CN2160093Y - Vertical coal burning hot-blast stove - Google Patents

Vertical coal burning hot-blast stove Download PDF

Info

Publication number
CN2160093Y
CN2160093Y CN 93206988 CN93206988U CN2160093Y CN 2160093 Y CN2160093 Y CN 2160093Y CN 93206988 CN93206988 CN 93206988 CN 93206988 U CN93206988 U CN 93206988U CN 2160093 Y CN2160093 Y CN 2160093Y
Authority
CN
China
Prior art keywords
hot
blast stove
layer
flue gas
sleeve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 93206988
Other languages
Chinese (zh)
Inventor
李秉公
梁秋蓉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 93206988 priority Critical patent/CN2160093Y/en
Application granted granted Critical
Publication of CN2160093Y publication Critical patent/CN2160093Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Solid-Fuel Combustion (AREA)

Abstract

The utility model discloses a vertical coal burning hot-blast stove, being composed of a hearth, five layers of sleeves, a hot-blast chamber and a long fume tube. The utility model is characterized in that four annular jackets are formed by the five layers of sleeves, and the high-temperature fume and air are separated and flow in the four jackets. The thermal efficiency can reach to 75 percent, the heating load is more than one million kilocalories per hour, and the total weight is 6.3 tons when the heating load is one million kilocalories per hour. The utility model has the advantages of adequate heat exchange, high thermal efficiency, considerable heating load, simple structure, small volume, light weight and easy manufacture.

Description

Vertical coal burning hot-blast stove
The utility model relates to a kind of heating and drying plant of hot-air central heating.It is a kind of vertical coal-fired hot-blast stove.
Existing vertical fire coal hot-blast stove heating load is all smaller, generally all 400,000 kilocalories/time below, otherwise volume is just very huge, gives and makes; Transportation, installation bring very big difficulty.
The purpose of this utility model provides that a kind of heating load is big, and simple in structure, volume is little, makes to be easy to the vertical fire coal hot-blast stove again.
For achieving the above object, this vertical fire coal hot-blast stove structurally is provided with five layers of sleeve, from outside to inside, be respectively ground floor sleeve, second layer sleeve, the 3rd layer of sleeve, the 4th layer of sleeve, layer 5 sleeve, the chuck of having formed four garden annulars by these five layers of sleeves, high-temperature flue gas and air flow respectively in these four chucks at interval, can make high-temperature flue gas and air carry out sufficient heat exchange.In the layer 5 sleeve, also be provided with the tubulation bundle, make high-temperature flue gas and air carry out a heat exchange again.Therefore the utility model heat transfer area is big, and heat exchange is abundant, and thermal efficiency height can reach 75%, and heating load is big, up to 1,000,000 kilocalories/time more than, and structure is simple, volume is little, and is in light weight, 1,000,000 kilocalories/time, gross weight has only 6.3 tons; It is easy again to make.
The utility model is taked following structure: as accompanying drawing 1, accompanying drawing 2, shown in the accompanying drawing 3, it comprises the burner hearth (1) that second layer sleeve (5) and burner hearth top cover (6) are formed, cold wind import (3), coal-feeding door (24), the ground floor air jacket (20) that ground floor sleeve (4) and second layer sleeve (5) are formed, the second layer air jacket (18) that the 3rd layer of sleeve (7) and the 4th layer of sleeve (8) are formed, air channel (21), hot blast chamber (16), hot-blast outlet (12), the ground floor high-temperature flue gas chuck (19) that second layer sleeve (5) and the 3rd layer of sleeve (7) are formed, the second layer high-temperature flue gas chuck (17) that the 4th layer of sleeve (8) and layer 5 sleeve (9) are formed, short smoke pipe (11), long smoke pipe (10), smoke-box (13), exhaust opening (14).Ground floor air jacket (20) and second layer air jacket (18) and hot blast chamber (16) are communicated with them by air channel (21).Ground floor high-temperature flue gas chuck (19) and second layer high-temperature flue gas chuck (17) are communicated with them by short smoke pipe (11).The later high-temperature flue gas of coal combustion in the burner hearth, enter in the ground floor high-temperature flue gas chuck (19) by several arcuate sockets (23) on the burner hearth top cover, with ground floor air jacket (20) in air and second layer air jacket (18) in air carry out heat exchange, enter in the second layer high-temperature flue gas chuck (17) by several short smoke pipes (11) again, with second layer air jacket (18) in air and hot blast chamber (16) in air carry out heat exchange, again carry out heat exchange with the outer air of pipe again in long smoke pipe (10), fume collecting chamber (13) is passed through in the back, exhaust opening (14), deduster, air-introduced machine and chimney enter atmosphere.Cold air by air blast is through air inlet (3), enter in the ground floor air jacket (20), absorb the heat that interior radiant heat of burner hearth and the interior flue gas of ground floor high-temperature flue gas chuck (19) are passed to, making it temperature raises, enter then in the second layer air jacket (18), absorb the heat that the interior flue gas of high-temperature flue gas chuck (19) and (17) is passed to, temperature further improves, carry out heat exchange by the interior flue gas of hot blast chamber (16) and tubulation (10) again, after reaching needed temperature, just discharge, be sent to the user by hot-blast outlet (12).
Embodiment of the present utility model is provided by accompanying drawing.
Fig. 1 is a structure principle chart of the present utility model.
Fig. 2 is the cutaway view of A-A among Fig. 1.
Fig. 3 is the schematic diagram of burner hearth top cover.
Wherein 1 is burner hearth, and 2 is fire clay, and 3 is the cold wind import, 4 is the ground floor sleeve, and 5 is second layer sleeve, and 6 is the burner hearth top cover, 7 is the 3rd layer of sleeve, and 8 is the 4th layer of sleeve, and 9 is the layer 5 sleeve, 10 are long smoke pipe, and 11 are short smoke pipe, and 12 is hot-blast outlet, 13 is fume collecting chamber, and 14 is exhaust opening, and 15 is tube sheet, 16 is the hot blast chamber, and 17 is second layer high-temperature flue gas chuck, and 18 is second layer air jacket, 19 is ground floor high-temperature flue gas chuck, 20 is the ground floor air jacket, and 21 is the air channel, and 22 is ash removing opening, 23 is the arcuate socket discharge flue, 24 is coal-feeding door, and 25 is boiler foundation, and 26 is fire grate.The operation principle of present embodiment and top narration are identical.

Claims (6)

1, the vertical fire coal hot-blast stove a kind of by burner hearth, that five floor sleeve and hot blast chamber are formed is characterized in that being made up of five layers of sleeve the chuck of four garden annulars.
2, by the described hot-blast stove of claim 1, it is characterized in that in hot blast chamber (16), being equipped with some long smoke pipes (10).
3, by the described hot-blast stove of claim 1, it is characterized in that between second layer air jacket (18) and hot blast chamber (16), several air channels (21) being installed also.
4,, it is characterized in that between ground floor high-temperature flue gas chuck (19) and second layer high-temperature flue gas chuck (17), also being equipped with several short smoke pipes (11) by the described hot-blast stove of claim 1.
5, by the described hot-blast stove of claim 1, it is characterized in that being equipped with four ash removing openings (22) on burner hearth top cover (6), these four ash removing openings all are communicated with second layer high-temperature flue gas chuck (17).
6,, it is characterized in that on burner hearth top cover (6), having the exhaust smoke hole (23) of several arcs by the described hot-blast stove of claim 1.
CN 93206988 1993-03-17 1993-03-17 Vertical coal burning hot-blast stove Expired - Fee Related CN2160093Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 93206988 CN2160093Y (en) 1993-03-17 1993-03-17 Vertical coal burning hot-blast stove

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 93206988 CN2160093Y (en) 1993-03-17 1993-03-17 Vertical coal burning hot-blast stove

Publications (1)

Publication Number Publication Date
CN2160093Y true CN2160093Y (en) 1994-03-30

Family

ID=33789836

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 93206988 Expired - Fee Related CN2160093Y (en) 1993-03-17 1993-03-17 Vertical coal burning hot-blast stove

Country Status (1)

Country Link
CN (1) CN2160093Y (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102128491A (en) * 2011-04-09 2011-07-20 山西新聚星锅炉有限公司 Radiation-pot-type hot blast boiler
CN106839748A (en) * 2017-03-29 2017-06-13 合肥工业大学 A kind of pair of Heat Room grain heat-drying hot-blast stove

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102128491A (en) * 2011-04-09 2011-07-20 山西新聚星锅炉有限公司 Radiation-pot-type hot blast boiler
CN106839748A (en) * 2017-03-29 2017-06-13 合肥工业大学 A kind of pair of Heat Room grain heat-drying hot-blast stove

Similar Documents

Publication Publication Date Title
CN202350303U (en) Energy-saving hot air boiler
CN101672523A (en) Cyclone composite heat-exchange dedusting smokeless boiler
CN2160093Y (en) Vertical coal burning hot-blast stove
CN102393070B (en) Energy-saving hot-air boiler
CN2323269Y (en) Vertical multipurpose incinerating and water heating furnace
CN201434406Y (en) Inflamer in biomass stove
CN2563440Y (en) Multiple combustion chanmber separate burning gasification energy saving boiler
CN2467962Y (en) Environment protection energy-saving coal combustion hot-air stove
CN2542928Y (en) Quick-heating efficient smokeless evaporation coal-saving boiler
CN2300823Y (en) Three-chamber normal and back combustion coal stove for cooking and warming
CN2348305Y (en) Thermal conduction coal three-purpose boiler
CN2195067Y (en) Hot tube hot-air furnace
CN2294421Y (en) Vertical and ambient pressure water boiler using oil or gas as fuel
CN2085048U (en) Multifunctional horizontal coal hot-blast stove
CN2463751Y (en) Hot-air drier
CN2302409Y (en) Efficient domestic warming and heating water stove
CN2539100Y (en) Energy-saving heating boiler
CN2566133Y (en) Cooking Heating stove
CN2091429U (en) Vertical warm air furnace with dual-layer arc fire box
CN2295135Y (en) High-efficient flow-regulated heating stove
CN2285880Y (en) Vertical atmospheric hot-water boiler
CN2454637Y (en) Heating stove
CN2206900Y (en) Hot-blast combustion-supporting water furnace
CN2268187Y (en) Boiler capable of multi-time combustion
CN2312427Y (en) Vertical type spiral combustion boiler

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee