CN215254700U - Garbage storehouse roofing bolt ball rack construction system that slides - Google Patents

Garbage storehouse roofing bolt ball rack construction system that slides Download PDF

Info

Publication number
CN215254700U
CN215254700U CN202120774614.0U CN202120774614U CN215254700U CN 215254700 U CN215254700 U CN 215254700U CN 202120774614 U CN202120774614 U CN 202120774614U CN 215254700 U CN215254700 U CN 215254700U
Authority
CN
China
Prior art keywords
bolt ball
slides
rack
channel
ball rack
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120774614.0U
Other languages
Chinese (zh)
Inventor
高正来
赵光杰
张慧康
余婉君
沈东�
周国山
李兴亮
汪泳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China United Engineering Corp Ltd
Original Assignee
China United Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China United Engineering Corp Ltd filed Critical China United Engineering Corp Ltd
Priority to CN202120774614.0U priority Critical patent/CN215254700U/en
Application granted granted Critical
Publication of CN215254700U publication Critical patent/CN215254700U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model relates to a rubbish storehouse roofing bolt ball rack construction system that slides belongs to steel construction high altitude rack installation construction field, can be used to the construction of msw incineration power generation project rubbish storehouse roofing bolt ball rack. The utility model discloses an including dish knot scaffold work platform, starting bolt ball rack, concrete bracket, channel-section steel track of sliding, traction winch and dish knot scaffold, the channel-section steel track of sliding is arranged on the concrete bracket, starting bolt ball rack is installed on the channel-section steel track of sliding, traction winch arranges on the shear force wall of the side of garbage storehouse, and traction winch is connected with starting bolt ball rack, dish knot scaffold work platform sets up the below at starting bolt ball rack. Still include personnel's passageway from top to bottom, personnel's passageway from top to bottom sets up the lower part at dish knot scaffold work platform.

Description

Garbage storehouse roofing bolt ball rack construction system that slides
Technical Field
The utility model relates to a rubbish storehouse roofing bolt ball rack construction system that slides belongs to steel construction high altitude rack installation construction field, can be used to the construction of msw incineration power generation project rubbish storehouse roofing bolt ball rack.
Background
The garbage storehouse roofing rack is high in suspended height and large in area, belongs to large-scale dangerous engineering operation exceeding a certain scale, and consumes a large amount of manpower and material resources regardless of loose assembly or integral assembly and hoisting. And in the construction process, the suspension operation and the hoisting operation are more, the construction difficulty is high, the safety coefficient is low, the quality control is difficult, and the construction is easily influenced by severe weather.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to overcome the above-mentioned not enough that exists among the prior art, and provide a reasonable structural design's rubbish storehouse roofing bolt ball rack construction system that slides.
The utility model provides a technical scheme that above-mentioned problem adopted is: this garbage storehouse roofing bolt ball rack construction system that slides, its structural feature lies in: including a dish knot scaffold work platform, starting bolt ball rack, concrete bracket, channel-section steel track of sliding, traction hoist engine and dish knot scaffold, the channel-section steel track of sliding is arranged on the concrete bracket, starting bolt ball rack is installed on channel-section steel track of sliding, traction hoist engine arrange on the shear force wall of the side of garbage storehouse, and traction hoist engine and starting bolt ball rack are connected, dish knot scaffold work platform sets up the below at starting bolt ball rack.
Further, still include personnel's passageway from top to bottom, personnel's passageway from top to bottom sets up the lower part at dish knot scaffold work platform.
Further, still including transport tank and pillar bolt ball, the transport tank passes through the pillar bolt ball and installs on the channel-section steel track that slides, starting bolt ball rack is installed on the transport tank.
Further, still include the tower crane, the tower crane cooperates with starting bolt ball rack.
Compared with the prior art, the utility model has the advantages of it is following:
(1) the plate-buckle type scaffold is erected to serve as an operation platform for assembling the net rack, so that the phenomenon that personnel hangs over the net rack for operation is avoided, the influence of weather is small, the welding quality is guaranteed, and the safety of the construction process is improved.
(2) The net rack parts are hoisted to the disc buckle scaffold operation platform by adopting a tower crane, the starting bolt ball net rack is supported and moved by a carrying ground tank, a traction winch provides sliding traction force, large-scale hoisting machinery is not needed for assistance, and the renting cost of the hoisting machinery is effectively saved.
(3) The processes of assembling, coating, mounting the top purlin plate and the like of the starting bolt ball net rack are continuously carried out, so that the construction time is saved.
(4) The bolt ball of the support column is screwed up with each rod piece, the nodes are integrally slid after precision adjustment, and the integral alignment is carried out after the sliding is finished, so that the construction quality is ensured.
Drawings
Fig. 1 is the utility model discloses garbage storehouse roofing bolt ball rack construction system's that slides schematic structure view.
In the figure: the device comprises a disc buckle scaffold operation platform 1, a personnel up-down passage 2, a starting bolt ball net rack 3, a concrete corbel 4, a channel steel sliding track 5, a traction winch 6, a carrying tank 7, a pillar bolt ball 8, a tower crane 9 and a disc buckle scaffold 10.
Detailed Description
The present invention will be described in further detail by way of examples with reference to the accompanying drawings, which are illustrative of the present invention and are not intended to limit the present invention.
Examples are given.
Referring to fig. 1, it should be understood that the structures, ratios, sizes, etc. shown in the drawings attached to the present specification are only used for matching with the contents disclosed in the specification, so as to be known and read by those skilled in the art, and are not used for limiting the limit conditions that the present invention can be implemented, so that the present invention has no essential technical significance, and any modifications of the structures, changes of the ratio relationships, or adjustments of the sizes should still fall within the scope of the present invention. Meanwhile, in the present specification, if there are terms such as "upper", "lower", "left", "right", "middle" and "one", they are used for clarity of description only, and are not intended to limit the scope of the present invention, and changes or adjustments of the relative relationship thereof are considered as the scope of the present invention without substantial changes in the technical content.
The rubbish storehouse roofing bolt ball rack construction system that slides in this embodiment detains scaffold operation platform 1, personnel upper and lower passageway 2, starting bolt ball rack 3, concrete corbel 4, channel-section steel track 5 that slides, pulls hoist engine 6, transport tank 7, pillar bolt ball 8, tower crane 9 and dish and detains scaffold 10 including the dish.
Channel-section steel track 5 that slides in this embodiment arranges on concrete corbel 4, and starting bolt ball rack 3 installs on channel-section steel track 5 that slides, draws hoist engine 6 to arrange on the shear force wall of the side of rubbish storehouse, and draw hoist engine 6 and be connected with starting bolt ball rack 3, and dish detains scaffold operation platform 1 and sets up the below at starting bolt ball rack 3.
Passageway 2 sets up in the lower part of dish buckle scaffold work platform 1 about personnel in this embodiment, and transport tank 7 passes through pillar bolt ball 8 to be installed on channel-section steel track 5 that slides, and starting bolt ball rack 3 is installed on transport tank 7, and tower crane 9 cooperates with starting bolt ball rack 3.
Specifically, by erecting the plate buckle scaffold operation platform 1 to the top of the garbage warehouse, the assembling, welding, coating and the like of the net rack are performed on the plate buckle scaffold operation platform 1.
The starting bolt ball net rack 3 is assembled, coated, a top purlin plate is installed, and the like, adjusted and measured on the coil buckle scaffold operation platform 1, and then the sliding is carried out after the quality is checked and accepted.
The net rack parts such as the support bolt ball 8 and the rod piece are hoisted to the disc buckle scaffold operation platform 1 by adopting a tower crane arranged beside a garbage warehouse, assembled and loaded through the carrying tank 7, and the traction winch 6 pulls the starting bolt ball net rack 3 to slide along the channel steel sliding track 5.
After the starting bolt ball net rack 3 integrally slides in place, the step bolt ball net rack 3 is lifted through a hydraulic jack, the carrying tank 7 is removed, and the whole body is located.
The construction method of the garbage warehouse roof bolt ball net rack sliding construction system in the embodiment is as follows:
a. a disc buckle scaffold operation platform 1 of the disc buckle scaffold 10 is erected; the erected disc buckle scaffold operation platform 1 adopts a disc buckle type floor scaffold and is erected to the installation height of the net rack.
The type of the coil-buckled scaffold upright rod steel pipe mainly adopts a phi 48 multiplied by 3.2 multiplied by 2000mm galvanized steel pipe; the transverse horizontal rod pipe adopts a phi 48 multiplied by 2.5 multiplied by 840mm galvanized steel pipe, and the longitudinal horizontal rod pipe adopts a phi 48 multiplied by 2.5 multiplied by 2040mm galvanized steel pipe; the vertical inclined rod adopts a galvanized steel pipe with the diameter of 33 multiplied by 2.3 multiplied by 2756 mm; the scaffold board is made of a stamped steel plate.
The scaffold pipe is hoisted to the garbage warehouse by a tower crane arranged beside the garbage warehouse. An adjustable base is arranged below the upright stanchion and is erected and checked layer by layer, the longitudinal distance of the upright stanchion is 1.5m, the transverse distance is 0.9m, the step distance of the scaffold is 2.0m, the cross braces are arranged according to the JGJ 130-supplement 2011 full-hall frame standard, and the personnel upper and lower channels are erected along with the disc buckle frame.
b. Assembling, coating and installing purlin battens by starting the bolt ball net rack 3; assembling, coating and installing purlin plates and the like of the starting bolt ball net rack 3 are all carried out on the plate buckle scaffold operation platform 1.
Placing sleepers on the operation platform, assembling a starting bolt ball net rack on the sleepers, installing purlin supporting plates and purlins after assembling is completed, and performing quality inspection including nondestructive testing on the net rack. And after the inspection is finished, performing operations such as anticorrosion and fireproof paint spraying on the net rack.
c. Mounting a sliding device; the sliding device comprises a channel steel sliding track 5, a carrying tank 7, a traction winch 6 and the like.
After the assembly of the starting bolt ball net rack is finished, the starting bolt ball net rack is jacked up by a jack, and a carrying tank is arranged below the support bolt ball; and the channel steel rails are arranged along concrete corbels on the wall surfaces on two sides of the garbage bin, and the channel steel rails adopt 40# C channel steel. The other end of the garbage storehouse is provided with two 5T windlasses, and the other ends of the windlasses are hung on the starting bolt ball net rack.
d. The starting bolt ball net rack 3 is installed and slides step by step; the slippage depends on a carrying tank 7 as a bearing tool, and a traction winch 6 pulls the slippage.
Starting a winch, drawing the net rack to slide along the channel steel rail, and assembling the bolt ball net rack on the operation platform in a spanning manner; after the assembly and the coating of each span are finished, a winch is started to pull the net rack to move to the other side, then the net rack of the next span is assembled until the net racks are completely assembled, and all the tanks in the carrying place are positioned on the concrete corbels.
e. Dismantling the sliding device and positioning the net rack; after the tank slides in place, the step bolt ball net rack 3 is lifted by a hydraulic jack, and the tank 7 is removed and carried.
After the net rack slides in place, the jack is respectively placed to every transport ground tank both sides one, with the net rack jacking, removes transport ground tank, again with the whole position that falls of net rack to pre-buried board on welding pillar bolt ball and the bracket, the construction of bolt ball net rack sliding is accomplished.
In addition, it should be noted that the specific embodiments described in the present specification may be different in the components, the shapes of the components, the names of the components, and the like, and the above description is only an example of the structure of the present invention. All the equivalent changes or simple changes made according to the structure, characteristics and principle of the utility model are included in the protection scope of the utility model. Various modifications, additions and substitutions may be made by those skilled in the art without departing from the scope of the invention as defined in the accompanying claims.

Claims (4)

1. The utility model provides a rubbish storehouse roofing bolt ball rack construction system that slides which characterized in that: including dish knot scaffold work platform (1), starting bolt ball rack (3), concrete bracket (4), channel-section steel track (5) that slides, traction hoist engine (6) and dish knot scaffold (10), channel-section steel track (5) that slides are arranged on concrete bracket (4), install on channel-section steel track (5) that slides starting bolt ball rack (3), traction hoist engine (6) are arranged on the shear force wall of the side of rubbish storehouse and traction hoist engine (6) are connected with starting bolt ball rack (3), dish knot scaffold work platform (1) sets up the below at starting bolt ball rack (3).
2. The garbage storehouse roofing bolt ball net rack construction system that slides of claim 1, characterized in that: the scaffold is characterized by further comprising an upper and lower personnel channel (2), wherein the upper and lower personnel channel (2) is arranged on the lower portion of the plate buckle scaffold operation platform (1).
3. The garbage storehouse roofing bolt ball net rack construction system that slides of claim 1, characterized in that: still including transport tank (7) and pillar bolt ball (8), install on channel-section steel track (5) that slides through pillar bolt ball (8) transport tank (7), starting bolt ball rack (3) are installed on transport tank (7).
4. The garbage storehouse roofing bolt ball net rack construction system that slides of claim 1, characterized in that: still include tower crane (9), tower crane (9) and starting bolt ball rack (3) cooperation.
CN202120774614.0U 2021-04-15 2021-04-15 Garbage storehouse roofing bolt ball rack construction system that slides Active CN215254700U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120774614.0U CN215254700U (en) 2021-04-15 2021-04-15 Garbage storehouse roofing bolt ball rack construction system that slides

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120774614.0U CN215254700U (en) 2021-04-15 2021-04-15 Garbage storehouse roofing bolt ball rack construction system that slides

Publications (1)

Publication Number Publication Date
CN215254700U true CN215254700U (en) 2021-12-21

Family

ID=79509000

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120774614.0U Active CN215254700U (en) 2021-04-15 2021-04-15 Garbage storehouse roofing bolt ball rack construction system that slides

Country Status (1)

Country Link
CN (1) CN215254700U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116378432A (en) * 2023-05-23 2023-07-04 北京城建集团有限责任公司 High-level sliding construction and track setting method for flat net rack

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116378432A (en) * 2023-05-23 2023-07-04 北京城建集团有限责任公司 High-level sliding construction and track setting method for flat net rack

Similar Documents

Publication Publication Date Title
CN201417657Y (en) Installation device of indoor transformer
CN110886233A (en) Construction method for connecting T-shaped beam with bridge
CN105003090A (en) Temporary support frame for mounting assembly type steel structure
CN215254700U (en) Garbage storehouse roofing bolt ball rack construction system that slides
CN107227686A (en) A kind of tunnel-type anchorage pre-stress system locating support construction method
CN211551986U (en) Air pipe sliding installation device in steel structure net rack and air pipe system
CN101177933B (en) Bridge rib hoisting and supporting rack integral construction method and device
CN113958112A (en) Comprehensive scaffold construction method
CN110748156B (en) Sliding positioning top supporting structure of large silo and construction method thereof
CN209907972U (en) Conversion frame for longitudinal and transverse conversion of precast concrete exterior wall cladding
CN204876631U (en) Assembled steel structure installation uses interim support frame
CN117005664A (en) Electric translation type hanging basket
CN217439544U (en) Building top outer vertical surface overhanging structure template supporting system
CN215212427U (en) Adjustable unloading platform with steel structure for building
CN206753087U (en) A kind of lighting roof operating platform structure
JP3950800B2 (en) Suspension scaffold
CN205369948U (en) Lifting device for daylighting top is used for installing
CN212201400U (en) Assembled steel structure external hanging type protective frame
CN201128882Y (en) Lifting and supporting brackets integrated construction device for bridge arch rib
CN112627043A (en) Installation device and method for composite cable saddle of narrow cavern of suspension bridge in mountainous area
CN210563326U (en) Overhead unit type overhead sliding splicing operation platform
CN218292479U (en) Construction elevator does not need to do basic shore structure based on two limb shaped steel post
CN110805189A (en) Method for mounting steel structure of daylighting roof
CN218894376U (en) High-altitude cantilever platform formwork system
DE202005002896U1 (en) Roof structure, for a railway station platform, has lateral beams supported on parallel carriers at vertical pillars with a variable configuration for different roof heights

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant