CN215447448U - Cooling device for roasting furnace chamber - Google Patents

Cooling device for roasting furnace chamber Download PDF

Info

Publication number
CN215447448U
CN215447448U CN202120970348.9U CN202120970348U CN215447448U CN 215447448 U CN215447448 U CN 215447448U CN 202120970348 U CN202120970348 U CN 202120970348U CN 215447448 U CN215447448 U CN 215447448U
Authority
CN
China
Prior art keywords
ventilator
furnace chamber
ventilation pipe
cooling device
main ventilation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202120970348.9U
Other languages
Chinese (zh)
Inventor
曾岩东
何成
顾桂全
肖述兵
姬发奎
杨金华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huanghe Hydropower Development Co Ltd
Huanghe Xinye Co Ltd
Original Assignee
Huanghe Hydropower Development Co Ltd
Huanghe Xinye Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huanghe Hydropower Development Co Ltd, Huanghe Xinye Co Ltd filed Critical Huanghe Hydropower Development Co Ltd
Priority to CN202120970348.9U priority Critical patent/CN215447448U/en
Application granted granted Critical
Publication of CN215447448U publication Critical patent/CN215447448U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Vertical, Hearth, Or Arc Furnaces (AREA)

Abstract

The utility model discloses a roasting furnace chamber cooling device, which comprises a main ventilation pipe and a support, wherein the support supports the main ventilation pipe above a furnace chamber, and further comprises a forward ventilator, a reverse ventilator, a bin cooling hose and an operation box, the forward ventilator and the reverse ventilator are respectively arranged at two ends of the main ventilation pipe, the operation box is electrically connected with the forward ventilator and the reverse ventilator, and the bin cooling hose is arranged on the main ventilation pipe.

Description

Cooling device for roasting furnace chamber
Technical Field
The utility model relates to the technical field of cooling equipment, in particular to a cooling device for a roasting furnace chamber.
Background
In the aluminum electrolysis anode roasting process, 4 roasting furnaces are provided, each roasting furnace is provided with 36 furnace chambers, each furnace chamber is provided with 8 material boxes, and in the production process, raw anode blocks are put into the material boxes to be roasted at high temperature, so that in the long-term use process, wall bodies are cracked, refractory mud falls off and materials on the surfaces of furnace walls are bonded, air leakage is caused due to poor sealing, the quality of carbon blocks is influenced, natural gas is wasted, and great potential safety hazards exist, therefore, repair, sealing treatment and cleaning of bonding materials are not performed regularly, and the process is called furnace protection; too high temperature in the feed box, personnel can't directly get into, need cool down, and traditional cooling method is natural cooling, wastes a large amount of time, can't accomplish the work of protecting the stove in the short time to lead to sealed heat preservation that other furnace chambers are influenced to bad influence the charcoal piece quality, reduce output, reduction in production efficiency.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a roasting furnace chamber cooling device.
In order to achieve the purpose, the technical scheme adopted by the utility model is as follows: the utility model provides a roasting furnace chamber cooling device, includes main ventilation pipe and support, and the support supports main ventilation pipe in the furnace chamber top, still includes forward ventilation fan, reverse fan, workbin cooling hose and control box, forward ventilation fan and reverse fan are installed respectively in main ventilation pipe both ends position, the equal electric connection of control box and forward ventilation fan and reverse fan, workbin cooling hose installs on main ventilation pipe.
Preferably, the number of the bin cooling hoses is eight, and the bin cooling hoses are uniformly, vertically and detachably arranged on the main ventilating pipe.
Preferably, the forward ventilator and the reverse ventilator are centrifugal ventilators of the same type and are respectively installed at two ends of the main ventilation pipe through flanges.
Preferably, the length of the main ventilation pipe is larger than the width of the furnace chamber, a partition plate is fixedly installed in the middle of the main ventilation pipe, and the partition plate separates the inner part of the main ventilation pipe from opposite wind.
Preferably, the number of the brackets is two, and the brackets are respectively arranged at two ends of the main ventilating pipe.
Preferably, the air conditioner further comprises two lifting lugs, and the two lifting lugs are respectively arranged at two ends of the upper part of the main ventilating pipe.
Preferably, the operation box is used for controlling the start and stop of the forward ventilator and the reverse ventilator.
Preferably, the operation box is a distribution box which controls the start and stop of the forward ventilator and the reverse ventilator through buttons.
Compared with the prior art, the utility model has the advantages that:
the device is simple in structure and convenient to operate and transport, the centrifugal ventilator is erected on the furnace chamber to forcibly cool the material box, the structure is simple, the device is convenient and easy to operate, the risk of heatstroke of personnel is reduced, and the cooling time is shortened, so that the furnace protecting and charging time is shortened, the production efficiency is improved, the effect of sealing other furnace chambers is achieved in time, and the quality of carbon blocks is improved.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to the drawings without creative efforts.
FIG. 1 is a schematic view of a cooling apparatus for a roasting chamber according to the present invention.
The device comprises a forward ventilator 1, a flange 2, a main ventilation pipe 3, a lifting lug 4, a reverse ventilator 5, a support 6, a bin cooling hose 7 and an operation box 8.
Detailed Description
The preferred embodiments of the present invention will be described in detail below with reference to the accompanying drawings so that the advantages and features of the present invention can be more easily understood by those skilled in the art, and the scope of the present invention will be more clearly and clearly defined.
Referring to fig. 1, the utility model provides a roasting furnace chamber cooling device, which comprises a main ventilation pipe 3 and a support 6, wherein the support 6 supports the main ventilation pipe 3 above a furnace chamber, the roasting furnace chamber cooling device also comprises a forward ventilator 1, a reverse ventilator 5, a bin cooling hose 7 and an operation box 8, the forward ventilator 1 and the reverse ventilator 5 are respectively arranged at two ends of the main ventilation pipe 3, the operation box 8 is electrically connected with the forward ventilator 1 and the reverse ventilator 5, and the bin cooling hose 7 is arranged on the main ventilation pipe 3.
In the embodiment, the number of the cooling hoses of the material box is eight, the cooling hoses are uniformly, vertically and detachably arranged on the main ventilation pipe 3 and can be fixed through screws, and the maintenance and the replacement are convenient.
In this embodiment, the forward ventilator 1 and the reverse ventilator 5 are centrifugal ventilators of the same type, and both are respectively installed at both ends of the main ventilation pipe 3 through the flanges 2, and the purpose thereof is to blow cooling air of the same air volume into the main ventilation pipe 3 from both ends.
In this embodiment, the length of the main ventilation pipe 3 is greater than the width of the furnace chamber, a partition board is fixedly installed in the middle of the main ventilation pipe 3, and the partition board separates the opposite wind in the main ventilation pipe 3, so that the wind entering each furnace chamber is similar, and the uniform cooling effect is achieved.
In this embodiment, two brackets 6 are provided, and are respectively installed at two ends of the main ventilation pipe 3.
In this embodiment, the air conditioner further comprises two lifting lugs 4, and the two lifting lugs 4 are respectively installed at two ends of the upper part of the main ventilation pipe 3.
In this embodiment, the operation box 8 is used to control the start and stop of the forward ventilator 1 and the reverse ventilator 5.
In this embodiment, the operation box 8 is the block terminal, and it opens through the start and stop of button control forward ventilator 1 and reverse fan 5.
The working principle is as follows: firstly, the device is hoisted to the upper part of a furnace chamber needing cooling and is stable, then the bin cooling hose 7 is put down, one bin of the furnace chamber corresponds to one bin cooling hose 7, the power supply is switched on, then the forward ventilator 1 and the reverse ventilator 5 are started, each bin of the furnace chamber is cooled, two ventilators are stopped after cooling is completed, the power supply is switched off, each bin cooling hose 7 is collected, and finally the device is hoisted to other furnace chambers to be cooled according to the steps.
Although the embodiments of the present invention have been described with reference to the accompanying drawings, various changes or modifications may be made by the patentees within the scope of the appended claims, and within the scope of the utility model, as long as they do not exceed the scope of the utility model described in the claims.

Claims (8)

1. The utility model provides a roasting furnace chamber cooling device, includes main ventilation pipe and support, and the support supports main ventilation pipe above the furnace chamber, its characterized in that: still include forward ventilator, reverse fan, workbin cooling hose and control box, forward ventilator and reverse fan install respectively in main ventilation pipe both ends position, the equal electric connection of control box and forward ventilator and reverse fan, workbin cooling hose installs on main ventilation pipe.
2. The roasting furnace chamber cooling device according to claim 1, characterized in that: the cooling hoses of the material box are eight in number and are uniformly, vertically and detachably arranged on the main ventilating pipe.
3. The roasting furnace chamber cooling device according to claim 2, characterized in that: the forward ventilator and the reverse ventilator are centrifugal ventilators of the same type and are respectively installed at two ends of the main ventilation pipe through flanges.
4. The roasting furnace chamber cooling device according to claim 3, characterized in that: the length of the main ventilation pipe is larger than the width of the furnace chamber, a partition board is fixedly installed in the middle of the main ventilation pipe, and the partition board separates opposite wind in the main ventilation pipe.
5. The cooling device for a roasting furnace chamber of claim 4, wherein two brackets are provided and are respectively installed at both ends of the main ventilating duct.
6. The roasting furnace chamber cooling device according to claim 5, characterized in that: the two lifting lugs are respectively arranged at two ends of the upper part of the main ventilating pipe.
7. The roasting furnace chamber cooling device according to claim 1, characterized in that: the operation box is used for controlling the start and stop of the forward ventilator and the reverse ventilator.
8. The roasting furnace chamber cooling device according to claim 7, characterized in that: the operation box is the block terminal, and it opens through the start-stop of button control forward ventilator and reverse fan.
CN202120970348.9U 2021-05-08 2021-05-08 Cooling device for roasting furnace chamber Expired - Fee Related CN215447448U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120970348.9U CN215447448U (en) 2021-05-08 2021-05-08 Cooling device for roasting furnace chamber

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120970348.9U CN215447448U (en) 2021-05-08 2021-05-08 Cooling device for roasting furnace chamber

Publications (1)

Publication Number Publication Date
CN215447448U true CN215447448U (en) 2022-01-07

Family

ID=79706792

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120970348.9U Expired - Fee Related CN215447448U (en) 2021-05-08 2021-05-08 Cooling device for roasting furnace chamber

Country Status (1)

Country Link
CN (1) CN215447448U (en)

Similar Documents

Publication Publication Date Title
CN203448816U (en) Structurally-improved reflow soldering machine
CN111748664B (en) Blast furnace ironmaking slag heat utilization system
CN207282948U (en) A kind of anti-mine dust type power distribution cabinet of mining site
CN109385648A (en) A kind of copper foil warpage annealing device and method
CN106219522A (en) Graphitizing furnace and artificial plumbago negative pole material graphitization production method
CN215447448U (en) Cooling device for roasting furnace chamber
CN201170691Y (en) Sintering furnace for salt core
CN108707713B (en) Hot blast stove heat preservation device and method
CN207816009U (en) A kind of ferromanganese smelting electric furnace flue gas recovery system
CN205282940U (en) Heat dissipating device for distribution box
CN209357795U (en) Energy storage container
CN206648480U (en) A kind of lithium battery atmosphere furnace energy saving circulating system
CN209877615U (en) Roller kiln cooling device
CN208026022U (en) Convection current Split clean baking oven
CN209010572U (en) A kind of horizontal magnetic furnace of novel vertical lifting
CN109059559B (en) Vertical electric heating hot air circulation preheating furnace
CN216356442U (en) High-efficient heat sink is used to high-voltage inverter
CN207040090U (en) A kind of new electrical control gear
CN215113978U (en) Cooling device of medium-frequency electric furnace
CN213208435U (en) High-efficient quick glaze line drying apparatus
CN219511300U (en) Waste heat utilization type shunt structure of electric melting furnace
CN205133710U (en) Efficient aluminium alloy ageing furnace
CN217877045U (en) Air inlet device of improved bell jar furnace for temperature rise impurity removal section
CN111792639B (en) Recarburizer graphitization furnace convenient for heat accumulation
CN204164649U (en) One vacuumizes heating system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220107

CF01 Termination of patent right due to non-payment of annual fee