CN214925404U - Assembled concrete escape canal mould - Google Patents
Assembled concrete escape canal mould Download PDFInfo
- Publication number
- CN214925404U CN214925404U CN202121053972.9U CN202121053972U CN214925404U CN 214925404 U CN214925404 U CN 214925404U CN 202121053972 U CN202121053972 U CN 202121053972U CN 214925404 U CN214925404 U CN 214925404U
- Authority
- CN
- China
- Prior art keywords
- mould
- support frame
- equipment box
- baffle
- frame
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
The utility model relates to a municipal construction equipment technical field specifically is assembled concrete escape canal mould, the inside of support frame is close to middle section position department fixed mounting has the bed die, and the inside movable mounting of support frame have with the last mould of bed die adaptation, the mounting bracket with support frame sliding connection is all installed at the both ends of going up the mould, the upper surface middle part position department of support frame installs the equipment box, the cylinder with the mounting bracket adaptation is installed at the both ends of equipment box, and the middle part position department symmetry of equipment box installs the baffle. The utility model has the advantages of simple structure and novel design, it makes the mount slide on the slide rail to drive the removal of mould, further is favorable to adjusting the distance of going up mould and bed die, the drawing of patterns after the escape canal of being convenient for is pour, in addition, through the sliding connection of baffle, makes things convenient for the loading and unloading of baffle, thereby the washing of upper and lower mould of being convenient for improves the utility model discloses the quality of later stage pouring.
Description
Technical Field
The utility model relates to a municipal construction equipment technical field specifically is assembled concrete escape canal mould.
Background
In recent years, most of cities in China have serious waterlogging conditions, how to accelerate the rapid discharge of surface rainwater runoff becomes the problem which is mainly solved in urban construction and environmental management, surface water can enter a roadbed through seams, cracks and the like of cement concrete and permeate into a structural layer to soften the roadbed, so that various engineering diseases are generated on the roadbed, and roadbed drainage is a key process for ensuring the quality of a roadbed body and later-stage operation, so that a drainage system needs to be arranged on the roadbed, a drainage ditch has good drainage capacity and bearing capacity, the problem of water immersion damage of the roadbed is effectively solved, and the service life of the roadbed is prolonged.
And current escape canal mould is inconvenient taking out after pouring the completion, and pour the completion back mould inside wash inconvenient, seriously influence the later stage and use, consequently, technical personnel in the field provide assembled concrete escape canal mould to solve the problem that proposes in the above-mentioned background art.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide an assembled concrete escape canal mould to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: assembled concrete escape canal mould, including the support frame, the inside of support frame is close to middle section position department fixed mounting has the bed die, and the inside movable mounting of support frame have with the last mould of bed die adaptation, the mounting bracket with support frame sliding connection is all installed at the both ends of going up the mould, the upper surface middle part position department of support frame installs the equipment box, the cylinder with the mounting bracket adaptation is installed at the both ends of equipment box, and the middle part position department symmetry of equipment box installs the baffle, the upper surface of equipment box is located and installs the feeder hopper between two baffles, and the lower surface of equipment box is located and installs the spring pipe that runs through the mould between two baffles, support frame bilateral symmetry slidable mounting has the adjustable shelf, the baffle with the support frame adaptation is all installed to the lower surface of adjustable shelf.
As a further aspect of the present invention: the equal symmetry in both sides of support frame has seted up the slide rail, two first slider with slide rail sliding connection is all installed at the both ends of mounting bracket, two the equal symmetry in one side of adjustable shelf installs the second slider with slide rail sliding connection.
As a further aspect of the present invention: the connecting parts of the second sliding blocks and the sliding rails are all sleeved with anti-slip pads, and the anti-slip pads are members made of rubber materials.
As a further aspect of the present invention: the two ends of the lower die and the upper die are fixedly provided with sealing gaskets which are abutted to the baffle plates, and the middle of the movable frame is provided with a handle.
As a further aspect of the present invention: the upper surface symmetry of adjustable shelf has seted up the draw-in groove, the buckle with the draw-in groove adaptation is all installed at the both ends of mounting bracket.
As a further aspect of the present invention: the baffle slope is installed in the inside of equipment box, and the clearance between two baffles forms the chamber of keeping in.
Compared with the prior art, the beneficial effects of the utility model are that: the utility model has the advantages of simple structure and novel design, it makes the mount slide on the slide rail to drive the removal of mould, further is favorable to adjusting the distance of going up mould and bed die, the drawing of patterns after the escape canal of being convenient for is pour, in addition, through the sliding connection of baffle, makes things convenient for the loading and unloading of baffle, thereby the washing of upper and lower mould of being convenient for improves the utility model discloses the quality of later stage pouring.
Drawings
FIG. 1 is a schematic structural view of an assembled concrete drain mold;
FIG. 2 is a schematic view of the construction of the baffles in the fabricated concrete drain mold;
fig. 3 is a schematic view showing an internal structure of an equipment box in the fabricated concrete drain mold.
In the figure: 1. a support frame; 2. an equipment box; 3. a baffle plate; 4. a lower die; 5. an upper die; 6. a mounting frame; 7. a gasket; 8. a slide rail; 9. a first slider; 10. a cylinder; 11. a spring tube; 12. a feed hopper; 13. a second slider; 14. a partition plate; 15. a movable frame.
Detailed Description
Referring to fig. 1-3, in the embodiment of the present invention, an assembly type concrete drainage ditch mold comprises a supporting frame 1, a lower mold 4 is fixedly installed inside the supporting frame 1 near a middle position, an upper mold 5 adapted to the lower mold 4 is movably installed inside the supporting frame 1, two ends of the upper mold 5 are both provided with an installation frame 6 slidably connected to the supporting frame 1, an equipment box 2 is installed at a middle position of an upper surface of the supporting frame 1, two ends of the equipment box 2 are provided with cylinders 10 adapted to the installation frame 6, a partition plate 14 is symmetrically installed at a middle position of the equipment box 2, a feeding hopper 12 is installed between the two partition plates 14 on an upper surface of the equipment box 2, a spring tube 11 penetrating through the upper mold 5 is installed between the two partition plates 14 on a lower surface of the equipment box 2, movable frames 15 are symmetrically and slidably installed on two sides of the supporting frame 1, a baffle plate 3 adapted to the supporting frame 1 is installed on lower surfaces of the movable frames 15, when the concrete drainage device is used, concrete is filled into the temporary storage cavity through the feed hopper 12, the concrete is enabled to enter the spring tube 11 through the inclined arrangement of the two partition plates 14, the concrete is further enabled to enter a gap between the upper die 5 and the lower die 4, and drainage ditches are favorably poured, in the process, the sealing of the two ends of the pouring is realized under the action of the baffle plate 3 and the sealing gasket 7, so that the concrete is prevented from overflowing, the production cost is reduced, after the pouring is completed, the mounting frame 6 is driven to move upwards through the air cylinder 10, so that the upper die 5 is driven to move, the distance between the upper die 5 and the lower die 4 is further favorably adjusted, the demoulding after the drainage ditches are poured is facilitated, in addition, the sliding connection between the second sliding block 13 and the sliding rail 8 is favorable for driving the movable frame 15 to move, the baffle plate 3 is convenient to assemble and disassemble, and the upper die 5 is further convenient to pour, The washing in clearance between the lower mould 4 improves the utility model discloses the quality that the later stage was pour.
In fig. 1, slide rail 8 has been seted up to the equal symmetry in both sides of support frame 1, first slider 9 with 8 sliding connection of slide rail is all installed at the both ends of two mounting brackets 6, the equal symmetry in one side of two adjustable shelf 15 installs second slider 13 with 8 sliding connection of slide rail, through the sliding connection between first slider 9 and the slide rail 8, the mounting bracket 6 of being convenient for slides, thereby drive the removal of mould 5, further be favorable to adjusting the distance of mould 5 and lower mould 4, the drawing of patterns after the escape canal of being convenient for is pour.
In fig. 1 and 2, the joints of the second sliders 13 and the slide rails 8 are all sleeved with non-slip pads, each non-slip pad is a rubber member, and friction between the second slider 13 and the slide rail 8 is increased, so that stability of the movable frame 15 is improved.
In fig. 1, the sealing gaskets 7 which are abutted to the baffle 3 are fixedly mounted at the two ends of the lower die 4 and the upper die 5, so that the sealing at the two ends is realized, the concrete is prevented from overflowing, the production cost is reduced, and the handle is mounted at the middle position of the movable frame 15, so that the movable frame 15 can move conveniently.
In fig. 1 and 2, the draw-in groove has been seted up to the upper surface symmetry of adjustable shelf 15, and the buckle with the draw-in groove adaptation is all installed at the both ends of mounting bracket 6, through the block between buckle and the draw-in groove, is favorable to adjustable shelf 15 to drive the fixed of baffle 3, realizes pouring the sealed at both ends to prevent that the concrete from spilling over reduction in production cost.
In fig. 3, the partition plates 14 are obliquely installed inside the equipment box 2, and the gap between the two partition plates 14 forms a temporary storage cavity, so that the concrete can enter the spring tube 11 through the oblique arrangement of the two partition plates 14.
The utility model discloses a theory of operation is: the utility model has simple structure and novel design, when in use, the feed hopper 12 is used for filling concrete into the temporary storage cavity, the two baffle plates 14 are inclined to facilitate the concrete to enter the spring tube 11, further the concrete enters the gap between the upper mould 5 and the lower mould 4 to facilitate the pouring of the drainage ditch, in the process, under the action of the baffle plate 3 and the sealing gasket 7, the sealing of the two pouring ends is realized, thereby preventing the concrete from overflowing, the production cost is reduced, after the pouring is finished, the mounting frame 6 is driven to move upwards through the cylinder 10, the mounting frame 6 is convenient to slide through the sliding connection between the first slide block 9 and the slide rail 8, thereby the upper mould 5 is driven to move, the distance between the upper mould 5 and the lower mould 4 is further convenient to adjust, the demoulding after the pouring of the drainage ditch is convenient, in addition, through the sliding connection between the second slide block 13 and the slide rail 8, be favorable to driving the removal of adjustable shelf 15 to make things convenient for the loading and unloading of baffle 3, the washing in the clearance between further be convenient for go up mould 5, bed die 4 improves the utility model discloses the quality that the later stage was pour.
The above-mentioned, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.
Claims (6)
1. Assembled concrete escape canal mould, including support frame (1), its characterized in that, the inside of support frame (1) is close to middle section position department fixed mounting has bed die (4), and the inside movable mounting of support frame (1) has last mould (5) with bed die (4) adaptation, go up the both ends of mould (5) and all install mounting bracket (6) with support frame (1) sliding connection, the upper surface middle part department of support frame (1) installs equipment box (2), the cylinder (10) with mounting bracket (6) adaptation is installed at the both ends of equipment box (2), and the middle part position department symmetry of equipment box (2) installs baffle (14), the upper surface of equipment box (2) is located and installs feeder hopper (12) between two baffle (14), and the lower surface of equipment box (2) is located and installs between two baffle (14) and runs through spring pipe (11) of mould (5), the supporting frame (1) is provided with a movable frame (15) in a bilateral symmetry sliding manner, and the lower surface of the movable frame (15) is provided with a baffle (3) matched with the supporting frame (1).
2. The assembled concrete drainage ditch mold according to claim 1, wherein slide rails (8) are symmetrically arranged on both sides of the support frame (1), first slide blocks (9) slidably connected with the slide rails (8) are respectively installed at both ends of the two mounting frames (6), and second slide blocks (13) slidably connected with the slide rails (8) are respectively symmetrically installed on one sides of the two movable frames (15).
3. The fabricated concrete drainage ditch mold according to claim 2, wherein the joints of the second sliding blocks (13) and the sliding rails (8) are sleeved with non-slip mats, and the non-slip mats are rubber members.
4. The fabricated concrete drainage ditch mold according to claim 1, wherein the lower mold (4) and the upper mold (5) are both fixedly provided with sealing gaskets (7) which are abutted against the baffle (3), and a handle is arranged in the middle of the movable frame (15).
5. The assembled concrete drainage ditch mold according to claim 1, wherein the upper surface of the movable frame (15) is symmetrically provided with clamping grooves, and both ends of the mounting frame (6) are provided with buckles adapted to the clamping grooves.
6. Fabricated concrete drain mould according to claim 1, characterised in that the partition (14) is mounted inclined inside the equipment box (2) and that the gap between two partitions (14) forms a temporary storage chamber.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121053972.9U CN214925404U (en) | 2021-05-18 | 2021-05-18 | Assembled concrete escape canal mould |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121053972.9U CN214925404U (en) | 2021-05-18 | 2021-05-18 | Assembled concrete escape canal mould |
Publications (1)
Publication Number | Publication Date |
---|---|
CN214925404U true CN214925404U (en) | 2021-11-30 |
Family
ID=79061079
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202121053972.9U Active CN214925404U (en) | 2021-05-18 | 2021-05-18 | Assembled concrete escape canal mould |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN214925404U (en) |
-
2021
- 2021-05-18 CN CN202121053972.9U patent/CN214925404U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN216372666U (en) | Autoclaved aerated concrete production mold | |
CN211104585U (en) | Forming equipment of imitative stone material type curb of cement base | |
CN110385771B (en) | Method for continuously forming high-strength concrete product by six stations through wet process | |
CN214925404U (en) | Assembled concrete escape canal mould | |
CN212704239U (en) | Automatic pressfitting casting mould of sand mould | |
CN111705568B (en) | Construction method for smart city construction rail traffic engineering | |
CN205009475U (en) | Decorative composite insulating panel compaction device | |
CN219604091U (en) | Quick compaction device for highway construction | |
CN210797616U (en) | Cast-in-place concrete base for rain and sewage pipeline | |
CN211666283U (en) | Concrete filling and tamping device | |
CN213034888U (en) | Prefabricated mould of pouring of stair convenient to drawing of patterns | |
CN114179198A (en) | Prefabricated staircase component production line and production method thereof | |
CN210647468U (en) | Belt cleaning device is used in metal casting processing | |
CN112025914A (en) | Concrete vibration pouring device for prefabricated components of prefabricated building | |
CN220784339U (en) | Prefabricated assembled concrete inspection shaft mould | |
CN219855105U (en) | Special-shaped reducing pile forming top trowelling device | |
CN215094518U (en) | Reinforced concrete drain pipe ejecting structure that demolds | |
CN218255824U (en) | Full-automatic casting machine | |
CN214195552U (en) | Combined core mould | |
CN211137560U (en) | Adjustable road ditch mould | |
CN212954166U (en) | Prefabricated component mould stacking device | |
CN216372653U (en) | Recycled aggregate brick making production equipment | |
CN211006553U (en) | Casting formwork for construction of infiltration channel structure | |
CN214238789U (en) | Self-heating type cement pipe pouring mold | |
CN211054009U (en) | Prefabricated rectangle piping lane mould suitable for push pipe engineering |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |