CN2152149Y - Matrix fin type steel pipe coal economizer - Google Patents

Matrix fin type steel pipe coal economizer Download PDF

Info

Publication number
CN2152149Y
CN2152149Y CN92236462U CN92236462U CN2152149Y CN 2152149 Y CN2152149 Y CN 2152149Y CN 92236462 U CN92236462 U CN 92236462U CN 92236462 U CN92236462 U CN 92236462U CN 2152149 Y CN2152149 Y CN 2152149Y
Authority
CN
China
Prior art keywords
economizer
tube
boiler
pipe
fin
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN92236462U
Other languages
Chinese (zh)
Inventor
李宝瑞
张慧
李振森
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN92236462U priority Critical patent/CN2152149Y/en
Application granted granted Critical
Publication of CN2152149Y publication Critical patent/CN2152149Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E20/00Combustion technologies with mitigation potential
    • Y02E20/34Indirect CO2mitigation, i.e. by acting on non CO2directly related matters of the process, e.g. pre-heating or heat recovery

Landscapes

  • Heat-Exchange Devices With Radiators And Conduit Assemblies (AREA)

Abstract

The utility model provides a novel economizer device which overcomes the respective defects of the prior cast iron economizer and the prior steel pipe economizer and integrates the advantages of the cast iron economizer and the steel pipe economizer into a whole. The thick-wall large seamless boiler steel pipe is used as a main pipe, thin steel plate fins are welded on the main pipe to form the economizer pipes which are arranged in a matrix, the economizer pipes are welded and connected by elbows, no flange is arranged between the pipes, and the side supporting plates are arranged in a boiler flue.

Description

Matrix finned steel tube coal saving device
Economizer is to utilize the waste heat of boiler smoke to come the heat exchanger of heated feed water, belong to the boiler technology field, economizer is installed in the boiler flue, when economizer is flowed through in boiler feedwater, absorb the heat of high-temperature flue gas, feed temperature raises, make water in the evaporating heating surface of boiler, can reduce caloric receptivity, thereby reduce the boiler fired coal consumption, simultaneously because the heating tasks of water has partly been finished by economizer, cause the task of water-cooling wall and convection bank to be alleviated, thereby under the identical condition of Boiler Steam output, the economizer that serviceability is good, can reduce evaporating heating surface, save and manufacture boiler evaporating heating surface such as water-cooling wall, used steel such as convection bank.
Books and periodicals, data according to domestic existing various relevant boilers are contained, and domestic boiler generally adopts cast iron gilled tube economizer and snakelike light pipe formula steel tube economizer.They have pluses and minuses separately.
Cast iron gilled tube economizer is non-boiling formula economizer, cylinder iron makes, and is connected with cast-iron bend with flange between pipe, and its advantage is: wear-resistant stronger with corrosion resistance; Shortcoming is: compressive resistance is low, can not bear water slug, easily leaks, easily stifled ash, and maintenance capacity is big, and the thermal efficiency is low.
Coiled pipe steel pipe type economizer is to make with steel pipe, and its advantage is: can bear high pressure, not be afraid of water slug, be difficult for stifled ash, shortcoming is: coiled pipe inside is difficult to clean, wearability and corrosion-resistant, and higher to water quality requirement, cost is higher.
More than visible " boiler administrative skill ", " small-sized heat power plant boiler equipment and operation " books such as (publication of hydraulic and electric engineering publishing house).
The purpose of this utility model is that a kind of wear-resisting, corrosion-resistant, anti-water slug, withstand voltage will be provided, and, nothing low to water quality requirement leaked, and saves the high-quality steel; The economizer that volume is little, endotherm area is big, the UTILIZATION OF VESIDUAL HEAT IN coefficient is high.
Task of the present utility model is finished as follows: at first adopt the big nothing of heavy wall to meet the boiler steel steel pipe to do female pipe, tailor fin with the carbon steel sheet metal, female pipe is matrix and arranges, constitute the economizer tube by welding between fin and female pipe, each does gripper shoe with a steel plate two ends, economizer tube, is weldingly connected by elbow between tube and tube.Nowhere flange connects every group of economizer, thereby has stopped the leakage source point, and new material--heavy wall heavy caliber boiler steel seamless steel pipe is done female pipe can reach wear-resistant, corrosion-resistant owing to adopt, and improves compressive resistance, is not afraid of the purpose of water slug.And inside easy cleaning than coiled pipe, female pipe is gone up welding steel system fin, can increase heating surface area, invar is than the heat transfer coefficient height of cast iron again, so the thermal efficiency also improves greatly than cast iron gilled tube economizer, compare with snakelike light pipe steel pipe type economizer, because the boiler steel steel pipe is lower than common seamless steel pipe to water quality requirement, so can reduce requirements in water quality.Wear-resistant more corrosion-resistant than common steel tube again.Installing fin additional both can increase heating surface, can save again and do female effective high-quality steel, can reduce cost.
Further describe in conjunction with the accompanying drawings with regard to its structure composition below, its structure is installed and is seen accompanying drawing.
Figure (one) is a structural representation
Figure (two) is that the economizer tube is along the axis half-sectional view
Figure (three) is fin shapes figure
Figure (four) is integral installation figure
The meaning of numbering representative is in the accompanying drawing:
(1) female pipe, (2) fin, (3) connecting bend, (4) side gripper shoe, (5) fin and female pipe solder side, (6) gripper shoe and economizer tube solder side, (7) connecting bend and economizer tube solder side, (8) boiler flue wall, (9) flue, (10) economizer inlet valve, (11) economizer flowing water Valve.
Make with reference to the female effective boiler steel seamless steel pipe in figure (one) (1), (2) fin is tailored into a rectangle or the b circle of figure (three) with sheet metal, punch according to female external diameter of pipe in the center, referring to figure (two) fin is evenly worn at interval and to be gone on foot on female pipe, welding forms solder side (5) between fin and female pipe, so make many economizer tube, punch respectively with two blocks of steel plates again and make gripper shoe (4), penetrate from two ends and to support the economizer tube, note to make the economizer tube to arrange into battle array during punching, welding forms solder side (6) between side gripper shoe and female pipe, connecting bend (3) also forms with the boiler steel steel tube bending, the mother's pipe that the side gripper shoe outside is stretched out with connecting bend welds one by one, reserve the Inlet and outlet water mouth of pipe, make the economizer tube formation one of all installations be the water stream channel that matrix is arranged, after the water pressure test, can pack in the flue (9), be arranged in the boiler flue by side gripper shoe (4) with reference to figure (four), seal in the feed water system of boiler through inlet valve (10) flowing water Valve (11), can put into operation.
Through trial run, economizer leakage and bombing accident did not take place, and improved the thermal efficiency, through on SHL20~25/400 type boiler, surveying, the more former cylinder iron economizer of matrix fin type steel tube economizer is imported and exported water-feeding difference and is brought up to 78 ℃ by 36 ℃, and the economizer maintenance capacity reduces greatly.
The utility model--matrix finned steel tube coal saving, owing to adopted new material and new technology, concentrate the advantage of existing cast iron gilled tube economizer and steel tube economizer, overcome separately disadvantage, both wear-resistant corrosion-resistant, withstand voltage, can bear water slug again, the used high-quality steel of steel tube economizer processed are saved again in not water funk boiling, and cost is low and volume is little, endotherm area is big, fume afterheat usage factor height, the boiler for adopting cast iron gilled tube economizer can not change its former design overall dimensions, directly substitute cast iron gilled tube economizer, reach stable, better energy-saving and cost-reducing, the purpose of material-saving.

Claims (3)

1, a kind of matrix fin type steel tube economizer, this economizer is arranged in the boiler flue by side gripper shoe (4), and is connected with the feed water system of boiler with flowing water Valve (11) by inlet valve (10), it is characterized in that:
Above-mentioned economizer is made up of mother pipe (1), fin (2), connecting bend (3), gripper shoe (4), wherein female pipe fin composition economizer tube that upward a plurality of sheet metals are made in the uniform welding, a plurality of economizer tube by connecting bend through being welded into the economizer tube battle array.
2,, it is characterized in that above-mentioned female Guan Shi is made by heavy wall, heavy caliber, seamless boiler steel steel pipe according to the matrix fin type steel tube economizer of claim 1.
3, require 1 matrix fin type steel tube economizer according to aforesaid right, it is characterized in that above-mentioned fin makes square or circular with the carbon sheet plate.
CN92236462U 1992-10-19 1992-10-19 Matrix fin type steel pipe coal economizer Expired - Fee Related CN2152149Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN92236462U CN2152149Y (en) 1992-10-19 1992-10-19 Matrix fin type steel pipe coal economizer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN92236462U CN2152149Y (en) 1992-10-19 1992-10-19 Matrix fin type steel pipe coal economizer

Publications (1)

Publication Number Publication Date
CN2152149Y true CN2152149Y (en) 1994-01-05

Family

ID=33777991

Family Applications (1)

Application Number Title Priority Date Filing Date
CN92236462U Expired - Fee Related CN2152149Y (en) 1992-10-19 1992-10-19 Matrix fin type steel pipe coal economizer

Country Status (1)

Country Link
CN (1) CN2152149Y (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102147107A (en) * 2011-04-22 2011-08-10 广州迪森热能技术股份有限公司 Boiler for biomass circulating fluidized bed
CN102155734A (en) * 2011-04-22 2011-08-17 广州迪森热能技术股份有限公司 Biomass evaporator

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102147107A (en) * 2011-04-22 2011-08-10 广州迪森热能技术股份有限公司 Boiler for biomass circulating fluidized bed
CN102155734A (en) * 2011-04-22 2011-08-17 广州迪森热能技术股份有限公司 Biomass evaporator

Similar Documents

Publication Publication Date Title
CN105737182A (en) Smoke in-depth cooler
CN105042622A (en) Air preheater based one air-water heat exchange
CN201327013Y (en) 100t/h fuel or gas steam injection boiler
CN2152149Y (en) Matrix fin type steel pipe coal economizer
CN205535903U (en) Flue gas deep cooling ware
CN203454861U (en) Spiral fin tube type steam air preheater
CN202349996U (en) Boiler waste heat recycling device
CN101865623B (en) Helical flat pipe for waste heat boiler
CN201072263Y (en) Oil-contaminated water ultra-high temperature heat pump assembly
CN211260758U (en) System for moving high-level economizer of tower furnace to tail flue and improving energy level utilization arrangement
CN2924459Y (en) Combined heat tube heat exchanger
CN104075336B (en) A kind of energy recycle device
CN2286303Y (en) Energy-saving corrugated and coil pipe steam-water two-stage heat exchanger
CN202188627U (en) Safe and energy-saving angle pipe hot-water boiler
CN2199431Y (en) Flue waste-heat energy-saver
CN205137516U (en) Air heater based on air water heat transfer
CN221122268U (en) Gas turbine waste heat boiler with final heating surface being plate heat exchanger
CN104913498A (en) High-efficiency energy-saving normal-pressure horizontal super-conducting gas boiler
CN201706938U (en) Spiral flat pipe applied to waste heat boiler
CN219674185U (en) Heat exchange coil pipe of water pipe boiler body
CN2876681Y (en) Efficient return type heat exchanger
CN219869237U (en) High-efficiency shell-and-tube heat exchanger suitable for light hydrocarbon recovery process
CN202709096U (en) Pressure-resistant planetary pipe ring type roller slag cooler
CN215259716U (en) Finned tube type waste heat boiler
CN216769435U (en) Reheating steam heating system of high-parameter waste incineration exhaust-heat boiler

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee