CN215643618U - Engineering cost progress management device - Google Patents
Engineering cost progress management device Download PDFInfo
- Publication number
- CN215643618U CN215643618U CN202122231142.7U CN202122231142U CN215643618U CN 215643618 U CN215643618 U CN 215643618U CN 202122231142 U CN202122231142 U CN 202122231142U CN 215643618 U CN215643618 U CN 215643618U
- Authority
- CN
- China
- Prior art keywords
- mounting plate
- shaped mounting
- management device
- progress management
- rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 claims abstract description 13
- 230000001681 protective effect Effects 0.000 claims description 12
- 230000005540 biological transmission Effects 0.000 claims description 10
- 238000010521 absorption reaction Methods 0.000 claims description 3
- 230000035939 shock Effects 0.000 claims description 3
- 238000000034 method Methods 0.000 description 14
- 230000000712 assembly Effects 0.000 description 1
- 238000000429 assembly Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
Images
Landscapes
- Road Signs Or Road Markings (AREA)
Abstract
The utility model discloses a construction cost progress management device which comprises a first L-shaped mounting plate and a second L-shaped mounting plate, wherein a supporting mechanism for supporting the device is arranged on the first L-shaped mounting plate and the second L-shaped mounting plate, and a rotating shaft is rotatably connected between the first L-shaped mounting plate and the second L-shaped mounting plate. According to the engineering cost progress management device, after the management device is used, the management board on the rotating shaft is driven to rotate again through rotation of the rotating handle, at the moment, the management board is rotated to the position below the first L-shaped mounting plate and the second L-shaped mounting plate, the management board is stored and processed after being used, the two first supporting rods and the two second supporting rods are collected through reverse rotation of the threaded sleeves, a storage mechanism of the engineering progress management device after being used is formed, the occupied area of the whole engineering progress management device after being not used is reduced, and the engineering progress management device is further convenient to place and store.
Description
Technical Field
The utility model belongs to the technical field of construction cost, and particularly relates to a construction cost progress management device.
Background
Engineering cost is at the in-process of construction operation, for the actual information of in time mastering the engineering, carries out real-time data to the construction progress through management device and follows up usually, and the current whole appearance of engineering progress management device is great and can't accomodate the storage to the management billboard, causes the management device to need occupy great space and place when not using, the use of the engineering cost progress management device of being not convenient for.
The present invention has been made in view of this situation.
SUMMERY OF THE UTILITY MODEL
In order to solve the technical problems, the utility model adopts the technical scheme that:
a project cost progress management device comprises a first L-shaped mounting plate and a second L-shaped mounting plate, wherein a supporting mechanism for supporting the device is arranged on the first L-shaped mounting plate and the second L-shaped mounting plate, a rotating shaft is rotatably connected between the first L-shaped mounting plate and the second L-shaped mounting plate, a management signboard is fixed on the side wall of the rotating shaft, and a containing mechanism for containing the management signboard is arranged on the first L-shaped mounting plate;
storage mechanism is including fixing the protective housing on first L type mounting panel, the one end of pivot is located the inside of protective housing and is fixed with the worm wheel, it is connected with the dwang to rotate on the protective housing, the one end of dwang is located the inside of protective housing and is fixed with the worm, intermeshing sets up between worm and the worm wheel, the other end of dwang is fixed with the rotation handle.
The supporting mechanism comprises two first supporting rods and two second supporting rods which are respectively connected to the first L-shaped mounting plate and the second L-shaped mounting plate in a rotating mode, the first supporting rods and the second supporting rods are connected with rotating wheels through cushioning assemblies, and an adjusting mechanism used for managing the use height of the signboard is arranged between the two first supporting rods and the second supporting rods.
Guiding mechanism is including rotating the threaded rod of connection on two first bracing piece lateral walls, two the screw thread of threaded rod sets up to opposite soon, two the relative one end thread engagement of threaded rod is connected with the thread bush, two rotate respectively on the relative lateral wall of second bracing piece and be connected with dead lever and slide bar, slide bar sliding connection is on the dead lever.
The shock absorption assembly comprises transmission rods which are connected to one ends of the first supporting rod and the second supporting rod in a sliding mode, a connecting plate is fixed to the other end of each transmission rod, springs are sleeved on the side walls of the transmission rods, and the rotating wheels are installed on the connecting plate.
And a connecting rod is arranged between the first supporting rod and the second supporting rod.
And bearings are sleeved at two ends of the rotating shaft, and the two bearings are respectively embedded on the first L-shaped mounting plate and the second L-shaped mounting plate.
Compared with the prior art, the utility model has the following beneficial effects:
according to the construction cost progress management device, in the using process of the construction cost progress management device, the distances between the first L-shaped mounting plate and the support surface and between the second L-shaped mounting plate and the support surface are adjusted through the adjusting mechanism, the using height of the management billboard is further adjusted, the management billboard is convenient to use at different display heights, and the practicability of the progress management device is improved.
According to the engineering cost progress management device, after the management device is used, the management board on the rotating shaft is driven to rotate again through rotation of the rotating handle, at the moment, the management board is rotated to the position below the first L-shaped mounting plate and the second L-shaped mounting plate, the management board is stored and processed after being used, the two first supporting rods and the two second supporting rods are collected through reverse rotation of the threaded sleeves, a storage mechanism of the engineering progress management device after being used is formed, the occupied area of the whole engineering progress management device after being not used is reduced, and the engineering progress management device is further convenient to place and store.
According to the project progress management device, in the using process of the project progress management device, the whole project progress management device can be subjected to cushioning protection through the cushioning component, so that the project progress management device is prevented from being stressed and toppled under the action of external force, and the using process of the project progress management device is more stable.
The following describes embodiments of the present invention in further detail with reference to the accompanying drawings.
Drawings
In the drawings:
FIG. 1 is a schematic view of the overall configuration of the present invention;
FIG. 2 is a schematic view of the internal structure of the storage mechanism of the present invention;
FIG. 3 is an enlarged view taken at A in FIG. 2;
fig. 4 is an enlarged view at B in fig. 2.
In the figure: 1-a first L-shaped mounting plate; 2-a second L-shaped mounting plate; 301-a first support bar; 302-a second support bar; 401-threaded rod; 402-a threaded sleeve; 403-fixing the rod; 404-a slide bar; 5-a connecting rod; 601-a transmission rod; 602-a connection plate; 603-a spring; 7-a rotating wheel; 8-a rotating shaft; 9-management board; 1001-protective box; 1002-rotating the rod; 1003-worm; 1004-a worm gear; 1005-turning the handle.
Detailed Description
In order to make the objects, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and the following embodiments are used to illustrate the present invention.
As shown in fig. 1 to 4, a construction cost progress management device includes a first L-shaped mounting plate 1 and a second L-shaped mounting plate 2, a support mechanism for supporting the device is disposed on the first L-shaped mounting plate 1 and the second L-shaped mounting plate 2, a rotating shaft 8 is rotatably connected between the first L-shaped mounting plate 1 and the second L-shaped mounting plate 2, a management signboard 9 is fixed on a side wall of the rotating shaft 8, and a storage mechanism for storing the management signboard 9 is disposed on the first L-shaped mounting plate 1;
the containing mechanism is including fixing the protective housing 1001 on first L type mounting panel 1, the one end of pivot 8 is located the inside of protective housing 1001 and is fixed with worm wheel 1004, it is connected with dwang 1002 to rotate on the protective housing 1001, the one end of dwang 1002 is located the inside of protective housing 1001 and is fixed with worm 1003, intermeshing sets up between worm 1003 and the worm wheel 1004, the other end of dwang 1002 is fixed with rotates handle 1005, can form the containing mechanism after the engineering progress management device uses, the area occupied of whole engineering progress management device after not using has been reduced, further be convenient for placing and the storage of engineering progress management device.
The supporting mechanism comprises two first supporting rods 301 and two second supporting rods 302 which are respectively connected to the first L-shaped mounting plate 1 and the second L-shaped mounting plate 2 in a rotating mode, the two first supporting rods 301 and the two second supporting rods 302 are connected with a rotating wheel 7 through a cushioning component, an adjusting mechanism used for managing the use height of the signboard 9 is arranged between the two first supporting rods 301 and the two second supporting rods 302, and the progress management device is more stable in the use process through the supporting mechanism.
Adjustment mechanism is including rotating threaded rod 401 of connection on two first bracing pieces 301 lateral walls, the screw thread of two threaded rods 401 is turned to opposite setting, the relative one end thread engagement of two threaded rods 401 is connected with thread bush 402, it is connected with dead lever 403 and slide bar 404 to rotate respectively on the relative lateral wall of two second bracing pieces 302, slide bar 404 sliding connection is on dead lever 403, through adjustment mechanism, the use height of adjustment management billboard 9, be convenient for management billboard 9 uses under different show height, the practicality of progress management device has been improved.
The bradyseism subassembly includes the transfer line 601 of sliding connection in first bracing piece 301 and second bracing piece 302 one end, and the other end of transfer line 601 is fixed with connecting plate 602, and the cover is equipped with spring 603 on the lateral wall of each transfer line 601, and runner 7 installs on connecting plate 602, through the bradyseism subassembly, carries out the bradyseism protection to whole engineering progress management device, avoids making engineering progress management device atress take place to empty under the effect of external force, makes the process that engineering progress management device used more stable.
A connecting rod 5 is installed between the two first supporting rods 301 and the second supporting rod 302, and the first supporting rod 301 and the second supporting rod 302 move synchronously through the connecting rod 5.
The both ends cover of pivot 8 is equipped with the bearing, and two bearings inlay respectively and establish on first L type mounting panel 1 and second L type mounting panel 2, through the supporting role of bearing, make pivot 8 pivoted more stable.
In the process of using the engineering cost progress management device, firstly, the whole device is moved to a designated position through each rotating wheel 7, after the movement is completed, the threaded sleeve 402 is rotated, because the threads on the two threaded rods 401 are arranged in opposite rotating directions, the two first supporting rods 301 are driven to be stressed to move away from each other under the meshing transmission action of the threaded sleeve 402 and the two threaded rods 401, the two second supporting rods 302 are driven to synchronously move away from each other through the connecting rod 5 in the movement process of the two first supporting rods 301, the sliding rod 404 is driven to slide on the fixed rod 403 in the movement process of the two first supporting rods 301, the movement of the two second supporting rods 302 is guided, after the movement adjustment of the two first supporting rods 301 and the second supporting rods 302 away from each other, the two first supporting rods 301 and the second supporting rods 302 are abutted against the supporting surface, the management signboard 9 between the first L-shaped mounting plate 1 and the second L-shaped mounting plate 2 is supported, so that the management signboard is more stable in the use process, and in the process that the two first supporting rods 301 and the second supporting rod 302 move away from each other, the distance between the first L-shaped mounting plate 1 and the second L-shaped mounting plate 2 and the supporting surface is adjusted, the use height of the management signboard 9 is further adjusted, the management signboard 9 can be conveniently used at different display heights, and the practicability of the progress management device is improved;
then, when the project progress management and display operation is required, the worm 1003 at the other end of the rotating rod 1002 is driven to rotate by the rotating handle 1005, the rotating shaft 8 is driven to rotate by the meshing transmission of the worm 1003 and the worm wheel 1004 during the rotation of the worm 1003, the management signboard 9 is rotated to the positions above the first L-shaped mounting plate 1 and the second L-shaped mounting plate 2 by the rotation of the rotating shaft 8, the project progress management operation can be performed by drawing corresponding information on the management signboard 9, the management signboard 9 can be rotated to different viewing angles during the rotation of the rotating shaft 8, the progress management device can be conveniently used at different viewing angles, after the management device is used, the management signboard 9 on the rotating shaft 8 is driven to rotate again by the rotation of the rotating handle 1005, at this time, the management signboard 9 is rotated to the positions below the first L-shaped mounting plate 1 and the second L-shaped mounting plate 2, the management signboard 9 is stored after being used, and the two first supporting rods 301 and the two second supporting rods 302 are collected through the reverse rotation of the threaded sleeve 402 to form a storage mechanism after the engineering progress management device is used, so that the occupied area of the whole engineering progress management device after the engineering progress management device is not used is reduced, and the engineering progress management device is further convenient to place and store;
finally, in the process of using the engineering progress management device, when the engineering progress management device is shaken under the pushing of external force, the two first supporting rods 301 and the second supporting rod 302 are stressed to slide on the transmission rod 601, in the sliding process, each spring 603 is pushed to deform under stress to generate elasticity, under the action of the elasticity of each spring 603, the whole engineering progress management device is subjected to cushioning protection, the phenomenon that the engineering progress management device is stressed to topple under the action of the external force is avoided, and the using process of the engineering progress management device is more stable.
Claims (6)
1. A project cost progress management device comprises a first L-shaped mounting plate (1) and a second L-shaped mounting plate (2), and is characterized in that a supporting mechanism for supporting a device is arranged on the first L-shaped mounting plate (1) and the second L-shaped mounting plate (2), a rotating shaft (8) is rotatably connected between the first L-shaped mounting plate (1) and the second L-shaped mounting plate (2), a management billboard (9) is fixed on the side wall of the rotating shaft (8), and a receiving mechanism for receiving the management billboard (9) is arranged on the first L-shaped mounting plate (1);
storage mechanism is including fixing protective housing (1001) on first L type mounting panel (1), the one end of pivot (8) is located the inside of protective housing (1001) and is fixed with worm wheel (1004), it is connected with dwang (1002) to rotate on protective housing (1001), the one end of dwang (1002) is located the inside of protective housing (1001) and is fixed with worm (1003), intermeshing sets up between worm (1003) and worm wheel (1004), the other end of dwang (1002) is fixed with rotates handle (1005).
2. The construction cost progress management device according to claim 1, wherein the supporting mechanism comprises two first supporting rods (301) and two second supporting rods (302) which are respectively connected to the first L-shaped mounting plate (1) and the second L-shaped mounting plate (2) in a rotating manner, the two first supporting rods (301) and the two second supporting rods (302) are connected with a rotating wheel (7) through a shock absorption component, and an adjusting mechanism for adjusting the use height of the signboard (9) is arranged between the two first supporting rods (301) and the second supporting rods (302).
3. The construction cost progress management device according to claim 2, wherein the adjusting mechanism comprises a threaded rod (401) rotatably connected to the side walls of the two first support rods (301), the thread direction of the two threaded rods (401) is opposite, the opposite ends of the two threaded rods (401) are in thread engagement with threaded sleeves (402), the opposite side walls of the two second support rods (302) are rotatably connected with a fixed rod (403) and a sliding rod (404), and the sliding rod (404) is slidably connected to the fixed rod (403).
4. A construction cost progress management device according to claim 2, wherein the shock absorption assembly comprises a transmission rod (601) slidably connected to one end of the first support rod (301) and one end of the second support rod (302), the other end of the transmission rod (601) is fixed with a connection plate (602), a spring (603) is sleeved on a side wall of each transmission rod (601), and the rotating wheel (7) is mounted on the connection plate (602).
5. A construction cost progress management device according to claim 2, wherein a connecting rod (5) is installed between the first supporting rod (301) and the second supporting rod (302).
6. A construction cost progress management device according to claim 1, wherein bearings are sleeved on both ends of the rotating shaft (8), and the two bearings are respectively embedded on the first L-shaped mounting plate (1) and the second L-shaped mounting plate (2).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202122231142.7U CN215643618U (en) | 2021-09-15 | 2021-09-15 | Engineering cost progress management device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202122231142.7U CN215643618U (en) | 2021-09-15 | 2021-09-15 | Engineering cost progress management device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN215643618U true CN215643618U (en) | 2022-01-25 |
Family
ID=79916172
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202122231142.7U Expired - Fee Related CN215643618U (en) | 2021-09-15 | 2021-09-15 | Engineering cost progress management device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN215643618U (en) |
-
2021
- 2021-09-15 CN CN202122231142.7U patent/CN215643618U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN211349792U (en) | Novel training board is read to portable english | |
CN215643618U (en) | Engineering cost progress management device | |
CN216293357U (en) | Rotary folding keyboard platform | |
CN210403094U (en) | Transmission structure for enterprise management consultation information display rack | |
CN206921015U (en) | A kind of storage device simple in construction and easy to use | |
CN207580445U (en) | A kind of big data publicity mobile device | |
CN113796653A (en) | Internet-based multifunctional information technology consultation service device | |
CN112820187A (en) | New forms of energy goods shelves display screen convenient to adjust is used to open air | |
CN112419939A (en) | A display device for creating design product propaganda with literary composition | |
CN214012451U (en) | Notice device for student management | |
CN111210677A (en) | Equipment for accounting teaching | |
CN220449371U (en) | Winding device for nickel-titanium alloy wire processing | |
CN217815826U (en) | Anti-overturning computer display expansion device | |
CN214897508U (en) | Publicity column with flexible adjusting function for student management | |
CN212032604U (en) | Internet big data analysis report display device | |
CN216902258U (en) | Data center stores frame | |
CN220069198U (en) | Wheel stopping device storage cabinet | |
CN217337834U (en) | Accounting document stores show inquiry unit | |
CN210930350U (en) | Drawing board storage rack for art design | |
CN216556033U (en) | Cam disc structure of agricultural mechanical equipment | |
CN219562940U (en) | Movable bearing installation device | |
CN216388690U (en) | Timely propaganda device for information management | |
CN213411825U (en) | Bearing box installation bearing tool | |
CN219550088U (en) | Data annotation model training system | |
CN217623636U (en) | A transfer device for motor accessory production |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20220125 |