CN214879483U - Multifunctional hanging bracket for mounting high-pile wharf component - Google Patents

Multifunctional hanging bracket for mounting high-pile wharf component Download PDF

Info

Publication number
CN214879483U
CN214879483U CN202121326324.6U CN202121326324U CN214879483U CN 214879483 U CN214879483 U CN 214879483U CN 202121326324 U CN202121326324 U CN 202121326324U CN 214879483 U CN214879483 U CN 214879483U
Authority
CN
China
Prior art keywords
wire rope
fixedly connected
hole
steel wire
connecting plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121326324.6U
Other languages
Chinese (zh)
Inventor
夏国光
樊朝雨
马渊奎
盛健
刘振华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC First Harbor Engineering Co Ltd
No 5 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Original Assignee
CCCC First Harbor Engineering Co Ltd
No 5 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC First Harbor Engineering Co Ltd, No 5 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd filed Critical CCCC First Harbor Engineering Co Ltd
Priority to CN202121326324.6U priority Critical patent/CN214879483U/en
Application granted granted Critical
Publication of CN214879483U publication Critical patent/CN214879483U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model relates to a port navigation engineering technical field specifically is a multi-functional gallows for high pile wharf component installation, including the chord member, the equal fixedly connected with web member in both sides of chord member, the equal fixedly connected with mounting panel in both ends of chord member, jib connecting hole and wire rope connecting hole have been seted up respectively to one side of mounting panel, the outer wall of chord member is provided with first connecting plate and second connecting plate respectively, perpendicular lewis hole has been seted up to one side of second connecting plate, first connecting plate with the horizontal contained angle of chord member is 45, the jib connecting hole the wire rope connecting hole with the outer wall of perpendicular lewis hole all is provided with the pore wall reinforcing plate. The utility model discloses in, the use of multi-functional gallows has not only been solved and has been used the bridge crane to the inconvenient problem of marine various types beam slab installations, and has improved on-the-spot installation effectiveness, reduces ship machine live time, has saved the manpower simultaneously, has high-efficient construction, practices thrift the characteristics of cost.

Description

Multifunctional hanging bracket for mounting high-pile wharf component
Technical Field
The utility model relates to a port navigation engineering technical field specifically is a multi-functional gallows for high-pile wharf component installation.
Background
The port and navigation engineering refers to the industries covering wharfs, embankment slopes, revetments, yard roads, dock berths, ship locks, underwater foundations and foundations, earthworks, artificial islands and platforms, coastal and offshore engineering, channel improvement and drainage engineering, dredging and hydraulic reclamation, underwater excavation and obstacle removal, underwater reef explosion and other engineering things.
At present, when installing high-pile wharf components, the bridge girder erection machine is installed by directly hoisting through connecting a steel wire rope on a hanging bar, the abrasion of a lifting trolley of the bridge girder erection machine is also large, the danger coefficient is high, time and labor are wasted, the installation efficiency is low, and the expected effect of a project is hardly reached on cost control and construction progress. Therefore, there is a need for a multifunctional hanger for high pile pier component installation to solve the above problems.
SUMMERY OF THE UTILITY MODEL
Based on the weak point among the prior art mentioned in the above-mentioned background art, for this reason the utility model provides a multi-functional gallows for high stake pier component installation.
The utility model discloses an adopt following technical scheme to overcome above technical problem, specifically do:
the utility model provides a multi-functional gallows for high stake pier component installation, includes the chord member, the equal fixedly connected with web member in both sides of chord member, the equal fixedly connected with mounting panel in both ends of chord member, jib connecting hole and wire rope connecting hole have been seted up respectively to one side of mounting panel, the outer wall of chord member is provided with first connecting plate and second connecting plate respectively, perpendicular lewis hole has been seted up to one side of second connecting plate, first connecting plate with the horizontal included angle of chord member is 45.
As a further aspect of the present invention: the hanger rod connecting hole, the steel wire rope connecting hole and the outer wall of the vertical hanging hole are provided with hole wall reinforcing plates, the hole wall reinforcing plates are of annular structures, and the inner diameter of each hole wall reinforcing plate is equal to that of the hanger rod connecting hole, the steel wire rope connecting hole and the vertical hanging hole.
As a further aspect of the present invention: one side of the first connecting plate is provided with a first steel wire rope, one end of the first steel wire rope is fixedly connected with a first hanging ring, and the first hanging ring is fixedly connected with a cross beam body.
As a further aspect of the present invention: one side of the second connecting plate is provided with a second steel wire rope, one end of the second steel wire rope is fixedly connected with a second hanging ring, and the second hanging ring is fixedly connected with the track beam body.
As a further aspect of the present invention: one side of the second connecting plate is provided with a fourth steel wire rope, one end of the fourth steel wire rope is fixedly connected with a fourth hanging ring, and the fourth hanging ring is fixedly connected with the panel body.
As a further aspect of the present invention: one side of mounting panel is provided with third wire rope, third wire rope's one end fixedly connected with third rings, third rings fixedly connected with longeron body.
After the structure more than adopting, the utility model discloses compare in prior art, possess following advantage: the multifunctional hanging bracket is used for solving the problem that various types of beam plates on the sea are inconvenient to install by using the bridge girder erection machine, improving the field installation efficiency, reducing the service time of the ship crane, saving manpower, and having the characteristics of high-efficiency construction and cost saving.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention.
Fig. 2 is a schematic view of the connection structure of the beam body of the present invention.
Fig. 3 is the schematic view of the connection structure of the track beam body of the present invention.
Fig. 4 is a schematic view of the panel body connection structure of the present invention.
Fig. 5 is a schematic view of the connection structure of the longitudinal beam body of the present invention.
In the figure: 1. a chord member; 2. a first connecting plate; 3. a web member; 4. a boom attachment hole; 5. mounting a plate; 6. connecting holes for steel wire ropes; 7. a hole wall reinforcing plate; 8. a vertical lifting hole; 9. a second connecting plate; 10. a beam body; 11. a first hanging ring; 12. a first wire rope; 13. a track beam body; 14. a second hoisting ring; 15. a second wire rope; 16. a third hoisting ring; 17. a stringer body; 18. a third wire rope; 19. a fourth wire rope; 20. a panel body; 21. and a fourth hanging ring.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1, in an embodiment of the present invention, a multifunctional hanger for installing a high pile wharf component includes a chord 1, web members 3 are fixedly connected to both sides of the chord 1, mounting plates 5 are fixedly connected to both ends of the chord 1, a boom connecting hole 4 and a wire rope connecting hole 6 are respectively formed in one side of each mounting plate 5, a first connecting plate 2 and a second connecting plate 9 are respectively arranged on an outer wall of the chord 1, a vertical hanging hole 8 is formed in one side of each second connecting plate 9, and a horizontal included angle between the first connecting plate 2 and the chord 1 is 45 °;
two lifting beam hanging bars of the bridge girder erection machine are assembled into a whole through a hoisting frame, 4 lifting lugs are arranged on the upper portion of the hoisting frame, 8 lifting lugs are arranged on the lower portion of the hoisting frame, wherein two groups of hoisting points on the lower portion form an angle of 45 degrees to solve the problem of steering of the steel wire ropes, the steel wire ropes with 4 different sizes can be hung on the lifting lugs simultaneously, the requirements of hoisting different beam plates are met, and when one type of beam plate is hoisted, other steel wire ropes do not need to be removed, so that the field installation efficiency is improved.
In an embodiment of the present invention, the outer walls of the hanger rod connecting hole 4, the wire rope connecting hole 6 and the vertical hanging hole 8 are all provided with a hole wall reinforcing plate 7, the hole wall reinforcing plate 7 is an annular structure, and the inner diameter of the hole wall reinforcing plate 7 is the same as the inner diameters of the hanger rod connecting hole 4, the wire rope connecting hole 6 and the vertical hanging hole 8;
because the inner diameter of the hole wall reinforcing plate 7 is the same as the inner diameters of the suspender connecting hole 4, the wire rope connecting hole 6 and the vertical hanging hole 8, the service lives of the suspender connecting hole 4, the wire rope connecting hole 6 and the vertical hanging hole 8 can be prolonged.
Example 2
Referring to fig. 2, compared with embodiment 1, the embodiment further includes that a first steel wire rope 12 is disposed on one side of the first connecting plate 2, one end of the first steel wire rope 12 is fixedly connected with a first hanging ring 11, and the first hanging ring 11 is fixedly connected with a beam body 10;
when the beam body 10 is installed, 4 lead-sealed first steel wire ropes 12 with the length of 2000mm and the diameter of 36.5mm are selected, after being folded in half, two ends of each lead-sealed first steel wire rope are connected with a hoisting frame through a 25T clamping ring, and the folded point is connected with a beam component at the position of a hoisting point through the 25T clamping ring.
Example 3
Referring to fig. 3, compared with the embodiment 1-2, a second steel wire rope 15 is disposed on one side of the second connecting plate 9, one end of the second steel wire rope 15 is fixedly connected to a second hanging ring 14, and the second hanging ring 14 is fixedly connected to the track beam body 13;
4 lead-sealed second steel wire ropes 15 with the length of 2800mm and the diameter of 36.5mm are selected when the track beam body 13 is installed, after being folded, two ends of the track beam body are connected with snap rings used by panel steel wire ropes through 25T snap rings, and the folded points are connected with beam members at hanging point positions through the 25T snap rings.
Example 4
Referring to fig. 4, compared with the embodiments 1 to 3, a fourth steel wire rope 19 is disposed on one side of the second connecting plate 9, one end of the fourth steel wire rope 19 is fixedly connected to a fourth hanging ring 21, and the fourth hanging ring 21 is fixedly connected to a panel body 20;
4 length of selecting of panel body 20 is 2400mm when the installation, diameter 36.5 mm's lead seals fourth wire rope 19, fourth wire rope 19 one end is connected with hoist and mount frame through the 25T snap ring, the other end links to each other at the hoisting point position with the 25T snap ring for the board component, because the used gallows hoisting point of second wire rope 15 of installation fourth wire rope 19 and installation track roof beam body 13 is the same position, in order to avoid too much wire rope to cause and hang the problem of being unable to be connected with the hoisting point, so at first be connected the snap ring that fourth wire rope 19 is connected with hoist and mount frame, meet second wire rope 15 through the 25T snap ring that 25T snap ring and fourth wire rope 19 used, the problem of track roof beam body 13 hoisting point and connection snap ring direction unanimity has been solved simultaneously.
Example 5
Referring to fig. 5, compared with the embodiments 1 to 3, a third steel wire rope 18 is disposed on one side of the mounting plate 5, one end of the third steel wire rope 18 is fixedly connected to a third hoisting ring 16, and the third hoisting ring 16 is fixedly connected to a longitudinal beam body 17;
2 lead-sealed third steel wire ropes 18 with the length of 2800mm and the diameter of 36.5mm are selected when the longitudinal beam body 17 is installed, two ends of each longitudinal beam body are connected with a hoisting frame through 25T clamping rings after being folded, the folded points are connected with beam components at hoisting points through the 25T clamping rings, and if the directions of the clamping rings and the hoisting points are consistent during field hoisting, the directions can be changed by adding a group of clamping rings.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention.

Claims (6)

1. The utility model provides a multi-functional gallows for high stake pier component installation, includes chord member (1), its characterized in that, the equal fixedly connected with web member (3) in both sides of chord member (1), the equal fixedly connected with mounting panel (5) in both ends of chord member (1), jib connecting hole (4) and wire rope connecting hole (6) have been seted up respectively to one side of mounting panel (5), the outer wall of chord member (1) is provided with first connecting plate (2) and second connecting plate (9) respectively, perpendicular lewis hole (8) have been seted up to one side of second connecting plate (9), first connecting plate (2) with the horizontal included angle of chord member (1) is 45.
2. The multifunctional hanging bracket for the installation of the high pile wharf component as claimed in claim 1, wherein the outer walls of the hanger rod connecting hole (4), the steel wire rope connecting hole (6) and the vertical hanging hole (8) are all provided with a hole wall reinforcing plate (7), the hole wall reinforcing plate (7) is of an annular structure, and the inner diameter of the hole wall reinforcing plate (7) is the same as that of the hanger rod connecting hole (4), the steel wire rope connecting hole (6) and the vertical hanging hole (8).
3. The multifunctional hanging bracket for the installation of the high pile wharf component as claimed in claim 1, wherein a first steel wire rope (12) is arranged on one side of the first connecting plate (2), a first hanging ring (11) is fixedly connected to one end of the first steel wire rope (12), and a cross beam body (10) is fixedly connected to the first hanging ring (11).
4. The multifunctional hanging bracket for the installation of the high pile wharf component is characterized in that a second steel wire rope (15) is arranged on one side of the second connecting plate (9), a second hanging ring (14) is fixedly connected to one end of the second steel wire rope (15), and a track beam body (13) is fixedly connected to the second hanging ring (14).
5. The multifunctional hanging bracket for the installation of the high pile wharf component as claimed in claim 1, wherein a fourth steel wire rope (19) is arranged on one side of the second connecting plate (9), a fourth hanging ring (21) is fixedly connected to one end of the fourth steel wire rope (19), and a panel body (20) is fixedly connected to the fourth hanging ring (21).
6. The multifunctional hanging bracket for the installation of the high pile wharf component is characterized in that a third steel wire rope (18) is arranged on one side of the installation plate (5), a third hanging ring (16) is fixedly connected to one end of the third steel wire rope (18), and a longitudinal beam body (17) is fixedly connected to the third hanging ring (16).
CN202121326324.6U 2021-06-15 2021-06-15 Multifunctional hanging bracket for mounting high-pile wharf component Active CN214879483U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121326324.6U CN214879483U (en) 2021-06-15 2021-06-15 Multifunctional hanging bracket for mounting high-pile wharf component

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121326324.6U CN214879483U (en) 2021-06-15 2021-06-15 Multifunctional hanging bracket for mounting high-pile wharf component

Publications (1)

Publication Number Publication Date
CN214879483U true CN214879483U (en) 2021-11-26

Family

ID=78930984

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121326324.6U Active CN214879483U (en) 2021-06-15 2021-06-15 Multifunctional hanging bracket for mounting high-pile wharf component

Country Status (1)

Country Link
CN (1) CN214879483U (en)

Similar Documents

Publication Publication Date Title
CN201857618U (en) Floating guide platform and steel casing supported drilling platform deepwater pile foundation
CN214401781U (en) Gripping mechanism suitable for large-tonnage underwater steel pipe pile clearing device
CN214879483U (en) Multifunctional hanging bracket for mounting high-pile wharf component
CN104060592B (en) Method for 1/4 land territory preassembling and overwater dispersion of large cylinder main grids of cellular steel sheet piles
CN1330829C (en) Integrated hoisting method and special slings for steel pipe concrete flexible cable arch bridge
CN104088280A (en) Combined construction process of pre-assembling integrated driving and splicing and separable driving of secondary cell of cellular steel sheet pile large cylinder
CN102206938A (en) Novel method for installing upper part block of offshore platform
CN104627326A (en) Special lifting and vibration-driving ship for integrated driving of cell type steel sheet pile large cylinders and vice cells
CN105129632A (en) Grid-type steel sheet pile large cylinder main grid installation construction special-purpose crane ship
CN214401783U (en) Buoyancy tank platform suitable for large-tonnage underwater steel pipe pile clearing device
CN207192584U (en) A kind of boom hoisting of torsion-bending ratio
CN105129597A (en) Lifting beam special for floating container bulwark
CN112609695B (en) Large-tonnage underwater steel pipe pile removing device and construction method
CN210797277U (en) Public road bridge roof beam construction bracket convenient to it is fixed
CN114857358A (en) Suspension type cable winding system
CN109403325B (en) Large-diameter steel-concrete combined cylinder dispersed multi-open caisson foundation and construction method thereof
CN209162919U (en) A kind of three way ropes position system on cutter suction dredger
CN214734249U (en) Wharf boat stay bar lifting device
CN214401782U (en) Reaction frame suitable for large-tonnage underwater steel pipe pile clearing device
CN217051267U (en) Pipe culvert segment lifting appliance
CN214570249U (en) A gallows for installing pier protective equipment
JP2020070114A (en) Work ship with tower crane and its operating method
CN217399592U (en) Steel construction device under complicated marine condition environment
CN104088273B (en) A kind of lattice steel sheet pile nominative 1/4 cylinder land-based area preassembling method
CN113957919B (en) Gravity type round caisson concrete breast wall bottom die supporting system