CN215035466U - Base for controlling cutting deformation of sliced tower drum - Google Patents
Base for controlling cutting deformation of sliced tower drum Download PDFInfo
- Publication number
- CN215035466U CN215035466U CN202023298666.XU CN202023298666U CN215035466U CN 215035466 U CN215035466 U CN 215035466U CN 202023298666 U CN202023298666 U CN 202023298666U CN 215035466 U CN215035466 U CN 215035466U
- Authority
- CN
- China
- Prior art keywords
- backup pad
- fixed mounting
- tower
- base
- circular arc
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Working Measures On Existing Buildindgs (AREA)
Abstract
The utility model belongs to the technical field of a burst tower section of thick bamboo cutting frock, especially, a base for controlling burst tower section of thick bamboo cutting deformation, fixed with false flange to current technique, both sides are with the gyro wheel frame in addition, lead to tower section of thick bamboo cutting in-process to produce easily and warp, can't guarantee the precision, can not guarantee the unanimous problem of welding seam size when vertical flange welds, now propose following scheme, it includes the bottom plate, the bottom fixed mounting of bottom plate has backup pad one that two symmetries set up, backup pad two that two symmetries set up and backup pad three that two symmetries set up, and fixed mounting has same circular arc to support between backup pad one, backup pad two and the backup pad three with one, and fixed mounting has same connecting plate between two backup pad one. The utility model discloses, can fix a plurality of positions of fragmentation tower, guarantee the erection welding precision, and can place the tower section of thick bamboo of different diameters, can also bear great weight and do not produce deformation simultaneously.
Description
Technical Field
The utility model relates to a burst tower section of thick bamboo cutting frock technical field especially relates to a base for controlling burst tower section of thick bamboo cutting deformation.
Background
The cutting of burst tower and vertical flange welding in-process need be controlled the precision, need prevent to warp when the cutting, also need carry out inside and outside seam to vertical flange strip when the welding, guarantee that the welding seam is little, just need a positioner that can fix burst tower and make cutting steady when with the welding, be difficult to produce size error.
In the prior art, a false flange is used for fixing, and two sides of the false flange are provided with roller frames, so that the tower drum is easy to deform in the cutting process, the precision cannot be ensured, and the size of a welding seam cannot be ensured to be consistent when a longitudinal flange is welded, so that a base for controlling the cutting deformation of a segmented tower drum is provided.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving current technique and being fixed with false flange, both sides are including the gyro wheel frame, lead to producing easily among the tower section of thick bamboo cutting process and warp, can't guarantee the precision, can not guarantee the shortcoming of welding seam size unanimity during vertical flange welding, and the base that is used for controlling burst tower section of thick bamboo cutting deformation that proposes.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a base for controlling burst tower section of thick bamboo cutting warp, includes the bottom plate, the bottom fixed mounting of bottom plate has backup pad one that two symmetries set up, backup pad two that two symmetries set up and backup pad three that two symmetries set up, and fixed mounting has same circular arc to support between backup pad one, backup pad two and the backup pad three with one side, and fixed mounting has same connecting plate between two backup pad one, and top fixed mounting with backup pad one, backup pad two and backup pad three of one side has same circular arc board, be equipped with a plurality of bolts on the circular arc board, the top of arc board is equipped with the tower body board.
Preferably, the top of the arc plate is provided with a plurality of pressing plates, the bolt is provided with a nut in a threaded sleeve manner, the nut is matched with the corresponding pressing plate, the bottom end of the bolt is fixedly provided with a flat gasket, and an elastic pad is arranged between the nut and the pressing plate.
Preferably, the rib plates are fixedly arranged on the sides, far away from each other, of the two supporting plates III.
The utility model discloses, can fix a plurality of positions of fragmentation tower, guarantee the erection welding precision, and can place the tower section of thick bamboo of different diameters, can also bear great weight and do not produce deformation simultaneously.
Drawings
Fig. 1 is a schematic structural diagram of a base for controlling the cutting deformation of a segmented tower barrel according to the present invention;
fig. 2 is a schematic side view of a base for controlling the cutting deformation of a segmented tower barrel according to the present invention;
fig. 3 is a schematic top view of a base for controlling the cutting deformation of a segmented tower barrel according to the present invention;
fig. 4 is a schematic structural view of a rib plate of a base for controlling the cutting deformation of a segmented tower.
In the figure: 1. a base plate; 2. a first support plate; 3. a second support plate; 4. a third support plate; 5. a connecting plate; 6. arc support; 7. a rib plate; 8. a circular arc plate; 9. hanging a rubber plate; 10. pressing a plate; 11. a bolt; 12. a nut; 13. a spring pad; 14. and (7) a flat gasket.
Detailed Description
The technical solutions in the embodiments will be described clearly and completely with reference to the drawings in the embodiments, and it is obvious that the described embodiments are only a part of the embodiments, but not all embodiments.
Examples
Referring to fig. 1-4, a base for controlling slicing tower cylinder cutting deformation, including bottom plate 1, the bottom fixed mounting of bottom plate 1 has backup pad one 2 that two symmetries set up, backup pad two 3 that two symmetries set up and backup pad three 4 that two symmetries set up, backup pad one 2 with one side, fixed mounting has same circular arc to support 6 between backup pad two 3 and the backup pad three 4, fixed mounting has same connecting plate 5 between two backup pad one 2, backup pad one 2 with one side, the top fixed mounting of backup pad two 3 and backup pad three 4 has same circular arc board 8, be equipped with a plurality of bolts 11 on the circular arc board 8, the top of circular arc board 8 is equipped with the tower body board.
In this embodiment, the top of circular arc board 8 is equipped with a plurality of clamp plates 10, and threaded sleeve is equipped with nut 12 on the bolt 11, and nut 12 mutually supports with the clamp plate 10 that corresponds, and the bottom fixed mounting of bolt 11 has flat gasket 14, is equipped with bullet pad 13 between nut 12 and the clamp plate 10.
In this embodiment, the two supporting plates three 4 are fixedly provided with the rib plates 7 at the sides far away from each other.
In this embodiment, the backup pad is used for supporting arc plate 8, length is confirmed according to arc plate 8's size, each 3 of the 7 left and right sides of gusset are each, install the laminating department at backup pad and arc plate 8, make the base be difficult for producing the deformation under the atress of certain degree, arc plate 8 is placed in the backup pad, length range is confirmed according to the size of piecing towers, conveniently be used for the fixed stay of not unidimensional piecing towers, rubber-coated sheet 9 is installed on arc plate 8, make the piecing towers place back arc plate 8 and tower body board and be difficult to produce after contacting and collide with, tower body board and the contact of piecing towers, make not unidimensional piecing towers steady placing in certain extent, clamp plate 10 is used for bolt 11 and nut 12's installation to be fixed. All structures in this application can carry out the selection of material and length according to actual use condition, and the attached drawing is schematic structure chart, and specific actual dimensions can make appropriate adjustment.
The above descriptions are only preferred embodiments of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art should be considered to be within the scope of the present invention, and the technical solutions and the utility model concepts of the present invention are equivalent to, replaced or changed.
Claims (3)
1. The utility model provides a base for controlling burst tower section of thick bamboo cutting is warp, includes bottom plate (1), its characterized in that, the bottom fixed mounting of bottom plate (1) has backup pad one (2) that two symmetries set up, backup pad two (3) that two symmetries set up and backup pad three (4) that two symmetries set up, and fixed mounting has same circular arc to support (6) between backup pad one (2), backup pad two (3) and the backup pad three (4) with one side, and fixed mounting has same connecting plate (5) between two backup pad one (2), and the top fixed mounting of backup pad one (2), backup pad two (3) and backup pad three (4) with one side has same circular arc board (8), be equipped with a plurality of bolts (11) on circular arc board (8), the top of circular arc board (8) is equipped with the tower body board.
2. The base for controlling the cutting deformation of the partitioned tower drum according to claim 1, wherein a plurality of pressure plates (10) are arranged at the top of the circular arc plate (8), nuts (12) are sleeved on the bolts (11) in a threaded manner, the nuts (12) are matched with the corresponding pressure plates (10), flat gaskets (14) are fixedly installed at the bottom ends of the bolts (11), and elastic gaskets (13) are arranged between the nuts (12) and the pressure plates (10).
3. The base for controlling the cutting deformation of the sliced tower according to claim 1, wherein the side of the two supporting plates (4) far away from each other is fixedly provided with a rib plate (7).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202023298666.XU CN215035466U (en) | 2020-12-30 | 2020-12-30 | Base for controlling cutting deformation of sliced tower drum |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202023298666.XU CN215035466U (en) | 2020-12-30 | 2020-12-30 | Base for controlling cutting deformation of sliced tower drum |
Publications (1)
Publication Number | Publication Date |
---|---|
CN215035466U true CN215035466U (en) | 2021-12-07 |
Family
ID=79223910
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202023298666.XU Active CN215035466U (en) | 2020-12-30 | 2020-12-30 | Base for controlling cutting deformation of sliced tower drum |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN215035466U (en) |
-
2020
- 2020-12-30 CN CN202023298666.XU patent/CN215035466U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN215035466U (en) | Base for controlling cutting deformation of sliced tower drum | |
CN206393113U (en) | A kind of flexibility circular arc wrapper sheet side wall assembling tyre | |
CN106838474A (en) | A kind of pipeline elevator with regulatory function | |
CN106378578A (en) | Spot welding clamp for pipe fitting | |
CN212338414U (en) | Corridor gallows convenient to installation | |
CN210703405U (en) | Welding structure of heat exchanger tube plate | |
CN206263522U (en) | A kind of pipe fitting spot welding fixture (SWFX) | |
CN201737140U (en) | Marine inclined ladder | |
CN213289193U (en) | Steel pipe welding frock clamping table | |
CN214995049U (en) | Connecting joint of curved surface aluminum plate and curtain wall upright post | |
CN101870338B (en) | Inclined ladder for ship | |
CN201366564Y (en) | Cylindrical automatic straight seam submerged arc welding device | |
CN212361017U (en) | Fixed bolster stamping workpiece | |
CN211398779U (en) | Combined pipe fitting double-bracket | |
CN209670370U (en) | A kind of box column fine strain of millet assembling jig frame | |
CN109058589B (en) | Vibration reduction hanging bracket device of light flexible pipeline and forming process thereof | |
CN212584418U (en) | High strength stainless steel welded tube structure | |
CN213176288U (en) | Lightweight support stamping workpiece with high bearing capacity | |
CN212859205U (en) | High-stability clamping device for metal casting | |
CN217778588U (en) | Pedal mounting bracket | |
CN220407695U (en) | Special frock of protection screen preparation | |
CN214639761U (en) | Feeder fuselage structure for punching press | |
CN216812390U (en) | High-temperature alloy plate convenient to splice | |
CN213038755U (en) | Prefabricated wall panel hanging rack for wall panel of operating room | |
CN214662998U (en) | Horizontal hydraulic 80-type rolling machine with good stability |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |