CN215211555U CN202120613980.8U CN202120613980U CN215211555U CN 215211555 U CN215211555 U CN 215211555U CN 202120613980 U CN202120613980 U CN 202120613980U CN 215211555 U CN215211555 U CN 215211555U
Authority
CN
China
Prior art keywords
steel plate
steel
wave form
corrugated
reinforcing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120613980.8U
Other languages
Chinese (zh)
Inventor
王再胜
蒋震震
俞科梁
詹婧雯
叶蔚禹
戴佳乐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Zhongnan Lvjian Technology Group Co ltd
Original Assignee
Zhejiang Zhongnan Construction Group Steel Structure Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Zhongnan Construction Group Steel Structure Co Ltd filed Critical Zhejiang Zhongnan Construction Group Steel Structure Co Ltd
Priority to CN202120613980.8U priority Critical patent/CN215211555U/en
Application granted granted Critical
Publication of CN215211555U publication Critical patent/CN215211555U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model discloses an adopt node of double splint formula built-in fitting connection wave form steel plate wall and girder steel, including wave form steel plate wall, girder steel and reinforcing steel plate, wave form steel plate wall adopts two wave form steel plate combinations to form, pours into the concrete in the cavity that forms between the wave form steel plate. Adopt two reinforcing steel plates fixed connection respectively on the lateral surface of wave form steel sheet, be equipped with between two reinforcing steel plates and to the stay bolt, to the stay bolt and pass the wave form steel sheet, to stay bolt and concrete combination as overall structure each other, girder steel fixed connection is on reinforcing steel plate. The utility model discloses a strengthening steel plate thickens, strengthens the region that the corrugated steel plate is used for connecting the girder steel, increases the regional atress ability that is used for setting up the roof beam component on the corrugated steel plate for the corrugated steel plate satisfies the installation demand of girder steel, avoids corrugated steel plate self structure to be destroyed, improves corrugated steel plate combination wall and roof beam component connection's stability, simple structure moreover, low in manufacturing cost, construction convenience, the installation rate is fast.

Description

Adopt node of two splint formula built-in fittings connection wave form steel sheet wall and girder steel
Technical Field
The utility model belongs to the technical field of building structure, concretely relates to adopt node that double splint formula built-in fitting connects wave form steel sheet wall and girder steel.
Background
In view of the development requirements and the technical challenges of steel structure houses, the core technology and the structural system of the corrugated steel plate combined structure are provided. The bearing structure composed of the corrugated steel plate wall, the steel beams and the floor bearing plate has the characteristics of high bearing efficiency, excellent anti-seismic performance and the like, and is suitable for being applied to multi-high-rise steel structure buildings such as houses, office buildings, hospitals, schools and the like.
The residential building system with the corrugated steel plate combined structure takes a corrugated steel plate wall as a core technology, and consists of two layers of corrugated steel plates, inner concrete and split bolts, wherein the three layers form an excellent combined effect. The corrugated steel plate has good stability, the buckling resistance bearing capacity of the corrugated steel plate can be several times to dozens of times higher than that of a flat steel plate, the corrugated steel plate is restrained by concrete and the split bolts, the bending and shearing resistance bearing capacity of the corrugated steel plate is greatly improved, the concrete is restrained by the corrugated steel plate and the split bolts, the compressive strength of the concrete can be fully exerted, and the using amount of steel is obviously reduced.
In the prior art, the corrugated steel plate wall comprises a corrugated steel plate, and the corrugated steel plate is thin, so that the structure of the corrugated steel plate is easily damaged when the corrugated steel plate is connected with a beam member.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the above-mentioned technical problem that exists among the prior art, provide a node that adopts double splint formula built-in fitting to connect corrugated steel plate wall and girder steel for junction between corrugated steel plate and the girder steel is strengthened, increases the regional atress ability that is used for setting up the roof beam component on the corrugated steel plate, avoids corrugated steel plate self structure to be destroyed, improves corrugated steel plate wall and roof beam component connection's stability, and simple structure, low in manufacturing cost, and convenient construction, the installation rate is fast.
In order to solve the technical problem, the utility model discloses a following technical scheme:
a node for connecting a corrugated steel plate wall and a steel beam by adopting a double-clamping-plate type embedded part comprises the corrugated steel plate wall and the steel beam, wherein the corrugated steel plate wall is formed by assembling corrugated steel plates, and the steel beam is an I-shaped steel beam in the prior art. The method is characterized in that: still including the reinforcing steel plate, reinforcing steel plate fixed connection is on the lateral surface of wave form steel sheet, and girder steel fixed connection is on the reinforcing steel plate.
The utility model discloses a two wave form steel sheets form wave form steel sheet wall, and the cast in concrete in the cavity that forms between two wave form steel sheets, two wave form steel sheets adopt to connect the stay bolt among the prior art. The equal fixedly connected with reinforcing steel plate of two wave form steel plates, in order to adapt to the connection between reinforcing steel plate and the girder steel, the thickness of the reinforcing steel plate that is used for being connected with the girder steel is greater than the thickness of another reinforcing steel plate, and in actual construction, the thickness of the reinforcing steel plate that is used for being connected with the girder steel is 20mm, and the thickness of another reinforcing steel plate is 10 mm. Fixedly connected with is to the stay bolt between two reinforced steel plate for two reinforced steel plate connect into overall structure, and the stay bolt passes the wave form steel sheet, and stay bolt and concrete combine each other for overall structure, make two reinforced steel plate, stay bolt and wave form steel plate wall connect into overall structure, increase the atress ability that is used for the reinforced steel plate of being connected with the girder steel, and then satisfy the installation demand of girder steel. The utility model discloses a strengthening steel plate thickens, strengthens the region that the corrugated steel plate is used for connecting the girder steel, increases the regional atress ability that is used for setting up the roof beam component on the corrugated steel plate for the corrugated steel plate satisfies the installation demand of girder steel, avoids corrugated steel plate self structure to be destroyed, improves corrugated steel plate wall and roof beam component connection's stability, simple structure moreover, low in manufacturing cost, construction convenience, the installation rate is fast.
Further, single split bolt is equipped with four nuts, and mutual fixed connection's wave form steel sheet and reinforcing plate setting adopt two nuts to carry on spacingly to wave form steel sheet and reinforcing plate between two nuts, increase the joint strength between wave form steel sheet and the reinforcing plate, avoid the welding department between wave form steel sheet and the reinforcing plate the condition of splitting to appear.
Furthermore, the reinforcing steel plate is welded on the outer side face of the corrugated steel plate, so that the reinforcing steel plate and the corrugated steel plate are simple in fixing mode and easy to operate.
Furthermore, the corners of the corrugated steel plate are chamfered to form inclined planes, so that the outer side face of the corrugated steel plate is tightly attached to the reinforcing steel plate, the reinforcing steel plate and the corrugated steel plate are conveniently welded and fixed, and the welding quality between the reinforcing steel plate and the corrugated steel plate is improved.
Further, the reinforcing steel plate is rectangular, the reinforcing steel plate is simple in shape and can be obtained through cutting in a factory, batch production is facilitated, and the reinforcing steel plate in the rectangular shape is easier to be attached to the outer side face of the corrugated steel plate.
Further, the reinforced steel plate is welded with the connecting plate, the steel beam passes through fixing bolt and connecting plate fixed connection, can set up the bolt hole in advance on the web of steel beam and connecting plate, and the connecting plate can multiplicable reinforced steel plate and the web of steel beam between the connection area, and installation labour saving and time saving simultaneously only receives the shear force between steel beam and the reinforced steel plate, conveniently dismantles the operation to the steel beam moreover.
Furthermore, the steel beam is welded on the reinforced steel plate, so that the fixed mode between the reinforced steel plate and the steel beam is simple and easy to operate, the welded connection does not need drilling, and the welding structure is good in tightness.
The utility model discloses owing to adopted above-mentioned technical scheme, following beneficial effect has:
the utility model discloses a reinforcing steel plate thickens, strengthens the region that corrugated steel plate is used for connecting the girder steel, and two reinforcing steel plates, tie bolt and corrugated steel plate wall connect into overall structure moreover, increase the atress ability that is used for the reinforcing steel plate of being connected with the girder steel, and then satisfy the installation demand of girder steel. The utility model discloses can increase the regional atress ability that is used for setting up the roof beam component on the wave form steel sheet for the wave form steel sheet satisfies the installation demand of girder steel, avoids wave form steel sheet self structure to be destroyed, improves wave form steel sheet wall and roof beam component connection's stability, simple structure moreover, low in manufacturing cost, construction convenience, the installation rate is fast.
Drawings
The present invention will be further explained with reference to the accompanying drawings:
fig. 1 is a schematic structural diagram of a first embodiment of the present invention;
fig. 2 is a schematic structural view of the connection between the reinforcing steel plate and the split bolt in the first embodiment of the present invention;
FIG. 3 is an enlarged view of the structure at A in FIG. 1;
fig. 4 is a schematic structural diagram of a second embodiment of the present invention;
fig. 5 is a schematic structural view of the connection between the reinforcing steel plate and the split bolt in the second embodiment of the present invention.
In the figure, 1-corrugated steel plate; 2-a steel beam; 3-reinforcing the steel plate; 4-inclined plane; 5-a cavity; 6-split bolts; 7-a nut; 8-connecting plates; 9-fixing the bolt.
Detailed Description
As shown in fig. 1 to 3, in accordance with a first embodiment of the present invention,
the utility model provides an adopt node of double splint formula built-in fitting connection wave form steel plate wall and girder steel, includes wave form steel plate wall, girder steel 2 and reinforcing steel plate 3, and the wave form steel plate wall adopts wave form steel plate 1 assembly to form, and wave form steel plate 1 and post welded fastening, the thickness of wave form steel plate 1 is 5mm, and girder steel 2 adopts the I-shaped steel roof beam among the prior art. The reinforcing steel plate 3 is fixedly connected to the outer side face of the corrugated steel plate 1, and the steel beam 2 is fixedly connected to the reinforcing steel plate 3.
The utility model discloses a two corrugated steel plate 1 form corrugated steel plate wall, and the concrete is poured into in the cavity 5 that forms between two corrugated steel plate 1, and two corrugated steel plate 1 adopt to connect the stay bolt among the prior art. Two equal fixedly connected with reinforced steel plate 3 of wave form steel sheet 1, in order to adapt to the connection between reinforced steel plate 3 and the girder steel 2, the thickness that is used for reinforced steel plate 3 of being connected with girder steel 2 is greater than the thickness of another reinforced steel plate 3, and in actual construction, the thickness that is used for reinforced steel plate 3 of being connected with girder steel 2 is 20mm, and the thickness of another reinforced steel plate 3 is 10 mm. Fixedly connected with is to drawing bolt 6 between two reinforced steel plate 3 for two reinforced steel plate 3 connect into overall structure, pass wave form steel sheet 1 to drawing bolt 6, combine each other for overall structure to drawing bolt 6 and concrete, make two reinforced steel plate 3, connect into overall structure to drawing bolt 6 and wave form steel plate wall, increase the atress ability that is used for reinforced steel plate 3 be connected with girder steel 2, and then satisfy girder steel 2's installation demand. The utility model discloses a strengthening steel plate 3 thickens, strengthens the region that corrugated steel plate 1 is used for connecting girder steel 2, increases the regional atress ability that is used for setting up the roof beam component on the corrugated steel plate 1 for corrugated steel plate 1 satisfies girder steel 2's installation demand, avoids corrugated steel plate 1 self structure to be destroyed, improves corrugated steel plate wall and roof beam component connection's stability, simple structure moreover, low in manufacturing cost, construction convenience, the installation rate is fast.
A single split bolt 6 is equipped with four nuts 7, and mutual fixed connection's wave form steel sheet 1 and reinforcing steel plate 3 set up between two nuts 7, adopt two nuts 7 to carry on spacingly to wave form steel sheet 1 and reinforcing steel plate 3, increase the joint strength between wave form steel sheet 1 and the reinforcing steel plate 3, avoid the welding department between wave form steel sheet 1 and the reinforcing steel plate 3 the condition of splitting to appear.
The reinforced steel plate 3 is welded on the outer side surface of the corrugated steel plate 1, so that the reinforced steel plate 3 and the corrugated steel plate 1 are simple in fixing mode and easy to operate. The chamfer is carried out at the corner of wave form steel sheet 1, forms inclined plane 4 for closely laminating between wave form steel sheet 1's lateral surface and the reinforcing steel plate 3, conveniently will reinforcing steel plate 3 and wave form steel sheet 1 welded fastening, improve the welding quality between reinforcing steel plate 3 and the wave form steel sheet 1.
The reinforcing steel plate 3 is rectangular, the reinforcing steel plate 3 is simple in shape and can be obtained by cutting in a factory, batch production is facilitated, and the reinforcing steel plate 3 in the rectangular shape is more easily attached to the outer side face of the corrugated steel plate 1.
3 welding of reinforced steel plate has connecting plate 8, and girder steel 2 can set up the bolt hole in advance on the web of girder steel 2 and connecting plate 8 through fixing bolt 9 and 8 fixed connection of connecting plate, and connecting plate 8 multiplicable connected area between the web of reinforced steel plate 3 and girder steel 2 installs labour saving and time saving simultaneously, only receives the shear force between girder steel 2 and the reinforced steel plate 3, and the operation is dismantled to girder steel 2 to the convenience moreover.
As shown in fig. 4 and 5, in order to implement the second embodiment of the present invention,
the utility model provides an adopt node of double splint formula built-in fitting connection wave form steel plate wall and girder steel, includes wave form steel plate wall, girder steel 2 and reinforced steel plate 3, and the wave form steel plate wall adopts wave form steel plate 1 assembly to form, and wave form steel plate 1 and post welded fastening, the thickness of wave form steel plate 1 is 5mm, and girder steel 2 adopts I-shaped girder steel 2 among the prior art. The reinforcing steel plate 3 is fixedly connected to the outer side face of the corrugated steel plate 1, and the steel beam 2 is fixedly connected to the reinforcing steel plate 3.
The utility model discloses a two corrugated steel plate 1 form corrugated steel plate wall, and the concrete is poured into in the cavity 5 that forms between two corrugated steel plate 1, and two corrugated steel plate 1 adopt to connect stay bolt 6 among the prior art. Two equal fixedly connected with reinforced steel plate 3 of wave form steel sheet 1, in order to adapt to the connection between reinforced steel plate 3 and the girder steel 2, the thickness that is used for reinforced steel plate 3 of being connected with girder steel 2 is greater than the thickness of another reinforced steel plate 3, and in actual construction, the thickness that is used for reinforced steel plate 3 of being connected with girder steel 2 is 20mm, and the thickness of another reinforced steel plate 3 is 10 mm. Fixedly connected with is to drawing bolt 6 between two reinforced steel plate 3 for two reinforced steel plate 3 connect into overall structure, pass wave form steel sheet 1 to drawing bolt 6, combine each other for overall structure to drawing bolt 6 and concrete, make two reinforced steel plate 3, connect into overall structure to drawing bolt 6 and wave form steel plate wall, increase the atress ability that is used for reinforced steel plate 3 be connected with girder steel 2, and then satisfy girder steel 2's installation demand. The utility model discloses a strengthening steel plate 3 thickens, strengthens the region that corrugated steel plate 1 is used for connecting girder steel 2, increases the regional atress ability that is used for setting up the roof beam component on the corrugated steel plate 1 for corrugated steel plate 1 satisfies girder steel 2's installation demand, avoids corrugated steel plate 1 self structure to be destroyed, improves corrugated steel plate wall and roof beam component connection's stability, simple structure moreover, low in manufacturing cost, construction convenience, the installation rate is fast.
A single split bolt 6 is equipped with four nuts 7, and mutual fixed connection's wave form steel sheet 1 and reinforcing steel plate 3 set up between two nuts 7, adopt two nuts 7 to carry on spacingly to wave form steel sheet 1 and reinforcing steel plate 3, increase the joint strength between wave form steel sheet 1 and the reinforcing steel plate 3, avoid the welding department between wave form steel sheet 1 and the reinforcing steel plate 3 the condition of splitting to appear.
The reinforced steel plate 3 is welded on the outer side surface of the corrugated steel plate 1, so that the reinforced steel plate 3 and the corrugated steel plate 1 are simple in fixing mode and easy to operate. The chamfer is carried out at the corner of wave form steel sheet 1, forms inclined plane 4 for closely laminating between wave form steel sheet 1's lateral surface and the reinforcing steel plate 3, conveniently will reinforcing steel plate 3 and wave form steel sheet 1 welded fastening, improve the welding quality between reinforcing steel plate 3 and the wave form steel sheet 1.
The reinforcing steel plate 3 is rectangular, the reinforcing steel plate 3 is simple in shape and can be obtained by cutting in a factory, batch production is facilitated, and the reinforcing steel plate 3 in the rectangular shape is more easily attached to the outer side face of the corrugated steel plate 1.
Girder steel 2 welds on steel plate 3 for the fixed mode between steel plate 3 and the girder steel 2 is simple, easy operation, and welded connection need not drilling moreover, and welded structure leakproofness is good.
The above is only a specific embodiment of the present invention, but the technical features of the present invention are not limited thereto. Any simple changes, equivalent substitutions or modifications made on the basis of the present invention to solve the same technical problems and achieve the same technical effects are all covered by the protection scope of the present invention.

Claims (7)

1. A joint for connecting a corrugated steel plate wall and a steel beam by adopting a double-splint type embedded part comprises:
the corrugated steel plate wall is formed by combining two corrugated steel plates, and concrete is poured into a cavity formed between the two corrugated steel plates;
a steel beam;
it is characterized in that the preparation method is characterized in that,
still include the reinforcing steel plate, adopt two reinforcing steel plate difference fixed connection be in on the lateral surface of wave form steel plate, two fixedly connected with split bolt between the reinforcing steel plate, the split bolt passes the wave form steel plate, the split bolt with the concrete combines each other for overall structure, girder steel fixed connection is in on the reinforcing steel plate.
2. The joint for connecting the corrugated steel plate wall and the steel beam by adopting the double-splint type embedded part as claimed in claim 1, wherein: the split bolt is provided with four nuts, and the corrugated steel plate and the reinforcing steel plate which are fixedly connected with each other are arranged between the two nuts.
3. The joint for connecting the corrugated steel plate wall and the steel beam by adopting the double-splint type embedded part as claimed in claim 1, wherein: the reinforcing steel plate is welded on the outer side surface of the corrugated steel plate.
4. The joint for connecting the corrugated steel plate wall and the steel beam by using the double-clamp-plate type embedded part as claimed in claim 3, wherein: and chamfering corners of the corrugated steel plate to form inclined planes.
5. The joint for connecting the corrugated steel plate wall and the steel beam by adopting the double-splint type embedded part as claimed in claim 1, wherein: the reinforcing steel plate is rectangular.
6. The joint for connecting the corrugated steel plate wall and the steel beam by adopting the double-splint type embedded part as claimed in claim 1, wherein: the reinforced steel plate is welded with a connecting plate, and the steel beam is fixedly connected with the connecting plate through a fixing bolt.
7. The joint for connecting the corrugated steel plate wall and the steel beam by adopting the double-splint type embedded part as claimed in claim 1, wherein: the steel beam is welded on the reinforced steel plate.
CN202120613980.8U 2021-03-26 2021-03-26 Adopt node of two splint formula built-in fittings connection wave form steel sheet wall and girder steel Active CN215211555U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120613980.8U CN215211555U (en) 2021-03-26 2021-03-26 Adopt node of two splint formula built-in fittings connection wave form steel sheet wall and girder steel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120613980.8U CN215211555U (en) 2021-03-26 2021-03-26 Adopt node of two splint formula built-in fittings connection wave form steel sheet wall and girder steel

Publications (1)

Publication Number Publication Date
CN215211555U true CN215211555U (en) 2021-12-17

Family

ID=79444393

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120613980.8U Active CN215211555U (en) 2021-03-26 2021-03-26 Adopt node of two splint formula built-in fittings connection wave form steel sheet wall and girder steel

Country Status (1)

Country Link
CN (1) CN215211555U (en)

Similar Documents

Publication Publication Date Title
CN108894362B (en) Assembled grid type thin-wall steel plate recycled concrete combined shear wall and assembling method
CN111962952B (en) Steel pipe concrete column-H-shaped steel beam-steel support-pi-shaped connecting piece combined type middle column bottom node and manufacturing method
CN112942573B (en) Assembled beam-column node mortise-tenon structure and construction method
CN103821261A (en) Assembly honeycomb steel plate shear wall
CN108867939B (en) Buckling-restrained steel plate shear wall
CN210621923U (en) Assembled concrete frame structure based on phase change wall
CN113802740A (en) Joint shear-resistant assembly type beam-slab combination system based on orthogonal corrugated steel plate bending-resistant drawknot composite floor slab
CN111962950B (en) Steel pipe concrete column-H-shaped steel beam-steel support-pi-shaped connecting piece combined corner column middle node and manufacturing method
CN215211555U (en) Adopt node of two splint formula built-in fittings connection wave form steel sheet wall and girder steel
CN206545308U (en) A kind of Steel Castellated Beams rib concrete folding plate
CN112160418A (en) Anti special-shaped post frame construction system of side of assembled buckled plate
CN112302167A (en) Assembled steel construction dysmorphism post frame construction system
CN112523367A (en) Steel beam and concrete filled steel tube vertical member assembled side plate node
CN111042385A (en) Assembled double-layer steel plate combined shear wall
CN216195427U (en) Box column and H shaped steel roof beam rigid connection node
CN212506733U (en) Assembled concrete structure beam column connected node
CN213539290U (en) Assembly welding type steel structure beam column connection reinforced node
CN113802741A (en) Pin shear connection assembly type beam-slab combination system based on orthogonal corrugated steel plate bending-resistant tie-bar composite floor slab
CN111962953B (en) Concrete filled steel tube column-H-shaped steel beam-steel support-pi-shaped connecting piece combined side column middle node and manufacturing method
CN213539882U (en) Middle node of steel pipe concrete column H-shaped steel beam support pi-shaped connecting side column
CN213087034U (en) Concrete beam-column steel connection full-assembly structure
CN213773849U (en) L-shaped concrete filled steel tube column and steel beam bolted welding connection node structure
CN103835399A (en) Prestress embedded steel plate-concrete combined shear wall
CN114319656A (en) Multilayer orthogonal profiled steel sheet-concrete combined shear wall
CN215253491U (en) Node for connecting corrugated steel plate wall and steel beam by adopting built-in T-shaped embedded part

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 311400 No.18, Changkou East Street, Changkou Town, Fuyang District, Hangzhou City, Zhejiang Province

Patentee after: Zhejiang Zhongnan Lvjian Technology Group Co.,Ltd.

Address before: 311400 No.18, Changkou East Street, Changkou Town, Fuyang District, Hangzhou City, Zhejiang Province

Patentee before: ZHEJIANG ZHONGNAN CONSTRUCTION GROUP STEEL STRUCTURE Co.,Ltd.