CN216130157U - Deep basal pit spring eye gushes water drainage structures - Google Patents

Deep basal pit spring eye gushes water drainage structures Download PDF

Info

Publication number
CN216130157U
CN216130157U CN202121223199.6U CN202121223199U CN216130157U CN 216130157 U CN216130157 U CN 216130157U CN 202121223199 U CN202121223199 U CN 202121223199U CN 216130157 U CN216130157 U CN 216130157U
Authority
CN
China
Prior art keywords
drainage ditch
drainage
spring eye
water collecting
collecting well
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121223199.6U
Other languages
Chinese (zh)
Inventor
曾鹏
成静静
杜光伟
杨梓健
赵志国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fourth Bureau First Construction Engineering Co Ltd
Original Assignee
China Construction Fourth Bureau First Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fourth Bureau First Construction Engineering Co Ltd filed Critical China Construction Fourth Bureau First Construction Engineering Co Ltd
Priority to CN202121223199.6U priority Critical patent/CN216130157U/en
Application granted granted Critical
Publication of CN216130157U publication Critical patent/CN216130157U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The utility model provides a deep foundation pit spring hole water burst drainage structure which comprises an elevator water collecting well, wherein a main drainage ditch is dug between the elevator water collecting well and the spring hole at the farthest end, other spring holes between the elevator water collecting well and the spring hole at the farthest end are respectively dug with a secondary drainage ditch communicated with the main drainage ditch, and steel pipes for drainage are pre-buried in the main drainage ditch and the secondary drainage ditch. The water level of the foundation pit is effectively controlled, so that the construction of subsequent processes is not influenced, the quality of a building is guaranteed, and meanwhile, the safety of constructors and equipment is guaranteed. Belongs to the technical field of building engineering.

Description

Deep basal pit spring eye gushes water drainage structures
Technical Field
The utility model relates to a deep foundation pit spring hole water burst, drainage and drainage structure, and belongs to the technical field of building engineering.
Background
With the rapid development of national economy, various super high-rise buildings emerge endlessly, and the deep foundation pit engineering is increased day by day. The spring hole is one of the common problems in building construction during the excavation process of the foundation pit, the continuous water burst of the spring hole can cause many problems such as local ground collapse, supporting structure deformation and the like, and the processing effect of the spring hole directly influences the quality and safety of the building. Therefore, exploring the deep foundation pit spring hole gushing water drainage treatment technology has certain practical significance for foundation pit excavation and foundation construction.
Disclosure of Invention
The utility model aims to: the deep foundation pit spring eye gushing water drainage structure effectively controls the water level of a foundation pit, so that the construction of subsequent processes is not influenced, the quality of a building is guaranteed, and meanwhile, the safety of constructors and equipment is guaranteed.
In order to solve the problems, the deep foundation pit spring hole water burst drainage structure is supposed to be adopted and comprises an elevator water collecting well, a main drainage ditch is dug between the elevator water collecting well and the spring hole at the farthest end, other spring holes between the elevator water collecting well and the spring hole at the farthest end are respectively dug with a secondary drainage ditch communicated with the main drainage ditch, and steel pipes for drainage are pre-buried in the main drainage ditch and the secondary drainage ditch.
In the drainage structure, a concrete retaining wall is constructed along a side line in the elevator water collecting well;
among the aforementioned drainage structures, the bed course has all been under construction to the bottom in main ditch and the secondary drainage ditch, and the construction of drainage ditch both sides has the concrete block, and the inboard of bed course upside and concrete block has the cement mortar layer along the construction of drainage ditch, the steel pipe is laid on the cement mortar layer, and the chucking has the flitch between the both sides of steel pipe and the cement mortar layer.
Compared with the prior art, the utility model excavates the foundation pit at the most by taking the deepest water collecting well (elevator water collecting well) in the excavation range of the foundation pit as the water collecting pit for spring eye water gushing drainage, drains the spring eye water gushing to the water collecting pit, and pumps out the spring eye water gushing through the water pump, thereby ensuring that the water level of the foundation pit meets the construction requirement.
Drawings
FIG. 1 is a schematic plan view of the present invention (arrows indicate spring flow);
fig. 2 is a view showing a drain installation.
Detailed Description
In order to make the structure and the using manner of the present invention clearer, the present invention will be further explained with reference to the attached drawings.
Example (b):
referring to fig. 1 and 2, the embodiment provides a deep foundation pit spring eye gushing water drainage structure, including elevator sump well 1, concrete retaining wall 2 has been under construction along the boundary line in elevator sump well 1, digs between elevator sump well 1 and the farthest end spring eye 5 and is equipped with main drainage ditch 6, and other spring eyes 7 between elevator sump well 1 and the farthest end spring eye 5 dig respectively and are equipped with the secondary escape canal 8 that communicates to main drainage ditch 6, all pre-buried steel pipe 3 that is used for the drainage in main drainage ditch 6 and the secondary escape canal 8.
The bottom in main ditch 6 and the time escape canal 8 all is under construction has bed course 9, and the escape canal both sides are under construction has concrete block 10, and the inboard of bed course 9 upside and concrete block 10 is under construction along the escape canal has cement mortar layer 11, steel pipe 3 is laid on cement mortar layer 11, and the chucking has flitch 12 between the both sides of steel pipe 3 and cement mortar layer 11, and the upper portion lid in escape canal is equipped with apron 13, and the top is backfill soil 14.
During the specific construction, the construction is carried out according to the following steps:
the method comprises the following steps: the method comprises the steps of firstly excavating the deepest water collecting well (an elevator water collecting well 1) in an excavation range, manufacturing a concrete retaining wall 2 with the thickness of 200mm along the side line of the deepest water collecting well, arranging a water suction pump (the model is selected according to the actual water collecting quantity) in a water collecting pit, pre-embedding a steel pipe 3 with the pipe diameter of 110mm at the bottom, forming a screw opening in the inner side of the steel pipe 3, manufacturing a matched seal, and ensuring that the seal is screwed tightly without gaps.
And step two, after other areas are excavated, finding out the water burst position, then carrying out conical excavation on the part of the water burst position, accurately positioning the position of a spring eye, and excavating a main drainage ditch 6 from the position of the concrete retaining wall 2 to find a slope in the direction of the elevator water collecting well 1. The main drainage ditch 6 is connected with the spring holes 5 at the farthest end, and the positions of the other spring holes 7 are respectively dug out secondary drainage ditches 8 to be connected with the main drainage ditch 6 and to find slopes towards the main drainage ditch 6 to form a spring hole water gushing drainage network. The minimum of the depth of the drainage ditch is not less than 400mm (the depth can be adjusted according to the actual water gushing condition and the actual elevation of the spring eye, and the water gushing level of the spring eye is higher than the bottom of the drainage ditch).
Step three, pouring a C15 cushion layer 9 with the thickness of 100mm after the excavation of each drainage ditch is finished, setting the position of a pipe groove by snapping a line, building a 120mm standard brick along the snapping ink line, placing a steel pipe 3 with the diameter of 110mm in the drainage ditch for drainage, connecting the steel pipe 3 in the main drainage ditch 6 with the steel pipe 3 in the secondary drainage ditch 8 by adopting a tee joint, and fixing by using a flange or a hoop. After each steel pipe 3 is connected, the next steel pipe 3 is installed after the good drainage condition is observed.
Step four: after the steel pipes 3 are installed, a cover plate 13 with the thickness of 100mm and a concrete cover plate are arranged above the drainage ditch, layered backfilling is carried out after tight sealing, the thickness of the backfilled soil is not more than 200mm after compaction every time, and the backfilling is carried out from two sides simultaneously, so that the side bricks of the drainage ditch are prevented from collapsing.
Step five: and the conical opening at the position of the spring hole is backfilled by adopting gravel, and the top of the conical opening is filled and leveled. And (3) starting subsequent procedures of construction of a bottom plate cushion layer, water prevention and the like, pouring concrete from all directions to the position of the water collecting pit in a centralized manner, sealing and screwing a water outlet by using a pipeline prepared in advance before pouring the concrete to the water collecting pit, and pouring a water outlet pipe into the concrete after taking out the water suction pump.
The above description is only for the purpose of illustrating the preferred embodiments of the present invention and is not to be construed as limiting the utility model, and any modifications, equivalents and improvements made within the spirit and principle of the present invention are intended to be included within the scope of the present invention.

Claims (3)

1. The utility model provides a deep basal pit spring eye gushes water drainage structure which characterized in that: the drainage device comprises an elevator water collecting well (1), a main drainage ditch (6) is dug between the elevator water collecting well (1) and a farthest end spring eye (5), other spring eyes (7) between the elevator water collecting well (1) and the farthest end spring eye (5) are respectively dug to be provided with a secondary drainage ditch (8) communicated to the main drainage ditch (6), and steel pipes (3) used for drainage are pre-buried in the main drainage ditch (6) and the secondary drainage ditch (8).
2. The deep foundation pit spring eye water gushing, draining and draining structure of claim 1, wherein: concrete retaining walls (2) are constructed in the elevator water collecting well (1) along the side lines.
3. The deep foundation pit spring eye water gushing, draining and draining structure of claim 1, wherein: the bottom in main ditch (6) and secondary escape canal (8) is all under construction there is bed course (9), and the construction of escape canal both sides has concrete block (10), and the inboard of bed course (9) upside and concrete block (10) is under construction along the escape canal has cement mortar layer (11), steel pipe (3) are laid on cement mortar layer (11), and the chucking has flitch (12) between the both sides of steel pipe (3) and cement mortar layer (11).
CN202121223199.6U 2021-06-02 2021-06-02 Deep basal pit spring eye gushes water drainage structures Active CN216130157U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121223199.6U CN216130157U (en) 2021-06-02 2021-06-02 Deep basal pit spring eye gushes water drainage structures

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121223199.6U CN216130157U (en) 2021-06-02 2021-06-02 Deep basal pit spring eye gushes water drainage structures

Publications (1)

Publication Number Publication Date
CN216130157U true CN216130157U (en) 2022-03-25

Family

ID=80766085

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121223199.6U Active CN216130157U (en) 2021-06-02 2021-06-02 Deep basal pit spring eye gushes water drainage structures

Country Status (1)

Country Link
CN (1) CN216130157U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115419093A (en) * 2022-09-26 2022-12-02 中建港航局集团有限公司 Bottom plate construction method during piping of deep foundation pit with underwater channel interface

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115419093A (en) * 2022-09-26 2022-12-02 中建港航局集团有限公司 Bottom plate construction method during piping of deep foundation pit with underwater channel interface

Similar Documents

Publication Publication Date Title
CN109881694B (en) Construction structure and method for plugging foundation pit substrate water and sand gushing
CN105002913B (en) A kind of highly permeable stratum deep basal pit back cover water sealing structure and its construction method
CN104404974B (en) The thick sand-pebble layer deep basal pit of high artesian slip casting back cover structure and construction technology thereof
CN103046565B (en) Draining method for ultra-deep batholith deep foundation pit
CN207892653U (en) Decompression hydrophobic structure suitable for Weathering-residual soil layer fissure zone
CN105926682A (en) Basement baseplate post-cast strip construction method with pressure bearing water and higher water pressure
CN112252336A (en) Construction method for backfilling foundation trench of premixed fluidized solidified soil
CN108331026B (en) Prefabricated reinforced concrete inspection well and construction method thereof
US11566390B2 (en) Construction method of reclaiming land from the sea based on basement utilization
CN109235493A (en) Basement beam slab is backbreak and short formwork construction method in a kind of contrary sequence method
CN216130157U (en) Deep basal pit spring eye gushes water drainage structures
CN112459116A (en) Construction method for rebuilding basement bottom plate of existing building
CN110206071A (en) A kind of diaphram wall seam reinforcement means and device
CN107100206A (en) A kind of prevention and controls of basement leakage
CN212336250U (en) Pipe jacking connection guide row structure
CN212641468U (en) Pit-in-pit rapid construction structure
CN206495224U (en) A kind of foundation pit of elevator shaft dewatering process structure
CN112302136A (en) Connecting structure of new and old drainage pipelines under non-closure working condition and construction method thereof
CN209854754U (en) Sand flow stratum semi-closed open caisson structure
CN109881691B (en) Method for processing foundation pit inner base exploration hole piping in deep foundation pit excavation process
CN103866787A (en) Process for constructing impervious concrete wall by using open excavation and inverted construction method
CN204825916U (en) Highly permeable stratum deep basal pit back cover stagnant water structure
CN107419811B (en) The method and its structure of basement bottom board support pile and drain hole waterproofing and leakage-stopping
CN111335445B (en) Construction method of concrete catch basin by using steel pipe as inner mold
CN114108777A (en) Municipal drainage pipeline construction technology

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant