CN214747897U - Building construction monitoring system - Google Patents

Building construction monitoring system Download PDF

Info

Publication number
CN214747897U
CN214747897U CN202120844906.7U CN202120844906U CN214747897U CN 214747897 U CN214747897 U CN 214747897U CN 202120844906 U CN202120844906 U CN 202120844906U CN 214747897 U CN214747897 U CN 214747897U
Authority
CN
China
Prior art keywords
concrete
wall body
plc controller
monitoring system
building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120844906.7U
Other languages
Chinese (zh)
Inventor
肖飞
张红改
高群
韩军
蔡欣宇
张双双
刘青满
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Jianyan Construction Engineering Quality Safety Identification Co ltd
Original Assignee
Jiangsu Jianyan Construction Engineering Quality Safety Identification Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Jianyan Construction Engineering Quality Safety Identification Co ltd filed Critical Jiangsu Jianyan Construction Engineering Quality Safety Identification Co ltd
Priority to CN202120844906.7U priority Critical patent/CN214747897U/en
Application granted granted Critical
Publication of CN214747897U publication Critical patent/CN214747897U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Length Measuring Devices By Optical Means (AREA)

Abstract

The utility model discloses a building construction monitoring system, which comprises a PLC controller, strain gauges and a level gauge, wherein the PLC controller is respectively connected with a steel bar detector for obtaining the change sensing data of a steel bar structure, a total station for detecting the inclination condition of a building and a laser position measuring instrument for detecting the displacement distance of a target, the strain gauges are divided into a concrete embedded strain gauge for obtaining the internal sensing data of a wall body and a concrete surface strain gauge for measuring the surface strain of the wall body, the concrete embedded strain gauge and the concrete surface strain gauge are electrically connected with the PLC controller, the PLC controller is electrically connected with the level gauge for detecting the structural stability of the construction wall body through data connection, the utility model adopts the sectional replacement of concrete for each floor, and (3) carrying out deformation monitoring on the upper structure while replacing the concrete, and carrying out inclination monitoring on the whole structure.

Description

Building construction monitoring system
Technical Field
The utility model relates to a construction technical field specifically is a construction monitoring system.
Background
The building construction refers to production activities in the engineering construction implementation stage, is the construction process of various buildings, and also can be a process of changing various lines on a design drawing into a real object at a specified place. The method comprises foundation engineering construction, main structure construction, roofing engineering construction, decoration engineering construction and the like. The construction site is called a construction site or a construction site, and is also called a construction site, and a monitoring system is required to detect during the replacement process of concrete of each floor by construction.
In the prior art, no related monitoring system exists in the concrete replacement process, the stress condition of the structure after the wall body is disassembled cannot be detected in the construction process, and potential safety hazards exist, so that the application file provides a building construction monitoring system.
Disclosure of Invention
The utility model provides a construction monitoring system, the utility model discloses take the segmentation replacement concrete to each floor, carry out deformation monitoring to superstructure simultaneously replacing the concrete to the monitoring of inclining to the structure is whole.
In order to solve the technical problem, the utility model discloses a technical scheme is: the utility model provides a building construction monitoring system, includes PLC controller, strainometer and surveyor's level, the PLC controller links to each other with the reinforcing bar detection instrument that is used for obtaining steel bar structure change sensing data, the total powerstation that is used for detecting the building slope situation, the laser position survey appearance of surveying target displacement distance respectively, the strainometer divide into the concrete surface formula strainometer that is used for obtaining the inside sensing data of wall body and is used for wall body surface strain measurement data that is buried strainometer and concrete surface formula strainometer and PLC controller electric connection, and PLC controller electric connection data connection has the surveyor's level that is used for detecting construction wall body structure stability.
Further, the PLC controller is connected with a power supply module for providing power supply.
Further, the LED touch screen is further included, and the PLC is connected with the LED touch screen.
Furthermore, a measuring building is arranged on one side of the total station, and the distance between the total station and the measuring building is larger than 1.5 times of the height of the measuring building.
Furthermore, the concrete embedded type strain gauge is installed inside a wall body and tied to a reinforcing ribbed steel bar inside the wall body through a binding wire, and the concrete surface type strain gauge is attached to the surface of the wall body through epoxy glue.
Further, the PLC controller is S7-300 in model.
Compared with the prior art, the beneficial effects of the utility model are as follows:
1. the utility model discloses take the segmentation replacement concrete to each floor, carry out deformation monitoring to superstructure simultaneously replacing the concrete to the whole monitoring that inclines of structure, the atress situation of each part of effective monitoring improves the security.
2. The utility model discloses a PLC controller and LED touch-sensitive screen can in time handle the analysis to the data of accepting to contrast the show, quick each part situation of audio-visual understanding improves the monitoring convenience.
Drawings
FIG. 1 is a schematic block diagram of a building construction monitoring system of the present invention;
fig. 2 is the utility model relates to a schematic block diagram in the building construction monitoring system work progress.
Detailed Description
The technical solution in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, rather than all embodiments, and all other embodiments obtained by a person of ordinary skill in the art without creative work belong to the protection scope of the present invention based on the embodiments of the present invention.
According to an embodiment of the present invention, shown in fig. 1 and 2: the utility model provides a building construction monitoring system, including the PLC controller, strainometer and surveyor's level, the PLC controller respectively with be used for obtaining the reinforcing bar detection instrument of steel bar structure change sensing data, a total powerstation for detecting the building slope situation, the laser position survey appearance of surveying target displacement distance links to each other, the strainometer divide into the concrete that is used for obtaining the inside sensing data of wall body and buries formula strainometer and the concrete surface formula strainometer that is used for wall body surface strain measurement data, concrete buries formula strainometer and concrete surface formula strainometer and PLC controller electric connection, PLC controller electric connection data connection has and is used for detecting the steady surveyor's level of construction wall body structure.
The LED touch screen, the PLC controller links to each other with the LED touch screen, carries out the analysis to the data of monitoring through the LED touch screen, simultaneously through each monitoring components and parts of touch-sensitive screen control, and total powerstation one side is provided with measures the building, and the total powerstation is placed apart from measuring the distance of building and is greater than 1.5 times of measuring the building height, places the total powerstation position, makes the building within detection range, improves the monitoring accuracy nature.
The concrete embedded type strain meter is installed inside a wall body and tied up on reinforcing band rib steel bars inside the wall body through the tie wires, the concrete surface type strain meter is attached to the surface of the wall body through epoxy glue, the concrete embedded type strain meter is installed through the tie wires, the position adjustment is convenient, the installation is simple, the concrete surface type strain meter is attached to the surface of the wall body through the epoxy glue, the installation stability is improved, the PLC is S7-300 in model number, and the PLC analyzes and calculates monitoring data.
As an embodiment of the utility model, when replacing the concrete to the floor, bury formula strainometer with the concrete and adopt the ligature silk to tie up on the reinforcing band rib reinforcing bar, make the formula strainometer of concrete bury be in mobile state, adopt epoxy adhesive to paste on the wall surface with concrete surface formula strainometer, need clear away structure surface floating ash or local chisel hair before pasting, install the reinforcing bar detection instrument on the reinforcing bar, place the total powerstation at the distance that is greater than the 1.5 times distance of measurement building height, the upper strata corresponds the position at the shear force wall that does not replace and sets up the surveyor level, place laser position measurement appearance on one side of the concrete of replacement.
As an embodiment of the utility model, when examining the floor, measure shear force wall internal stress through the formula strainometer of concrete buryying, concrete surface formula strainometer is to the stress on shear force wall surface, detect the inside steel bar structure change of concrete through the steel bar detection instrument, the total powerstation detects the whole slope condition of building, detect the stability of constructing the wall body through the spirit level, detect the target position distance through laser position apparatus, give the PLC controller with data transmission, the PLC controller handles the operation to the data of accepting, show data through the LED touch-sensitive screen, the staff is under construction through the data that detect out.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be combined as appropriate to form other embodiments understood by those skilled in the art.

Claims (5)

1. The utility model provides a building construction monitoring system, its characterized in that, includes PLC controller, strainometer and surveyor's level, the PLC controller links to each other with the reinforcing bar detection instrument that is used for obtaining steel bar structure change sensing data, the total powerstation that is used for detecting the slope situation of building, the laser position survey appearance of surveying target displacement distance respectively, the strainometer divide into the concrete that is used for obtaining the inside sensing data of wall body and burys the strainometer and is used for wall body surface strain measurement data's concrete surface formula strainometer, and concrete burys formula strainometer and concrete surface formula strainometer and PLC controller electric connection, and PLC controller electric connection data connection has the surveyor that is used for detecting construction wall body stable in structure.
2. The construction monitoring system of claim 1, wherein: the LED touch screen is further included, and the PLC is connected with the LED touch screen.
3. The construction monitoring system of claim 1, wherein: and a measuring building is arranged on one side of the total station, and the distance between the total station and the measuring building is more than 1.5 times of the height of the measuring building.
4. The construction monitoring system of claim 1, wherein: the concrete embedded strain gauge is installed inside a wall body and tied to reinforcing ribbed steel bars inside the wall body through binding wires, and the concrete surface type strain gauge is adhered to the surface of the wall body through epoxy glue.
5. The construction monitoring system of claim 1, wherein: the PLC controller is S7-300 in model.
CN202120844906.7U 2021-04-23 2021-04-23 Building construction monitoring system Active CN214747897U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120844906.7U CN214747897U (en) 2021-04-23 2021-04-23 Building construction monitoring system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120844906.7U CN214747897U (en) 2021-04-23 2021-04-23 Building construction monitoring system

Publications (1)

Publication Number Publication Date
CN214747897U true CN214747897U (en) 2021-11-16

Family

ID=78612415

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120844906.7U Active CN214747897U (en) 2021-04-23 2021-04-23 Building construction monitoring system

Country Status (1)

Country Link
CN (1) CN214747897U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113323446A (en) * 2021-04-23 2021-08-31 江苏省苏科建设技术发展有限公司 Building construction supporting device, monitoring system and dismounting method
CN114234901A (en) * 2021-11-30 2022-03-25 中建四局第一建设有限公司 Information monitoring method and system for dismantling and modifying super high-rise building

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113323446A (en) * 2021-04-23 2021-08-31 江苏省苏科建设技术发展有限公司 Building construction supporting device, monitoring system and dismounting method
CN113323446B (en) * 2021-04-23 2023-08-15 江苏省苏科建设技术发展有限公司 Building construction supporting device, monitoring system and dismounting method
CN114234901A (en) * 2021-11-30 2022-03-25 中建四局第一建设有限公司 Information monitoring method and system for dismantling and modifying super high-rise building

Similar Documents

Publication Publication Date Title
CN108960621B (en) Bridge monitoring and evaluating method for passing through high-speed rail bridge under shield tunnel construction
CN214747897U (en) Building construction monitoring system
CN203848823U (en) Combined type underground deep disaster monitoring device
CN105043344B (en) A kind of sedimentation distribution monitoring system and monitoring method based on continuous fiber section bar
CN201233230Y (en) Displacement measurement machine for working face baseboard
CN201109914Y (en) Apparatus for monitoring sedimentation of soft soil foundation
CN103278384B (en) Testing device and measuring method for anchorage performance of coal and rock mass in coal mine tunnel
CN104406559B (en) A kind of landslide horizontal shift vertical characteristics sensor unit and using method
CN103471647B (en) A kind of shield tunnel remote automation monitoring method
CN110992197B (en) Early warning method and system for irregular convergence deformation of coal mine tunnel
CN108280969A (en) A kind of high slope surface deformation monitoring and warning system and its method for early warning
CN106959095A (en) Geology internal displacement three-dimension monitor system and its Embedded installation method, measuring method
CN107631752A (en) A kind of apparatus and method of middle wire type Tailings Dam monitoring
CN105606070A (en) Device and method for testing vertical and horizontal deformation of building
CN209055073U (en) Crack width monitoring system based on fiber grating technology
CN206529812U (en) A kind of direct burial test system
CN204479065U (en) A kind of High Precision Traverses formula tunneling boring stability of slope monitor and early warning system
CN109556524A (en) Crack width monitoring system and method based on fiber grating technology
CN113514000A (en) Method for monitoring deformation of steel plate vertical shaft wall
CN106088171B (en) A kind of prefabricated pile Horizontal Displacement and pile body stress joint test method
CN112187843A (en) BIM-based system and method for automatically monitoring capital construction risks of deep foundation pit
CN208172969U (en) A kind of high slope surface deformation monitoring and warning system
CN203672311U (en) Landslide deep displacement monitoring system
CN103422487B (en) Method for measuring settlement deformation by utilizing inclinometer and angle-adjustable converter
CN100342205C (en) Method for measuring sliding surface position and slippage of landslip and its device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant