CN214836519U - Mine solid waste cemented filling structure - Google Patents

Mine solid waste cemented filling structure Download PDF

Info

Publication number
CN214836519U
CN214836519U CN202120531734.8U CN202120531734U CN214836519U CN 214836519 U CN214836519 U CN 214836519U CN 202120531734 U CN202120531734 U CN 202120531734U CN 214836519 U CN214836519 U CN 214836519U
Authority
CN
China
Prior art keywords
slide
type frame
threaded rod
mounting bracket
solid waste
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202120531734.8U
Other languages
Chinese (zh)
Inventor
杨洪双
曹望清
冯青雄
杨彦朋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenmu Haihong Mining Co ltd
Original Assignee
Shenmu Haihong Mining Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenmu Haihong Mining Co ltd filed Critical Shenmu Haihong Mining Co ltd
Priority to CN202120531734.8U priority Critical patent/CN214836519U/en
Application granted granted Critical
Publication of CN214836519U publication Critical patent/CN214836519U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model discloses a mine solid waste cemented filling structure, including U type frame, threaded rod, draw runner, shower, spacing clamp and slide, the both ends symmetrical welding of U type frame has the supporting seat, the welding of one side of U type frame has left mounting bracket, the welding of the opposite side of U type frame has right mounting bracket, the bilateral symmetry welding of draw runner has the head, the head passes through the intermediate position department of bolt fastening at U type frame, the one end of threaded rod is rotated and is installed on left mounting bracket, the other end of threaded rod is rotated and is installed on right mounting bracket, the slide screw thread is installed on the threaded rod, the last surface sliding mounting of slide is on the draw runner, the activity is pegged graft on the spacing clamp and is had the connecting rod, the connecting rod screw thread is installed on the slide. The utility model discloses, compact structure, it is convenient to use, is convenient for change conveyer pipe position, satisfies personnel's user demand.

Description

Mine solid waste cemented filling structure
Technical Field
The utility model relates to a mining technical field specifically is a mine solid waste cemented filling structure.
Background
The waste rock cemented filling uses the driving waste rock or broken waste rock of mine as filling aggregate, uses cement or red mud as cementing agent, and fills the waste rock into the goaf after self-leaching and mixing. The method is characterized in that mine solid wastes are fully utilized in a mine, the optimum water consumption filling is realized by taking the mechanical filling performance as a target through a flow-dividing conveying and self-spraying mixing process of crushed waste rock aggregate and cementing agent slurry, the energy consumption and the consumption of the cementing agent are reduced to the maximum extent, the cost of the filling material of the waste rock cementing filling is lower than that of a fine sand cementing filling, and the waste rock cementing filling has better compression resistance and smaller shrinkage deformation than a mortar cementing filling. After the waste rock cemented filling is filled into a stope, the water hardly seeps, and the environmental pollution to the underground can be avoided.
The theme flow of the waste rock cemented filling process is as follows: collecting or preparing the waste stone aggregate, preparing cement slurry or mortar, shunting and conveying the cement slurry or the mortar and the waste stone aggregate to a mixing point of the underground filling material, preliminarily mixing the cement slurry or the mortar and the waste stone aggregate at the mixing point of the underground filling material in a self-pouring mode to prepare a waste stone cemented filling mixture, and filling the cemented filling material into the goaf through mechanical conveying or self-weight conveying.
At the in-process that grout sprayed, because pipeline's is fixed, can only be towards a position, when needing to change the position, need artifical transport, change the position of conveyer pipe, can not satisfy personnel's user demand.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a mine solid waste cemented filling structure possesses compact structure, and it is convenient to use, is convenient for change conveyer pipe position, satisfies personnel's user demand's advantage, solves the in-process that sprays at the grout, because pipeline's fixed, can only towards a position, when needing to change the position, needs artifical transport, changes the position of conveyer pipe, can not satisfy personnel's user demand's problem.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a mine solid waste cemented filling structure, includes U type frame, threaded rod, draw runner, shower, spacing clamp and slide, the both ends symmetrical welding of U type frame has the supporting seat, the welding of one side of U type frame has left mounting bracket, the welding of the opposite side of U type frame has right mounting bracket, the bilateral symmetry welding of draw runner has the head, the head passes through the intermediate position department of bolt fastening at U type frame, the one end of threaded rod is rotated and is installed on left mounting bracket, the other end of threaded rod is rotated and is installed on right mounting bracket, the slide thread mounting is on the threaded rod, the last sliding surface of slide installs on the draw runner, the activity is pegged graft on the spacing clamp and is had the connecting rod, the connecting rod thread mounting is on the slide.
Preferably, the rack is installed on the left installation frame through bolts, and the rack is rotatably connected with the threaded rod.
Preferably, the connecting rod is kept away from the one end welding of slide and is had the rotation cap, it has the rubber cap to glue on the rotation cap.
Preferably, the spray pipe is located between the lower surface of the sliding seat and the limiting clamp, and the limiting clamp is designed in an arc shape.
Preferably, the lower surface of the end socket protrudes out of the lower surface of the sliding strip, the upper surface of the sliding seat is provided with a sliding groove matched with the sliding strip, and the sliding strip is slidably mounted on the sliding groove.
Preferably, the number of the connecting rods is four, and the four connecting rods are distributed in a rectangular array relative to the sliding seat.
Compared with the prior art, the beneficial effects of the utility model are as follows:
1. the utility model discloses mine solid waste cemented filling structure is in the use, can fix conveying pipeline between spacing clamp and slide, thereby move the fixed position of connecting rod with the shower through twisting, when the position of shower needs to be changed, connect external power, make power device in the frame drive the threaded rod and rotate, through the thread engagement effect between threaded rod and the slide, make the slide on the draw runner, thereby it changes horizontal position to drive the shower, moreover, the steam generator is compact in structure, it is convenient to use, be convenient for change conveyer pipe position, satisfy personnel's user demand.
Drawings
Fig. 1 is a schematic view of the structure of the present invention;
FIG. 2 is a schematic side view of the present invention;
fig. 3 is a schematic structural diagram of a in fig. 1 according to the present invention.
In the figure: 1. a supporting seat; 2. a U-shaped frame; 3. a frame; 4. a left mounting bracket; 5. a threaded rod; 6. a slide bar; 7. sealing the end; 8. a right mounting bracket; 9. a shower pipe; 10. a limiting clamp; 11. rotating the cap; 12. a connecting rod; 13. a slide carriage.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "front end", "rear end", "both ends", "one end", "the other end" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element to which the reference is made must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first" and "second" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "disposed," "connected," and the like are to be construed broadly, and for example, "connected" may be either fixedly connected or detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Referring to fig. 1 to fig. 3, the present invention provides an embodiment: the utility model provides a mine solid waste cemented filling structure, includes U type frame 2, threaded rod 5, draw runner 6, shower 9, spacing clamp 10 and slide 13, and the both ends symmetrical welding of U type frame 2 has supporting seat 1, and the welding of one side of U type frame 2 has left mounting bracket 4, and the welding of the opposite side of U type frame 2 has right mounting bracket 8, and the bilateral symmetry welding of draw runner 6 has head 7, and head 7 passes through the bolt fastening in the intermediate position department of U type frame 2.
The one end of threaded rod 5 is rotated and is installed on left mounting bracket 4, the other end of threaded rod 5 is rotated and is installed on right mounting bracket 8, install frame 3 through the bolt on left side mounting bracket 4, rotate between frame 3 and the threaded rod 5 and be connected, slide 13 threaded mounting is on threaded rod 5, slide 13's upper surface slidable mounting is on draw runner 6, the lower surface of the outstanding draw runner 6 of lower surface of head 7, and slide 13's upper surface set up the spout with 6 looks adaptations of draw runner, slide 6 slidable mounting is on the spout, shower 9 is located between slide 13 lower surface and the stop clip 10, and stop clip 10 adopts the arc design, can fix pipeline between stop clip 10 and slide 13, thereby move connecting rod 12 through twisting the rigidity of shower 9.
Connecting rod 12 is pegged graft in the activity on the stop clip 10, connecting rod 12 threaded mounting is on slide 13, connecting rod 12 keeps away from the one end welding of slide 13 and has a rotation cap 11, it has the rubber cap to rotate cap 11, connecting rod 12 is four altogether, four connecting rods 12 are the rectangular array distribution for slide 13, when the position of shower 9 needs to be changed, connect external power, make power device in the frame 3 drive threaded rod 5 and rotate, through the thread engagement effect between threaded rod 5 and the slide 13, make slide 13 slide on draw runner 6, thereby drive shower 9 and change horizontal position, when not needing to use, twist through rotating cap 11 and move connecting rod 12, make stop clip 10 keep away from slide 13 and can tear down shower 9 compact structure, and convenient to use, be convenient for change conveyer pipe position, satisfy personnel's user demand.
As is well known to those skilled in the art, the threaded rod 5 of the present invention also requires the provision of power means to rotate it, and as is well known to those skilled in the art, the provision of such power is well known, is in routine terms or is of common general knowledge and will not be described in detail herein, and any choice may be made by those skilled in the art depending on its needs or convenience.
The working principle is as follows: the utility model discloses mine solid waste gluing fills structure in the use, can fix conveying pipeline between stop clip 10 and slide 13, thereby move connecting rod 12 through twisting with the rigidity of shower 9, when the position of shower 9 needs to be changed, connect external power, make power device in the frame 3 drive threaded rod 5 and rotate, through the meshing of screw thread effect between threaded rod 5 and the slide 13, make slide 13 slide on draw runner 6, thereby it changes horizontal position to drive shower 9, when not needing to use, twist through rotating cap 11 and move connecting rod 12, make stop clip 10 keep away from slide 13 and can pull down shower 9.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (6)

1. The utility model provides a mine solid waste cemented filling structure, includes U type frame (2), threaded rod (5), draw runner (6), shower (9), stop clip (10) and slide (13), its characterized in that: the utility model discloses a quick-witted support structure, including U type frame (2), right mounting bracket (8), head (7) are welded to the both ends symmetry welding of U type frame (2), one side welding of U type frame (2) has left mounting bracket (4), the opposite side welding of U type frame (2) has right mounting bracket (8), the bilateral symmetry welding of draw runner (6) has head (7), head (7) pass through the bolt fastening in the intermediate position department of U type frame (2), the one end of threaded rod (5) is rotated and is installed on left mounting bracket (4), the other end of threaded rod (5) is rotated and is installed on right mounting bracket (8), slide (13) screw thread is installed on threaded rod (5), the last surface sliding of slide (13) is installed on draw runner (6), the activity is pegged graft on spacing clamp (10) and is had connecting rod (12), connecting rod (12) screw thread is installed on slide (13).
2. The mine solid waste cemented filling structure according to claim 1, characterized in that: the left mounting frame (4) is provided with a rack (3) through a bolt, and the rack (3) is rotatably connected with the threaded rod (5).
3. The mine solid waste cemented filling structure according to claim 1, characterized in that: the one end welding that slide (13) was kept away from in connecting rod (12) has rotation cap (11), it has the rubber cap to rotate cap (11) rubberizing.
4. The mine solid waste cemented filling structure according to claim 1, characterized in that: the spray pipe (9) is positioned between the lower surface of the sliding seat (13) and the limiting clamp (10), and the limiting clamp (10) adopts an arc design.
5. The mine solid waste cemented filling structure according to claim 1, characterized in that: the lower surface of the seal head (7) protrudes out of the lower surface of the sliding strip (6), the upper surface of the sliding seat (13) is provided with a sliding groove matched with the sliding strip (6), and the sliding strip (6) is slidably mounted on the sliding groove.
6. The mine solid waste cemented filling structure according to claim 1, characterized in that: the number of the connecting rods (12) is four, and the four connecting rods (12) are distributed in a rectangular array relative to the sliding seat (13).
CN202120531734.8U 2021-03-15 2021-03-15 Mine solid waste cemented filling structure Expired - Fee Related CN214836519U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120531734.8U CN214836519U (en) 2021-03-15 2021-03-15 Mine solid waste cemented filling structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120531734.8U CN214836519U (en) 2021-03-15 2021-03-15 Mine solid waste cemented filling structure

Publications (1)

Publication Number Publication Date
CN214836519U true CN214836519U (en) 2021-11-23

Family

ID=78758214

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120531734.8U Expired - Fee Related CN214836519U (en) 2021-03-15 2021-03-15 Mine solid waste cemented filling structure

Country Status (1)

Country Link
CN (1) CN214836519U (en)

Similar Documents

Publication Publication Date Title
CN208184755U (en) A kind of coal mine driving suspension device that can easily be accommodated
CN101672191A (en) Mechanized method for installing resin anchor rod
CN214836519U (en) Mine solid waste cemented filling structure
CN110596750A (en) Assembler for pre-tightening and mounting micro-seismic sensor on underground coal mine anchor rod
CN2931752Y (en) Hand-held water injection type coal seam drill for exploring water
CN205857415U (en) Preformed hole plugging device
CN208950620U (en) A kind of coal mining temporary support for drivage face hydraulic support
CN208996752U (en) A kind of soft mould filling mining bracket
CN214887123U (en) High-pressure water shutoff and drainage device for tunnel engineering
CN212690075U (en) Supporting device for coal mining
CN204663563U (en) A kind of coal machine hydraulic support equipment
CN210948681U (en) A entry driving device for colliery is operation in pit
CN207741815U (en) A kind of slip casting machine flowmeter
CN109681537A (en) A kind of Noval bearing seat for high-pressure pump installation
CN208168923U (en) A kind of heading machine dust-depositing system
CN207777311U (en) A kind of coal mine repair hydraulic device
CN215213427U (en) Ground high-pressure grouting bone material device
CN214944324U (en) Corrosion-resistant supporting net for coal mine tunnel
CN2846357Y (en) Screw conveyer for coal mine
CN205954620U (en) Stock construction equipment for building
CN217055098U (en) Novel mine gushes out water shutoff device
CN218444538U (en) Coal mine geology deep sampler
CN216339550U (en) Improved generation hydraulic engineering uses multi-functional grout mechanism
CN218150989U (en) Temporary roadway supporting device for coal mining engineering
CN219431858U (en) Colliery sticky tape transportation gallery country rock slip casting device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211123

CF01 Termination of patent right due to non-payment of annual fee