CN215803213U - Building concrete construction template anchor clamps - Google Patents

Building concrete construction template anchor clamps Download PDF

Info

Publication number
CN215803213U
CN215803213U CN202122368885.9U CN202122368885U CN215803213U CN 215803213 U CN215803213 U CN 215803213U CN 202122368885 U CN202122368885 U CN 202122368885U CN 215803213 U CN215803213 U CN 215803213U
Authority
CN
China
Prior art keywords
plank sheathing
buffering
deformation
concrete construction
building concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202122368885.9U
Other languages
Chinese (zh)
Inventor
杨小钰
王尧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Technology and Business College
Original Assignee
Shanxi Technology and Business College
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Technology and Business College filed Critical Shanxi Technology and Business College
Priority to CN202122368885.9U priority Critical patent/CN215803213U/en
Application granted granted Critical
Publication of CN215803213U publication Critical patent/CN215803213U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses a building concrete construction formwork clamp in the technical field of building construction facilities, which comprises a wooden formwork, a pouring mould, angle irons, lug blocks, connecting columns, adjusting rods and thread sections, wherein the thread turning directions of the two thread sections are opposite, the two thread sections are respectively arranged on the two connecting columns in a penetrating manner corresponding to threads, the surface of the wooden formwork is connected with an anti-deformation plate in a butting manner, and the anti-deformation plate is connected onto the connecting columns through a buffer unit. Consolidate four tip to four plank sheathing through four angle bars, and rotate by adjusting the pole, make four angle bars draw close relatively and press from both sides tight plank sheathing, and then consolidate the plank sheathing, and it is less to the destruction of plank sheathing, the timber waste has been reduced, in addition because four angle bars can relative movement, and then the not equidimension pouring mould that adaptable plank sheathing encloses, in addition through buffer unit counter deformation board production elasticity support, and then pour the deformation that the in-process produced to the plank sheathing and cushion, the anti deformability of plank sheathing is improved.

Description

Building concrete construction template anchor clamps
Technical Field
The utility model relates to the technical field of building construction facilities, in particular to a building concrete construction template clamp.
Background
At present, construction templates such as concrete structural columns, beams and the like in the field of buildings basically adopt wood templates, and the wood templates have the advantages of convenience in manufacturing and strong plasticity.
After the wood formwork in the prior art is used, the wood formwork is generally dismantled, but the dismantled wood formwork is greatly damaged, so that great waste is caused, and through retrieval, Chinese patent No. CN201176711Y discloses a building concrete construction formwork clamp which comprises a fastener and a pull rod, wherein the fastener is matched with the fastener and the pull rod for installation, the fastener is in an angle iron shape, fixing holes are formed in the upper part and the lower part of the fastener, and a pull rod fixing column is arranged in the middle of the fastener; the pull rod comprises a rod-shaped body, one end of the rod-shaped body is a bolt body, the bolt body is fixed on the pull rod fixing column through a nut, and the other end of the rod-shaped body is a fastening strip which is abutted against the fastener and used in a matched mode.
The application also aims to provide a technical scheme which can reinforce the wooden template and reduce the loss of the wooden template.
Based on the above, the utility model designs a building concrete construction formwork clamp to solve the problems.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a building concrete construction formwork clamp, which aims to solve the problems that the wood formwork in the prior art proposed in the background art is generally dismantled after being used, but the dismantled wood formwork is greatly damaged, so that the waste is large.
In order to achieve the purpose, the utility model provides the following technical scheme: the utility model provides a building concrete construction formwork anchor clamps, includes four plank sheathing, four enclose into a casting mold between the plank sheathing, adjacent two the angle bar is installed in the cooperation of the end that links to each other of plank sheathing, respectively be equipped with the ear piece on two sections outer walls of angle bar, each horizontal rigid coupling has the spliced pole on the ear piece, adjacent two be connected with the regulation pole jointly on the spliced pole, the length direction both ends of regulation pole respectively are equipped with the screw thread section, two the screw thread of screw thread section is revolved to opposite, and corresponds the screw thread respectively and wears to locate two on the spliced pole, the conflict in plank sheathing surface is connected with the anti board that warp, the anti board that warp passes through the buffer unit and connects on the spliced pole.
In the above construction concrete construction formwork clamp, the deformation-resistant plate corresponds to the middle of the wooden formwork.
In the above formwork fixture for building concrete construction, the buffer unit includes buffer posts vertically and fixedly connected to opposite ends of the deformation-resistant plate, buffer seats are penetrated through the connecting posts, mounting grooves for the buffer posts to be inserted and combined in a telescopic manner and in a blind hole manner are formed in the buffer seats, buffer springs are arranged in the mounting grooves, and the buffer springs elastically abut against the buffer posts and drive the buffer posts to slide towards the outer sides of the buffer seats.
In the above construction concrete template fixture, a displacement sensor is arranged in the mounting groove, and one end of the buffer column penetrating into the mounting groove is provided with an induction block matched with the displacement sensor for use.
In the above building concrete construction formwork clamp, a cotter pin is arranged at one end of the buffer column penetrating into the mounting groove, and a kidney-shaped hole for the cotter pin to be inserted is formed in the outer wall of the buffer seat.
Compared with the prior art, the utility model has the beneficial effects that: four ends of four wooden templates are reinforced through four angle bars, and rotate by adjusting the pole, make four angle bars draw close relatively and press from both sides tight wooden template, and then consolidate the wooden template, and it is less to the destruction of wooden template, the timber waste has been reduced, in addition because four angle bars can relative movement, and then the not equidimension pouring mold that adaptable wooden template encloses, in addition, it produces elasticity and supports to resist the deformation board through buffer unit antagonism deformation board, and then pour the deformation that the in-process produced to the wooden template and cushion, improve the resistance to deformation ability of wooden template, make concrete structure surface quality after pouring higher in addition, through setting up displacement sensor, the response piece, can detect the deformation degree of wooden template pouring in-process, be convenient for carry out the subsequent sequence and improve.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings used in the description of the embodiments will be briefly introduced below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and it is obvious for those skilled in the art that other drawings can be obtained according to the drawings without creative efforts.
FIG. 1 is a schematic top view of the structure of the present invention;
FIG. 2 is an enlarged view of a portion of the structure at A in FIG. 1;
FIG. 3 is an enlarged view of a portion of the structure shown at B in FIG. 1;
fig. 4 is an enlarged schematic view of a partial structure at C in fig. 1.
In the drawings, the components represented by the respective reference numerals are listed below:
the device comprises 1-angle iron, 2-deformation-resistant plates, 3-threaded sections, 4-wood templates, 5-connecting columns, 6-buffer seats, 7-buffer columns, 8-split pins, 9-mounting grooves, 10-buffer springs, 11-displacement sensors, 12-sensing blocks and 13-kidney-shaped holes.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides a technical solution: a building concrete construction template clamp comprises four wooden templates 4, a pouring mold is enclosed among the four wooden templates 4, angle irons 1 are installed at the connecting ends of every two adjacent wooden templates 4 in a matched mode, lug blocks are arranged on two sections of outer walls of each angle iron 1 respectively, connecting columns 5 are horizontally and fixedly connected onto the lug blocks respectively, adjusting rods are commonly connected onto the two adjacent connecting columns 5, thread sections 3 are arranged at the two ends of the length direction of each adjusting rod respectively, the thread turning directions of the two thread sections 3 are opposite and are respectively arranged on the two connecting columns 5 in a penetrating mode corresponding to threads, anti-deformation plates 2 are connected onto the surfaces of the wooden templates 4 in an abutting mode, the anti-deformation plates 2 are connected onto the connecting columns 5 through buffer units, the four angle irons 1 are arranged on the pouring mold, the four angle irons 1 respectively correspond to the four end portions of the pouring mold, as shown in the figure, two vertical sections of the angle irons 1 respectively abut against the outer walls of the two wooden templates, and then the adjusting rods are screwed, when adjusting the pole and rotating, two screw thread sections 3 on it close with two spliced pole 5 screw threads soon respectively, because the screw thread of two screw thread sections 3 revolves to opposite, make two adjacent spliced poles 5 be close to relatively, and then make four angle bars press from both sides tight four plank formworks, pour the in-process, the concrete has pressure to the plank formwork, make the plank formwork probably produce the deformation, and resist the deformation board through the buffer unit number and produce elasticity and support the top, and then can cushion the deformation effort that the plank formwork receives.
In this embodiment, the anti-deformation plate 2 corresponds to the middle of the plank sheathing 4, and the middle of the plank sheathing 4 is subjected to a large pressure or a large stress concentration, so that the anti-deformation capability of the plank sheathing 4 can be improved by reinforcing the middle of the plank sheathing 4 through the anti-deformation plate 2.
In this embodiment, the buffer unit includes perpendicular rigid coupling buffer post 7 on the relative both ends of anti-deformation board 2, wear to be equipped with buffer seat 6 on the spliced pole 5, be equipped with on the buffer seat 6 and supply buffer post 7 flexible the inserting, the mounting groove 9 of blind hole form, be equipped with buffer spring 10 in the mounting groove 9, buffer spring 10 elasticity is supported and is pushed against buffer post 7 and drive buffer post 7 and slide towards the outside of buffer seat 6, after anti-deformation board 2 received the effort, will make buffer post 7 slide towards buffer seat 6 inboard, and produce the extrusion force to buffer spring 10, buffering through buffer spring 10, and then cushion the deformation force that wooden template 4 received.
In this embodiment, be equipped with displacement sensor 11 in the mounting groove 9, buffer column 7 penetrates one of mounting groove 9 and serves and be equipped with the response piece 12 that uses with displacement sensor 11 cooperation, through buffer column 7's removal for displacement sensor 11 can receive the removal of response piece 12, and produce the removal signal, and then feed back to external control ware, so that detect the deformation degree of plank sheathing.
In this embodiment, the cotter 8 is worn to be equipped with by one end in the buffering post 7 penetrates mounting groove 9, offers on the outer wall of buffer seat 6 and supplies cotter 8 to insert the waist shape hole 13 that closes, slides and spacing in waist shape hole 13 through cotter 8 for buffering post 7 can not break away from out in mounting groove 9.
In the description herein, references to the description of "one embodiment," "an example," "a specific example" or the like are intended to mean that a particular feature, structure, material, or characteristic described in connection with the embodiment or example is included in at least one embodiment or example of the utility model. In this specification, the schematic representations of the terms used above do not necessarily refer to the same embodiment or example. Furthermore, the particular features, structures, materials, or characteristics described may be combined in any suitable manner in any one or more embodiments or examples.
The preferred embodiments of the utility model disclosed above are intended to be illustrative only. The preferred embodiments are not exhaustive and do not limit the utility model to the precise embodiments disclosed. Obviously, many modifications and variations are possible in light of the above teaching. The embodiments were chosen and described in order to best explain the principles of the utility model and the practical application, to thereby enable others skilled in the art to best utilize the utility model. The utility model is limited only by the claims and their full scope and equivalents.

Claims (5)

1. The utility model provides a building concrete construction formwork anchor clamps, includes four plank sheathing (4), four enclose into a casting mould between plank sheathing (4), its characterized in that, adjacent two angle bar (1) is installed in the cooperation of the end that links to each other of plank sheathing (4), respectively be equipped with the ear piece on two sections outer walls of angle bar (1), each horizontal rigid coupling has spliced pole (5), adjacent two on the ear piece be connected with the regulation pole jointly on spliced pole (5), the length direction both ends of regulation pole respectively are equipped with screw thread section (3), two the screw thread of screw thread section (3) revolves to opposite, and corresponds the screw thread respectively and wears to locate two on spliced pole (5), plank sheathing (4) surface is contradicted and is connected with anti-deformation board (2), anti-deformation board (2) are connected on spliced pole (5) through buffer unit.
2. The building concrete construction formwork clamp according to claim 1, wherein the deformation-resistant plate (2) corresponds to a middle position of the wooden formwork (4).
3. The building concrete construction formwork clamp according to claim 1, wherein the buffering unit comprises buffering columns (7) vertically and fixedly connected to opposite ends of the anti-deformation plate (2), buffering seats (6) penetrate through the connecting columns (5), mounting grooves (9) which are used for the buffering columns (7) to be inserted and combined in a telescopic mode and are in a blind hole mode are formed in the buffering seats (6), buffering springs (10) are arranged in the mounting grooves (9), and the buffering springs (10) elastically abut against the buffering columns (7) and drive the buffering columns (7) to slide towards the outer sides of the buffering seats (6).
4. The building concrete construction formwork clamp according to claim 3, wherein a displacement sensor (11) is arranged in the mounting groove (9), and an induction block (12) matched with the displacement sensor (11) is arranged at one end of the buffering column (7) penetrating into the mounting groove (9).
5. The building concrete construction template clamp according to claim 3, wherein a cotter pin (8) is arranged at one end of the buffer column (7) penetrating into the mounting groove (9), and a kidney-shaped hole (13) for the cotter pin (8) to be inserted is arranged on the outer wall of the buffer seat (6).
CN202122368885.9U 2021-09-28 2021-09-28 Building concrete construction template anchor clamps Expired - Fee Related CN215803213U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122368885.9U CN215803213U (en) 2021-09-28 2021-09-28 Building concrete construction template anchor clamps

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122368885.9U CN215803213U (en) 2021-09-28 2021-09-28 Building concrete construction template anchor clamps

Publications (1)

Publication Number Publication Date
CN215803213U true CN215803213U (en) 2022-02-11

Family

ID=80167577

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122368885.9U Expired - Fee Related CN215803213U (en) 2021-09-28 2021-09-28 Building concrete construction template anchor clamps

Country Status (1)

Country Link
CN (1) CN215803213U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115214013A (en) * 2022-07-19 2022-10-21 李国强 Intelligent production facility of building beam column

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115214013A (en) * 2022-07-19 2022-10-21 李国强 Intelligent production facility of building beam column
CN115214013B (en) * 2022-07-19 2023-11-14 中国二十二冶集团有限公司 Intelligent production equipment for building beam and column

Similar Documents

Publication Publication Date Title
CN201535064U (en) Template for buildings
CN215803213U (en) Building concrete construction template anchor clamps
CN111497006B (en) High-compactness PC (polycarbonate) component structure and production process thereof
CN210737843U (en) Prefabricated assembled concrete shear force wall
CN210857607U (en) Frame structure of building wall
CN213143853U (en) Template device for light-transmitting material modified rammed earth wall
CN211548303U (en) Detachable steel bar truss building carrier plate of assembled
CN211850723U (en) Fixing structure of I-steel of overhanging scaffold
CN114250965A (en) Climbing frame wall-attaching device for variable cross-section construction of high-rise building and construction method thereof
CN207526113U (en) A kind of reinforcing mold of windowsill coping formwork
CN213926893U (en) Concrete prefabricated external wall panel
CN111270846A (en) Fixing structure of I-steel of overhanging scaffold
CN210421927U (en) Cast-in-place linkage segment template strutting arrangement of instrument formula concrete superimposed sheet
CN217631304U (en) Reinforced concrete linear simple structure formwork bracing and pulling stabilizing device
CN220848736U (en) Be applied to pre-buried construction's of outer wall tubular product seepage prevention structure
CN211369514U (en) Assembled construction formwork
CN215859109U (en) Building engineering template fixing device
CN215631611U (en) Hang mould bearing structure
CN219080960U (en) High-strength and high-toughness wood building template
CN219080992U (en) Building construction beam structure
CN208618793U (en) Novel fabricated builds shear wall slab molding die
CN220414878U (en) Template reinforcing apparatus for construction
CN214462542U (en) Wall body auxiliary supporting and fixing structure for building expansion joint construction
CN220790326U (en) Concrete reinforcing steel bar stretching structure
CN217175709U (en) Rectangular wall column wood formwork fixing device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220211

CF01 Termination of patent right due to non-payment of annual fee