CN214834631U - Construction hanging basket with good stability - Google Patents
Construction hanging basket with good stability Download PDFInfo
- Publication number
- CN214834631U CN214834631U CN202121652045.9U CN202121652045U CN214834631U CN 214834631 U CN214834631 U CN 214834631U CN 202121652045 U CN202121652045 U CN 202121652045U CN 214834631 U CN214834631 U CN 214834631U
- Authority
- CN
- China
- Prior art keywords
- hanging basket
- construction hanging
- fixed
- construction
- buffer box
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 74
- 239000000872 buffer Substances 0.000 claims abstract description 57
- 230000003139 buffering effect Effects 0.000 claims abstract description 38
- 238000013016 damping Methods 0.000 claims description 34
- 230000035939 shock Effects 0.000 claims description 12
- 238000010521 absorption reaction Methods 0.000 claims description 2
- 238000000034 method Methods 0.000 abstract description 6
- 230000002035 prolonged effect Effects 0.000 abstract description 4
- 230000009286 beneficial effect Effects 0.000 abstract description 2
- 239000000284 extract Substances 0.000 description 3
- 230000000694 effects Effects 0.000 description 2
- 239000011435 rock Substances 0.000 description 2
- 230000004075 alteration Effects 0.000 description 1
- 230000000740 bleeding effect Effects 0.000 description 1
- 238000004140 cleaning Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000004321 preservation Methods 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Images
Landscapes
- Emergency Lowering Means (AREA)
Abstract
The utility model discloses a construction hanging basket that stationarity is good, including construction hanging basket main part, fixed buffer box, buffering bracing piece and arc anticollision board, fixed buffer box is installed to construction hanging basket main part one side, be equipped with the buffering bracing piece on the fixed buffer box, arc anticollision board is installed to buffering bracing piece one end, fixed stop is installed to the buffering bracing piece other end, be equipped with buffer spring in the fixed buffer box. The beneficial effects of the utility model are that, prevent through arc anticollision board that the construction hanging basket main part from rocking the building of colliding with at the lift in-process, cushion the collision dynamics through buffer spring, reduce the collision dynamics, fixed sucking disc adsorbs to fix the construction hanging basket main part with the building, guaranteed the stability of construction hanging basket main part, prevent that the construction hanging basket main part from rocking, improved the security, can cushion the impact force that the construction hanging basket main part falls to the ground, prevent to cause the damage to equipment, the service life is prolonged.
Description
Technical Field
The utility model relates to a construction equipment technical field specifically is a construction hanging basket that stationarity is good.
Background
The hanging basket is a high-altitude operation device which can replace a traditional scaffold, reduce labor intensity, improve working efficiency and be reused, the use of the construction hanging basket gradually becomes a trend, and the hanging basket is widely accepted in high-altitude operations such as outer wall construction, curtain wall installation, heat preservation construction, maintenance and cleaning of outer walls and the like of high-rise multi-storey high buildings.
The construction hanging basket is because can meet its self problem of rocking at the lift in-process, and the construction hanging basket rocks and collides with the building easily, not only can cause the damage to the building, still is unfavorable to constructor's people's body safety, and at eminence during operation, can wind usually and lead to the hanging basket to rock, and the people does not have safety device in the high altitude.
SUMMERY OF THE UTILITY MODEL
Not enough to prior art, the utility model provides a construction hanging basket that stationarity is good to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: the utility model provides a construction hanging basket that stationarity is good, includes construction hanging basket main part, fixed buffer case, buffering bracing piece and arc anticollision board, fixed buffer case is installed to construction hanging basket main part one side, be equipped with the buffering bracing piece on the fixed buffer case, and the buffering bracing piece runs through fixed buffer case and fixed buffer case sliding connection, arc anticollision board is installed to buffering bracing piece one end, fixed stop is installed to the buffering bracing piece other end, and fixed stop is located inside the fixed buffer case, be equipped with buffer spring in the fixed buffer case.
Preferably, the electric hydraulic push rod is installed to construction hanging basket main part one end, and the electric hydraulic push rod is located fixed baffle-box below, installs fixed sucking disc on the flexible end of electric hydraulic push rod, installs the aspiration pump in the fixed baffle-box, and the exhaust end of aspiration pump installs the exhaust tube, and exhaust tube one end runs through fixed baffle-box and fixed sucking disc fixed connection.
Preferably, damping bottom plate is installed to construction hanging basket main part bottom, is equipped with the buffering shock attenuation pole between damping bottom plate and the construction hanging basket main part, buffering shock attenuation pole one end and damping bottom plate fixed connection, and the buffering shock attenuation pole other end and construction hanging basket main part fixed connection, the cover is equipped with damping spring on the buffering shock attenuation pole.
