting steel wire 11 is connected with the first connecting bar 5. And the lifting steel wire 11 is tightened up through the action of the lifting machine 10, so that the whole hanging basket base 4 is driven to be attached to the hanging basket base 4 paved with the template 8, and then pouring is carried out.
Example 3:
on the basis of examples 1-2:
the first connecting strip 5 is rotatably connected with an auxiliary supporting rod 12; the bottom of the auxiliary supporting rod 12 is rotatably connected with the first connecting strip 5; the edge of the template 8 is provided with a limit strip 13; the tail end of the auxiliary supporting rod 12 is abutted against the limiting strip 13.
Example 4:
on the basis of examples 1 to 3:
the auxiliary supporting rod 12 is a telescopic rod.
Example 5:
on the basis of examples 1 to 4:
an operation corridor 14 is arranged below the front end of the cradle base 4; guard railings 15 are arranged around the operation corridor 14; a plurality of fixed connecting rods 16 are arranged on the operation corridor 14; the top of the fixed connecting rod 16 is connected with the cradle base 4.
Example 6:
on the basis of examples 1 to 5:
the supporting column 9 is of an L-shaped structure, and a horizontal section 17 is arranged outwards at the top of the supporting column 9; the drawing machine 10 is disposed on the horizontal section 17.
Example 7:
on the basis of examples 1 to 6: the second connecting strips 6 are provided with a plurality of groups.
The application is in the process of operation. When the device is to be moved, the sliding block 7 moves along the sliding rail 3 under the driving action, a gap exists between the bridge body 1 and the cradle base 4, the movement of the whole device cannot be influenced, and the sliding block 7 drives the whole cradle frame 2 to move to the end of the bridge for the next operation;
when pouring operation is to be carried out, the lifting steel wire 11 is tightened up through the action of the lifting machine 10, the whole hanging basket base 4 is driven to be attached to the hanging basket base 4 paved with the template 8, and then pouring is carried out. After pouring and accomplishing, relax and carry steel wire 11, continue to move forward with the device, pour for the next round and prepare, support column 9 can be dismantled according to the condition, selects the preferred position of carrying, this application the effect of carrying the drawing machine be the rolling or relax carry the steel wire, satisfy the rolling or relax and carry the existing equipment of steel wire function all can use.
Reference throughout this specification to "an embodiment" means that a particular feature, structure, or characteristic described in connection with the embodiment is included in at least one embodiment described generally in this application. The appearances of the same phrase in various places in the specification are not necessarily all referring to the same embodiment. Further, when a particular feature, structure, or characteristic is described in connection with any embodiment, it is submitted that it is within the scope of the utility model to effect such feature, structure, or characteristic in connection with other embodiments.
Although the utility model has been described herein with reference to a number of illustrative embodiments thereof, it should be understood that numerous other modifications and embodiments can be devised by those skilled in the art that will fall within the spirit and scope of the principles of this disclosure. More specifically, various variations and modifications are possible in the component parts and/or arrangements of the subject combination arrangement within the scope of the disclosure, the drawings and the appended claims. In addition to variations and modifications in the component parts and/or arrangements, other uses will also be apparent to those skilled in the art.

Claims (7)

1. A hanging basket structure for bridge construction is characterized by comprising a bridge body (1), a sliding track group and a hanging basket frame (2);
the sliding track group comprises two sliding tracks (3) which are arranged in parallel; the sliding rail (3) is arranged along the extension direction of the bridge deck;
the bottom of the bridge body (1) is provided with a hanging basket frame (2); the hanging basket frame (2) comprises a hanging basket base (4); two ends of the hanging basket base (4) are provided with first connecting strips (5); the first connecting strip (5) is horizontally arranged, and the bottom of the first connecting strip is fixedly connected with the cradle base (4);
the top of the first connecting strip (5) is provided with a second connecting strip (6); the second connecting strip (6) is arranged to be an L-shaped structure and comprises a vertical section and a horizontal section; the bottom of the vertical section is fixedly connected with the top of the first connecting bar (5); the top of the vertical section is provided with a horizontal section; a slide block (7) is arranged on the inner side of the horizontal section;
the sliding block (7) is matched with the sliding track (3);
the first connecting strips (5) are respectively arranged on two sides of the bridge body (1);
a template (8) is movably arranged between the bridge body (1) and the cradle base (4).
2. The hanging basket structure for bridge construction according to claim 1, wherein: a support pillar (9) is movably arranged at the top of the bridge body (1); the top of the supporting column (9) is connected with a pulling machine (10); a lifting steel wire (11) is connected and arranged on the lifting machine (10); the lifting steel wire (11) is connected with the first connecting strip (5).
3. The hanging basket structure for bridge construction according to claim 1, wherein: the first connecting bar (5) is rotatably connected with an auxiliary supporting rod (12); the bottom of the auxiliary supporting rod (12) is rotatably connected with the first connecting bar (5); the edge of the template (8) is provided with a limit strip (13); the tail end of the auxiliary supporting rod (12) is abutted against the limiting strip (13).
4. The hanging basket structure for bridge construction according to claim 3, wherein: the auxiliary supporting rod (12) is a telescopic rod.
5. The hanging basket structure for bridge construction according to claim 1, wherein: an operation corridor (14) is arranged below the front end of the hanging basket base (4); guard railings (15) are arranged around the operation corridor (14); a plurality of fixed connecting rods (16) are arranged on the operation corridor (14); the top of the fixed connecting rod (16) is connected with the cradle base (4).
6. The hanging basket structure for bridge construction according to claim 2, wherein: the supporting column (9) is of an L-shaped structure, and a horizontal section (17) is arranged outwards at the top of the supporting column (9); the drawing machine (10) is arranged on the horizontal section (17).
7. The hanging basket structure for bridge construction according to claim 1, wherein: the second connecting strips (6) are provided with a plurality of groups.
CN202122348892.2U 2021-09-27 2021-09-27 Hanging basket structure for bridge construction Active CN216194118U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122348892.2U CN216194118U (en) 2021-09-27 2021-09-27 Hanging basket structure for bridge construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122348892.2U CN216194118U (en) 2021-09-27 2021-09-27 Hanging basket structure for bridge construction

Publications (1)

Publication Number Publication Date
CN216194118U true CN216194118U (en) 2022-04-05

Family

ID=80926407

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122348892.2U Active CN216194118U (en) 2021-09-27 2021-09-27 Hanging basket structure for bridge construction

Country Status (1)

Country Link
CN (1) CN216194118U (en)

Similar Documents

Publication Publication Date Title
CN206644772U (en) A kind of good automobile using collision prevention girders of anti-collision effect
CN106522832B (en) Vertical raising drilling machine
CN216194118U (en) Hanging basket structure for bridge construction
CN219823501U (en) Tower crane lifting hook safety auxiliary structure
CN216006623U (en) Bridge bracket overhauls hanging flower basket
CN108035530B (en) Oil tank inner wall construction hanging basket
CN213476647U (en) Construction hanging basket suspension device for steel structure gallery bridge
CN214558889U (en) Core pulling machine for super-long plate
CN213418067U (en) Telescopic shed framework structure
CN212246023U (en) Hoisting device of assembled concrete external wall panel
CN211285309U (en) Traveling type hanging basket for bridge construction
CN211395624U (en) Sundry cleaning device for hydraulic engineering
CN209703983U (en) Move back composite roof truss adhesion type hoisting frame under desk-top special-shaped operating condition
CN202088198U (en) Lifting device for disassembling monorail crane
CN219568627U (en) Bridge girder erection machine with adjustable landing leg height
CN205589412U (en) Build in supplementary anti - attitude of boats and ships to segment to stand up to hoist to link up with and use simple and easy stores pylon
CN206487128U (en) A kind of Guiding Support Elevating Scaffold
CN221094884U (en) Basket device is hung in portable bridge overhead working
CN220245368U (en) Electric hoist gantry crane
CN219653547U (en) Auxiliary device for bridge anti-collision guardrail construction
CN112045172B (en) Sand box turnover device
CN220685798U (en) Bridge movement hanging basket device for bridge construction
CN210422119U (en) Road and bridge engineering protector
CN213895026U (en) Steel cable hoist moving frame
CN210341680U (en) Door type corrugated steel web plate installation and overhanging type hanging bracket structure