CN215107169U - Operation platform for outer wall construction - Google Patents

Operation platform for outer wall construction Download PDF

Info

Publication number
CN215107169U
CN215107169U CN202022956037.5U CN202022956037U CN215107169U CN 215107169 U CN215107169 U CN 215107169U CN 202022956037 U CN202022956037 U CN 202022956037U CN 215107169 U CN215107169 U CN 215107169U
Authority
CN
China
Prior art keywords
rod
wall
vertical rod
clamping
spring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022956037.5U
Other languages
Chinese (zh)
Inventor
杨则超
李逸蜚
闫晓庆
董锐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Sixth Engineering Bureau Tianjin Green Building Technology Co Ltd
Original Assignee
China Construction Sixth Engineering Bureau Tianjin Green Building Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Sixth Engineering Bureau Tianjin Green Building Technology Co Ltd filed Critical China Construction Sixth Engineering Bureau Tianjin Green Building Technology Co Ltd
Priority to CN202022956037.5U priority Critical patent/CN215107169U/en
Application granted granted Critical
Publication of CN215107169U publication Critical patent/CN215107169U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

An operation platform for outer wall construction comprises a hook, wherein a first vertical rod is fixedly installed at the bottom of the hook, a small round rod is fixedly installed on the side surface of the first vertical rod facing an outer wall, a first spring is fixedly installed at one end, far away from the first vertical rod, of the small round rod, the other end of the first spring is connected to the outer wall, a first cross rod is fixedly installed on one side surface, far away from the outer wall, of the bottom of the first vertical rod, a second vertical rod is fixedly installed at one end, far away from the first vertical rod, of the first cross rod, a third cross rod parallel to the outer wall is fixedly installed at the bottom of the second vertical rod, a sleeve is externally and slidably installed on the third cross rod, and a clamping rod is slidably connected in the sleeve, the stability of the operation platform is maintained.

Description

Operation platform for outer wall construction
Technical Field
The utility model relates to a construction equipment technical field especially relates to an operation platform is used in outer wall construction.
Background
With the rapid development of modern construction of cities in China, higher and higher high-rise buildings become symbols of modern cities, and plastering, painting and wall tile construction of building outer walls, subsequent maintenance, repair, cleaning and the like are performed.
However, in the prior art, in actual use, a temporary hoist crane is built from a building roof, people, construction materials, a construction platform and the like are put down from the roof for suspension construction operation by using a rope, the construction operation platform is mostly built by a scaffold, a large amount of materials and manpower are consumed, the building time is long, the efficiency is low, the labor intensity of workers is high, the platform is single in length and cannot be stretched randomly, the building is required to be rebuilt by the workers at times, the built construction platform is movable and easy to shake, and particularly, the higher the building, the larger the swing amplitude is, and great potential safety hazards exist.
Disclosure of Invention
The utility model provides an solve above-mentioned problem, provide an operation platform is used in outer wall construction.
The utility model discloses the technical scheme who takes:
an operation platform for outer wall construction comprises a hook, wherein a first vertical rod is fixedly installed at the bottom of the hook, a round rod is fixedly installed on the side face, facing the outer wall, of the first vertical rod, a first spring is fixedly installed at one end, far away from the first vertical rod, of the round rod, the other end of the first spring is connected to the outer wall, a first cross rod is fixedly installed on one side face, far away from the outer wall, of the bottom of the first vertical rod, a second vertical rod is fixedly installed at one end, far away from the first vertical rod, of the first cross rod, a third cross rod parallel to the outer wall is fixedly installed at the bottom of the second vertical rod, a sleeve is slidably installed outside the third cross rod, a clamping rod is slidably connected in the sleeve, a steel pipe is fixedly installed at one end, far away from the second vertical rod, of the third cross rod, a second spring is movably connected in the steel pipe, one end of the second spring is fixedly installed with one end of the third cross rod, one end, far away from the third cross rod of the second spring is in lap joint with the clamping rod in the sleeve, the other end of the clamping rod stretches out of the sleeve, a first slide rail is fixedly mounted on the upper surface of the clamping rod, a first pulley is hinged to the surface of the first slide rail, a second slide rail is fixed to the inner surface of the sleeve, the first pulley is connected with the second slide rail in a rolling mode, a fixed pulley is fixedly mounted on the inner wall, away from one end of the third transverse rod, of the sleeve through a round rod, the fixed pulley is connected with the first slide rail in a rolling mode, a bolt rod is movably inserted into the sleeve, and the bottom end of the bolt rod is movably inserted into the steel pipe.
The hook is provided with a buckle at one end far away from the first vertical rod, and the buckle is movably connected with the surface of the first vertical rod.
And a second cross rod is fixedly arranged above the first cross rod on the upper part of the first vertical rod.
The one end that screens pole is close to the third horizontal pole be equipped with the interior screens pole of undergauge, the buckle groove has been seted up to the end of interior screens pole, the shutoff is clogged to the bottom in buckle groove, is connected with buckle spring in the buckle inslot on the shutoff, buckle piece is connected on the top of buckle spring.
And magnets are arranged on the surfaces of the first pulley and the second sliding rail.
The upper portion fixed mounting of second montant have flexible surrounding rod, the one end fixed mounting that second montant was kept away from to flexible surrounding rod has the third montant, the one end fixed connection that the third horizontal pole was kept away from to the bottom and the screens pole of third montant.
And an end boss is arranged at one end of the third cross rod connected with the steel pipe, and an end blocking wall is arranged at one end of the third cross rod sleeved with the sleeve.
The utility model has the advantages that: the utility model discloses a place the couple on the building outer wall that has the rail, block couple and first montant each other through the buckle device of couple endpoint department, make first montant and outer wall form parallel relation through the extrusion of round bar and first spring and outer wall when first montant and outer wall are nonparallel, maintained the stability of operation platform; the utility model discloses still form the horizontal removal of operation platform simultaneously through manual promotion third montant, the third montant inwards promotes and drives first pulley and fixed pulley at first slide rail surface roll, first pulley can drive the screens pole at second slide rail surface roll and remove, when reaching a critical point, thereby screens pole end point department can extrude the second spring and block the inner wall of steel pipe with the screens pole, screens pole and steel pipe reciprocal anchorage, when needs tensile operation platform, downwards extrude the buckle piece of screens pole port department through the bolt board, when reaching the critical point, under the pressure of second spring, the screens pole can pop out rapidly from the inner wall of steel pipe, first pulley rolls to the direction of third montant simultaneously, when first pulley and fixed pulley are tangent, thereby fix operation platform under the condition of magnet inter attraction.
Drawings
Fig. 1 is a left side view of the present invention.
Fig. 2 is a front view of the present invention.
Fig. 3 is a partially enlarged view of a portion a in fig. 2.
Fig. 4 is a schematic structural view of the clamping rod of the present invention sleeved at one end of the sleeve.
Fig. 5 is a partially enlarged view of a portion B in fig. 2.
Wherein: 1-hooking; 2-a first vertical bar; 3-round bar; 4-a first spring; 5-a first cross bar; 6-a second cross bar; 7-a second vertical bar; 8-a third cross bar; 9-a sleeve; 10-a steel pipe; 11-a second spring; 12-a position-clamping rod; 13-a second slide rail; 14-a first pulley; 15-a first slide rail; 16-a fixed pulley; 17-a latch rod; 18-telescopic surrounding rods; 19-a third vertical bar; 20-buckling; 21-an inner clamping rod; 22-a snap groove; 23-plugging; 24-a snap spring; 25-a snap block; 26-end bosses; 27-end stop wall.
Detailed Description
An operation platform for outer wall construction comprises a hook 1, wherein a first vertical rod 2 is fixedly installed at the bottom of the hook 1, a round rod 3 is fixedly installed on the side face, facing an outer wall, of the first vertical rod 2, a first spring 4 is fixedly installed at one end, away from the first vertical rod 2, of the round rod 3, the other end of the first spring 4 is connected onto the outer wall, a first cross rod 5 is fixedly installed on one side face, away from the outer wall, of the bottom of the first vertical rod 2, a second vertical rod 7 is fixedly installed at one end, away from the first vertical rod 2, of the first cross rod 5, a third cross rod 8 parallel to the outer wall is fixedly installed at the bottom of the second vertical rod 7, a sleeve 9 is installed outside the third cross rod 8 in a sliding mode, a clamping rod 12 is connected inside the sleeve 9 in a sliding mode, a steel pipe 10 is fixedly installed at one end, away from the second vertical rod 7, of the third cross rod 8, and a second spring 11 is movably connected inside the steel pipe 10, one end of a second spring 11 is fixedly mounted at one end of the third cross rod 8, one end of the second spring 11, far away from the third cross rod 8, is in lap joint with a clamping rod 12 in a sleeve 9, the other end of the clamping rod 12 extends out of the sleeve 9, a first slide rail 15 is fixedly mounted on the upper surface of the clamping rod 12, a first pulley 14 is hinged to the surface of the first slide rail 15, a second slide rail 13 is fixed on the inner surface of the sleeve 9, the first pulley 14 is in rolling connection with the second slide rail 13, a fixed pulley 16 is fixedly mounted on the inner wall of the sleeve 9, far away from one end of the third cross rod 8, through a round rod, the fixed pulley 16 is in rolling connection with the first slide rail 15, a bolt rod 17 is movably inserted on the sleeve 9, and the bottom end of the bolt rod 17 is movably inserted into the steel pipe 10.
The hook 1 is provided with a buckle 20 at one end far away from the first vertical rod 2, and the buckle 20 is movably connected with the surface of the first vertical rod 2.
And a second cross rod 6 is fixedly arranged above the first cross rod 5 at the upper part of the first vertical rod 2.
One end of the clamping rod 12 close to the third cross rod 8 is provided with a reducing inner clamping rod 21, the end of the inner clamping rod 21 is provided with a clamping groove 22, the bottom end of the clamping groove 22 is filled with a blocking 23, the blocking 23 is connected with a clamping spring 24 in the clamping groove 22, and the top end of the clamping spring 24 is connected with a clamping block 25.
The surfaces of the first pulley 14 and the second slide rail 13 are provided with magnets.
The upper portion fixed mounting of second montant 7 have flexible enclosing rod 18, the one end fixed mounting that second montant 7 was kept away from to flexible enclosing rod 18 has third montant 19, the one end fixed connection that third horizontal pole 8 was kept away from to the bottom of third montant 19 and screens pole 12.
An end boss 26 is arranged at one end of the third cross rod 8 connected with the steel pipe 10, and an end blocking wall 27 is arranged at one end of the third cross rod 8 sleeved with the sleeve 9.
The working principle is as follows: when in use, the utility model is used for hooking the hook 1 on the outer wall of a building with a fence, clamping the hook 1 with the first vertical rod 2 through the buckle 20 at the end of the hook 1, when the first vertical rod 2 is not parallel to the outer wall, the first vertical rod 2 and the outer wall form a parallel relation through the extrusion of the round rod 3 and the first spring 4, maintaining the stability of the operation platform, the utility model can also form the transverse movement of the operation platform through manually pushing the third vertical rod 19, the third vertical rod 19 pushes inwards to drive the first pulley 14 and the fixed pulley 16 to roll on the surface of the first slide rail 15, the first pulley 14 rolls on the surface of the second slide rail 13 to drive the clamping rod 12 to move, when a critical point is reached, the end of the inner clamping rod 21 of the clamping rod 12 can extrude the second spring 11, thereby clamping the end of the inner clamping rod 21 of the clamping rod 12 into the steel pipe 10, the clamping spring 24 upwards pops up the clamping block 25, so that the clamping rod 12 is stably clamped in the steel pipe 10, when the operation platform needs to be stretched, the clamping block 25 at the clamping groove 22 of the clamping rod 12 is downwards extruded through the latch plate 17, the clamping block 25 compresses the clamping spring 24, when a critical point is reached, the clamping block 25 is lower than the end wall of the steel pipe 10, under the pressure of the second spring 11, the clamping rod 12 can be quickly popped out from the inner wall of the steel pipe 10, meanwhile, the first pulley 14 rolls towards the direction of the third vertical rod 19, and when the first pulley 14 and the fixed pulley 16 are tangent, the operation platform is fixed under the condition of mutual attraction of magnets.
The embodiments of the present invention have been described in detail, but the description is only for the preferred embodiments of the present invention and should not be construed as limiting the scope of the present invention. All the equivalent changes and improvements made according to the application scope of the present invention should still fall within the patent coverage of the present invention.

Claims (7)

1. The operating platform for the construction of the outer wall is characterized by comprising a hook (1), wherein a first vertical rod (2) is fixedly mounted at the bottom of the hook (1), a round rod (3) is fixedly mounted on the side face, facing the outer wall, of the first vertical rod (2), a first spring (4) is fixedly mounted at one end, away from the first vertical rod (2), of the round rod (3), the other end of the first spring (4) is connected to the outer wall, a first transverse rod (5) is fixedly mounted at one side face, away from the outer wall, of the bottom of the first vertical rod (2), a second vertical rod (7) is fixedly mounted at one end, away from the first vertical rod (2), of the first transverse rod (5), a third transverse rod (8) parallel to the outer wall is fixedly mounted at the bottom of the second vertical rod (7), a sleeve (9) is slidably mounted outside the third transverse rod (8), and a clamping rod (12) is slidably connected in the sleeve (9), the one end fixed mounting that second montant (7) were kept away from to third horizontal pole (8) has steel pipe (10), swing joint has second spring (11) in steel pipe (10), and the one end of second spring (11) and the one end fixed mounting of third horizontal pole (8), the one end and screens pole (12) overlap joint in sleeve pipe (9) that third horizontal pole (8) were kept away from to second spring (11), the other end of screens pole (12) stretches out sleeve pipe (9), the last fixed surface of screens pole (12) installs first slide rail (15), the surface of first slide rail (15) articulates there is first pulley (14), the internal surface of sleeve pipe (9) is fixed with second slide rail (13), first pulley (14) and second slide rail (13) roll connection, the inner wall that third horizontal pole (8) one end was kept away from to sleeve pipe (9) has fixed pulley (16) through round bar fixed mounting, and the fixed pulley (16) is in rolling connection with the first sliding rail (15), a plug pin rod (17) is movably inserted on the sleeve (9), and the bottom end of the plug pin rod (17) is movably inserted into the steel pipe (10).
2. The operating platform for the construction of the outer wall is characterized in that a buckle (20) is arranged at one end, far away from the first vertical rod (2), of the hook (1), and the buckle (20) is movably connected with the surface of the first vertical rod (2).
3. The outer wall construction operation platform as claimed in claim 2, wherein a second cross bar (6) is fixedly arranged above the first cross bar (5) at the upper part of the first vertical bar (2).
4. The outer wall construction operation platform according to claim 1, wherein one end of the clamping rod (12) close to the third cross rod (8) is provided with a reducing inner clamping rod (21), the end of the inner clamping rod (21) is provided with a clamping groove (22), the bottom end of the clamping groove (22) is filled with a plug (23), the plug (23) is connected with a clamping spring (24) in the clamping groove (22), and the top end of the clamping spring (24) is connected with a clamping block (25).
5. The outer wall construction operation platform as claimed in claim 1, wherein magnets are arranged on the surfaces of the first pulley (14) and the second slide rail (13).
6. The operating platform for the outer wall construction is characterized in that a telescopic surrounding rod (18) is fixedly mounted at the upper part of the second vertical rod (7), a third vertical rod (19) is fixedly mounted at one end, far away from the second vertical rod (7), of the telescopic surrounding rod (18), and the bottom end of the third vertical rod (19) is fixedly connected with one end, far away from the third transverse rod (8), of the clamping rod (12).
7. The operation platform for the outer wall construction is characterized in that an end boss (26) is arranged at one end, connected with the steel pipe (10), of the third cross rod (8), and an end blocking wall (27) is arranged at one end, sleeved on the third cross rod (8), of the sleeve (9).
CN202022956037.5U 2020-12-09 2020-12-09 Operation platform for outer wall construction Active CN215107169U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022956037.5U CN215107169U (en) 2020-12-09 2020-12-09 Operation platform for outer wall construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022956037.5U CN215107169U (en) 2020-12-09 2020-12-09 Operation platform for outer wall construction

Publications (1)

Publication Number Publication Date
CN215107169U true CN215107169U (en) 2021-12-10

Family

ID=79306896

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022956037.5U Active CN215107169U (en) 2020-12-09 2020-12-09 Operation platform for outer wall construction

Country Status (1)

Country Link
CN (1) CN215107169U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114775990A (en) * 2022-05-26 2022-07-22 广州城市职业学院 Safe type is external work platform for assembly type structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114775990A (en) * 2022-05-26 2022-07-22 广州城市职业学院 Safe type is external work platform for assembly type structure
CN114775990B (en) * 2022-05-26 2023-08-04 广州城市职业学院 Safety type externally hung operation platform for assembled building

Similar Documents

Publication Publication Date Title
CN204716124U (en) Portable removable level-sensing device inspection platform
CN215107169U (en) Operation platform for outer wall construction
CN206110686U (en) Hopper for building
CN208454342U (en) A kind of safety of tower crane platform and standard knot install conjoined device
CN207260528U (en) A kind of construction automatic plastering machine
CN209703953U (en) External wall apparatus of plastering
CN207792625U (en) Scalable lengthening cantilever crane structure
CN105725935A (en) Novel cleaning equipment for outer wall of high-rise building
CN208261547U (en) A kind of wire drawing machine puts wire drawing liquid structure
CN110301869A (en) It is a kind of for cleaning the external wall cleaning device of external wall
CN213171212U (en) A hoisting apparatus for building engineering
CN208456101U (en) A kind of housing construction scaffold
CN210683010U (en) Stair climbing machine device
CN208202604U (en) A kind of construction discharging platform
CN210194448U (en) A hanging flower basket during removal for bridge construction
CN208551672U (en) Facade cleaning device
CN216516928U (en) Portable concrete hopper device
CN217420151U (en) Aluminum alloy curtain wall with anti-drop structure
CN215549803U (en) Adjustable automatic mortar feeding device
CN215085819U (en) Portal pivot formula aerial fog dust suppression device
CN208056656U (en) Building machinery engineering hopper
CN214169976U (en) Building platform safety device of unloading of encorbelmenting
CN212926977U (en) Can have enough to meet need formula high-rise fire control gallery inner courtyard operation platform
CN215319670U (en) Stirring building
CN219773566U (en) Glass curtain wall repair maintenance hoisting equipment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant