CN214871759U - Roof wall body fluting drilling equipment for construction - Google Patents

Roof wall body fluting drilling equipment for construction Download PDF

Info

Publication number
CN214871759U
CN214871759U CN202121695770.4U CN202121695770U CN214871759U CN 214871759 U CN214871759 U CN 214871759U CN 202121695770 U CN202121695770 U CN 202121695770U CN 214871759 U CN214871759 U CN 214871759U
Authority
CN
China
Prior art keywords
case
crane span
span structure
flat
orbit planning
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121695770.4U
Other languages
Chinese (zh)
Inventor
金志祥
张宇
段吉友
陶鹏
李欠岳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianye Construction Group Co ltd
Original Assignee
Tianye Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianye Construction Group Co ltd filed Critical Tianye Construction Group Co ltd
Priority to CN202121695770.4U priority Critical patent/CN214871759U/en
Application granted granted Critical
Publication of CN214871759U publication Critical patent/CN214871759U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Processing Of Stones Or Stones Resemblance Materials (AREA)

Abstract

The utility model discloses a roof wall body fluting drilling equipment for construction relates to building construction equipment technical field, need drill and stay wire fluting at the in-process of construction for solving the current roof among the prior art, and current operation mode is operated through manual control machinery behind the measurement mark, and not only the construction volume is big and the difficult problem of guarantee fluting precision. The top of flat groove drilling rod machine case is provided with the case lid, and the surface of case lid is provided with control module, the bottom of flat groove drilling rod machine case is provided with the case seat, and one side of flat groove drilling rod machine bottom of the case portion is provided with the water pipe interface, the below of case seat is provided with the orbit planning crane span structure, and the orbit planning crane span structure has two, the top of orbit planning crane span structure is provided with the rail roof beam, and the bottom of orbit planning crane span structure is provided with the reservation hole site, the both ends of orbit planning crane span structure all are provided with the switching take, and the switching take passes through bolted connection with the orbit planning crane span structure.

Description

Roof wall body fluting drilling equipment for construction
Technical Field
The utility model relates to a construction equipment technical field specifically is a roof wall body fluting drilling equipment for construction.
Background
Roofing engineering is one of the main parts of building construction engineering, and comprises materials and equipment used by the engineering and technical activities such as design, construction, maintenance and the like; also refers to an object of engineering construction, and plays a role in guaranteeing functions. In particular, roofing projects need to be able to withstand temperature, wind, rain, ice, snow and even shock, and to withstand temperature differences and deformation caused by stretching and cracking of the base structure, in addition to safely carrying various loads.
However, in the existing roof, drilling and stay wire slotting are required in the building construction process, the existing operation mode is to manually control machinery to operate after measurement marking, the construction amount is large, and slotting precision is not easy to guarantee; therefore, the existing requirements are not met, and the roof wall grooving and drilling device for building construction is provided for the requirements.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a roof wall body fluting drilling equipment for construction to solve the current roof that proposes in the above-mentioned background art and need drill and draw wire fluting at the in-process of construction, current operation mode is that manual control machinery operates after the measurement mark, not only the problem of the big and difficult guarantee fluting precision of construction volume.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a roof wall body fluting drilling equipment for construction, includes flat groove drilling rod machine case, the top of flat groove drilling rod machine case is provided with the case lid, and the surface of case lid is provided with control module, the bottom of flat groove drilling rod machine case is provided with the box base, and one side of flat groove drilling rod machine bottom of the case portion is provided with the water pipe connector, the below of box base is provided with the orbit planning crane span structure, and the orbit planning crane span structure has two, the top of orbit planning crane span structure is provided with the rail beam, and the bottom of orbit planning crane span structure is provided with reserves the hole site, the both ends of orbit planning crane span structure all are provided with the switching strap, and the switching strap passes through bolted connection with the orbit planning crane span structure.
Preferably, a power supply group box is arranged inside the flat-slot drill rod case, a driving shaft is arranged at the bottom of the power supply group box, and the power supply group box is rotatably connected with the driving shaft.
Preferably, the other end of the driving shaft is provided with a combined sleeve, and the combined sleeve and the driving shaft are arranged into an integrated structure.
Preferably, the other end of the combined sleeve is provided with a flat blade drill rod, the flat blade drill rod is connected with the combined sleeve through a bolt, and the outer surface of the flat blade drill rod is provided with a vertical tooth groove.
Preferably, a lifting frame is arranged inside the box base, the power supply group box is connected with the lifting frame in a sliding mode, and an inner machine cabin is arranged above the lifting frame.
Preferably, the two sides of the box base are provided with electric control slide rails, the electric control slide rails are connected with the track planning bridge frame in a sliding mode through rail beams, one side between the electric control slide rails is provided with a water outlet nozzle, and the water outlet nozzle is connected with the water pipe connector through a pipeline.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model discloses erect orbit planning crane span structure according to the measurement route, hole site through the bottom is fixed the orbit planning crane span structure on the building face, then bridge through the switching take piece between the orbit planning crane span structure, later place flat groove drilling rod machine case between two sets of crane span structures, the lifting height of power pack case is adjusted through the control module at box top afterwards, be provided with the drive shaft in the bottom of power pack case, can realize rotating operation between the two, and the perpendicular tooth's socket on flat sword drilling rod surface can help the drilling rod to fix a position drilling, also can realize horizontal kerve, the box will carry out fluting or drilling work along the crane span structure is automatic after adjusting high, whole fluting process need not manual intervention, ensure the horizontal accuracy of fluting act as go-between;
2. the utility model discloses a both sides of case seat are provided with automatically controlled slide rail, and one side between the automatically controlled slide rail is provided with out the water spray nozzle, and goes out the water spray nozzle and pass through the pipe connection with water pipe connector, sprays the clear water at the fluting region through the nozzle, can avoid appearing the phenomenon of raise dust like this.
Drawings
FIG. 1 is an overall front view of the present invention;
FIG. 2 is a schematic view of the structure of the plain-blade drill rod of the present invention;
fig. 3 is a schematic view of the box base structure of the present invention.
In the figure: 1. a flat groove drill rod case; 2. a box cover; 3. a box base; 4. a water pipe connector; 5. a control module; 6. planning a bridge frame by a track; 7. a rail beam; 8. switching the connection lugs; 9. a power pack box; 10. a drive shaft; 11. a combination sleeve; 12. a plain-edge drill pipe; 13. a vertical tooth socket; 14. a lifting frame; 15. an electrically controlled slide rail; 16. a water outlet nozzle; 17. and (4) an internal machine bin.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1, the present invention provides an embodiment: a roof wall slotting and drilling device for building construction comprises a flat groove drill rod case 1, a case cover 2 is arranged at the top of the flat groove drill rod case 1, a control module 5 is arranged on the outer surface of the case cover 2, case bases 3 are arranged at the bottom of the flat groove drill rod case 1, a water pipe connector 4 is arranged on one side of the bottom of the flat groove drill rod case 1, a water pipe needs to be connected at the connector when the roof drilling device is used, the drill rod can be cooled, dust pollution can be reduced, a track planning bridge frame 6 is arranged below the case bases 3, two track planning bridge frames 6 are arranged, a rail beam 7 is arranged at the top of the track planning bridge frame 6, reserved hole sites are arranged at the bottom of the track planning bridge frame 6, switching lugs 8 are arranged at two ends of the track planning bridge frame 6, the switching lugs 8 are connected with the track planning bridge frame 6 through bolts, the track planning bridge frame 6 needs to be erected according to a measuring route before the roof drilling device is used, the track planning bridge frames 6 are fixed on a building surface through hole sites at the bottom, the track planning bridge frames 6 are bridged through the switching lugs 8, and then the flat-slot drill pipe case 1 is placed between the two bridge frames, so that the case body automatically performs slotting or drilling work along the bridge frames.
Referring to fig. 2, a power pack box 9 is arranged inside a flat-slot drill rod case 1, a driving shaft 10 is arranged at the bottom of the power pack box 9, the power pack box 9 is rotatably connected with the driving shaft 10, a combined sleeve 11 is arranged at the other end of the driving shaft 10, the combined sleeve 11 and the driving shaft 10 are in an integrated structure, a flat-blade drill rod 12 is arranged at the other end of the combined sleeve 11, the flat-blade drill rod 12 is connected with the combined sleeve 11 through bolts, a vertical tooth socket 13 is arranged on the outer surface of the flat-blade drill rod 12, and the vertical tooth socket 13 on the surface of the flat-blade drill rod 12 can help the drill rod to perform positioning drilling and can also realize horizontal slot broaching.
Referring to fig. 3, a lifting frame 14 is arranged inside a box base 3, a power supply group box 9 is slidably connected with the lifting frame 14, an inner machine cabin 17 is arranged above the lifting frame 14, electric control slide rails 15 are arranged on two sides of the box base 3, the electric control slide rails 15 are slidably connected with a track planning bridge frame 6 through rail beams 7, a water outlet nozzle 16 is arranged on one side between the electric control slide rails 15, the water outlet nozzle 16 is connected with a water pipe connector 4 through a pipeline, and clear water is sprayed to a groove area through the nozzle, so that dust can be prevented from flying.
The working principle is as follows: when the drilling rig is used, the track planning bridge frame 6 is erected according to a measuring route, the track planning bridge frame 6 is fixed on a building surface through hole sites at the bottom, the track planning bridge frame 6 is bridged through the switching butt strap 8, then the flat groove drill rod case 1 is placed between two groups of bridge frames, a water pipe needs to be connected at an interface of the side surface, not only can the temperature of a drill rod be reduced, but also dust pollution can be reduced, the lifting height of the power group case 9 is adjusted through the control module 5 at the top of the case body, the bottom of the power group case 9 is provided with the driving shaft 10, the rotation operation can be realized between the two, the flat blade drill rod 12 is installed at the other end of the driving shaft 10, the vertical tooth socket 13 on the surface of the flat blade drill rod 12 can help the drill rod to position and drill, the horizontal groove pulling can also be realized, and the case body can automatically perform grooving or drilling work along the bridge frame after the height is adjusted, the whole slotting process does not need manual intervention, and the horizontal precision of the slotting stay wire is guaranteed.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (6)

1. The utility model provides a roof wall body fluting drilling equipment for construction, includes flat slot drilling rod machine case (1), its characterized in that: the top of flat groove drilling rod machine case (1) is provided with case lid (2), and the surface of case lid (2) is provided with control module (5), the bottom of flat groove drilling rod machine case (1) is provided with case seat (3), and one side of flat groove drilling rod machine case (1) bottom is provided with water pipe connector (4), the below of case seat (3) is provided with orbit planning crane span structure (6), and orbit planning crane span structure (6) have two, the top of orbit planning crane span structure (6) is provided with rail roof beam (7), and the bottom of orbit planning crane span structure (6) is provided with the reservation hole site, the both ends of orbit planning crane span structure (6) all are provided with switching strap (8), and switching strap (8) pass through bolted connection with orbit planning crane span structure (6).
2. The roof wall grooving and drilling device for building construction according to claim 1, wherein: the drill rod machine box with the flat grooves is characterized in that a power supply group box (9) is arranged inside the drill rod machine box with the flat grooves (1), a driving shaft (10) is arranged at the bottom of the power supply group box (9), and the power supply group box (9) is rotatably connected with the driving shaft (10).
3. The roof wall grooving and drilling device for building construction according to claim 2, wherein: the other end of the driving shaft (10) is provided with a combined sleeve (11), and the combined sleeve (11) and the driving shaft (10) are arranged to be of an integrated structure.
4. The roof wall grooving and drilling device for building construction according to claim 3, wherein: the other end of the combined sleeve (11) is provided with a flat-blade drill rod (12), the flat-blade drill rod (12) is connected with the combined sleeve (11) through a bolt, and the outer surface of the flat-blade drill rod (12) is provided with a vertical tooth groove (13).
5. The roof wall grooving and drilling device for building construction according to claim 2, wherein: the inside of case seat (3) is provided with lifting frame (14), and power pack case (9) and lifting frame (14) sliding connection, the top of lifting frame (14) is provided with interior machine storehouse (17).
6. The roof wall grooving and drilling device for building construction according to claim 1, wherein: the two sides of the box base (3) are provided with electric control slide rails (15), the electric control slide rails (15) are connected with the track planning bridge frame (6) in a sliding mode through rail beams (7), one side between the electric control slide rails (15) is provided with a water outlet nozzle (16), and the water outlet nozzle (16) is connected with the water pipe connector (4) through a pipeline.
CN202121695770.4U 2021-07-26 2021-07-26 Roof wall body fluting drilling equipment for construction Active CN214871759U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121695770.4U CN214871759U (en) 2021-07-26 2021-07-26 Roof wall body fluting drilling equipment for construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121695770.4U CN214871759U (en) 2021-07-26 2021-07-26 Roof wall body fluting drilling equipment for construction

Publications (1)

Publication Number Publication Date
CN214871759U true CN214871759U (en) 2021-11-26

Family

ID=78927489

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121695770.4U Active CN214871759U (en) 2021-07-26 2021-07-26 Roof wall body fluting drilling equipment for construction

Country Status (1)

Country Link
CN (1) CN214871759U (en)

Similar Documents

Publication Publication Date Title
CN204716131U (en) The multi-faceted high-precision borehole equipment of a kind of subway tunnel
CN105539207A (en) Comprehensive operation vehicle for multifunctional metro contact network
CN213898042U (en) Building construction operation supporting mechanism
CN214871759U (en) Roof wall body fluting drilling equipment for construction
CN211667740U (en) Street lamp for urban road with power generation facility and be convenient for transportation
CN105539205A (en) Comprehensive operation vehicle for subway overhead line system
CN212766235U (en) Equipment suitable for prefabricated rail top air duct assembly construction of subway station
CN113787627A (en) Wall grooving machine and grooving method thereof
CN212984561U (en) Civil engineering safety scaffold
CN212198417U (en) Safety protection device of intelligent working vehicle for aircraft wing assembly
CN209635762U (en) Lamp box installs vehicle
CN211967899U (en) Automatic spraying and maintaining device for highway bridge precast beam field
CN201459605U (en) U-rib assembling device of steel box girder
CN216076180U (en) Scaffold for house repair
CN110528953A (en) A kind of communications tower of anti-climbing solar energy
CN213952920U (en) Novel telescopic roof construction operation platform that uses in energy-conserving reduction of loss roof construction
CN205945605U (en) Distributing type photovoltaic module ground mounting structure
CN216950382U (en) Scaffold structure for tunnel construction
CN218290283U (en) Pole is embraced in equipment box lift
CN215052099U (en) Bridge maintenance workbench
CN213742696U (en) Foundation ditch safety device for highway engineering
CN216000977U (en) Perforating device is used at building bridge job site
CN221236378U (en) Construction work platform for parapet wall
CN219410466U (en) Municipal construction site marking cleaning equipment
CN113618755B (en) Intelligent temperature measuring robot and temperature measuring method for temperature measuring hole in top of coke oven

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant