CN214739530U - Building slabstone hangs structure futilely - Google Patents

Building slabstone hangs structure futilely Download PDF

Info

Publication number
CN214739530U
CN214739530U CN202023333747.9U CN202023333747U CN214739530U CN 214739530 U CN214739530 U CN 214739530U CN 202023333747 U CN202023333747 U CN 202023333747U CN 214739530 U CN214739530 U CN 214739530U
Authority
CN
China
Prior art keywords
plate
connecting plate
mounting
frame
screw
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202023333747.9U
Other languages
Chinese (zh)
Inventor
任兵兵
马国�
王旭
李科
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jingkai Construction Group Co ltd
Original Assignee
Jingkai Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jingkai Construction Group Co ltd filed Critical Jingkai Construction Group Co ltd
Priority to CN202023333747.9U priority Critical patent/CN214739530U/en
Application granted granted Critical
Publication of CN214739530U publication Critical patent/CN214739530U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Finishing Walls (AREA)

Abstract

The application relates to a dry hanging structure of a building stone slab, which relates to the field of decoration of the building stone slab and comprises a mounting frame, a hanging frame and a hanging frame, wherein the mounting frame is arranged on a wall body; the first screw rod penetrates through the mounting frame and is used for fixing the mounting frame on the wall body; the connecting frame is provided with an adhesion layer, and the adhesion layer is used for connecting the stone plate and the connecting frame; the second screw is in threaded connection with the connecting frame and is used for fixing the connecting frame on the mounting frame; the second screw penetrates through the mounting frame and then is connected with the connecting frame; the mounting frame comprises a first mounting plate and a first connecting plate fixedly connected with the first mounting plate; the first screw penetrates through the first mounting plate, the second screw penetrates through the first connecting plate, and the first connecting plate is perpendicular to the first mounting plate; the connecting frame comprises a second mounting plate and a second connecting plate fixedly connected with the second mounting plate; the adhesion layer is fixed on the second mounting plate, and the second screw rod is in threaded connection with the second connecting plate. This application has improved the stability of hanging the structure futilely to building slabstone connection.

Description

Building slabstone hangs structure futilely
Technical Field
The application relates to the field of decoration dry hanging of building stone slabs, in particular to a dry hanging structure of a building stone slab.
Background
The dry hanging structure is a general name of a structure which adopts a metal hanging piece to firmly hang the decorative material on a structural body to form a decorative surface.
When carrying out the dry-hanging connection to building slabstone, the dry-hanging structure commonly used at present is relatively poor to the stability that building slabstone is connected for building slabstone takes place to drop easily.
Disclosure of Invention
In order to improve the stability of hanging the structure futilely to building slabstone is connected, this application provides a structure is hung futilely to building slabstone.
The application provides a structure is hung futilely to building slabstone adopts following technical scheme:
a dry-hanging structure for building stone slabs comprises
The mounting frame is arranged on the wall body;
the first screw rod penetrates through the mounting frame and is used for fixing the mounting frame on the wall body;
the connecting frame is provided with an adhesion layer, and the adhesion layer is used for connecting the stone plate and the connecting frame; and
the second screw is in threaded connection with the connecting frame and used for fixing the connecting frame on the mounting frame;
and the second screw penetrates through the mounting frame and then is connected with the connecting frame.
Through adopting above-mentioned technical scheme, when installing fixedly building slabstone, the staff utilizes first screw rod earlier to install the mounting bracket on the wall body fixedly, then utilize to glue the layer and fix the link on building slabstone, then the staff recycles the second screw rod and is in the same place both erection fixings with link and mounting bracket, thereby the realization is fixed the installation of building slabstone, it glues the link tightly with building slabstone to glue the layer this moment, and the link passes through the second screw rod to be fixed on the mounting bracket, the mounting bracket is fixed on the wall body through first screw rod again, thereby hang fixedly to building slabstone futilely, the stability of this structure of hanging futilely to building slabstone connection has been improved.
Optionally, the mounting bracket includes a first mounting plate and a first connecting plate fixedly connected to the first mounting plate;
the first screw rod passes through first mounting panel, first screw rod is located the top of first connecting plate, the second screw rod passes first connecting plate, first connecting plate perpendicular to first mounting panel.
Through adopting above-mentioned technical scheme, when fixed mounting frame, the staff uses first screw rod to fix first mounting panel on the wall body, and first screw rod is fixed the first half of first mounting panel, then recycles the second screw rod and fixes the link installation on first connecting plate to the realization is fixed to the installation of building slabstone.
Optionally, the connecting frame includes a second mounting plate and a second connecting plate fixedly connected to the second mounting plate;
the adhesion layer is fixed on the second mounting plate, the second screw rod is in threaded connection with the second connecting plate, and the second connecting plate is perpendicular to the second mounting plate.
Through adopting above-mentioned technical scheme, the staff will be glued the layer and paste on building slate with the back on the wall body is fixed to the mounting bracket, then aim at first connecting plate with the second connecting plate, pass first connecting plate with the second screw rod and twist soon the second connecting plate to it is fixed to install second connecting plate and first connecting plate, and then realize fixed the installation to building slate.
Optionally, a third screw rod is further arranged on the first mounting plate in a penetrating mode, the lower half portion of the first mounting plate is fixed on the wall through the third screw rod, and the third screw rod is located below the first connecting plate.
Through adopting above-mentioned technical scheme, install fixedly through utilizing the third screw to the lower half of first mounting panel to improved the stability of mount on the wall body, and then improved the stability of whole dry-hang structure.
Optionally, the mounting bracket further includes a third connecting plate, the third connecting plate is located between the first connecting plate and the third screw, the second connecting plate is located between the first connecting plate and the third connecting plate, and the second screw passes through the third connecting plate.
Through adopting above-mentioned technical scheme, when fixing the link installation to the mounting bracket, the second connecting plate can be installed between first connecting plate and the third connecting plate, then uses the second screw rod to carry out first connecting plate and second connecting plate and install fixedly to make the second screw rod wear to establish on the third connecting plate, thereby to further having improved the stability of link on the mounting bracket.
Optionally, two ends of the second connecting plate are respectively abutted to the first connecting plate and the third connecting plate.
Optionally, the connecting frame further comprises a supporting plate fixed on the second connecting plate, the supporting plate is perpendicular to the second connecting plate, and the supporting plate is attached to the side face of the stone plate.
Through adopting above-mentioned technical scheme, utilize the backup pad to support the side end face of building slabstone to this dry structure of hanging has improved the stability to building slabstone.
Optionally, the second connecting plate is provided with an anti-falling plate, a groove is formed between the anti-falling plate and the supporting plate, and the adhesion layer is located in the groove.
Through adopting above-mentioned technical scheme, reduced the risk that the adhesion layer drops from the second connecting plate.
In summary, the present application includes at least one of the following beneficial technical effects:
1. when installing the fixed to building slabstone, the staff utilizes first screw rod earlier to install the mounting bracket on the wall body fixedly, then utilize to glue the layer and fix the link on building slabstone, then the staff recycles the second screw rod and is in the same place the link with mounting bracket both installation, thereby the realization is fixed to the installation of building slabstone, it glues the link tightly with building slabstone to glue the layer this moment, and the link passes through the second screw rod to be fixed on the mounting bracket, the mounting bracket is fixed on the wall body through first screw rod again, thereby hang futilely fixedly to building slabstone, the stability of this structure of hanging futilely to building slabstone connection has been improved.
2. When fixing the link installation to the mounting bracket, the second connecting plate can be installed between first connecting plate and the third connecting plate, then uses the second screw rod to carry out first connecting plate and second connecting plate installation fixed to make the second screw rod wear to establish on the third connecting plate, thereby to further having improved the stability of link on the mounting bracket.
Drawings
Fig. 1 is a schematic overall structure diagram of an embodiment of the present application.
Fig. 2 is a partially enlarged schematic view of fig. 1.
Description of reference numerals: 11. a mounting frame; 111. a first mounting plate; 112. a first connecting plate; 113. a third connecting plate; 12. a first screw; 13. a connecting frame; 130. an adhesive layer; 131. a second mounting plate; 132. a second connecting plate; 133. a support plate; 134. an anti-drop plate; 14. a second screw; 21. and a third screw.
Detailed Description
The present application is described in further detail below with reference to the attached drawings.
The embodiment of the application discloses structure is hung futilely to building slabstone.
Referring to fig. 1 and 2, the building slate dry hanging structure comprises a mounting frame 11, a first screw 12, a connecting frame 13 and a second screw 14.
First screw rod 12 is fixed the installation of mounting bracket 11 on the wall body or fossil fragments, is equipped with on the link 13 and glues even layer 130, glues even layer 130 and pastes on the building slabstone, second screw rod 14 and link 13 threaded connection, second screw rod 14 pass behind the mounting bracket 11 to be connected with link 13 to it is fixed to install link 13 and mounting bracket 11.
Referring to fig. 1 and 2, the mounting frame 11 includes a first mounting plate 111 and a first connecting plate 112, the first connecting plate 112 is vertically fixed on the first mounting plate 111, the first mounting plate 111 abuts against the wall, the first screws 12 pass through the first mounting plate 111 and then are screwed on the wall, the number of the first screws 12 is multiple, the multiple first screws 12 are horizontally distributed on the first mounting plate 111, the first screws 12 are all located above the first connecting plate 112, and the first screws 12 fix the upper half of the first mounting plate 111. After the first mounting plate 111 is fixed on the wall, the first connecting plate 112 is horizontally arranged, and a through hole is formed in the first connecting plate 112.
The connecting frame 13 comprises a second mounting plate 131 and a second connecting plate 132, the second connecting plate 132 is vertically fixed on the second mounting plate 131, the adhesion layer 130 is adhered and fixed on the back of the building stone plate, the second connecting plate 132 is placed below the first connecting plate 112, the second screws 14 penetrate through holes in the first connecting plate 112 and then are in threaded connection with the second connecting plate 132, the number of the second screws 14 is multiple, the multiple second screws 14 are uniformly distributed on the first connecting plate 112, so that the multiple second screws 14 are fixedly connected with the first connecting plate 112 and the second connecting plate 132, the connecting frame 13 is fixedly mounted on the mounting frame 11, and the building stone plate is connected in a dry hanging mode.
Further, referring to fig. 1 and 2, in order to improve the stability of the first mounting plate 111 on the wall body, third screws 21 are further inserted into the first mounting plate 111, the third screws 21 are located below the first connecting plate 112, the number of the third screws 21 is plural, the plural third screws 21 are horizontally and uniformly distributed on the first mounting plate 111, and the plural third screws 21 fix the lower half of the first mounting plate 111.
The mounting bracket 11 further includes a third connecting plate 113 disposed on the first mounting plate 111, the third connecting plate 113 is located between the first connecting plate 112 and the third screw 21, the third connecting plate 113 is parallel to the first connecting plate 112, the second connecting plate 132 is located between the first connecting plate 112 and the third connecting plate 113, and upper and lower ends of the second connecting plate 132 are abutted to the first connecting plate 112 and the third connecting plate 113, respectively. The third connecting plate 113 is provided with a through hole, the second screw 14 continues to screw the second screw 14 after the first connecting plate 112 and the second connecting plate 132 are connected and fixed, and the second screw 14 penetrates through the through hole in the third connecting plate 113.
Referring to fig. 1 and 2, in order to improve the stability of the connection frame 13 to the building slab, the connection frame 13 further includes a support plate 133 and a retaining plate 134 provided on the second mounting plate 131. The support plate 133 is vertically fixed to the second mounting plate 131, and the support plate 133 abuts on a side end surface of the building slab. The anti-slip plate 134 is obliquely disposed on the second connecting plate 132, a groove is formed between the anti-slip plate 134 and the supporting plate 133, and the adhesive layer 130 is adhered and fixed in the groove. When the building slate is installed, the anti-slip plate 134 is attached to the back end surface of the building slate.
This hang structure futilely two sets of uses together, and a set of upper end to building slabstone is connected, and another group is connected fixedly to the bottom of building slabstone to two sets of one on one install the building slabstone on the wall body.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (8)

1. The utility model provides a structure is hung futilely to building slabstone which characterized in that: comprises that
The mounting rack (11) is arranged on the wall body;
the first screw (12) penetrates through the mounting rack (11) and is used for fixing the mounting rack (11) on a wall body;
the connecting frame (13) is provided with an adhesion layer (130), and the adhesion layer (130) is used for connecting the stone plate and the connecting frame (13); and
the second screw (14) is in threaded connection with the connecting frame (13) and is used for fixing the connecting frame (13) on the mounting frame (11);
the second screw (14) penetrates through the mounting frame (11) and then is connected with the connecting frame (13).
2. A building slate dry-hanging structure as claimed in claim 1, wherein: the mounting frame (11) comprises a first mounting plate (111) and a first connecting plate (112) fixedly connected with the first mounting plate (111);
the first screw (12) penetrates through the first mounting plate (111), the first screw (12) is located above the first connecting plate (112), the second screw (14) penetrates through the first connecting plate (112), and the first connecting plate (112) is perpendicular to the first mounting plate (111).
3. A building slate dry-hanging structure as claimed in claim 2, wherein: the connecting frame (13) comprises a second mounting plate (131) and a second connecting plate (132) fixedly connected with the second mounting plate (131);
the adhesion layer (130) is fixed on the second mounting plate (131), the second screw (14) is in threaded connection with the second connecting plate (132), and the second connecting plate (132) is perpendicular to the second mounting plate (131).
4. A building slate dry-hanging structure as claimed in claim 3, wherein: still wear to be equipped with third screw rod (21) on first mounting panel (111), third screw rod (21) are fixed the lower half of first mounting panel (111) on the wall body, third screw rod (21) are located the below of first connecting plate (112).
5. A building stone plate dry-hanging structure as claimed in claim 4, wherein: the mounting rack (11) further comprises a third connecting plate (113), the third connecting plate (113) is located between the first connecting plate (112) and the third screw (21), the second connecting plate (132) is located between the first connecting plate (112) and the third connecting plate (113), and the second screw (14) penetrates through the third connecting plate (113).
6. A building slate dry-hanging structure according to claim 5, wherein: the two ends of the second connecting plate (132) are respectively abutted against the first connecting plate (112) and the third connecting plate (113).
7. A building slate dry-hanging structure as claimed in claim 3, wherein: the connecting frame (13) further comprises a supporting plate (133) fixed on the second connecting plate (132), the supporting plate (133) is perpendicular to the second connecting plate (132), and the supporting plate (133) is attached to the side face of the stone plate.
8. A building slate dry-hanging structure according to claim 7, wherein: be equipped with anticreep board (134) on second connecting plate (132), form the recess between anticreep board (134) and backup pad (133), it is located the recess to glue even layer (130).
CN202023333747.9U 2020-12-31 2020-12-31 Building slabstone hangs structure futilely Active CN214739530U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202023333747.9U CN214739530U (en) 2020-12-31 2020-12-31 Building slabstone hangs structure futilely

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202023333747.9U CN214739530U (en) 2020-12-31 2020-12-31 Building slabstone hangs structure futilely

Publications (1)

Publication Number Publication Date
CN214739530U true CN214739530U (en) 2021-11-16

Family

ID=78636943

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202023333747.9U Active CN214739530U (en) 2020-12-31 2020-12-31 Building slabstone hangs structure futilely

Country Status (1)

Country Link
CN (1) CN214739530U (en)

Similar Documents

Publication Publication Date Title
CN107268929B (en) Wallboard mounting structure
CN203308046U (en) Thermal insulation decorative plate hanging buckle assembly
CN103243890A (en) Hanging and buckling assembly of heat-insulating decorating plate and installation process of buckle assembly
CN214739530U (en) Building slabstone hangs structure futilely
CN208105743U (en) Without keel type ceramic tile dry-hanging piece for stone
CN212984291U (en) A quick mounting structure for building curtain adorns outward
CN214785586U (en) Decorative panel dry hanging piece for building construction
CN210892208U (en) Solar energy balcony hanging convenient to installation
CN205077805U (en) Dry pendant mounting structure of wall
CN211345894U (en) Mounting bracket for flat-plate solar collector embedded and mounted with building
CN111395702A (en) Ceiling keel structure for architectural decoration
CN220768680U (en) External wall decoration heat insulation board
CN219386970U (en) Ceramic tile anticreep mounting and package pipe rack thereof
CN217353342U (en) Plate dry hanging structure
CN217400069U (en) A stabilize wall structure of hanging for decorative board concatenation
CN213868708U (en) Dry-type connecting piece and heat-preservation and decoration integrated plate dry-hanging structure using same
CN216949254U (en) Dry-hanging stone system
CN213359067U (en) Connecting piece for horizontally mounting honeycomb plate
CN215054835U (en) Composite face brick dry hanging structure
CN210767606U (en) Be applied to heat preservation decorative board of building outer wall
CN214364610U (en) Heat-insulation decorative composite board
CN213710188U (en) Marble mounting rack
CN217580969U (en) Transverse connecting structure of decorative wallboard
CN220133243U (en) Composite stone suspended ceiling mounting structure
CN211200887U (en) House decoration structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant