CN216085923U CN202122422964.3U CN202122422964U CN216085923U CN 216085923 U CN216085923 U CN 216085923U CN 202122422964 U CN202122422964 U CN 202122422964U CN 216085923 U CN216085923 U CN 216085923U
Authority
CN
China
Prior art keywords
fixedly connected
construction device
plate
assembly
lifting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122422964.3U
Other languages
Chinese (zh)
Inventor
朱莉
张维翔
李旭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Boneng Power Installation Co ltd
Original Assignee
Shandong Boneng Power Installation Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Boneng Power Installation Co ltd filed Critical Shandong Boneng Power Installation Co ltd
Priority to CN202122422964.3U priority Critical patent/CN216085923U/en
Application granted granted Critical
Publication of CN216085923U publication Critical patent/CN216085923U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Current-Collector Devices For Electrically Propelled Vehicles (AREA)

Abstract

The utility model discloses a stringing construction device for mounting power equipment, which comprises a base, wherein fixed plates are fixedly connected to two sides of the top of the base, telescopic plates are connected to the separated sides of the two fixed plates in a sliding manner, and driving assemblies are arranged on the two telescopic plates. According to the stringing construction device for power equipment installation, the two expansion plates can be driven to perform height adjustment through the arrangement of the driving assembly, so that the lifting of different heights is met, the discharging work of power equipment is facilitated through the arrangement of the charging assembly, the transferring assembly also has the moving function, the discharging effect is improved, the situation that the construction device is far away from the installation position, the bottom of the construction device cannot be close to the installation position and cannot perform the discharging work is avoided, the distance between the bottom of the construction device and the installation position is shortened through the movement of the charging assembly, the discharging effect is improved, and the operation difficulty of workers is reduced.

Description

Stringing construction device for power equipment installation
Technical Field
The utility model relates to the technical field of electric power construction, in particular to a stringing construction device for electric power equipment installation.
Background
The power equipment comprises two categories of power generation equipment and power supply equipment, wherein the power generation equipment mainly comprises a power station boiler, a steam turbine, a gas turbine, a water turbine, a generator, a transformer and the like, and the power supply equipment mainly comprises power transmission lines, mutual inductors, contactors and the like with various voltage grades.
In the related art, when power equipment is installed, a corresponding construction device is required to be operated, the construction device is required to convey the power equipment to an installation position, and the existing construction device has certain defects, such as the existing construction device does not have a multi-section lifting function, and when the lifted power equipment is too far away from the installation position, the lifting device is inconvenient to unload, and the operation difficulty is improved.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the defect that the prior art does not have a multi-stage lifting function, and provides a stringing construction device for mounting power equipment.
In order to achieve the purpose, the utility model adopts the following technical scheme:
a stringing construction device for power equipment installation comprises a base, wherein fixed plates are fixedly connected to two sides of the top of the base, telescopic plates are slidably connected to the separated sides of the two fixed plates, driving assemblies are arranged on the two telescopic plates, a top plate is fixedly connected between the tops of the two telescopic plates, a lifting assembly is arranged at the top of the top plate, and a charging assembly is arranged at the lifting end of the lifting assembly;
through the arrangement of the driving assembly, the two telescopic plates can be driven to adjust the height, so that the lifting at different heights is met;
through the arrangement of the lifting assembly, the required power equipment can be driven to lift, and the operation effect is improved;
through the setting of the charging assembly, the discharging operation of the power equipment is convenient, the rotating assembly further has the moving function, the discharging effect is improved, the construction device is prevented from being far away from the installation position, the bottom of the construction device cannot be drawn close to the installation position, the discharging operation cannot be carried out, the distance between the bottom of the construction device and the installation position is drawn close through the movement of the charging assembly, the discharging effect is improved, and the operation difficulty of workers is reduced.
Preferably, the driving assembly comprises a first motor fixed on one side of the fixing plate and straight teeth fixed on the side surface of the expansion plate, and an output shaft of the first motor is fixedly connected with a gear meshed with the straight teeth.
Preferably, the hoisting component include fixed connection in the movable frame of roof, the bottom fixedly connected with biax motor of movable frame inner wall, the equal fixedly connected with winding wheel of both ends output shaft of biax motor, two the axle center pole of winding wheel all with the inner wall of movable frame rotates to be connected, two the surface winding of winding wheel has the steel cable.
Preferably, the subassembly of feeding is including being fixed in two the lifting plate of steel cable other end, the top sliding connection of lifting plate has the material loading frame, the equal sliding connection in both sides of the bottom of lifting plate has the carriage, two the one end of carriage all with the front fixed connection of material loading frame.
Preferably, the bottom fixedly connected with protection casing of lift plate, the inside fixedly connected with electric telescopic handle of protection casing, electric telescopic handle's other end fixedly connected with drive block, the bottom of drive block with the bottom sliding connection of protection casing inner wall, the top of drive block is fixed in the bottom fixed connection of lift plate.
Preferably, two the fixed plate with two equal fixedly connected with U type slide rail in the relative one side of expansion plate, the both sides of lifting plate all are provided with the rolling subassembly.
Compared with the prior art, the utility model has the beneficial effects that:
1. according to the utility model, through the arrangement of the driving assembly, the two expansion plates can be driven to perform height adjustment, so that the lifting at different heights is met, the required power equipment can be driven to lift through the arrangement of the lifting assembly, the operation effect is improved, and through the arrangement of the loading assembly, the unloading work of the power equipment is facilitated, the material transferring assembly also has the function of moving, so that the unloading effect is improved, the construction device is prevented from being far away from the installation position, the bottom of the construction device cannot be drawn close to the installation position, the unloading work cannot be performed, the distance between the bottom of the construction device and the installation position is drawn close through the movement of the loading assembly, the unloading effect is improved, and the operation difficulty of workers is reduced.
2. According to the utility model, the U-shaped slide rail is arranged, so that the rolling assembly can slide directionally, the stability of the lifting plate during up-and-down movement is indirectly improved, and the stability of the subsequent loading frame during left-and-right movement is improved.
Drawings
Fig. 1 is a schematic structural view of a stringing construction device for mounting electric power equipment according to the present invention;
fig. 2 is a structural rear view of the overhead line construction apparatus for electric power equipment installation according to the present invention;
fig. 3 is a structural sectional view of a lifting assembly according to the present invention;
fig. 4 is a structural plan view of the shield according to the present invention.
In the figure: 1. a base; 2. a fixing plate; 3. a retractable plate; 4. a drive assembly; 41. a first motor; 42. straight teeth; 43. a gear; 5. a top plate; 6. a lifting assembly; 61. a movable frame; 62. a double-shaft motor; 63. a winding wheel; 64. a steel cord; 7. a charging assembly; 71. a lifting plate; 72. a loading frame; 73. a carriage; 74. a protective cover; 75. an electric telescopic rod; 76. a drive block; 8. a U-shaped slide rail; 9. and (6) rolling the assembly.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments.
In the description of the present invention, it is to be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inner", "outer", and the like, indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, are merely for convenience in describing the present invention and simplifying the description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and thus, should not be construed as limiting the present invention.
Referring to fig. 1-4, the stringing construction device for power equipment installation comprises a base 1, wherein fixed plates 2 are fixedly connected to two sides of the top of the base 1, telescopic plates 3 are slidably connected to two sides of the two fixed plates 2, driving assemblies 4 are arranged on the two telescopic plates 3, a top plate 5 is fixedly connected between the tops of the two telescopic plates 3, a lifting assembly 6 is arranged at the top of the top plate 5, and a material loading assembly 7 is arranged at the lifting end of the lifting assembly 6;
through the arrangement of the driving assembly 4, the two expansion plates can be driven to adjust the height, so that the lifting at different heights can be met;
through the arrangement of the lifting assembly 6, the required power equipment can be driven to lift, and the operation effect is improved;
through the setting of the charging assembly 7, the discharging operation of the power equipment is convenient, the rotating assembly further has the moving function, the discharging effect is improved, the construction device is prevented from being far away from the installation position, the bottom of the construction device cannot be drawn close to the installation position, the discharging operation cannot be carried out, the distance between the bottom of the construction device and the installation position is drawn close through the movement of the charging assembly 7, the discharging effect is improved, and the operation difficulty of workers is reduced.
The driving assembly 4 comprises a first motor 41 fixed on one side of the fixed plate 2 and straight teeth 42 fixed on the side surface of the expansion plate 3, and an output shaft of the first motor 41 is fixedly connected with a gear 43 engaged with the straight teeth 42;
the first motor 41 is connected with an external power supply and a control switch, and is set by adopting a forward and reverse rotating motor and adopting a connection mode and a coding mode in the prior art.
The lifting assembly 6 comprises a movable frame 61 fixedly connected to the top plate 5, a double-shaft motor 62 is fixedly connected to the bottom of the inner wall of the movable frame 61, output shafts at two ends of the double-shaft motor 62 are fixedly connected with winding wheels 63, shaft center rods of the two winding wheels 63 are rotatably connected with the inner wall of the movable frame 61, and steel ropes 64 are wound on the outer surfaces of the two winding wheels 63;
the double-shaft motor 62 adopts a motor containing two output shafts in the prior art, is a positive and negative rotating motor, is connected with an external power supply and a control switch, adopts the connection mode and the coding mode in the prior art to set, is used for driving the two winding wheels 63 to rotate, and can drive the two steel ropes 64 to wind or unreel the work through the rotation of the two winding wheels 63.
The charging assembly 7 comprises a lifting plate 71 fixed at the other ends of the two steel cables 64, the top of the lifting plate 71 is slidably connected with a charging frame 72, two sides of the bottom of the lifting plate 71 are slidably connected with sliding frames 73, and one ends of the two sliding frames 73 are fixedly connected with the front surface of the charging frame 72;
the storage of the electric equipment is facilitated through the charging assembly 7, and the stability of the charging frame 72 in sliding back and forth is improved through the arrangement of the sliding frame 73.
A protective cover 74 is fixedly connected to the bottom of the lifting plate 71, an electric telescopic rod 75 is fixedly connected to the interior of the protective cover 74, a driving block 76 is fixedly connected to the other end of the electric telescopic rod 75, the bottom of the driving block 76 is slidably connected to the bottom of the inner wall of the protective cover 74, and the top of the driving block 76 is fixedly connected to the bottom of the lifting plate 71;
through the start-up of electric telescopic handle 75, can drive block 76 seesaw, through the motion of drive block 76, can drive material loading frame 72 seesaw, and then can drive the power equipment on the material loading frame 72 and carry out the side-to-side movement, be convenient for better carry power equipment to the position of installation.
The opposite sides of the two fixed plates 2 and the two telescopic plates 3 are fixedly connected with U-shaped slide rails 8, and rolling assemblies 9 are arranged on two sides of the lifting plate 71;
the arrangement of the U-shaped slide rail 8 is convenient for the directional sliding of the rolling assembly 9, so that the stability of the lifting plate 71 during the up-and-down movement is indirectly improved, and the stability of the subsequent loading frame 72 during the left-and-right movement is improved;
and roll subassembly 9 by extrusion spring, roll the frame and roll and take turns to constitute, go on rolling the frame through extrusion spring for roll the frame and drive the wheel that rolls and to the inside motion of U type slide rail 8, guarantee gliding stability, be convenient for follow-up U type slide rail 8 to the expansion plate 3 that rolls moreover, 2 tops of fixed plate set up the slide rail into the slope form, are convenient for roll the conversion of subassembly 9.
The functional principle of the utility model can be illustrated by the following operation modes:
in the utility model, the power equipment to be installed is placed in the charging frame, the two winding wheels 63 can be driven to rotate by starting the double-shaft motor 62, and the two steel ropes 64 can be driven to wind or unwind by the rotation of the two winding wheels 63;
by winding the two steel ropes 64, the lifting plate 71 can be driven to move upwards, and then the loading frame 72 and the power equipment can be driven to lift upwards, so that the power equipment at different positions can be installed;
when the installation position of the power equipment is high, the two first motors 41 are started to drive the gear 43 to rotate, the two expansion plates 3 move up and down through the rotation of the gear 43 and the meshing relation between the gear 43 and the straight teeth 42, the movement distance of the construction device can be adjusted through the upward movement of the two expansion plates 3, and the multi-section lifting function is achieved;
when the position of electrical equipment after promoting and installation is far away, when unable unloading, through the start-up of electric telescopic handle 75, can drive driving block 76 seesaw, through the motion of driving block 76, can drive dress material frame 72 seesaw, and then can drive the electrical equipment on the dress material frame 72 and carry out the side-to-side movement, be convenient for better carry electrical equipment to the position of installation.
The above description is only for the preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art should be considered to be within the technical scope of the present invention, and equivalent alternatives or modifications according to the technical solution of the present invention and the inventive concept thereof should be covered by the scope of the present invention.

Claims (6)

1. The utility model provides a stringing construction device for power equipment installation, includes base (1), its characterized in that, the equal fixedly connected with fixed plate (2) in both sides at the top of base (1), two the equal sliding connection in one side that fixed plate (2) departed from has expansion plate (3), two all be provided with drive assembly (4) on expansion plate (3), two fixedly connected with roof (5) between the top of expansion plate (3), the top of roof (5) is provided with promotes subassembly (6), the promotion end that promotes subassembly (6) is provided with charging assembly (7).
2. The stringing construction device according to claim 1, wherein the driving assembly (4) comprises a first motor (41) fixed on one side of the fixed plate (2) and a straight tooth (42) fixed on the side of the expansion plate (3), and an output shaft of the first motor (41) is fixedly connected with a gear (43) engaged with the straight tooth (42).
3. The stringing construction device according to claim 1, wherein the lifting assembly (6) comprises a movable frame (61) fixedly connected to the top plate (5), a double-shaft motor (62) is fixedly connected to the bottom of the inner wall of the movable frame (61), output shafts at two ends of the double-shaft motor (62) are fixedly connected with winding wheels (63), axial center rods of the two winding wheels (63) are rotatably connected with the inner wall of the movable frame (61), and steel ropes (64) are wound on the outer surfaces of the two winding wheels (63).
4. The trolley wire construction device for electric equipment installation as claimed in claim 3, wherein the loading assembly (7) comprises a lifting plate (71) fixed to the other end of the two steel cables (64), a loading frame (72) is slidably connected to the top of the lifting plate (71), sliding frames (73) are slidably connected to both sides of the bottom of the lifting plate (71), and one end of each of the two sliding frames (73) is fixedly connected to the front surface of the loading frame (72).
5. The stringing construction device for installing electric power equipment as claimed in claim 4, wherein a protective hood (74) is fixedly connected to the bottom of the lifting plate (71), an electric telescopic rod (75) is fixedly connected to the inside of the protective hood (74), a driving block (76) is fixedly connected to the other end of the electric telescopic rod (75), the bottom of the driving block (76) is slidably connected to the bottom of the inner wall of the protective hood (74), and the top of the driving block (76) is fixedly connected to the bottom of the lifting plate (71).
6. The stringing construction device for installing electrical equipment according to claim 4, wherein the two fixed plates (2) and the two expansion plates (3) are fixedly connected with a U-shaped sliding rail (8) on the opposite side, and the two lifting plates (71) are provided with rolling assemblies (9) on the two sides.
CN202122422964.3U 2021-10-09 2021-10-09 Stringing construction device for power equipment installation Active CN216085923U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122422964.3U CN216085923U (en) 2021-10-09 2021-10-09 Stringing construction device for power equipment installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122422964.3U CN216085923U (en) 2021-10-09 2021-10-09 Stringing construction device for power equipment installation

Publications (1)

Publication Number Publication Date
CN216085923U true CN216085923U (en) 2022-03-18

Family

ID=80637737

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122422964.3U Active CN216085923U (en) 2021-10-09 2021-10-09 Stringing construction device for power equipment installation

Country Status (1)

Country Link
CN (1) CN216085923U (en)

Similar Documents

Publication Publication Date Title
CN209170562U (en) A kind of mobile wireless video monitoring apparatus
CN208916643U (en) A kind of lifting appliance in construction
CN216085923U (en) Stringing construction device for power equipment installation
CN212799436U (en) Portable dyke consolidates hoist mechanism
CN210619883U (en) Efficient energy-saving winding and unwinding device for transmission cable
CN218174461U (en) Bridge door type multifunctional crane for container
CN111807152B (en) Large-scale cable coiling mechanism
CN215154233U (en) Tarpaulin covering machine
CN214692916U (en) Portable shield constructs quick-witted jack-up gallows
CN112850587A (en) Ground breakdown van for electric power system
CN207861724U (en) A kind of monkey and crane
CN216863547U (en) Operation and maintenance trolley for extra-high voltage converter station
CN111576981A (en) Remote control personnel lifting device at top of high-voltage power transmission tower and application method
CN220317194U (en) Photovoltaic installation construction platform
CN219058329U (en) Lead frame for crane
CN218174478U (en) Photovoltaic power plant hoist and mount construction equipment
CN115986627B (en) Tool for live replacement of overhead ground wire and use method thereof
CN209349498U (en) A kind of iron packet capping device using storage battery power supply
CN219078904U (en) Junction box for crane
CN219078912U (en) Reverse hook device for crane
CN219156325U (en) Novel travelling wheel for crane
CN217230159U (en) Auxiliary maintenance device for electric power engineering
CN220273095U (en) Movable switch switch cabinet of cabinet bracket device
CN216861221U (en) Battery changing device
CN218841642U (en) Lifting device for ship repair

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant