CN215489656U - Spacing device for fixing large-pitch convection tube bundle - Google Patents
Spacing device for fixing large-pitch convection tube bundle Download PDFInfo
- Publication number
- CN215489656U CN215489656U CN202122053197.3U CN202122053197U CN215489656U CN 215489656 U CN215489656 U CN 215489656U CN 202122053197 U CN202122053197 U CN 202122053197U CN 215489656 U CN215489656 U CN 215489656U
- Authority
- CN
- China
- Prior art keywords
- folded plate
- convection
- convection bank
- pitch
- fixed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Heat-Exchange Devices With Radiators And Conduit Assemblies (AREA)
Abstract
The utility model discloses a spacing device for fixing large-pitch convection tube bundles, which comprises a large-pitch convection tube bundle assembly consisting of a plurality of convection tube bundles, wherein tube holders are also fixed at the positions of the air inlet ends of the convection tube bundles, and connecting flat steels are correspondingly arranged between the tube holders, so that the connecting flat steels are integrally fixed at the air inlet ends of the large-pitch convection tube bundle assembly, folded plates are also inserted into gaps between adjacent convection tube bundles, the upper end of each folded plate is correspondingly fixed on the connecting flat steel, and a row of folded plates are connected and fixed by the connecting flat steels. This device is whole to replace pipe clamp and steel pipe in the traditional art through the folded plate, and the folded plate specifically constitutes through each hem 50mm in the steel sheet both sides after 3mm, and the folded plate is whole to be the spill structure to be vertical cartridge when concrete installation between adjacent convection bank, the degree of depth of cartridge then decides according to the clearance of convection bank, and its main advantage is that the consumptive material is less, and the cost is lower, and can reach prior art's effect.
Description
Technical Field
The utility model relates to the technical field of environmental protection equipment, in particular to a spacing device for fixing a large-pitch convection tube bundle.
Background
In the prior art, in a biomass boiler or an exhaust heat boiler with large dust content in flue gas, tube bundles on a convection heating surface are generally arranged at large pitches, and the advantages of difficult dust accumulation and convenient dust removal are realized, and how to ensure the clearance between the tube pieces is of great importance;
in the prior art, the conventional method usually adopts pipe clamps and connecting flat steel for fixation, large-diameter spaced steel pipes and connecting flat steel or profile steel for direct welding on a pipe sheet, and the manufacturing process of fixing the pipe clamps and the connecting flat steel is relatively complex and has the highest cost; the manufacturing process for connecting the flat steel by using the large-diameter spacing steel pipe frame is simple, the cost is intermediate, but the steel pipe has heavier dead weight, so that the connecting flat steel is easy to deform; the expansion of the tube bundle is influenced by directly welding the profile steel, and the safety coefficient is low.
Therefore, there is a need for a spacer for securing a large pitch convection bank that is easy and cost effective to manufacture and is structurally robust.
SUMMERY OF THE UTILITY MODEL
Utility model purpose: in view of the above-mentioned deficiencies in the prior art, a spacer for securing a large pitch convection bank is provided.
The technical scheme is as follows: in order to realize the purpose of the utility model, the utility model adopts the following technical scheme: the utility model provides a fixed coarse pitch convection bank's spacer assembly, includes the coarse pitch convection bank subassembly that constitutes by a plurality of convection bank, the inlet end position department of convection bank still is fixed with the conduit saddle, and correspondingly install the connection band steel again between the conduit saddle for connect the band steel monolithic stationary at the inlet end of coarse pitch convection bank subassembly, and the clearance between the adjacent convection bank in still the cartridge have the folded plate, and each folded plate upper end all corresponding fixes on connecting the band steel, should connect the band steel and couple together one row of folded plate.
Furthermore, the large-pitch convection bank assembly is correspondingly welded with pipe brackets at the upper ends of the two ends and the middle three convection banks.
Further, the folded plate is integrally concave, the folded plate is vertically inserted between the adjacent convection tube bundles, and the upper end of the folded plate is welded on the connecting flat steel.
Furthermore, the folded plate is formed by folding 50mm on two sides of a steel plate with the thickness of 3mm, so that the folded plate is integrally concave.
Further, the convection bank assembly comprises an upper flue gas inlet end and a lower flue gas outlet end.
Further, the pipe bracket is arranged to be of an arc-shaped structure and is welded at the air inlet end of the convection bank in a fitting mode.
Has the advantages that: compared with the prior art, the utility model has the following advantages:
(1) the device integrally replaces a pipe clamp and a steel pipe in the prior art by a folded plate, the folded plate is formed by 50mm folded edges on two sides of a steel plate after 3mm, the folded plate is integrally of a concave structure and is vertically inserted between adjacent convection tube bundles during specific installation, and the insertion depth is determined according to the clearance of the convection tube bundles;
(2) the concrete installation of folded plate is fixed through connecting band steel and conduit saddle realization in this device, convection bank's upper end is that corresponding welding has the conduit saddle, and it is then corresponding welded fastening on the conduit saddle to connect the band steel, it fixes the inlet end at convection bank's flue gas wholly to connect the band steel, the mounted position with the folded plate is corresponding, the equal welded fastening in upper end of each folded plate is on connecting the band steel like this, thereby get up the folded plate rigidity, its stable in structure, difficult emergence is out of shape, and the dismouting installation is all very convenient.
Drawings
FIG. 1 is a block diagram of the present invention;
FIG. 2 is a view of the structure of the utility model middle folding plate;
fig. 3 is an enlarged view of a portion a in fig. 1.
Detailed Description
The present invention will be further illustrated with reference to the accompanying drawings and specific examples, which are carried out on the premise of the technical solution of the present invention, and it should be understood that these examples are only for illustrating the present invention and are not intended to limit the scope of the present invention.
As shown in fig. 1, 2 and 3, a spacing device for fixing a large-pitch convection bank comprises a large-pitch convection bank assembly 2 consisting of a plurality of convection banks 1, wherein pipe brackets 3 are further fixed at the positions of the air inlet ends of the convection banks 1, and connecting flat steels 4 are correspondingly installed between the pipe brackets 3, so that the connecting flat steels 4 are integrally fixed at the air inlet ends of the large-pitch convection bank assembly 2, folded plates 5 are further inserted into gaps between adjacent convection banks 1, the upper ends of the folded plates 5 are correspondingly fixed on the connecting flat steels 4, and the connecting flat steels 4 connect and fix a row of folded plates 5.
This device is whole to replace pipe clamp and steel pipe in the traditional art through the folded plate, and the folded plate specifically constitutes through each hem 50mm in the steel sheet both sides after 3mm, and the folded plate is whole to be the spill structure to be vertical cartridge when concrete installation between adjacent convection bank, the degree of depth of cartridge then decides according to the clearance of convection bank, and its main advantage is that the consumptive material is less, and the cost is lower, and can reach prior art's effect.
The tube holders 3 are correspondingly welded at the upper ends of the three convection tube bundles 1 at the two ends and the middle part in the large-pitch convection tube bundle assembly 2; the folded plate 5 is integrally concave, the folded plate 5 is vertically inserted between the adjacent convection tube bundles 1, and the upper end of the folded plate 5 is welded on the connecting flat steel 4; the folded plate 5 is formed by folding 50mm on two sides of a steel plate with the thickness of 3mm respectively, so that the folded plate 5 is integrally concave; the convection bank 1 assembly comprises an upper flue gas inlet end and a lower flue gas outlet end; the pipe bracket 3 is arranged into an arc-shaped structure and is welded at the air inlet end of the convection bank 1 in a fitting manner.
The concrete installation of folded plate is fixed through connecting band steel and conduit saddle realization in this device, convection bank's upper end is that corresponding welding has the conduit saddle, and it is then corresponding welded fastening on the conduit saddle to connect the band steel, it fixes the inlet end at convection bank's flue gas wholly to connect the band steel, the mounted position with the folded plate is corresponding, the equal welded fastening in upper end of each folded plate is on connecting the band steel like this, thereby get up the folded plate rigidity, its stable in structure, difficult emergence is out of shape, and the dismouting installation is all very convenient.
The detailed description is to be construed as exemplary only and is not intended to limit the utility model from practice or the scope of the appended claims, which are intended to include all equivalent variations and modifications within the scope of the utility model as claimed.
Claims (6)
1. A spacer for securing a large pitch convection bank, comprising: include the macrostep convection bank subassembly (2) that constitute by a plurality of convection bank (1), the inlet end position department of convection bank (1) still is fixed with conduit saddle (3), and correspondingly install again between conduit saddle (3) and connect band steel (4) for connect band steel (4) whole fixation at the inlet end of macrostep convection bank subassembly (2), and the clearance between adjacent convection bank (1) still the cartridge has folded plate (5), and each folded plate (5) upper end all corresponding fixes on connecting band steel (4), should connect band steel (4) and connect fixedly with a row of folded plate (5).
2. A spacing device for a fixed large pitch convection bank as claimed in claim 1, wherein: and pipe brackets (3) are correspondingly welded at the two ends of the large-pitch convection pipe bundle assembly (2) and the upper ends of the three middle convection pipe bundles (1).
3. A spacing device for a fixed large pitch convection bank as claimed in claim 1, wherein: folded plate (5) wholly be the spill, just folded plate (5) vertical cartridge is between adjacent convection bank (1), folded plate (5) upper end welding is on connecting band steel (4).
4. A spacing device for a fixed large pitch convection bank as claimed in claim 3, wherein: the folded plate (5) is formed by folding 50mm on two sides of a steel plate with the thickness of 3mm, so that the folded plate (5) is integrally concave.
5. A spacing device for a fixed large pitch convection bank as claimed in claim 1, wherein: the convection bank (1) assembly comprises an upper smoke inlet end and a lower smoke outlet end.
6. A spacing device for a fixed large pitch convection bank as claimed in claim 1, wherein: the pipe bracket (3) is of an arc-shaped structure and is welded at the air inlet end of the convection bank (1).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202122053197.3U CN215489656U (en) | 2021-08-27 | 2021-08-27 | Spacing device for fixing large-pitch convection tube bundle |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202122053197.3U CN215489656U (en) | 2021-08-27 | 2021-08-27 | Spacing device for fixing large-pitch convection tube bundle |
Publications (1)
Publication Number | Publication Date |
---|---|
CN215489656U true CN215489656U (en) | 2022-01-11 |
Family
ID=79765602
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202122053197.3U Active CN215489656U (en) | 2021-08-27 | 2021-08-27 | Spacing device for fixing large-pitch convection tube bundle |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN215489656U (en) |
-
2021
- 2021-08-27 CN CN202122053197.3U patent/CN215489656U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201599786U (en) | Modular structure of heating surface of exhaust-heat boiler in convection segment of heating furnace | |
TWI345027B (en) | ||
CN215489656U (en) | Spacing device for fixing large-pitch convection tube bundle | |
CA2575259C (en) | Suspended steam boiler | |
CN102313449B (en) | Flame heating furnace pipe rack | |
CN106642063B (en) | A kind of novel superheater hanging apparatus | |
CN215523240U (en) | Heating surface positioning device | |
CN111609391A (en) | Tail heating surface fixing device for biomass CFB furnace | |
CN110805921B (en) | Flexible frame structure for heat preservation bearing of header and scattered pipe of flue gas heat exchanger | |
CN212131522U (en) | Sliding support of long-distance conveying pipeline | |
CN215523241U (en) | Boiler suspends pipe panel in midair and props up structure | |
CN216203493U (en) | Karman vortex street anti-vibration device | |
CN216993887U (en) | Fuel tank mounting bracket | |
CN214370314U (en) | Snakelike tube panel fixing device in tail flue | |
CN210505727U (en) | Modularized immersed membrane group device | |
CN209705424U (en) | A kind of heat distribution pipeline support of pipelines with regulatory function | |
CN213067085U (en) | Convection section structure for converter | |
CN205578084U (en) | Exhaust pipe | |
CN213021119U (en) | Steam coil pipe | |
CN217633852U (en) | Flexible sealing device for gas turbine waste heat boiler | |
CN220187460U (en) | Piping structure of horizontal stable high-pressure heater | |
CN218130984U (en) | Flue gas sealing device of vertical waste heat boiler SCR denitration system | |
CN212841519U (en) | Fin type coal economizer | |
CN221020793U (en) | Pipe penetrating auxiliary device for pipe-in-pipe process | |
CN220541393U (en) | Solar heat collection wall brick and wall |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |