CN215406210U - Static load experiment platform - Google Patents

Static load experiment platform Download PDF

Info

Publication number
CN215406210U
CN215406210U CN202121380997.XU CN202121380997U CN215406210U CN 215406210 U CN215406210 U CN 215406210U CN 202121380997 U CN202121380997 U CN 202121380997U CN 215406210 U CN215406210 U CN 215406210U
Authority
CN
China
Prior art keywords
secondary beam
hoist
mount
link
mounting panel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121380997.XU
Other languages
Chinese (zh)
Inventor
潘灿寰
黄羲
杨绍礼
杨鑫
***
王永康
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yunnan Chutian Engineering Testing Co ltd
Original Assignee
Yunnan Chutian Engineering Testing Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yunnan Chutian Engineering Testing Co ltd filed Critical Yunnan Chutian Engineering Testing Co ltd
Priority to CN202121380997.XU priority Critical patent/CN215406210U/en
Application granted granted Critical
Publication of CN215406210U publication Critical patent/CN215406210U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The utility model provides a static load experiment platform, includes girder and secondary beam, it colludes to be provided with the hoist and mount on the secondary beam, the hoist and mount is colluded and is become by mounting panel, link and spacing ring, the mounting panel passes through fixing bolt and is connected with the secondary beam, set up the link on the mounting panel, be provided with the spacing ring on the link, be provided with spacing bolt and stop nut on the spacing ring. The secondary beam adopts an inverted concave structure, effectively meets the requirement of the conventional square stacking platform on the height of an experimental site, effectively improves the stacking capacity and simplifies the installation steps. Be provided with the hoist and mount on the secondary beam and collude, the hoist and mount is colluded and is provided with stop device, the effectual lifting hook slippage that has prevented among the hoist and mount process.

Description

Static load experiment platform
Technical Field
The utility model belongs to the technical field of detection equipment, and particularly relates to a static load experiment platform.
Background
In static load experiments of test piles, currently, square pile loading platforms are mostly adopted, the requirements of the existing square pile loading platforms on an operation field are that the pile tops of the test piles need to be lower than the test field by about 1 meter, the bottoms of secondary beams are just erected on the operation field after main beams and jacks are erected, but in the actual situation, the test pile tops and the test field are at the same height or even higher than the test field, under the condition, the erection of the existing pile loading platforms is extremely difficult to operate, the pile loading capacity is greatly reduced, and the stability of the platforms is poor.
Disclosure of Invention
Aiming at the technical problems, the utility model provides a static load experiment platform, which has the specific technical scheme that:
the utility model provides a static load experiment platform, includes girder and secondary beam, it colludes to be provided with the hoist and mount on the secondary beam, the hoist and mount is colluded and is become by mounting panel, link and spacing ring, the mounting panel passes through fixing bolt and is connected with the secondary beam, set up the link on the mounting panel, be provided with the spacing ring on the link, be provided with spacing bolt and stop nut on the spacing ring.
The secondary beam adopts an inverted concave structure, effectively meets the requirement of the conventional square stacking platform on the height of an experimental site, effectively improves the stacking capacity and simplifies the installation steps. Be provided with the hoist and mount on the secondary beam and collude, the hoist and mount is colluded and is provided with stop device, the effectual lifting hook slippage that has prevented among the hoist and mount process.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of a hoisting hook structure of the utility model;
in the figure, 1-test pile, 2-secondary beam, 3-main beam, 4-jack, 201-mounting plate, 202-suspension loop, 203-fixing bolt, 204-limiting loop, 205-limiting bolt and 206-limiting nut.
Detailed Description
As shown in fig. 1-2, a static load experiment platform, includes girder 3 and secondary beam 2, it colludes to be provided with the hoist and mount on the secondary beam 2, the hoist and mount colludes and comprises mounting panel 201, link 202 and spacing ring 204, mounting panel 201 passes through fixing bolt 203 and is connected with secondary beam 2, set up link 202 on the mounting panel 201, be provided with spacing ring 204 on the link 202, be provided with stop bolt 205 and stop nut 206 on the spacing ring 204.
When the device is used, the jack 4, the main beam 3 and the secondary beam 2 are sequentially placed on the test pile 1, the hoisting hook is arranged on the secondary beam 2, the limiting ring 204 is arranged on the hoisting hook, and the limiting bolt 205 and the limiting nut 206 arranged on the limiting ring 204 can effectively prevent the danger caused by the slipping of the lifting hook in the hoisting process due to outdoor weather, wind power and the like in the hoisting process of the secondary beam 2.

Claims (1)

1. The utility model provides a static load experiment platform, its characterized in that, includes girder (3) and secondary beam (2), it colludes to be provided with hoist and mount on secondary beam (2), hoist and mount are colluded and are constituteed by mounting panel (201), link (202) and spacing ring (204), mounting panel (201) are connected with secondary beam (2) through fixing bolt (203), set up link (202) on mounting panel (201), be provided with spacing ring (204) on link (202), be provided with spacing bolt (205) and stop nut (206) on spacing ring (204).
CN202121380997.XU 2021-06-22 2021-06-22 Static load experiment platform Active CN215406210U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121380997.XU CN215406210U (en) 2021-06-22 2021-06-22 Static load experiment platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121380997.XU CN215406210U (en) 2021-06-22 2021-06-22 Static load experiment platform

Publications (1)

Publication Number Publication Date
CN215406210U true CN215406210U (en) 2022-01-04

Family

ID=79640769

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121380997.XU Active CN215406210U (en) 2021-06-22 2021-06-22 Static load experiment platform

Country Status (1)

Country Link
CN (1) CN215406210U (en)

Similar Documents

Publication Publication Date Title
CN109505317B (en) Compression resistance, resistance to plucking and horizontal static load test equipment of high stake
CN110206155A (en) A kind of bottom supernumerary segment hydraulic jacking system and construction method
CN101774511A (en) Climbing type hoist and using method thereof
CN215406210U (en) Static load experiment platform
CN201241333Y (en) Large-scale steel suspension box cofferdam elevating device with load
CN212670670U (en) Loading device and test equipment for foundation pile compression-resistant static load test
CN216512520U (en) Lifting system suitable for small space
CN212863940U (en) Quick hoisting accessory of transformer
CN112392245A (en) Assembly type cantilever I-shaped steel beam operation device capable of being turned over without wall penetration and operation method thereof
CN111894049A (en) Loading device and test equipment for foundation pile compression-resistant static load test
CN211169496U (en) Take quick hoist device of PC wallboard of counter weight
CN213329138U (en) Loading device and test equipment for foundation pile pulling-resistant static load test
CN201619965U (en) Climbing lift
CN107304030B (en) Special hoisting device for replacing heat exchange tube of transverse tube cooler and application method thereof
CN218114789U (en) Indoor and interlayer heavy component hoisting equipment
CN216713137U (en) Integral supporting anchoring equipment used in pile foundation static load test counter-force beam device
CN218862516U (en) Insulator jack-up operation cat ladder under 500kV transmission line
CN214005763U (en) A pile and carry platform for static load detects
CN211991570U (en) Tank deck supporting device
CN110778201B (en) Installation and erection method of high-pressure tower
CN220701879U (en) Large-scale equipment bearing platform
CN220787874U (en) Special tower group for wind power installation
CN215828215U (en) Self-balancing large-span net rack lifting structure
CN220620097U (en) High pier cast-in-situ section support steel pipe pile installation device
CN213015693U (en) Self-lifting tower erecting device based on semi-rigid composite material tower head crane

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: A static load experimental platform

Effective date of registration: 20231212

Granted publication date: 20220104

Pledgee: Bank of China Limited Kunming Guandu Branch

Pledgor: Yunnan Chutian Engineering Testing Co.,Ltd.

Registration number: Y2023980071297