CN215671491U - Quick detach formula construction protection system - Google Patents

Quick detach formula construction protection system Download PDF

Info

Publication number
CN215671491U
CN215671491U CN202122221057.2U CN202122221057U CN215671491U CN 215671491 U CN215671491 U CN 215671491U CN 202122221057 U CN202122221057 U CN 202122221057U CN 215671491 U CN215671491 U CN 215671491U
Authority
CN
China
Prior art keywords
protection system
supporting rod
quick
fixed rods
steel beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122221057.2U
Other languages
Chinese (zh)
Inventor
陈杰
夏双武
王国珏
黄祁聪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Modern Construction Industry Development Research Institute
Yujian Industrial Group Co ltd
Original Assignee
Chongqing Modern Construction Industry Development Research Institute
Yujian Industrial Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Modern Construction Industry Development Research Institute, Yujian Industrial Group Co ltd filed Critical Chongqing Modern Construction Industry Development Research Institute
Priority to CN202122221057.2U priority Critical patent/CN215671491U/en
Application granted granted Critical
Publication of CN215671491U publication Critical patent/CN215671491U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

The utility model discloses a quick-release type construction protection system which comprises a plurality of vertically arranged fixed rods, wherein the fixed rods are distributed at intervals along the length direction of a steel beam, the lower ends of the fixed rods are detachably connected with the steel beam, the upper ends of the fixed rods are provided with a supporting rod, the supporting rod and the fixed rods are coaxially arranged, and the lower ends of the supporting rods are detachably connected with the upper ends of the fixed rods; a plurality of placing members are arranged on one side of the supporting rod, the placing members are distributed at intervals along the length direction of the supporting rod, and one end of each placing member is fixedly connected with the supporting rod; the protective component is positioned between two adjacent support rods and is detachably connected with the placing component. The construction and installation are convenient, the installation surface is arranged on the main structure of the building, the quick assembly and disassembly and the reutilization can be realized, the installation efficiency of the construction protection system is greatly improved, the material consumption of the protection system is saved, and the safe operation of constructors is ensured.

Description

Quick detach formula construction protection system
Technical Field
The utility model relates to the technical field of fabricated buildings, in particular to a quick-release construction protection system.
Background
At present, in the actual construction process, a scaffold and a protective net are usually erected on the periphery of a building to enclose the building, so that construction protection is provided for the inside and the outside. However, the construction process of the large protection structure in the early installation and later disassembly processes is complicated, the construction period is long, the labor cost is high, a large amount of protection building materials are required to be consumed, the large amount of protection building materials are difficult to realize effective recycling, the building material recycling rate is low, and the comprehensive factors are not beneficial to regulation and control and cost management of the whole construction period of the construction project.
SUMMERY OF THE UTILITY MODEL
Aiming at the defects in the prior art, the utility model aims to provide a quick-release construction protection system to solve the problems that in the prior art, a protection structure is complicated to build, consumes more materials and is difficult to recycle after being disassembled.
The technical scheme adopted by the utility model is as follows:
a quick-release type construction protection system comprises a plurality of vertically arranged fixed rods, wherein the fixed rods are distributed at intervals along the length direction of a steel beam, the lower ends of the fixed rods are detachably connected with the steel beam, a supporting rod is vertically arranged at the upper end of each fixed rod, and the lower end of each supporting rod is detachably connected with the upper end of each fixed rod; the support rod is provided with a plurality of placing components which are vertically distributed at intervals along the support rod and are positioned at the same side of the support rod, and one end of each placing component is fixedly connected with the support rod; the support rod support structure further comprises a plurality of protection members, and the protection members are detachably connected with the placing members on at least two adjacent support rods.
In the actual construction process, the fixing rods, the supporting rods, the placing members and the protection members are assembled in advance, then the whole protection system is fixed on the steel beam to be constructed, and then after the construction is finished, the protection system is only required to be taken down from the steel beam without being completely disassembled and disassembled, so that the protection system is kept in an assembled state and can be continuously used for construction protection of other steel beams. Compared with the prior art, the protective system has the advantages that the required building materials are greatly reduced, the installation and the removal are convenient, the protective system can be continuously used after being removed, the construction efficiency is improved, the safety of constructors is guaranteed, meanwhile, the building materials are greatly saved, and the construction cost is effectively reduced.
Preferably, the placing component is L-shaped, the end part of the horizontal section of the placing component is fixedly connected with the supporting rod, and the end part of the vertical section of the placing component is arranged upwards.
Preferably, the guard member is a rail, the rail is horizontally placed on the placement member located at the same horizontal plane, and the rail is connected with the placement member by a reinforcing bolt passing through the rail and the placement member. During actual construction, select the kind of protective member according to construction environment's the condition, when constructor needs sufficient construction space, preferably adopt the railing as protective member, for constructor provides sufficient operating space, avoid protective member to influence constructor's construction operation.
Preferably, a protective net is further arranged on one side of the handrail, and the protective net is arranged in the vertical direction and fixedly connected with the handrail. When in actual use, the protective net can be arranged on one side of the handrail opposite to each other or one side of the handrail opposite to each other.
Preferably, the fixing rod passes through the preformed hole on the girder steel through fixing bolt and can dismantle with the girder steel and link to each other.
Preferably, the dead lever passes through the magnetism gauge stand and adsorbs with the girder steel and link to each other, and wherein, magnetism gauge stand upside has a constant head tank, and the lower extreme of dead lever stretches into in the constant head tank to can dismantle with the constant head tank and link to each other. When the utility model is used, the magnetism gauge stand is adsorbed with one side of girder steel and is linked to each other, can fix the dead lever on the girder steel through the magnetism gauge stand, need not carry out solitary drilling operation to the girder steel, reduces manufacturing procedure.
Preferably, the fixing rod is of a hollow structure, the lower end of the supporting rod extends into the upper end of the fixing rod, the supporting rod can move along the length direction of the fixing rod, and the fixing rod is fixedly connected with the supporting rod through a locking bolt penetrating through the upper end of the fixing rod.
Compared with the prior art, the utility model has the following advantages:
1. in the actual construction process, the fixing rods, the supporting rods, the placing members and the protection members are assembled in advance, the protection system is arranged on the steel beam to be constructed through the fixing rods during installation, temporary protection is provided for constructors, after the construction is finished, the whole protection system is detached from the steel beam, the protection system is not required to be disassembled, the protection system is kept in an assembled state, and the protection system can be continuously used for construction enclosure of other steel beams to be constructed.
2. In the actual work progress, can be according to actual construction needs, select protection system's fixed mode, both can fix it through fixing bolt, can adopt magnetism gauge stand to fix it again, avoid protection system to cause the damage to the girder steel when the installation, also simplified construction process.
3. In the actual use process, the construction and installation are convenient, the installation surface is arranged on the main structure of the building, the quick assembly and the quick disassembly can be realized, the reutilization can be realized, the installation efficiency of the construction protection system is greatly improved, the material consumption of the protection system is saved, and the safe operation of constructors is ensured.
Drawings
Fig. 1 is a schematic structural diagram of a quick-release construction protection system according to the present invention.
In the figure: the device comprises a fixing rod 1, a supporting rod 2, a placing component 3, a railing 4 and a protective net 5.
Detailed Description
The utility model will be further explained with reference to the drawings and the embodiments.
Example (b): a quick-release type construction protection system comprises a plurality of vertically arranged fixed rods 1, wherein the fixed rods are distributed at intervals along the length direction of a steel beam, the lower ends of the fixed rods are detachably connected with the steel beam, the upper ends of the fixed rods are vertically provided with supporting rods 2, and the lower ends of the supporting rods are detachably connected with the upper ends of the fixed rods; a plurality of placing components 3 are arranged on the supporting rod, the placing components are vertically distributed at intervals along the supporting rod and are positioned on the same side of a vertical plane where the supporting rod is positioned, and one end of each placing component is fixedly connected with the supporting rod; the support rod support structure further comprises a plurality of protection members, and the protection members are detachably connected with the placing members on at least two adjacent support rods.
When the device is specifically implemented, the placing component is L-shaped, the end part of the horizontal section of the placing component is fixedly connected with the supporting rod, and the end part of the vertical section of the placing component is arranged upwards. Wherein, when construction worker has certain requirement to the construction space, in order to avoid protection system to influence workman's operation, but protection component preferred adopts railing 4, and the railing is placed on being located the component of placing of same horizontal plane along the horizontal direction to through passing the railing and placing the reinforcing bolt of component with the railing with place the component and link to each other, provide sufficient operating space for construction worker. Still be equipped with the protection network in one side of railing, preferred for the building protection network, the protection network sets up along vertical direction to link to each other with the railing is fixed, the protection network can be established in one side that the railing is in opposite directions or one side that the railing deviates from mutually, does further protection to the job site. And when the construction worker does not have the requirement to operating space, the guard plate also can be selected for use to the protective member, and the guard plate sets up along vertical direction, and the guard plate is located one side that the protective member deviates from the bracing piece, and its downside is hugged closely with the upside of girder steel, and the upside upwards extends to link to each other with the vertical section of placing the component through connecting bolt. In the using process of actual construction, holes can be formed in the steel beam in advance for mounting the protection system, mounting holes of other members on the steel beam can be selected for fixing the protection system, and the fixing rod penetrates through the reserved holes in the steel beam through the fixing bolts to be detachably connected with the steel beam. In actual construction, in order to avoid the damage to the girder steel, the dead lever passes through the magnetism gauge stand and adsorbs with the girder steel and link to each other, and wherein, magnetism gauge stand upside has a constant head tank, and the lower extreme of dead lever stretches into in the constant head tank to can dismantle with the constant head tank through the bolt and link to each other, when using in practice, the magnetism gauge stand adsorbs with one side of girder steel and links to each other, can adsorb arbitrary one side of magnetism gauge stand and girder steel according to actual construction needs and link to each other, needn't carry out drilling operation to the girder steel, reduces the work procedure. All have magnetism on a plurality of planes in the magnetism gauge stand, can fix any angle, according to actual construction needs, the position through the dead lever is adjusted the position of magnetism gauge stand, when making the dead lever avoid having had the component on the girder steel, link to each other through magnetism gauge stand and girder steel magnetism, treat the construction completion back, when demolising protection system, rotate the handle of magnetism gauge stand, change its inside magnet two polar directions, can take off protection system from the girder steel very easily, thereby make protection system can used repeatedly many times. The dead lever is hollow structure, and the lower extreme of bracing piece stretches into the upper end of dead lever, and the bracing piece can remove along the length direction of dead lever, and the dead lever links to each other with the bracing piece is fixed through passing the locking bolt of its upper end.
The using method comprises the following steps: according to the actual need of construction, each appropriate component is selected, the fixing rods, the supporting rods, the placing components and the protecting components are assembled and connected in advance, the whole protecting system is fixed on the steel beam to be constructed through the fixing rods, temporary protection is provided for constructors, after the construction is completed, the fixing rods are detached from the steel beam, the protecting system is not required to be disassembled, the assembling state of the protecting system is kept, and the protecting system can be continuously used for construction enclosure of other steel beams to be constructed.
The present invention is not limited to the above-described embodiments, and configurations similar to or the same as those of the above-described embodiments of the present invention are within the scope of the present invention.
Finally, it should be noted that the above embodiments are only used for illustrating the technical solutions of the present invention and not for limiting the technical solutions, and those skilled in the art should understand that modifications or equivalent substitutions can be made on the technical solutions of the present invention without departing from the spirit and scope of the technical solutions, and all that should be covered by the claims of the present invention.

Claims (7)

1. A quick-release type construction protection system is characterized by comprising a plurality of vertically arranged fixed rods (1), wherein the fixed rods are distributed at intervals along the length direction of a steel beam, the lower ends of the fixed rods are detachably connected with the steel beam, the upper ends of the fixed rods are vertically provided with a supporting rod (2), and the lower ends of the supporting rods are detachably connected with the upper ends of the fixed rods; a plurality of placing components (3) are arranged on the supporting rod, are vertically distributed at intervals along the supporting rod and are positioned at the same side of the supporting rod, and one end of each placing component is fixedly connected with the supporting rod; the support rod support structure further comprises a plurality of protection members, and the protection members are detachably connected with the placing members on at least two adjacent support rods.
2. The quick-release type construction protection system according to claim 1, wherein the placement member is L-shaped, the end of the horizontal section is fixedly connected with the support rod, and the end of the vertical section is disposed upward.
3. The quick-release construction protection system according to claim 2, wherein the protection member is a rail (4), the rail is horizontally placed on a placement member located at the same level, and the rail is connected with the placement member by a reinforcing bolt passing through the rail and the placement member.
4. The quick-release construction protection system according to claim 3, wherein a protective net (5) is further arranged on one side of the rail, and the protective net is arranged in a vertical direction and fixedly connected with the rail.
5. The quick-release construction protection system according to claim 1, wherein the fixing rod is detachably connected to the steel beam by a fixing bolt passing through a predetermined hole in the steel beam.
6. The quick-release construction protection system according to claim 1, wherein the fixing rod is connected to the steel beam via a magnetic gauge stand, wherein a positioning groove is formed on the upper side of the magnetic gauge stand, and the lower end of the fixing rod extends into the positioning groove and is detachably connected to the positioning groove; the magnetic gauge stand is connected with one side of the steel beam in an adsorption manner.
7. The quick-release construction protection system according to claim 1, wherein the fixing rod is a hollow structure, the lower end of the supporting rod extends into the upper end of the fixing rod, and the supporting rod is capable of moving along the length direction of the fixing rod, and the fixing rod is fixedly connected to the supporting rod by a locking bolt passing through the upper end of the fixing rod.
CN202122221057.2U 2021-09-14 2021-09-14 Quick detach formula construction protection system Active CN215671491U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122221057.2U CN215671491U (en) 2021-09-14 2021-09-14 Quick detach formula construction protection system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122221057.2U CN215671491U (en) 2021-09-14 2021-09-14 Quick detach formula construction protection system

Publications (1)

Publication Number Publication Date
CN215671491U true CN215671491U (en) 2022-01-28

Family

ID=79963273

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122221057.2U Active CN215671491U (en) 2021-09-14 2021-09-14 Quick detach formula construction protection system

Country Status (1)

Country Link
CN (1) CN215671491U (en)

Similar Documents

Publication Publication Date Title
CN107558723B (en) Method for manufacturing and installing hanging bracket of hanging basket for inclined roof
CN203499229U (en) Operating platform for construction of elevator shaft
CN114059758A (en) Assembled double-layer integral elevator shaft platform
CN115492399A (en) Construction method for installing and adjusting hanging steel structure from bottom to top
CN215671491U (en) Quick detach formula construction protection system
CN107792774B (en) Integral hoisting method and hoisting tool for multiple steel platform secondary beams
CN203285050U (en) Combined type Bailey frame multifunctional platform carried by sliding formwork to rise and fall
CN115749364A (en) Building storey height increasing reconstruction and extension construction equipment and reconstruction and extension construction method thereof
CN209874434U (en) Simple and easy scaffold frame of encorbelmenting of building high latitude
CN101457587A (en) Template mutual-lifting type climbing formwork device and method
CN211547741U (en) Height-adjustable internal support cutting split heads
CN203640313U (en) Floor beam installing support
CN205077876U (en) Prestressed steel strand pulling machine and tensioning jack suspension device
JP4027170B2 (en) External scaffold device and construction method of external scaffold device
CN221398659U (en) Safety operation platform for assembled steel pipe stand column
CN216713748U (en) Platform combination device and combined platform equipment
CN110847352A (en) Bolt ball net rack purline assembling construction method
CN220414909U (en) Post-increased steel beam installation lifting frame
CN220954553U (en) Hanging basket for structural boundary beam picking, chiseling and repairing construction
CN215886130U (en) Guardrail for tower crane convenient to carry out quick assembly disassembly
CN213297074U (en) Portable outer wall handling frame of encorbelmenting
CN220487057U (en) Basket type operation platform for butt joint of steel giant columns
CN216380480U (en) Integral movable operation frame
CN210950176U (en) Large-scale condenser expansion joint installation slide and support