Preferably, fixed branch is installed to construction hanging flower basket main part top four corners department, and fixed frame is installed at the fixed branch top, and the cover is equipped with the connection ring on the fixed frame, and connects ring and fixed frame sliding connection, is equipped with on the connection ring and connects the rope.
Preferably, one end of the buffer spring is fixedly connected with the fixed baffle, and the other end of the buffer spring is fixedly connected with the fixed buffer box.
Preferably, damping spring one end and construction hanging flower basket main part fixed connection, the damping spring other end and vibration damping bottom plate fixed connection.
Preferably, the quantity of buffering bracing piece is four and evenly distributed on fixed baffle-box, and the quantity of electro-hydraulic pressure push rod is two and evenly distributed in building hanging flower basket main part, and the quantity of buffering shock attenuation pole is four and evenly distributed in building hanging flower basket main part bottom four corners department.
Advantageous effects
The utility model provides a construction hanging basket with good stability, which has the following beneficial effects that the device prevents the construction hanging basket main body from shaking and colliding with a building in the lifting process through the arc-shaped anti-collision plate, buffers the collision force through the buffer spring, reduces the collision force, contacts with the building through the telescopic extending fixing suction disc of the electric hydraulic push rod, the air suction pump extracts the air between the fixing suction disc and the building through the air suction pipe, the fixing suction disc and the building are adsorbed to fix the construction hanging basket main body, the stability of the construction hanging basket main body is ensured, the construction hanging basket main body is prevented from shaking, the safety is improved, the impact force of the landing of the construction hanging basket main body is buffered through the buffer shock-absorbing rod and the shock-absorbing spring, the equipment is prevented from being damaged, the service life is prolonged, the safety belt on the body of a worker is connected through the connecting rope, the protection effect is realized for the worker, the safety is improved, the connecting ring can slide on the fixing frame, and the position of workers can be moved conveniently.
Drawings
Fig. 1 is a schematic view of the main structure of the present invention.
Fig. 2 is a schematic view of the main sectional structure of the present invention.
Fig. 3 is a schematic top view of the main body of the present invention.
In the figure: 1. a construction basket body; 2. fixing a buffer box; 3. buffering the supporting rod; 4. an arc-shaped anti-collision plate; 5. fixing a baffle plate; 6. a buffer spring; 7. an electric hydraulic push rod; 8. fixing the sucker; 9. an air pump; 10. an air exhaust pipe; 11. a damping bottom plate; 12. a damping rod is buffered; 13. a damping spring; 14. fixing the supporting rod; 15. a fixing frame; 16. connecting the circular rings; 17. and connecting ropes.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "front end", "rear end", "both ends", "one end", "the other end" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element to which the reference is made must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first" and "second" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "disposed," "connected," and the like are to be construed broadly, and for example, "connected" may be either fixedly connected or detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Referring to fig. 1-3, the present invention provides an embodiment: the utility model provides a construction hanging basket that stationarity is good, includes construction hanging basket main part 1, fixed buffer case 2, buffering bracing piece 3 and arc anticollision board 4, fixed buffer case 2 is installed to 1 one side of construction hanging basket main part, be equipped with buffering bracing piece 3 on the fixed buffer case 2, and buffering bracing piece 3 runs through fixed buffer case 2 and fixed buffer case 2 sliding connection, arc anticollision board 4 is installed to 3 one ends of buffering bracing piece, fixed stop 5 is installed to the 3 other ends of buffering bracing piece, and inside fixed stop 5 is located fixed buffer case 2, be equipped with buffer spring 6 in the fixed buffer case 2, prevent through arc anticollision board 4 that construction hanging basket main part 1 from rocking the building of colliding with in the lift in-process, cushion through buffer spring 6 collision power, reduce the collision force.
Further, electronic hydraulic push rod 7 is installed to construction hanging basket main part 1 one end, and electronic hydraulic push rod 7 is located fixed buffer tank 2 below, install fixed sucking disc 8 on electronic hydraulic push rod 7's the flexible end, install aspiration pump 9 in the fixed buffer tank 2, aspiration tube 10 is installed to the end of bleeding of aspiration pump 9, and aspiration tube 10 one end runs through fixed buffer tank 2 and fixed sucking disc 8 fixed connection, stretch into fixed sucking disc 8 and the contact of building through electronic hydraulic push rod 7's flexible, aspiration pump 9 extracts the air between fixed sucking disc 8 and the building through aspiration tube 10, fixed sucking disc 8 is fixed construction hanging basket main part 1 with the building absorption, construction hanging basket main part 1's stability has been guaranteed, prevent that construction hanging basket main part 1 from rocking, the security has been improved.
Further, damping bottom plate 11 is installed to construction hanging basket main part 1 bottom, be equipped with buffering shock attenuation pole 12 between damping bottom plate 11 and the construction hanging basket main part 1, buffering shock attenuation pole 12 one end and 11 fixed connection of damping bottom plate, and the buffering shock attenuation pole 12 other end and construction hanging basket main part 1 fixed connection, the cover is equipped with damping spring 13 on the buffering shock attenuation pole 12, cushion the impact force that falls to the ground of construction hanging basket main part 1 through buffering shock attenuation pole 12 and damping spring 13, prevent to cause the damage to equipment, and service life is prolonged.
Further, fixed branch 14 is installed to 1 top four corners department of construction hanging flower basket main part, fixed frame 15 is installed at fixed branch 14 top, the cover is equipped with on the fixed frame 15 and connects ring 16, and connect ring 16 and fixed frame 15 sliding connection, be equipped with on the connection ring 16 and connect rope 17, connect the safety belt on one's body the staff through connecting rope 17, play the guard action to workman personnel, the security has been improved, connect ring 16 and can slide on fixed frame 15, make things convenient for staff shift position.
Further, buffer spring 6 one end and fixed stop 5 fixed connection, and the buffer spring 6 other end and fixed buffer case 2 fixed connection.
Further, damping spring 13 one end and construction hanging flower basket main part 1 fixed connection, the damping spring 13 other end and vibration damping bottom plate 11 fixed connection.
Further, the quantity of buffering bracing piece 3 is four and evenly distributed on fixed baffle-box 2, and the quantity of electronic hydraulic push rod 7 is two and evenly distributed on building hanging flower basket main part 1, and the quantity of buffering shock attenuation pole 12 is four and evenly distributed in building hanging flower basket main part 1 bottom four corners department.
The working principle is as follows: after the worker enters the construction hanging basket main body 1, the safety belt on the body is connected with the connecting rope 17, the worker is protected, the safety is improved, the connecting ring 16 can slide on the fixing frame 15, the worker can conveniently move the position, when the arc-shaped anti-collision plate 4 contacts with a building in the lifting process of the construction hanging basket main body 1, the arc-shaped anti-collision plate 4 applies pressure to the buffer spring 6 through the buffer supporting rod 3, the buffer spring 6 deforms and contracts after receiving the pressure, the buffer supporting rod 3 and the arc-shaped anti-collision plate 4 move backwards, the construction hanging basket main body 1 is prevented from shaking and colliding with the building in the lifting process, the collision strength is buffered through the buffer spring 6, the collision strength is reduced, after the construction hanging basket main body 1 moves to a required position, the electric hydraulic push rod 7 is started, the telescopic end of the electric hydraulic push rod 7 extends into and drives the fixed sucker 8 to start, fixed suction cup 8 and the contact of building, start aspiration pump 9, aspiration pump 9 extracts the air between fixed suction cup 8 and the building through exhaust tube 10, fixed suction cup 8 is adsorbed with the building and is fixed construction hanging flower basket main part 1, construction hanging flower basket main part 1's stability has been guaranteed, prevent that construction hanging flower basket main part 1 from rocking, the security has been improved, when construction hanging flower basket main part 1 falls to the ground, damping bottom plate 11 and ground contact, damping bottom plate 11 exerts pressure to buffering shock-absorbing rod 12 and damping spring 13, damping spring 13 receives to produce deformation after the pressure and the shrink simultaneously of buffering shock-absorbing rod 12, cushion the impact force of falling to the ground of construction hanging flower basket main part 1 through buffering shock-absorbing rod 12 and damping spring 13, prevent to cause the damage to equipment, service life is prolonged.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (7)
1. The utility model provides a construction hanging basket that stationarity is good, includes construction hanging basket main part (1), fixed buffer box (2), buffering bracing piece (3) and arc anticollision board (4), its characterized in that, fixed buffer box (2) are installed to construction hanging basket main part (1) one side, be equipped with buffering bracing piece (3) on fixed buffer box (2), and buffering bracing piece (3) run through fixed buffer box (2) and fixed buffer box (2) sliding connection, arc anticollision board (4) are installed to buffering bracing piece (3) one end, fixed stop (5) are installed to buffering bracing piece (3) other end, and inside fixed stop (5) were located fixed buffer box (2), be equipped with buffer spring (6) in fixed buffer box (2).
2. The construction hanging basket with good stability according to claim 1, wherein one end of the construction hanging basket body (1) is provided with an electric hydraulic push rod (7), the electric hydraulic push rod (7) is positioned below the fixed buffer box (2), a fixed sucker (8) is arranged at the telescopic end of the electric hydraulic push rod (7), an air suction pump (9) is arranged in the fixed buffer box (2), an air suction pipe (10) is arranged at the air suction end of the air suction pump (9), and one end of the air suction pipe (10) penetrates through the fixed buffer box (2) and is fixedly connected with the fixed sucker (8).
3. A construction hanging basket with good stability according to claim 1, wherein a damping bottom plate (11) is installed at the bottom of the construction hanging basket body (1), a damping rod (12) is arranged between the damping bottom plate (11) and the construction hanging basket body (1), one end of the damping rod (12) is fixedly connected with the damping bottom plate (11), the other end of the damping rod (12) is fixedly connected with the construction hanging basket body (1), and a damping spring (13) is sleeved on the damping rod (12).
4. A construction hanging basket with good stability according to claim 1, characterized in that fixing support rods (14) are installed at four corners of the top of the construction hanging basket body (1), a fixing frame (15) is installed at the top of the fixing support rods (14), a connecting ring (16) is sleeved on the fixing frame (15), the connecting ring (16) is slidably connected with the fixing frame (15), and a connecting rope (17) is arranged on the connecting ring (16).
5. A construction hanging basket with good stability according to claim 1, characterized in that one end of the buffer spring (6) is fixedly connected with the fixed baffle (5), and the other end of the buffer spring (6) is fixedly connected with the fixed buffer box (2).
6. A construction basket with good stability according to claim 3, wherein one end of the damping spring (13) is fixedly connected with the construction basket body (1), and the other end of the damping spring (13) is fixedly connected with the damping bottom plate (11).
7. A construction basket with good stability according to claim 1, wherein the number of the buffering support rods (3) is four and are uniformly distributed on the fixed buffer box (2), the number of the electro-hydraulic push rods (7) is two and are uniformly distributed on the construction basket body (1), and the number of the buffering shock absorption rods (12) is four and is uniformly distributed at four corners of the bottom of the construction basket body (1).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121652045.9U CN214834631U (en) | 2021-07-20 | 2021-07-20 | Construction hanging basket with good stability |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121652045.9U CN214834631U (en) | 2021-07-20 | 2021-07-20 | Construction hanging basket with good stability |
Publications (1)
Publication Number | Publication Date |
---|---|
CN214834631U true CN214834631U (en) | 2021-11-23 |
Family
ID=78833273
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202121652045.9U Expired - Fee Related CN214834631U (en) | 2021-07-20 | 2021-07-20 | Construction hanging basket with good stability |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN214834631U (en) |
-
2021
- 2021-07-20 CN CN202121652045.9U patent/CN214834631U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108545601A (en) | A kind of water pump handling appliance | |
CN214834631U (en) | Construction hanging basket with good stability | |
CN220666882U (en) | Protection device for building engineering | |
CN207405974U (en) | Construction hanging basket | |
CN112441523B (en) | Material lifting device for constructional engineering | |
CN212127443U (en) | Protection device for high-rise building construction | |
CN214569963U (en) | Anti-falling device | |
CN108862129A (en) | A kind of construction antihunting hanging basket | |
CN212531889U (en) | Prevent weighing down buffering building elevator | |
CN218581146U (en) | Aerial construction platform device based on steel construction special-shaped curtain that encorbelments | |
CN206720518U (en) | A kind of used during elevator falling Double damping buffer unit | |
CN219794607U (en) | Hanging basket for building construction | |
CN111472558A (en) | Building curtain wall exterior wall decoration automatic operation construction equipment | |
CN215443007U (en) | Elevating gear is used in engineering construction with safeguard function | |
CN213527186U (en) | Hanging basket type high-rise building fire fighting device | |
CN214995826U (en) | High-stability protection device for high-rise building construction | |
CN211847046U (en) | Lifting working platform of aerial work machine | |
CN220503674U (en) | Bridge detects safety device | |
CN212129874U (en) | High-safety hanging basket | |
CN220868754U (en) | Building hanging basket | |
CN216276822U (en) | Hanging basket for construction engineering | |
CN221193014U (en) | Hanging basket for bridge template trolley | |
CN215666502U (en) | A safe lift platform for construction | |
CN213774420U (en) | Hanging flower basket for construction | |
CN221399790U (en) | Engineering construction hanging basket |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20211123 |
|
CF01 | Termination of patent right due to non-payment of annual fee |