Integrated full-casing down-the-hole drill equipment
Technical Field
The utility model relates to an equipment, especially a full sleeve pipe down-the-hole drill equipment integrates.
Background
For the equipment applied to engineering or production and manufacture such as construction of cast-in-place piles and the like, a plurality of auxiliary equipment are needed, all the equipment is required to be placed on the site in the construction or manufacturing process, the equipment is required to be continuously replaced and adjusted, the construction equipment is heavy, and the movement and the adjustment are difficult. The multiple construction equipment is used alone, not only influences the efficiency of construction or manufacturing and still need provide a large amount of manpower and materials, increases the degree of difficulty of construction, increases the cost of construction or production.
SUMMERY OF THE UTILITY MODEL
In order to overcome the defects of the prior art, the utility model provides an equipment that uses in the bored concrete pile use is through the integrated full sleeve pipe down-the-hole drill equipment that integrates that double-deck base is integrated together.
The utility model provides a technical scheme that its technical problem adopted is: an integrated full-casing down-the-hole drill device comprises a base, and an extractor, a down-the-hole drill, a rapid winch, a power system, a concrete pump feeding system and an operation chamber which are integrated on the base; the base includes mounting panel and last mounting panel down, go up mounting panel and pull-out ware setting under on the mounting panel, quick hoist engine, driving system, concrete send pump system and control chamber all to set up on last mounting panel, the drilling tool that dives is through quick hoist engine hoist and mount on last mounting panel, and corresponds with the pull-out ware on the mounting panel down.
As the improvement of above-mentioned technical scheme, be provided with drilling installation position and integrated installation position on the mounting panel down, the extractor is installed on drilling installation position, it sets up on integrated installation position to go up the mounting panel, drilling installation position sets up tip at mounting panel down, integrated installation position sets up the position outside drilling installation position, the height that highly is greater than integrated installation position of drilling installation position.
As a further improvement of the technical scheme, a drilling installation groove is formed in the drilling installation position, the pulling device is arranged in the drilling installation groove, an installation through hole is further formed in the bottom of the drilling installation groove, and a sleeve of the pulling device extends to the drilling position of the cast-in-place pile from the installation through hole.
As a further improvement of the technical scheme, the quick winch is arranged on the upper mounting plate and is close to the end part of one end of the puller, the telescopic mast is further arranged on the side edge of the quick winch, and the down-hole drilling tool is hoisted by matching the telescopic mast and the quick winch.
As a further improvement of the technical scheme, the operating chamber is arranged on the side of the quick winch, and the power system and the concrete pump feeding system are combined and arranged on the end part of the upper mounting plate far away from one end of the extractor.
As a further improvement of the technical scheme, a balance supporting device is further arranged between the lower mounting plate and the upper mounting plate, and the balance supporting device supports the equipment on the upper mounting plate and the equipment on the lower mounting plate between the upper mounting plate and the lower mounting plate.
As a further improvement of the technical scheme, the balance supporting device comprises a supporting frame, oil cylinder supporting legs and supporting feet, a balance supporting groove is formed between the upper mounting plate and the lower mounting plate, the supporting frame is fixedly arranged in the balance supporting groove and extends to the side edge of the upper mounting plate after being combined with the lower mounting plate, the oil cylinder supporting legs are arranged at two ends of the supporting frame, and the supporting feet are fixed on oil rods of the oil cylinder supporting legs.
As a further improvement of the technical scheme, a plurality of groups of the balance supporting devices are arranged between the upper mounting plate and the lower mounting plate, two groups of supporting frames of the balance supporting devices are reversely arranged in each balance supporting groove, and the two supporting frames are fixed in the supporting grooves in a staggered manner.
The beneficial effects are that: the utility model discloses a rig equipment integrates has set up double-deck bottom mount pad, and the mounted position that misplaces on through the bottom mount pad carries out reasonable the integrating with different equipment for multiple bored concrete pile construction equipment can use simultaneously on a machine, the transportation of the equipment of being convenient for, the cooperation between the equipment of being convenient for is used. The construction efficiency is improved, a large amount of manpower and material resources are reduced, the construction or production cost is reduced, the construction difficulty is reduced, and the construction efficiency and precision are improved.
Drawings
The present invention will be further explained with reference to the drawings and examples.
FIG. 1 is a schematic view of the assembly of the present invention;
FIG. 2 is a schematic structural view of a base portion of the present invention;
fig. 3 is a schematic structural view of the lower mounting plate of the present invention.
1. A base; 11. a lower mounting plate; 12. an upper mounting plate; 13. drilling a mounting position; 14. mounting a through hole; 15. integrating the installation positions; 2. a balance support device; 21. a support frame; 22. an oil cylinder support leg; 23. a support leg; 24. a balance support groove; 3. a puller; 4. a hidden hole drilling tool; 5. a fast winch; 6. a power system; 7. a concrete pump system; 8. an operation chamber; 9. and a telescopic mast.
Detailed Description
The conception, the specific structure, and the technical effects produced by the present invention will be clearly and completely described below in conjunction with the embodiments and the accompanying drawings to fully understand the objects, the features, and the effects of the present invention. Obviously, the described embodiments are only a part of the embodiments of the present invention, and not all embodiments, and other embodiments obtained by those skilled in the art without inventive labor based on the embodiments of the present invention all belong to the protection scope of the present invention. In addition, all the connection/connection relations referred to in the patent do not mean that the components are directly connected, but mean that a better connection structure can be formed by adding or reducing connection auxiliary components according to specific implementation conditions. The utility model discloses each technical feature in the creation can the interactive combination under the prerequisite that does not contradict conflict each other.
Referring to fig. 1, an integrated full casing down-the-hole drill device comprises a base 1, and an extractor 3, a down-the-hole drill 4, a quick winch 5, a power system 6, a concrete pump system 7 and an operation room 8 which are integrated on the base 1; the base 1 includes mounting panel 11 and last mounting panel 12 down, it sets up on mounting panel 11 down to go up mounting panel 12 and pull-out ware 3, quick hoist engine 5, driving system 6, concrete send pump system 7 and control chamber 8 all to set up on last mounting panel 12, the drilling tool 4 that dives hoists on last mounting panel 12 through quick hoist engine 5, and corresponds with pull-out ware 3 on the mounting panel 11 down. The pulling-out device 3, the down-the-hole drilling tool 4, the quick winch 5, the power system 6, the concrete pump conveying system 7 and the operation chamber 8 are integrated on the integrated base 1 through the combination of the upper mounting plate 12 and the lower mounting plate 11, so that the use of a plurality of devices is more convenient, and the transportation of the devices and the matching between the devices are convenient. Not only the construction efficiency is improved, but also a large amount of manpower and material resources are reduced, the construction or production cost is increased, the construction difficulty is reduced, and the construction efficiency and precision are increased.
Referring to fig. 2, in order to facilitate reasonable installation of different devices, a drilling installation position 13 and an integrated installation position 15 are arranged on the lower installation plate 11, the extractor 3 is installed on the drilling installation position 13, the upper installation plate 12 is arranged on the integrated installation position 15, the drilling installation position 13 is arranged at one end of the lower installation plate 11, the integrated installation position 15 is arranged at a position outside the drilling installation position 13, and the height of the drilling installation position 13 is greater than that of the integrated installation position 15. Because of puller 3 needs great pull-out power to pull out the drilling tool when using for the supporting seat that supports puller 3 also can receive corresponding impact force, consequently, sets up puller 3 and other equipment respectively on two mounting panels, can avoid the lower support seat of installation puller 3 to cause the influence to other equipment when the atress produces the vibration, has improved the holistic stability of equipment, has improved the life of all the other equipment. Drilling installation position 13 department is provided with the drilling mounting groove, extractor 3 sets up in the drilling mounting groove, the bottom of drilling mounting groove still is provided with installation through-hole 14, and extractor 3's sleeve pipe extends to bored concrete pile drilling department from installation through-hole 14. The setting of drilling mounting groove can further reduce the mounting height of extraction tool 3, reduces extraction tool 3's focus, improves extraction tool 3's stability, and the setting of through-hole is convenient for stretch into the sleeve pipe of extraction tool 3 to drilling department downwards, makes things convenient for extraction tool 3's use.
The quick hoist 5 sets up on last mounting panel 12 and the tip that is close to one end with extractor 3, the side of quick hoist 5 still is provided with flexible mast 9, the dive hole drilling tool 4 is hoisted through flexible mast 9 and quick hoist 5 cooperation. The down-the-hole drilling tool 4 and the extractor 3 are respectively arranged on the two mounting plates, so that the situation that the supporting plates are subjected to large impact force when two devices with large stress operate is avoided. The operation chamber 8 is arranged at the side of the quick winch 5, and the power system 6 and the concrete pump system 7 are combined and arranged at the end part of the upper mounting plate 12 far away from one end of the extractor 3.
Referring to fig. 3, since the environment of the bottom surface of a construction equipment such as a drilling machine is complicated, it is often necessary to place the construction equipment on an uneven ground. Therefore, a balance support device 2 is further arranged between the lower mounting plate 11 and the upper mounting plate 12, and the balance support device 2 supports the equipment on the upper mounting plate 12 and the lower mounting plate 11 between the upper mounting plate 12 and the lower mounting plate 11. Balanced strutting arrangement 2 includes support frame 21, hydro-cylinder landing leg 22 and stabilizer blade 23, it is provided with balanced support groove 24 to go up between mounting panel 12 and the lower mounting panel 11, support frame 21 is fixed to be set up in balanced support groove 24, and extends to the side after supreme mounting panel 12 combines with lower mounting panel 11, hydro-cylinder landing leg 22 sets up at support frame 21 both ends, stabilizer blade 23 is fixed on hydro-cylinder landing leg 22's oil pole. The balance supporting devices 2 are arranged between the upper mounting plate 12 and the lower mounting plate 11 in a plurality of groups, the supporting frames 21 of the two groups of balance supporting devices 2 are reversely arranged in each balance supporting groove 24, and the two supporting frames 21 are fixed in the supporting grooves in a staggered manner. Preferably, four sets of the balance supporting devices 2 are arranged between the upper mounting plate 12 and the lower mounting plate 11, each two sets of the balance supporting devices 2 are arranged in one balance supporting groove 24, and the two balance supporting grooves 24 are respectively arranged at two ends of the upper mounting plate 12. When in use, the oil cylinder supporting legs 22 on each balance supporting device 2 can be independently adjusted so as to ensure that the whole equipment is in a balanced state.
While the preferred embodiments of the present invention have been described, the present invention is not limited to the above embodiments, and those skilled in the art can make various equivalent modifications or substitutions without departing from the spirit of the present invention, and such equivalent modifications or substitutions are intended to be included within the scope of the present invention as defined by the appended claims.