CN214739168U - Connecting node structure for steel structure partition wall stone facing and suspended ceiling - Google Patents

Connecting node structure for steel structure partition wall stone facing and suspended ceiling Download PDF

Info

Publication number
CN214739168U
CN214739168U CN202120076640.6U CN202120076640U CN214739168U CN 214739168 U CN214739168 U CN 214739168U CN 202120076640 U CN202120076640 U CN 202120076640U CN 214739168 U CN214739168 U CN 214739168U
Authority
CN
China
Prior art keywords
stone
surface layer
steel
gypsum board
layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120076640.6U
Other languages
Chinese (zh)
Inventor
刘桂花
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiai Interior Design Shanghai Co ltd
Original Assignee
Jiai Interior Design Shanghai Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiai Interior Design Shanghai Co ltd filed Critical Jiai Interior Design Shanghai Co ltd
Priority to CN202120076640.6U priority Critical patent/CN214739168U/en
Application granted granted Critical
Publication of CN214739168U publication Critical patent/CN214739168U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Finishing Walls (AREA)

Abstract

The utility model provides a connecting node structure for a steel structure partition wall stone facing and a suspended ceiling, which comprises a suspended ceiling keel, a light steel keel net rack, a gypsum board surface layer, a partition wall steel framework, a connecting angle steel, a stone line, a trimming piece, a stone surface layer and a connecting piece; the stone surface layer and the gypsum board surface layer are connected through stone lines, the back of each stone line is fixedly connected through a stone dry hanging piece, the upper end of the outer surface of each stone line is a vertical surface, the lower end of the outer surface of each stone line is composed of a plurality of sections of continuous arc surfaces, the top surface of each stone line is attached to the gypsum board surface layer, the bottom surface of each stone line is arranged on the top surface of the stone surface layer, and connecting pieces are uniformly arranged on the interface; the connecting piece is the rubber stick, and the connecting piece both ends are fixed respectively in the groove of predetermineeing of stone material lines bottom surface and stone material surface course top surface, have preset the compression clearance between stone material lines bottom surface and the stone material surface course top surface, and stone material lines surface upper end and gypsum board surface course corner are equipped with the receipts limit spare of full length.

Description

Connecting node structure for steel structure partition wall stone facing and suspended ceiling
Technical Field
The utility model relates to an architectural decoration technical field especially relates to a be used for steel construction partition wall stone material veneer and furred ceiling connected node structure.
Background
Generally adopt on the side of current steel construction partition wall both sides the dry hanging piece to be fixed with the stone material panel, the stone material panel directly leans on and furred ceiling veneer lug connection, and the stone material panel can extrude the furred ceiling veneer if take place to warp to produce the damage to the furred ceiling veneer, the stone material panel is direct to be connected with the furred ceiling veneer and also produces the inhomogeneous gap of width easily, and connected node is coarse, and erection joint handles poorly, and decorative effect is not good.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to prior art's defect and not enough, provide a be used for steel construction partition wall stone material veneer and furred ceiling connected node structure, adopt the utility model discloses a structure is equipped with the stone material lines between stone material surface course top and the gypsum board surface course and links up, is equipped with between stone material lines upper portion and the gypsum board surface course and receives the limit piece and handle, shelters from the cover gap, is provided with the rubber stick in stone material lines bottom surface and stone material surface course top surface, can offset the part extrusion that produces from the deformation of stone material surface course, reduces the damage to the furred ceiling veneer, has noticed architectural decoration's thin section node treatment, the construction is handled well, decorative effect is good.
In order to achieve the above object, the utility model adopts the following technical scheme: a connecting node structure for a steel structure partition wall stone facing and a suspended ceiling comprises a suspended ceiling keel, a light steel keel net rack, a gypsum board surface layer, a partition wall steel framework, connecting angle steel, stone lines, a trimming piece, a stone surface layer and a connecting piece; the suspended ceiling keel is a main stressed component of the gypsum board suspended ceiling, the suspended ceiling keel is fixedly connected with a top plate through a hanging piece, a light steel keel net frame is fixedly hung on the suspended ceiling keel through a hanging piece, a wood board layer is attached to and covered on the light steel keel net frame, and a gypsum board surface layer is attached to and covered on the wood board layer; the partition steel skeleton is formed by mutually splicing transverse, vertical and longitudinal galvanized steel angles, the bottom of the partition steel skeleton is fixedly connected with a ground foundation, the top of the partition steel skeleton abuts against a gypsum board surface layer, connecting steel angles are horizontally and transversely arranged on the side surfaces of two sides of the partition steel skeleton, a vertically arranged stone surface layer is hung on the connecting steel angles through stone dry hanging pieces, and the top of the stone surface layer is 150 mm away from the gypsum board surface layer and 200mm away from the gypsum board surface layer; the stone surface layer and the gypsum board surface layer are connected through stone lines, the back of each stone line is fixedly connected through a stone dry hanging piece, the upper end of the outer surface of each stone line is a vertical surface, the lower end of the outer surface of each stone line is composed of a plurality of sections of continuous arc surfaces, the top surface of each stone line is attached to the gypsum board surface layer, the bottom surface of each stone line is arranged on the top surface of the stone surface layer, and connecting pieces are uniformly arranged on the interface; the connecting piece is the rubber stick, and the connecting piece both ends are fixed respectively in the groove of predetermineeing of stone material lines bottom surface and stone material surface course top surface, have preset the compression clearance between stone material lines bottom surface and the stone material surface course top surface, and stone material lines surface upper end and gypsum board surface course corner are equipped with the receipts limit spare of full length.
Preferably, the hanging connection part of the stone surface layer and the stone line is provided with a stone dry hanging glue layer for reinforcing connection.
Preferably, the surface of the gypsum board surface layer is coated with a latex paint layer.
Preferably, the edge closing piece is an L-shaped aluminum alloy strip, and the edge closing piece is bonded and fixed at the corner by a structural adhesive layer.
The utility model has the advantages that: adopt the utility model discloses a structure is equipped with the stone material lines between stone material surface course top and the gypsum board surface course and links up, is equipped with between stone material lines upper portion and the gypsum board surface course and receives the limit piece and receive the limit and handle, shelters from and covers the gap, is provided with the rubber stick at stone material lines bottom surface and stone material surface course top surface, can offset the part extrusion that comes from the stone material surface course and warp the production, reduces the damage to the furred ceiling veneer, has noticed architectural decoration's thin and detailed node treatment, and the construction is handled well, and decorative effect is good.
Drawings
The accompanying drawings, which are included to provide a further understanding of the invention and are incorporated in and constitute a part of this application, illustrate embodiment(s) of the invention and together with the description serve to explain the principles of the invention.
Fig. 1 is a schematic view of a connection node structure for a steel structure partition wall stone facing and a suspended ceiling.
Wherein: 1 is a suspended ceiling keel, 2 is a light steel keel net rack, 3 is a wood board layer, 4 is a gypsum board surface layer, 5 is a partition wall steel framework, 6 is a connecting angle steel, 7 is a stone dry hanging piece, 8 is a stone line, 9 is a edging piece, 10 is a stone surface layer, 11 is a connecting piece, and 2-1 is a hanging piece.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
As shown in the figure, the connecting node structure for the steel structure partition wall stone facing and the suspended ceiling comprises a suspended ceiling keel 1, a light steel keel net rack 2, a gypsum board surface layer 4, a partition wall steel framework 5, connecting angle steel 6, stone lines 8, a trimming piece 9, a stone surface layer 10 and a connecting piece 11; the suspended ceiling keel 1 is a main stressed component of the gypsum board suspended ceiling, the suspended ceiling keel 1 is fixedly connected with a top plate by a hanging piece, a light steel keel net rack 2 is fixedly hung on the suspended ceiling keel 1 by a hanging piece 2-1, a woodworking board layer 3 is attached and covered on the light steel keel net rack 2, and a gypsum board surface layer 4 is attached and covered on the woodworking board layer 3; the partition steel skeleton 2 is formed by mutually splicing transverse, vertical and longitudinal galvanized angle steels, the bottom of the partition steel skeleton 2 is fixedly connected with a ground foundation, the top of the partition steel skeleton 2 abuts against a gypsum board surface layer 4, connecting angle steels 6 are horizontally and transversely arranged on the side surfaces of two sides of the partition steel skeleton 2, a vertically arranged stone surface layer 10 is hung on the connecting angle steels 6 by a stone dry hanging piece 7, and the top of the stone surface layer 10 is 200mm away from the gypsum board surface layer; a stone line 8 is arranged between the stone surface layer 10 and the gypsum board surface layer 4 for connection, the back surface of the stone line 8 is fixedly connected by a stone dry hanging piece 7, the upper end of the outer surface of the stone line 8 is a vertical surface, the lower end of the outer surface is composed of a plurality of sections of continuous arc surfaces, the top surface of the stone line 8 is attached to the gypsum board surface layer 4, the bottom surface of the stone line 8 is arranged on the top surface of the stone surface layer 10, and connecting pieces 11 are uniformly arranged on the interface; connecting piece 11 is the rubber stick, and connecting piece 11 both ends are fixed respectively in the groove of predetermineeing of 8 bottom surfaces of stone material lines and 10 top surfaces of stone material surface course, have preset the compression clearance between 8 bottom surfaces of stone material lines and 10 top surfaces of stone material surface course, and 8 surface upper ends of stone material lines and 4 corners of gypsum board surface course are equipped with through long receipts limit piece 9.
In specific implementation, the hanging connection between the stone surface layer 10 and the stone lines 8 is provided with a stone dry-hanging glue layer for reinforced connection.
In specific implementation, the surface of the gypsum board surface layer 4 is coated with a latex paint layer.
During specific implementation, the edge folding piece 9 is an L-shaped aluminum alloy strip, and the edge folding piece 9 is bonded and fixed at a corner by a structural adhesive layer.

Claims (4)

1. The utility model provides a be used for steel construction partition wall stone material veneer and furred ceiling connected node structure which characterized in that: comprises a suspended ceiling keel, a light steel keel net rack, a gypsum board surface layer, a partition steel framework, connecting angle steel, a stone line, a trimming piece, a stone surface layer and a connecting piece; the suspended ceiling keel is a main stressed component of the gypsum board suspended ceiling, the suspended ceiling keel is fixedly connected with a top plate through a hanging piece, a light steel keel net frame is fixedly hung on the suspended ceiling keel through a hanging piece, a wood board layer is attached to and covered on the light steel keel net frame, and a gypsum board surface layer is attached to and covered on the wood board layer; the partition steel skeleton is formed by mutually splicing transverse, vertical and longitudinal galvanized steel angles, the bottom of the partition steel skeleton is fixedly connected with a ground foundation, the top of the partition steel skeleton abuts against a gypsum board surface layer, connecting steel angles are horizontally and transversely arranged on the side surfaces of two sides of the partition steel skeleton, a vertically arranged stone surface layer is hung on the connecting steel angles through stone dry hanging pieces, and the top of the stone surface layer is 150 mm away from the gypsum board surface layer and 200mm away from the gypsum board surface layer; the stone surface layer and the gypsum board surface layer are connected through stone lines, the back of each stone line is fixedly connected through a stone dry hanging piece, the upper end of the outer surface of each stone line is a vertical surface, the lower end of the outer surface of each stone line is composed of a plurality of sections of continuous arc surfaces, the top surface of each stone line is attached to the gypsum board surface layer, the bottom surface of each stone line is arranged on the top surface of the stone surface layer, and connecting pieces are uniformly arranged on the interface; the connecting piece is the rubber stick, and the connecting piece both ends are fixed respectively in the groove of predetermineeing of stone material lines bottom surface and stone material surface course top surface, have preset the compression clearance between stone material lines bottom surface and the stone material surface course top surface, and stone material lines surface upper end and gypsum board surface course corner are equipped with the receipts limit spare of full length.
2. The connecting node structure for the steel structure partition stone veneer and the suspended ceiling as claimed in claim 1, wherein: the stone surface layer is connected with the stone line and is provided with a stone dry-hanging glue layer for reinforcing connection.
3. The connecting node structure for the steel structure partition stone veneer and the suspended ceiling as claimed in claim 1, wherein: and the surface of the gypsum board surface layer is coated with a latex paint layer.
4. The connecting node structure for the steel structure partition stone veneer and the suspended ceiling as claimed in claim 1, wherein: the edge folding piece is an L-shaped aluminum alloy strip and is bonded and fixed at a corner by a structural adhesive layer.
CN202120076640.6U 2021-01-11 2021-01-11 Connecting node structure for steel structure partition wall stone facing and suspended ceiling Active CN214739168U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120076640.6U CN214739168U (en) 2021-01-11 2021-01-11 Connecting node structure for steel structure partition wall stone facing and suspended ceiling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120076640.6U CN214739168U (en) 2021-01-11 2021-01-11 Connecting node structure for steel structure partition wall stone facing and suspended ceiling

Publications (1)

Publication Number Publication Date
CN214739168U true CN214739168U (en) 2021-11-16

Family

ID=78638809

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120076640.6U Active CN214739168U (en) 2021-01-11 2021-01-11 Connecting node structure for steel structure partition wall stone facing and suspended ceiling

Country Status (1)

Country Link
CN (1) CN214739168U (en)

Similar Documents

Publication Publication Date Title
CN107605071B (en) Light composite batten system and construction method thereof
CN108729572B (en) Production line of wall body
CN104453011B (en) Light outer wall structure and construction method thereof
CN214739168U (en) Connecting node structure for steel structure partition wall stone facing and suspended ceiling
CN108729580B (en) Wall manufacturing method
CN214739164U (en) Suspended ceiling end and wall facing connected node structure
CN106013773A (en) Assembled interior and exterior wall composite template mud leakage prevention device and construction method
CN212224374U (en) Decorative connecting node structure for peripheral metal plate of structural beam
CN211774992U (en) Wall body wood finish coat and furred ceiling connected node structure
CN211313162U (en) Improved light dry-hanging wallboard structure
CN210737838U (en) U-shaped steel support and integrated lightweight wall expansion joint structure using same
CN208981702U (en) A kind of high heat insulating ability decorative wall panels of large scale
CN214062096U (en) Node structure of joint of aluminum-plastic plate suspended ceiling and gypsum board suspended ceiling
CN217500889U (en) Joint structure for junction of wood cabinet and gypsum board veneer
CN212104773U (en) Steel sheet furred ceiling and wall body veneer receipts limit structure
CN211974191U (en) Closing-up node structure is connected with furred ceiling to wash platform top veneer
CN211899447U (en) Suspended ceiling stone line connecting node structure
CN207063251U (en) A kind of novel building sound insulation curtain wall construction
CN211899222U (en) Aluminum plate veneer tip and furred ceiling end connection node structure of gypsum board
CN213626414U (en) Stone material surface course bottom and wood veneer juncture connected node structure
CN213233934U (en) Decorative surface layer dry hanging system
CN217326228U (en) Connecting node structure for top of stone veneer and wood veneer
CN215759632U (en) Curtain bottom frame and building foundation end connection node structure
CN203834712U (en) Polyurethane waterproof heat preserving board for outer wall
CN214658440U (en) Wall body glass veneer bottom and stone material skirting connected node structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant