CN215857699U - Piling equipment for constructional engineering - Google Patents

Piling equipment for constructional engineering Download PDF

Info

Publication number
CN215857699U
CN215857699U CN202122321742.2U CN202122321742U CN215857699U CN 215857699 U CN215857699 U CN 215857699U CN 202122321742 U CN202122321742 U CN 202122321742U CN 215857699 U CN215857699 U CN 215857699U
Authority
CN
China
Prior art keywords
piling
water
mount
tup
component
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202122321742.2U
Other languages
Chinese (zh)
Inventor
李传丹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202122321742.2U priority Critical patent/CN215857699U/en
Application granted granted Critical
Publication of CN215857699U publication Critical patent/CN215857699U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Foundations (AREA)

Abstract

The utility model discloses piling equipment for constructional engineering, which comprises a fixed frame, wherein the lower end of the fixed frame is provided with a mounting member for mounting a device, the upper end of the fixed frame is provided with a piling member for piling, and the interior of the piling member is provided with a cooling member for cooling the device.

Description

Piling equipment for constructional engineering
Technical Field
The utility model relates to the technical field of building construction equipment, in particular to piling equipment for constructional engineering.
Background
Piling refers to driving piles into the ground to enable the building foundation to be firm, and piling training is an ideal choice for carrying out residual labor transfer training in rural areas, carrying out technical training in construction enterprises and carrying out re-employment training on off-duty workers.
Because a ground building is built on the ground and the ground is subjected to a large pressure, the ground must have sufficient strength against the pressure, which is often difficult to achieve, and therefore the ground bearing the building must be reinforced or the bearing manner of the ground is improved, so that it is conceivable to pile on the foundation, and most of the weight of the building is transmitted to a position deep below the ground through the pile, because the foundation at the position has a much larger bearing capacity than the ground, and the pile needs to be driven to a great depth, so that the distribution of the underground strata (called geological structure layer in the profession) is considered, and if the pressure of the building can be sufficiently borne, the pile is driven to the position, and if the pressure of the building can not be sufficiently borne, the pile is further driven.
The pile equipment for the building engineering that has now is difficult to fixing device when using, leads to the device during operation to take place the risk of turning on one's side, and current tup can rise at long-time work back temperature moreover, if can not lead to the work efficiency decline of device for the tup cooling, provides a pile equipment for the building engineering for this.
SUMMERY OF THE UTILITY MODEL
The present invention is directed to a piling device for construction engineering to solve the above problems of the background art.
In order to achieve the purpose, the utility model provides the following technical scheme: the piling equipment for the constructional engineering comprises a fixed frame, wherein a mounting member for mounting a device is arranged at the lower end of the fixed frame, a piling member for piling is arranged at the upper end of the fixed frame, and a cooling member for cooling the device is arranged in the piling member.
Preferably, the installation component includes that telescopic link, fixed bolster, damping spring and installation are detained, the telescopic link welding is in the upper end of mount, the quantity of fixed bolster has two sets ofly, and is two sets of the installation is detained all to the upper end of fixed bolster, the fixed bolster is detained through the installation and is fixed the mount joint, the lower extreme welding of mount has damping spring, damping spring's quantity has a plurality of groups, a plurality of groups damping spring equidistant range is at the lower extreme of mount, adjusts the height of pole of driving a pile through the length of adjusting the telescopic link to adapt to different work demands, the installation is detained and is fixed the fixed bolster at the both ends of mount, helps the balance of maintenance device, prevents to put the emergence of when driving a pile and turns on one's side, and damping spring can absorb the vibrations that the device during operation produced, plays absorbing effect, improves the precision of driving a pile.
Preferably, the pile component includes pile driving pole, pneumatic cylinder, tup and spouting mouth, the upper end of pile driving pole welding telescopic link, the middle part welding of pile driving pole has the pneumatic cylinder, the lower extreme welding of pneumatic cylinder has the tup, the material of tup is the stainless steel alloy, the spouting mouth has been seted up to the both sides of tup, the quantity of spouting mouth has a plurality of groups, a plurality of groups the spouting mouth reciprocates about the central symmetrical arrangement of tup through the inside pneumatic cylinder drive tup of pile driving pole to accomplish the process of pile driving, discharge the external world through the spouting mouth because of the mud that the pile driving produced.
Preferably, the cooling member includes water tank, water pump and water pipeline, the water tank welding is in the inside of piling pole, the one end of water tank and the water inlet intercommunication of water pump, the delivery port of water pump and the one end intercommunication of water pipeline, the other end of water pipeline extends to the inside of tup, draws water from the water tank through the water pump, sends water into the water pipeline again, and the water pipeline contacts with the tup after leading to water, absorbs the heat that the tup during operation produced, and the help tup cools off, prevents that the temperature of tup is too high.
Preferably, the quantity of mount has two sets ofly, every group the upper end of mount all welds a telescopic link, the shape of fixed bolster is "L" type, the mounting hole has been seted up at the both ends of mount, the installation buckle joint is in the mounting hole, shares the pressure of device during operation jointly through the multiunit fixed bolster, helps maintaining the balance of device.
Preferably, the one end of water tank is seted up and is extended to the filler on pile driving rod surface, the water pump passes through wire and external power supply equipment electric connection, water pipeline length is greater than the farthest distance between pile driving rod and the tup, adds water in the water tank through the filler, and external power supply equipment provides the required power of water pump during operation.
Compared with the prior art, the utility model has the beneficial effects that:
the balance of the device is maintained through the fixed support, the device is prevented from side turning during piling, the damping spring can absorb vibration generated during working of the device, the damping effect is achieved, the precision of piling is improved, the hydraulic cylinder in the piling rod drives the hammer to move up and down, so that the piling process is completed, slurry generated during piling is discharged to the outside through the slurry spraying port, when the device works, the water pump pumps water from the water tank, then the water is sent into the water pipeline, the water pipeline is contacted with the hammer after passing through the water, heat generated during working of the hammer is absorbed, the hammer is helped to be cooled, and the temperature of the hammer is prevented from being too high.
Drawings
FIG. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a side cross-sectional view of the work box mounting member of the present invention;
figure 3 is a side cross-sectional view of the piling component and cooling component of the present invention.
In the figure: 1. a fixed mount; 2. a mounting member; 3. a piling member; 4. a cooling member; 5. a telescopic rod; 6. fixing a bracket; 7. a damping spring; 8. installing a buckle; 9. piling a pile rod; 10. a hydraulic cylinder; 11. a hammer head; 12. a guniting port; 13. a water tank; 14. a water pump; 15. a water pipeline.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
In the description of the present invention, unless otherwise specified, the terms "upper", "lower", "left", "right", "front", "rear", "top", "bottom", and the like, indicate orientations or state relationships based on the orientations or state relationships shown in the drawings, are only for convenience in describing the present invention and simplifying the description, and do not indicate or imply that a referred mechanism or component must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention.
Referring to fig. 1-3, a piling device for construction engineering includes a fixed frame 1, a mounting member 2 for mounting a device is provided at a lower end of the fixed frame 1, a piling member 3 for piling is provided at an upper end of the fixed frame 1, and a cooling member 4 for cooling the device is provided inside the piling member 3.
Pile component 3 includes pile driving pole 9, pneumatic cylinder 10, tup 11 and whitewashing mouth 12, pile driving pole 9 welds in the upper end of telescopic link 5, the middle part welding of pile driving pole 9 has pneumatic cylinder 10, the lower extreme welding of pneumatic cylinder 10 has tup 11, the material of tup 11 is the stainless steel alloy, whitewashing mouth 12 has been seted up to the both sides of tup 11, the quantity of whitewashing mouth 12 has a plurality of groups, a plurality of groups whitewashing mouth 12 is about the central symmetrical arrangement of tup 11.
It should be noted that the piling bar 9 is welded at the upper ends of the two telescopic rods 5, and the hammer 11 has a hollow structure in the middle.
The working principle is as follows: a user fixes the fixing supports 6 at the two ends of the fixing frame 1 through the mounting buckles 8, which is helpful for maintaining the balance of the device and preventing the device from side turning during piling, the damping spring 7 can absorb the vibration generated during the working of the device, thereby playing a damping effect and improving the piling precision, and then the height of the piling rod 9 is adjusted by adjusting the length of the telescopic rod 5 to adapt to different working requirements, when the height of the pile driving rod 9 is determined, the hydraulic cylinder 10 inside the pile driving rod 9 drives the hammer head 11 to move up and down, to complete the process of piling, and when the device is working, the water pump 14 pumps water from the water tank 13, then the water is sent into the water pipeline 15, the water pipeline 15 is contacted with the hammer head 11 after the water is led through, heat generated when the hammer head 11 works is absorbed, the hammer head 11 is assisted to be cooled, and the temperature of the hammer head 11 is prevented from being overhigh.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a pile equipment for building engineering, includes mount (1), its characterized in that: the lower end of the fixed frame (1) is provided with a mounting component (2) for mounting a device, the upper end of the fixed frame (1) is provided with a piling component (3) for piling, and the inside of the piling component (3) is provided with a cooling component (4) for cooling the device.
2. A piling plant for construction engineering according to claim 1, wherein: installation component (2) are detained (8) including telescopic link (5), fixed bolster (6), damping spring (7) and installation, the upper end at mount (1) is welded in telescopic link (5), the quantity of fixed bolster (6) has two sets ofly, and is two sets of the installation is all welded and is detained (8) in the upper end of fixed bolster (6), fixed bolster (6) are detained (8) and mount (1) joint through the installation, the lower extreme welding of mount (1) has damping spring (7), the quantity of damping spring (7) has a plurality of groups, a plurality of groups damping spring (7) equidistant range is at the lower extreme of mount (1).
3. A piling plant for construction engineering according to claim 1, wherein: pile component (3) are including driving stake pole (9), pneumatic cylinder (10), tup (11) and whitewashing mouth (12), the upper end of driving stake pole (9) welding telescopic link (5), the middle part welding of driving stake pole (9) has pneumatic cylinder (10), the lower extreme welding of pneumatic cylinder (10) has tup (11), the material of tup (11) is the stainless steel alloy, whitewashing mouth (12) have been seted up to the both sides of tup (11), the quantity of whitewashing mouth (12) has a plurality of groups, a plurality of groups whitewashing mouth (12) are about the central symmetrical arrangement of tup (11).
4. A piling plant for construction engineering according to claim 1, wherein: the cooling member (4) comprises a water tank (13), a water pump (14) and a water pipeline (15), the water tank (13) is welded inside the pile driving rod (9), one end of the water tank (13) is communicated with a water inlet of the water pump (14), a water outlet of the water pump (14) is communicated with one end of the water pipeline (15), and the other end of the water pipeline (15) extends to the inside of the hammer head (11).
5. A piling plant for construction engineering according to claim 2, wherein: the quantity of mount (1) has two sets ofly, every group the upper end of mount (1) all welds telescopic link (5), the shape of fixed bolster (6) is "L" type, the mounting hole has been seted up at the both ends of mount (1), installation knot (8) joint is in the mounting hole.
6. Piling device for construction engineering according to claim 4, characterised in that: the water filling device is characterized in that one end of the water tank (13) is provided with a water filling port extending to the surface of the piling rod (9), the water pump (14) is electrically connected with external power supply equipment through a lead, and the length of the water pipeline (15) is greater than the farthest distance between the piling rod (9) and the hammer head (11).
CN202122321742.2U 2021-09-25 2021-09-25 Piling equipment for constructional engineering Expired - Fee Related CN215857699U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122321742.2U CN215857699U (en) 2021-09-25 2021-09-25 Piling equipment for constructional engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122321742.2U CN215857699U (en) 2021-09-25 2021-09-25 Piling equipment for constructional engineering

Publications (1)

Publication Number Publication Date
CN215857699U true CN215857699U (en) 2022-02-18

Family

ID=80256408

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122321742.2U Expired - Fee Related CN215857699U (en) 2021-09-25 2021-09-25 Piling equipment for constructional engineering

Country Status (1)

Country Link
CN (1) CN215857699U (en)

Similar Documents

Publication Publication Date Title
CN202352244U (en) Steel pipe tower pole number plate fixing device
CN215857699U (en) Piling equipment for constructional engineering
CN210341917U (en) Piling device for construction engineering
CN210315558U (en) Telescopic and deformable plug-in concrete vibrating bent
CN202689029U (en) Anchor rod foundation of photovoltaic module support
CN214460337U (en) Static pressure pipe pile
CN214245676U (en) Water ramming device for red mud rock block packing
CN212104009U (en) Hydraulic engineering construction is with foundation tamping unit who has stable structure
CN210900750U (en) Environment optimization device for landscaping
CN210013216U (en) Double-rod overlapped hydraulic pile hammer
CN208395817U (en) A kind of subgrade construction piling structure
CN211831748U (en) Agricultural is with device that loosens soil
CN215857693U (en) Improved pile driver
CN219410951U (en) Can install sandbox of single-tube tower fast
CN110541426A (en) Be suitable for prosthetic fender structure of enclosing of not cutting off water supply of large-scale water delivery channel
CN212868965U (en) Water hammer buffer device
CN218492502U (en) Pile driver auxiliary equipment for side slope severe condition construction
CN212106404U (en) Hydraulic oil tank of hydraulic reinforcing steel bar manufacturing equipment
CN219825246U (en) Construction engineering pile driving device
CN213038354U (en) Ramming device with damping structure for construction
CN213476875U (en) Diesel pile driver is used in construction of hammering pile pressing based on soft foundation soil property
CN220226272U (en) Mechanical arm for concrete vibrating robot
CN213419099U (en) Deep shaft concrete anti-blocking filling device
CN217056590U (en) Pump line stirrup strutting arrangement
CN216558572U (en) Blasting safety device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220218