CN214891873U - Scale treatment equipment for electric boiler - Google Patents

Scale treatment equipment for electric boiler Download PDF

Info

Publication number
CN214891873U
CN214891873U CN202121408773.5U CN202121408773U CN214891873U CN 214891873 U CN214891873 U CN 214891873U CN 202121408773 U CN202121408773 U CN 202121408773U CN 214891873 U CN214891873 U CN 214891873U
Authority
CN
China
Prior art keywords
electric boiler
boiler main
main part
scale treatment
mounting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121408773.5U
Other languages
Chinese (zh)
Inventor
董宏霞
于贵春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Heilongjiang Yuneng Environmental Protection Technology Co ltd
Original Assignee
Heilongjiang Yuneng Environmental Protection Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Heilongjiang Yuneng Environmental Protection Technology Co ltd filed Critical Heilongjiang Yuneng Environmental Protection Technology Co ltd
Priority to CN202121408773.5U priority Critical patent/CN214891873U/en
Application granted granted Critical
Publication of CN214891873U publication Critical patent/CN214891873U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Water Treatment By Electricity Or Magnetism (AREA)

Abstract

The utility model discloses an incrustation scale treatment facility for electric boiler, including electric boiler main part, electric boiler main part's bottom intercommunication has the outlet pipe, the surface demountable installation of outlet pipe bottom has sealed lid, one side demountable installation of electric boiler main part has the mounting panel, the top demountable installation of mounting panel has actuating mechanism, the mounting hole has been seted up on electric boiler main part's right side, the inside of mounting hole is inlayed and is installed the bearing, one side of actuating mechanism is passed through the bearing is connected with the drive shaft, one side fixed mounting on drive shaft top has the backup pad. In the above scheme, incrustation scale treatment facility utilizes the mutually supporting between spliced pole and the installation base to make things convenient for electric boiler's removal, avoided because the device is through the bolt mounting under the external environment, so in case the bolt receives the influence of liquid, will lead to the bolt to take place the corrosion, the problem that inconvenient device removed.

Description

Scale treatment equipment for electric boiler
Technical Field
The utility model relates to an electric boiler technical field, more specifically say, the utility model relates to an incrustation scale treatment facility for electric boiler.
Background
The boiler is an important heat energy supply device in national economy; the commercial, civil, greenhouse and breeding industries all need boilers to supply a large amount of heat energy; most boilers in the market at present use water as a heating medium, and in the long-term operation process of the boilers, water is easy to scale and adhere to the wall of the boiler, and the scale can seriously influence heat transfer, so that energy waste is caused.
When the existing scale treatment equipment for the electric boiler works, the device is arranged under the external environment through the bolt, so once the bolt is influenced by liquid, the bolt is corroded, and the device is inconvenient to move; moreover, the device does not have the function of removing the boiler scale at one time, which results in the increase of working time and further reduces the descaling efficiency of the device.
SUMMERY OF THE UTILITY MODEL
In order to overcome the above-mentioned defect of prior art, the embodiment of the utility model provides an incrustation scale treatment facility for electric boiler to solve prior art's incrustation scale treatment facility and utilize the mutually supporting between spliced pole and the installation base, thereby make things convenient for electric boiler's removal, avoided because the device is through the bolt installation under external environment, so in case the bolt receives the influence of liquid, will lead to the bolt to take place the corrosion, the problem that inconvenient device removed.
In order to solve the technical problem, the utility model provides a following technical scheme: an incrustation scale treatment device for an electric boiler comprises an electric boiler main body, wherein the bottom end of the electric boiler main body is communicated with a water outlet pipe, the surface of the bottom end of the water outlet pipe is detachably provided with a sealing cover, one side of the electric boiler main body is detachably provided with an installation plate, the top end of the mounting plate is detachably provided with a driving mechanism, the right side of the electric boiler main body is provided with a mounting hole, a bearing is embedded in the mounting hole, one side of the driving mechanism is connected with a driving shaft through the bearing, a supporting plate is fixedly arranged on one side of the top end of the driving shaft, a descaling plate is detachably arranged on the surface of the top end of the supporting plate, a supporting block is fixedly arranged on one side of the bottom end of the electric boiler main body, a fixed base is fixedly arranged on the surface of the bottom end of the supporting block, one side fixed mounting of unable adjustment base bottom has the spliced pole, unable adjustment base's bottom is passed through the spliced pole joint has the installation base.
The hydraulic pressure meter is detachably mounted on one side of the top end of the electric boiler main body, the other side of the top end of the electric boiler main body is communicated with two connecting pipes, and the number of the connecting pipes is two.
Wherein the diameter of the bearing is smaller than that of the mounting hole, and the thickness of the bearing is smaller than that of the mounting hole.
The top end of the descaling plate is attached to the inner surface of the electric boiler main body, the surface of the descaling plate is rough, and the descaling plate is arc-shaped.
Wherein, the quantity of backup pad is a plurality of, a plurality of the backup pad divide into three groups equally, the length of backup pad is less than the radius of electric boiler main part.
The mounting base comprises a fixing plate, a connecting rod is fixedly mounted on one side of the top end of the fixing plate, and a fixing bolt is detachably mounted on the left side of the top end of the fixing plate.
The connecting column is provided with a connecting groove, the connecting groove is matched with the top end of the connecting rod, and the connecting groove is four in number.
The number of the fixing bolts is four, and the bottom ends of the fixing bolts are matched with nuts embedded and installed in the ground.
The utility model discloses an above-mentioned technical scheme's beneficial effect as follows:
in the scheme, the scale treatment equipment is convenient for the movement of the electric boiler by utilizing the mutual matching between the connecting column and the mounting base, and the problem that the bolt is rusted and inconvenient to move when the bolt is influenced by liquid because the device is mounted in an external environment through the bolt is solved; in the above scheme, the scale treatment equipment utilizes the mutual cooperation between actuating mechanism, drive shaft, backup pad and the scale removal board to improve the scale removal efficiency of equipment, avoided because the device does not possess the function of once only cleaing away boiler scale, so can lead to operating time's increase, and then reduced the problem of device scale removal efficiency.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic view of the assembly of the fixing base and the mounting base of the present invention;
FIG. 3 is a schematic structural view of a main body part of the electric boiler of the present invention;
FIG. 4 is a schematic view of the assembly of the electric boiler main body and the driving mechanism of the present invention;
fig. 5 is the schematic diagram of the internal structure of the electric boiler main body of the present invention.
[ reference numerals ]
1. An electric boiler main body; 2. a water outlet pipe; 3. a sealing cover; 4. mounting a plate; 5. a drive mechanism; 6. mounting holes; 7. a bearing; 8. a drive shaft; 9. a support plate; 10. a descaling plate; 11. a support block; 12. a fixed base; 13. connecting columns; 14. installing a base; 15. a hydraulic gauge; 16. a connecting pipe; 141. a fixing plate; 142. a connecting rod; 143. and (5) fixing the bolt.
Detailed Description
In order to make the technical problems, technical solutions and advantages to be solved by the present invention clearer, the following detailed description will be given with reference to the accompanying drawings and specific embodiments.
The embodiment of the utility model provides a scale treatment device for an electric boiler as shown in attached figures 1 to 5, which comprises an electric boiler main body 1, wherein the bottom end of the electric boiler main body 1 is communicated with a water outlet pipe 2, the surface of the bottom end of the water outlet pipe 2 is detachably provided with a sealing cover 3, one side of the electric boiler main body 1 is detachably provided with a mounting plate 4, the top end of the mounting plate 4 is detachably provided with a driving mechanism 5, the right side of the electric boiler main body 1 is provided with a mounting hole 6, the inside of the mounting hole 6 is embedded with a bearing 7, one side of the driving mechanism 5 is connected with a driving shaft 8 through the bearing 7, one side of the top end of the driving shaft 8 is fixedly provided with a supporting plate 9, the surface of the top end of the supporting plate 9 is detachably provided with a scale removing plate 10, one side of the bottom end of the electric boiler main body 1 is fixedly provided with a supporting block 11, the surface of the bottom end of the supporting block 11 is fixedly provided with a fixed base 12, one side of the bottom end of the fixed base 12 is fixedly provided with a connecting column 13, the bottom end of the fixed base 12 is clamped with an installation base 14 through a connecting column 13;
one side of the top end of the electric boiler main body 1 is detachably provided with a hydraulic gauge 15, the other side of the top end of the electric boiler main body 1 is communicated with two connecting pipes 16, the number of the connecting pipes 16 is two, the diameter of the bearing 7 is smaller than that of the mounting hole 6, the thickness of the bearing 7 is smaller than that of the mounting hole 6, the top end of the descaling plate 10 is attached to the inner surface of the electric boiler main body 1, the surface of the descaling plate 10 is rough, the descaling plate 10 is arc-shaped, the number of the support plates 9 is a plurality, the support plates 9 are divided into three groups in equal amount, the length of the support plates 9 is smaller than that of the electric boiler main body 1, the mounting base 14 comprises a fixing plate 141, one side of the top end of the fixing plate 141 is fixedly provided with a connecting rod 142, the left side of the top end of the fixing plate 141 is detachably provided with a fixing bolt 143, the inside of the connecting rod 13 is provided with a connecting groove, the inside of the connecting groove is matched with the top end of the connecting rod 142, the connecting groove is four, the number of the fixing bolts 143 is four, and the bottom ends of the fixing bolts 143 are matched with nuts embedded and installed in the ground.
As shown in fig. 4, the diameter of the bearing 7 is smaller than that of the mounting hole 6, and the thickness of the bearing 7 is smaller than that of the mounting hole 6.
Specifically, the bearing 7 is provided to facilitate ensuring that the driving mechanism 5 can drive the driving shaft 8 to work, thereby improving the descaling efficiency.
Wherein, actuating mechanism 5 is YL model motor to be connected with external power supply electricity through the plug.
The working process of the utility model is as follows:
when the scale treatment equipment works, in order to improve the descaling efficiency of the device, a driving mechanism 5, a driving shaft 8, a supporting plate 9 and a descaling plate 10 are arranged, when the electric boiler main body 1 needs to be descaled, firstly, descaling liquid is introduced into the electric boiler main body 1, after a period of time, the driving mechanism 5 is started, the driving mechanism 5 can drive the driving shaft 8 to work, then the driving shaft 8 can drive the supporting plate 9 and the descaling plate 10 to rotate, because the top end of the descaling plate 10 is attached to the surface inside the electric boiler main body 1, and in addition, the surface of the descaling plate 10 is rough, the scale inside the electric boiler main body 1 can be removed, and because the length of the descaling plate 10 is the same as that inside the electric boiler main body 1, the descaling time can be saved, and the descaling efficiency of the device is improved.
Above-mentioned scheme, incrustation scale treatment facility is in the during operation, for the convenience of the removal of electric boiler main part 1 or dismantlement, so be provided with spliced pole 13 and installation base 14, when electric boiler main part 1 need remove, only need upwards promote electric boiler main part 1 through current device, then electric boiler main part 1 will be taken out from the top of installation base 14, thereby it is spacing no longer to carry out electric boiler main part 1 to make installation base 14, because connecting rod 142 is the joint inside spliced pole 13, so can directly take out, thereby make things convenient for the removal or the dismantlement of device, the practicality of device has been strengthened.
The points to be finally explained are: first, in the description of the present application, it should be noted that, unless otherwise specified and limited, the terms "mounted," "connected," and "connected" should be understood broadly, and may be a mechanical connection or an electrical connection, or a communication between two elements, and may be a direct connection, and "upper," "lower," "left," and "right" are only used to indicate a relative positional relationship, and when the absolute position of the object to be described is changed, the relative positional relationship may be changed;
secondly, the method comprises the following steps: in the drawings of the disclosed embodiments of the present invention, only the structures related to the disclosed embodiments are referred to, and other structures can refer to the common design, and under the condition of no conflict, the same embodiment and different embodiments of the present invention can be combined with each other;
and finally: the above description is only for the preferred embodiment of the present invention and should not be taken as limiting the invention, and any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (8)

1. The utility model provides an incrustation scale treatment facility for electric boiler, includes electric boiler main part (1), the bottom intercommunication of electric boiler main part (1) has outlet pipe (2), its characterized in that, the surface demountable installation of outlet pipe (2) bottom has sealed lid (3), one side demountable installation of electric boiler main part (1) has mounting panel (4), the top demountable installation of mounting panel (4) has actuating mechanism (5), mounting hole (6) have been seted up on the right side of electric boiler main part (1), the inside mosaic of mounting hole (6) is installed bearing (7), one side of actuating mechanism (5) is connected with drive shaft (8) through bearing (7), one side fixed mounting on drive shaft (8) top has backup pad (9), the surface demountable installation on backup pad (9) top has scale removal board (10), one side fixed mounting of electric boiler main part (1) bottom has supporting shoe (11), the fixed surface of supporting shoe (11) bottom installs unable adjustment base (12), one side fixed mounting of unable adjustment base (12) bottom has spliced pole (13), the bottom of unable adjustment base (12) is passed through spliced pole (13) joint has installation base (14).
2. The scale treatment apparatus for the electric boiler according to claim 1, wherein a hydraulic gauge (15) is detachably installed at one side of the top end of the electric boiler main body (1), and the other side of the top end of the electric boiler main body (1) is communicated with two connecting pipes (16).
3. Scale treatment apparatus for electric boilers according to claim 1, characterized in that the diameter of the bearing (7) is smaller than the diameter of the mounting hole (6), and the thickness of the bearing (7) is smaller than the thickness of the mounting hole (6).
4. The scale treatment apparatus for electric boiler according to claim 1, wherein the top end of the scale removing plate (10) is attached to the inner surface of the electric boiler main body (1), the surface of the scale removing plate (10) is rough, and the shape of the scale removing plate (10) is arc-shaped.
5. Scale treatment apparatus for electric boiler according to claim 1 characterized in that the number of support plates (9) is several, several support plates (9) are divided into three groups in equal amount, the length of support plates (9) is smaller than the radius of the electric boiler body (1).
6. The scale treatment apparatus for an electric boiler according to claim 1, wherein the mounting base (14) comprises a fixing plate (141), a connecting rod (142) is fixedly installed at one side of the top end of the fixing plate (141), and a fixing bolt (143) is detachably installed at the left side of the top end of the fixing plate (141).
7. The scale treatment apparatus for electric boilers according to claim 1, wherein the connecting column (13) is internally provided with connecting grooves, the inside of the connecting grooves is adapted to the top ends of the connecting rods (142), and the number of the connecting grooves is four.
8. The scale treatment apparatus for electric boilers according to claim 6, wherein the number of the fixing bolts (143) is four, and the bottom ends of the fixing bolts (143) are adapted to nuts installed in the ground.
CN202121408773.5U 2021-06-24 2021-06-24 Scale treatment equipment for electric boiler Active CN214891873U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121408773.5U CN214891873U (en) 2021-06-24 2021-06-24 Scale treatment equipment for electric boiler

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121408773.5U CN214891873U (en) 2021-06-24 2021-06-24 Scale treatment equipment for electric boiler

Publications (1)

Publication Number Publication Date
CN214891873U true CN214891873U (en) 2021-11-26

Family

ID=78930045

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121408773.5U Active CN214891873U (en) 2021-06-24 2021-06-24 Scale treatment equipment for electric boiler

Country Status (1)

Country Link
CN (1) CN214891873U (en)

Similar Documents

Publication Publication Date Title
CN214891873U (en) Scale treatment equipment for electric boiler
CN203285749U (en) Coupling device for submersible sewage pump
CN213543339U (en) Device for mounting inner core and baffle plate
CN113446382B (en) C-axis speed reducing mechanism of high-precision pipe bender
CN209876213U (en) Steel pipe butt joint auxiliary device
CN211233415U (en) Special water collecting and distributing device for seasonal underground energy storage system
CN210306438U (en) Positioning device is assembled with steel case roof beam to bridge
CN213687001U (en) Unattended maintenance-free bathing water heater
CN219546731U (en) Environment-friendly sewage pool steel support reverse hanging membrane device
CN217291360U (en) Bearing device for metal processing lathe
CN214664741U (en) Valley electricity heat accumulation heating equipment convenient to dismantle
CN219414708U (en) Electric boiler
CN212246406U (en) Multistage hydraulic homogeneous enameled pressed steel assembly structure anaerobic reactor
CN214664756U (en) Monitoring device for heating based on solar energy
CN210879471U (en) Guide vane servomotor fixing pin dismounting device
CN215391059U (en) Mud scraper for purifying room
CN216265787U (en) Small motor bearing detacher
CN220488488U (en) Water supply and drainage pipeline installation fixer
CN216954155U (en) Efficient intelligent plate type heat exchange unit for heat supply
CN109799104B (en) Elastic-plastic detection scaling machine for high-pressure heater
CN219597608U (en) Medical glass container cleaning equipment
CN215403172U (en) Integrated sewage treatment equipment convenient for assembling controller
CN211912838U (en) High-efficient sediment mud scraper
CN215675137U (en) Placing structure of horizontal drainage flash tank
CN219787269U (en) T-shaped nodular cast iron pipe disassembly and assembly maintenance device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant