CN215439238U - Combined hoisting frame for vertical shaft pipeline of high-rise building - Google Patents

Combined hoisting frame for vertical shaft pipeline of high-rise building Download PDF

Info

Publication number
CN215439238U
CN215439238U CN202120224167.1U CN202120224167U CN215439238U CN 215439238 U CN215439238 U CN 215439238U CN 202120224167 U CN202120224167 U CN 202120224167U CN 215439238 U CN215439238 U CN 215439238U
Authority
CN
China
Prior art keywords
support frame
hoisting
wire rope
rise building
frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120224167.1U
Other languages
Chinese (zh)
Inventor
郭向群
黄兴
汤畅忠
郭晓英
孙其官
孔令天
王骏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202120224167.1U priority Critical patent/CN215439238U/en
Application granted granted Critical
Publication of CN215439238U publication Critical patent/CN215439238U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a hoisting combined frame for a vertical shaft pipeline of a high-rise building, which comprises at least two support frames and support pipes between the support frames, wherein the support frames are provided with at least four waist holes which are in a strip shape, positioning bolts are arranged on the waist holes, the upper end and the lower end of a galvanized steel pipe to be transported are respectively inserted into the pipes by the positioning bolts on the upper support frame and the lower support frame for positioning, steel wire rope hoisting pins are arranged on the support frames, and the steel wire ropes penetrate through the steel wire rope hoisting pins and extend out of the uppermost support frame for connecting hoisting power equipment. The utility model can realize the hoisting of a plurality of galvanized pipelines by the hoisting device, can hoist a plurality of galvanized steel pipes at one time, is very convenient to install and disassemble, and can be flexibly adjusted according to the length, the number and the pipe diameter of the pipelines. The method is suitable for transporting pipelines containing the coating in building construction.

Description

Combined hoisting frame for vertical shaft pipeline of high-rise building
Technical Field
The utility model relates to the technical field of building construction tools.
Background
When the building construction, pipeline shaft and elevator well have generally been arranged to super high-rise and high-rise for installation pipeline and elevator, along with the development of building trade and building construction technology, the high-rise building construction is more and more, and outer inside curtain is installed with the construction progress, makes the hoist and mount of all kinds of electromechanical pipelines unable hoist and transport to each floor before the curtain is accomplished, utilizes the high-rise shaft of shaft combination hoist and mount frame instrument, can hoist the pipeline to the construction floor fast.
For an electromechanical construction unit, the transportation and installation of the pipeline in the vertical shaft in the process of high-rise electromechanical installation becomes a difficult point in the high-rise electromechanical engineering installation project. At present, the method which is mostly adopted is that only a single pipeline is adopted for hoisting, and the efficiency is low. Most of the pipelines are welded with a pair of lifting lugs at one end, the lifting hooks are hung on the lifting lugs and lifted upwards by using a hoist or a poplars, and the like, and the pipelines can be transported from a vertical shaft by using the method, or the pipelines are lifted to the pipeline installation position to be fixed, and then the lifting lugs welded in advance are removed. But the welding point is harmful to the pipeline after the lug is welded by the method. The lifting lug is cut after being used, which is time-consuming and labor-consuming,
disclosure of Invention
The utility model solves the technical problem of providing a hoisting tool which is time-saving and labor-saving, can hoist 4 pipelines once hoisting and has no damage to materials.
The technical scheme adopted by the utility model is that the hoisting combination frame for the vertical shaft pipeline of the high-rise building is a hoisting tool capable of hoisting the multi-pipeline combination well pipeline at one time, and comprises at least two support frames and support pipes between the support frames, wherein at least four waist holes are formed in the support frames, the waist holes are in a strip shape, positioning bolts are installed on the waist holes, the upper end and the lower end of a galvanized steel pipe to be transported are respectively inserted into the pipe for positioning by the positioning bolts on the upper support frame and the lower support frame, steel wire rope hoisting pins are installed on the support frames, and the steel wire ropes penetrate through the support frames and extend out of the uppermost support frame for being connected with hoisting power equipment.
The steel wire rope penetrates through the support frame at the lowest end and is fixed on the steel wire rope by a rope clamp.
The number of kidney holes on each support frame is 6.
The supporting tube is made of steel tubes, the steel tubes connecting the two supporting frames are divided into two sections, and the joints of the two sections of steel tubes are fixed by positioning tube clamps.
The utility model has the advantages that a plurality of galvanized steel pipes can be hoisted at one time, the galvanized steel pipes are very convenient to install and disassemble, and the supporting pipes and the positioning steel clamps can be adjusted to adapt to the length of the galvanized steel pipes.
Drawings
Fig. 1 is a front view of the combined hoisting and conveying frame for the vertical shaft pipeline of the high-rise building.
Fig. 2 is a bottom view corresponding to fig. 1.
Fig. 3 is a corresponding right side view of fig. 1.
Fig. 4 is a front view of another embodiment.
Fig. 5 is a partially enlarged view of the area a in fig. 3.
Labeled as: 1-support frame, 2-waist hole, 3-positioning bolt, 4-support tube, 41-groove, 5-positioning steel clip, 6-galvanized pipe, 7-steel wire rope hoisting pin, 8-steel wire rope, and 9-steel wire rope clip.
Detailed Description
The technical scheme of the utility model is further explained by combining the attached drawings.
The utility model relates to a lifting combined frame for a vertical shaft pipeline of a high-rise building, which comprises at least an upper support frame 1 and a lower support frame 1, wherein the support frames 1 are connected through support pipes 4, the support frames 1 are provided with strip waist holes 2, positioning bolts 3 are arranged on the waist holes 2, galvanized pipelines 6 are placed at the positions of the positioning bolts 3, upper bolt rods and lower bolt rods respectively extend into the galvanized pipelines 6 to play a role in positioning the galvanized pipelines 6, and the four positioning bolts 3 can be used for installing and transporting 4 galvanized pipelines 6. The upper and lower supporting tubes 4 are fixed by the positioning steel clamps 4, after the upper and lower supporting frames 1 are fixed, the whole combined frame and the galvanized pipe are firmly installed together, the steel wire rope penetrates through the supporting frame 1 at the bottommost layer and is fixed by the rope clamps, the steel wire rope upwards extends out of the supporting frame 1 at the top and is connected to the hoisting power device, and at the moment, the steel wire rope can be hoisted through the steel wire rope.
Set up rectangular shape waist hole 2 on the support frame 1 and can adjust the fixed position between the galvanized pipe 6 in a flexible way, when 6 pipe diameters of galvanized pipe are great, can outwards remove the bolt along waist hole 2, the interval between every bolt increases, makes to keep the clearance between every galvanized pipe. When the diameter of the galvanized pipe is smaller, the bolts can move towards the center along the waist holes 2, the distance between every two bolts is reduced, but a gap is still kept between the galvanized pipelines 6, two repositioning bolts 3 can be arranged on the support frame 1 at the moment, and the support frame 1 is also used for installing and fixing two layers of galvanized steel pipes which are annularly arranged.
More kidney holes 2 can be opened according to the requirement to load more galvanized pipes, such as 5, 6, 7, etc. As shown in fig. 4, the support frame is provided with 6 kidney holes which are annularly arranged around the center of the support frame 1. The number and the position of the waist holes can be adjusted according to the actual use condition. The galvanized steel pipe to be transported is very convenient to mount and dismount, and abrasion in the pipeline transportation process is avoided.
Every support frame 1 and stay tube 4 pass through the bolt or the welding is fixed mutually, when using, are connected and fasten the stay tube 4 of two upper and lower support frames 1 through location steel card 5, and the one end that stay tube 4 docks mutually is equipped with a recess for with 5 looks adaptations of location steel card, increase the fastness of installation, as shown in fig. 5.
The utility model can realize the hoisting of a plurality of galvanized pipelines, can quickly install and hoist the galvanized pipelines and can flexibly adjust according to the length, the number and the pipe diameter of the pipelines. The pipeline transportation system is suitable for pipeline transportation of high-rise buildings in building construction.

Claims (4)

1. High-rise building shaft pipeline handling combined bay, its characterized in that: including the stay tube between two at least support frames and the support frame, seted up four at least waist holes on the support frame, waist hole is the strip, and positioning bolt installs on waist hole, and both ends are fixed a position in the positioning bolt insert tube on two upper and lower support frames respectively about the galvanized steel pipe of awaiting transport, installs wire rope hoisting pin on the support frame, and wire rope passes and stretches out from the top support frame from it for connect hoist and mount power equipment.
2. The high-rise building shaft pipeline lifting combined frame as claimed in claim 1, wherein: the steel wire rope penetrates through the support frame at the lowest end and is fixed on the steel wire rope by a rope clamp.
3. The high-rise building shaft pipeline lifting combined frame as claimed in claim 1, wherein: the number of kidney holes on each support frame is 6.
4. The high-rise building shaft pipeline lifting combined frame as claimed in claim 1, wherein: the supporting tube is made of steel tubes, the steel tubes connecting the two supporting frames are divided into two sections, and the joints of the two sections of steel tubes are fixed by positioning tube clamps.
CN202120224167.1U 2021-01-27 2021-01-27 Combined hoisting frame for vertical shaft pipeline of high-rise building Active CN215439238U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120224167.1U CN215439238U (en) 2021-01-27 2021-01-27 Combined hoisting frame for vertical shaft pipeline of high-rise building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120224167.1U CN215439238U (en) 2021-01-27 2021-01-27 Combined hoisting frame for vertical shaft pipeline of high-rise building

Publications (1)

Publication Number Publication Date
CN215439238U true CN215439238U (en) 2022-01-07

Family

ID=79701088

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120224167.1U Active CN215439238U (en) 2021-01-27 2021-01-27 Combined hoisting frame for vertical shaft pipeline of high-rise building

Country Status (1)

Country Link
CN (1) CN215439238U (en)

Similar Documents

Publication Publication Date Title
US7112010B1 (en) Apparatus, systems and methods for erecting an offshore wind turbine assembly
US5603544A (en) Compression cap assembly for spreader pipe
CN110422752B (en) Assembly type structure laminated plate string hoisting equipment and hoisting method thereof
KR101215356B1 (en) Device for sling pile
CN107191676A (en) Construction method of buried pipeline
CN110902549A (en) Self-balancing tool system and PC component hoisting method applying same
CN111362118A (en) Tool for vertically hoisting and installing pipeline and hoisting method thereof
CN109680616B (en) Construction method for hoisting main beam by using cable crane and reverse lifting equipment
JP2007022789A (en) Suspension tool and vertical pipe construction method
CN215439238U (en) Combined hoisting frame for vertical shaft pipeline of high-rise building
CN108086697B (en) Precise positioning device and precise positioning method for embedded part hoisting
WO2023193403A1 (en) Row pipe bundle hoisting tooling and construction method therefor
CN215924170U (en) Device for mounting air duct in narrow vertical shaft
CN113753747B (en) Device and hoisting method for installing air pipe in narrow vertical shaft
CN112722734B (en) Method for transporting heavy steel pipes with large calibers in pipe gallery
JP2007145509A (en) Simple boom device
CN209815482U (en) Overhead hoist of aerated block
CN216042679U (en) Unsettled pipeline mounting tool
CN112660988B (en) A conveyer that is used for heavy steel pipe of heavy bore in piping lane
CN112282649B (en) Device and method for simultaneously setting multiple drilling casings
CN216638684U (en) Lifting and hanging device
CN214743736U (en) Newly-added pipeline laying device for liquid chemical wharf
CN107387869B (en) Electric elevator device for indoor vertical pipe and method for mounting gas pipeline by using same
CN114811182B (en) Construction structure and construction method for pipe-jacking section penetrating steel pipe
CN220264973U (en) Partition plate installation lifting device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant