CN214738317U - Environment-friendly building settlement observation device - Google Patents

Environment-friendly building settlement observation device Download PDF

Info

Publication number
CN214738317U
CN214738317U CN202120122104.5U CN202120122104U CN214738317U CN 214738317 U CN214738317 U CN 214738317U CN 202120122104 U CN202120122104 U CN 202120122104U CN 214738317 U CN214738317 U CN 214738317U
Authority
CN
China
Prior art keywords
fixedly connected
sleeve
environment
observation device
connecting rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202120122104.5U
Other languages
Chinese (zh)
Inventor
申怀立
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202120122104.5U priority Critical patent/CN214738317U/en
Application granted granted Critical
Publication of CN214738317U publication Critical patent/CN214738317U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Geophysics And Detection Of Objects (AREA)

Abstract

The utility model discloses an environment-friendly building settlement observation device relates to architectural equipment technical field. The utility model discloses a floating mechanism and fixed establishment, one side of floating mechanism is provided with the connecting rod, and one side of fixed establishment is provided with the sleeve, and the one end of connecting rod is rotated and is connected in telescopic one end, floats one side fixedly connected with connecting rod of ball, the one end fixedly connected with L shape frame of floating the ball of keeping away from of connecting rod, the top fixedly connected with adjusting unit of L shape frame. The utility model can be engaged in the wall of the building through the stud, and then after the fastening ring is fastened, the stud is not easy to loosen, thereby solving the problems that the embedded nut is easy to loose due to the influence of the wall, inconvenient to disassemble and not environment-friendly enough; through the interval of adjusting bolt and fore-set, contact the fore-set then, and by the effect of spring, can use this device repeatedly, solved current observation device and can't adjust, and all be fixed in the building outer wall, problem that can not used repeatedly.

Description

Environment-friendly building settlement observation device
Technical Field
The utility model belongs to the technical field of the architectural equipment, especially, relate to an environment-friendly building settlement observation device.
Background
The building settlement observation is suitable for industrial and civil buildings, in order to master the settlement condition of the building, the building is deformed due to the construction difference or the time lapse, and the settlement phenomenon which is unfavorable to the building is found in time so as to take measures and ensure the safe use of the building, but the method still has the following defects in the actual use:
1. the existing environment-friendly building settlement observation device generally adopts an embedded nut and a bolt capable of being in threaded connection, and the embedded nut is easily affected by a wall body to be loosened, so that the settlement observation accuracy is affected, and the device is inconvenient to disassemble and not environment-friendly enough;
2. the existing environment-friendly building settlement observation device is used for adjusting the detection range, most buildings are deformed along with the lapse of time, the observation device which is installed after the building is finished cannot accurately observe the settlement precision of the building, and the existing observation device is fixed on the outer wall of the building and cannot be reused.
Therefore, the existing environment-friendly building settlement observation device cannot meet the requirements in practical use, so that an improved technology is urgently needed in the market to solve the problems.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing an environment-friendly building settlement observation device, which can be meshed in the wall of a building through a stud, and then the stud is not easy to loosen after a fastening ring is fastened, thereby solving the problems that the embedded nut is easy to loose due to the influence of the wall, and is inconvenient to disassemble and not environment-friendly enough; through the interval of adjusting bolt and fore-set, contact the fore-set then, and by the effect of spring, can use this device repeatedly, solved current observation device and can't adjust, and all be fixed in the building outer wall, problem that can not used repeatedly.
In order to solve the technical problem, the utility model discloses a realize through following technical scheme:
the utility model relates to an observation device is subsided to environment-friendly building, including floating mechanism and fixed establishment, one side of floating mechanism is provided with the connecting rod, and one side of fixed establishment is provided with the sleeve, the one end of connecting rod is rotated and is connected in telescopic one end, and then floating mechanism rotates to be connected in one side of fixed establishment, and the fixed joint of fixed establishment is on the wall of building.
Further, the floating mechanism comprises a floating ball and an adjusting unit, one side of the floating ball is fixedly connected with a connecting rod, one end of the connecting rod, far away from the floating ball, is fixedly connected with an L-shaped frame, the length of the connecting rod can be set according to the position needing to be measured, so that the floating ball is located in an observable area, and the top of the L-shaped frame is fixedly connected with the adjusting unit.
Further, the fixing mechanism comprises a sleeve and a signal unit, one side of the sleeve is fixedly connected with a stud, the sleeve is adjacent to the floating mechanism, a fastening ring is meshed with the outer cylindrical surface of the stud, the stud can be meshed in the wall of a building, and the sleeve and the stud are movably clamped with the signal unit.
Furthermore, the adjusting unit comprises a bolt and a nut, the bolt is meshed with the top of the L-shaped frame, the top end of the bolt is adjacent to the fixing mechanism, the nut is meshed with the other side of the bolt located on the L-shaped frame, and the length of the bolt located on the top of the L-shaped frame and extending can be adjusted by rotating the bolt.
Furthermore, the signal unit comprises a jack-post and a wire, the jack-post is slidably clamped in the sleeve, one side of the jack-post, which is positioned in the sleeve and the stud, is provided with a connecting post, two contact ends are fixedly connected to the adjacent surface of the jack-post and the connecting post, and the two contact ends are positioned on two sides, namely a bulge and a depression, one end of the connecting post, which is far away from the jack-post, is fixedly connected with two wires, the wire penetrates through the connecting post and can be connected with alarm equipment or external equipment, one end of the adjacent contact end of the jack-post is fixedly connected with a limiting ring, one side of the limiting ring is fixedly connected with a spring and is positioned on the outer cylindrical surface of the jack-post, and the outer diameter of the limiting ring is larger than the inner diameter of the through hole formed in the jack-post.
Furthermore, the bottom activity interlude of sleeve one end has the inserted bar, and the inserted bar runs through L shape frame, and the inserted bar is located the fixed joint of the opposite side of L shape frame and has the bolt to fixed floating mechanism, and make floating mechanism rotatable.
The utility model discloses following beneficial effect has:
1. the utility model discloses a double-screw bolt can mesh in the wall of building, has the tight back of deciding of lock ring then, makes the difficult pine of double-screw bolt take off, and when not using this device, can dismantle its and wall break away from the back, has solved that pre-buried nut receives the influence of wall body easily and not hard up, and dismantles inconvenient, the problem of environmental protection inadequately.
2. The utility model discloses an interval of adjusting bolt and fore-set, the buoyancy that produces on the accessible building settlement in-process floater is located the surface of water makes the bolt rotate, contacts the fore-set then, accessible signal unit transmission signal, and by the effect of spring, can use this device repeatedly, has solved the unable regulation of current observation device, and all is fixed in the building outer wall, problem that can not used repeatedly.
Of course, it is not necessary for any particular product to achieve all of the above-described advantages at the same time.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings used in the description of the embodiments will be briefly introduced below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and it is obvious for those skilled in the art that other drawings can be obtained according to these drawings without creative efforts.
Fig. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic view of the floating mechanism of the present invention;
FIG. 3 is a schematic structural diagram of an adjusting unit of the present invention;
fig. 4 is a schematic structural view of the fixing mechanism of the present invention;
fig. 5 is another view angle structure diagram of the fixing mechanism of the present invention;
fig. 6 is a schematic diagram of the signal unit structure of the present invention.
In the drawings, the components represented by the respective reference numerals are listed below:
100. a floating mechanism; 110. floating the ball; 120. a connecting rod; 130. an L-shaped frame; 140. an adjustment unit; 141. a bolt; 142. a nut; 200. a fixing mechanism; 210. a sleeve; 220. a stud; 230. a fastening ring; 240. a signal unit; 241. a top pillar; 242. a contact end; 243. connecting columns; 244. a wire; 245. a limiting ring; 246. a spring; 250. inserting a rod; 260. and (4) a bolt.
Detailed Description
The technical solution in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention.
Referring to fig. 1-6, the present invention relates to an environment-friendly building settlement observation device, which comprises a floating mechanism 100 and a fixing mechanism 200, wherein a connecting rod 120 is disposed on one side of the floating mechanism 100, a sleeve 210 is disposed on one side of the fixing mechanism 200, one end of the connecting rod 120 is rotatably connected to one end of the sleeve 210, then the floating mechanism 100 is rotatably connected to one side of the fixing mechanism 200, and the fixing mechanism 200 is fixedly connected to the wall of the building.
As shown in fig. 2 and 3, the floating mechanism 100 includes a floating ball 110 and an adjusting unit 140, one side of the floating ball 110 is fixedly connected with a connecting rod 120, one end of the connecting rod 120, which is far away from the floating ball 110, is fixedly connected with an L-shaped frame 130, the length of the connecting rod 120 can be set according to a position to be measured, so that the floating ball 110 is located in an observable area, and the top of the L-shaped frame 130 is fixedly connected with the adjusting unit 140; the adjusting unit 140 includes a bolt 141 and a nut 142, the bolt 141 is engaged with the top of the L-shaped frame 130, the top end of the bolt 141 is adjacent to the fixing mechanism 200, and the bolt 141 is engaged with the nut 142 on the other side of the L-shaped frame 130, the bolt 141 can be adjusted by rotating the bolt 141 to adjust the length of the bolt 141 extending from the top of the L-shaped frame 130, and then the distance between the bolt 141 and the top pillar 241 can be adjusted, so that the bolt 141 can be rotated by buoyancy generated when the floating ball 110 is located on the water surface during the building settlement process, and then contacts the top pillar 241.
As shown in fig. 4-6, the fixing mechanism 200 includes a sleeve 210 and a signal unit 240, one side of the sleeve 210 is fixedly connected with a stud 220, the sleeve 210 is adjacent to the floating mechanism 100, a fastening ring 230 is engaged with an outer cylindrical surface of the stud 220, the stud 220 can be engaged in a wall of a building, and then the fastening ring 230 is fastened, so that the stud 220 is not easy to loosen, and when the device is not used, the stud 220 is detached from the wall, and the sleeve 210 and the inner portion of the stud 220 are movably clamped with the signal unit 240; an inserting rod 250 is movably inserted into the bottom of one end of the sleeve 210, the inserting rod 250 penetrates through the L-shaped frame 130, and a bolt 260 is fixedly clamped on the other side of the L-shaped frame 130 of the inserting rod 250 to fix the floating mechanism 100 and enable the floating mechanism 100 to rotate; the signal unit 240 comprises a top column 241 and a conducting wire 244, the top column 241 is slidably clamped in the sleeve 210, one side of the top column 241, which is positioned in the sleeve 210 and the stud 220, is provided with a connecting column 243, the adjacent surfaces of the top column 241 and the connecting column 243 are fixedly connected with two contact ends 242, the contact ends 242 at the two sides are provided with a protrusion and a depression, then when the top column 241 moves towards the connecting column 243, the contact end 242 on the top column 241 is clamped on the contact end 242 on the connecting column 243, one end of the connecting column 243 far away from the top column 241 is fixedly connected with two conducting wires 244, the conducting wire 244 penetrates through the connecting column 243 and can be connected with an alarm device or an external device so as to detect the settlement depth of a building, one end of the adjacent contact end 242 of the top column 241 is fixedly connected with a limiting ring 245, one side of the limiting ring 245 and the outer cylindrical surface of the top column 241 are fixedly connected with a spring 246, the outer diameter of the limiting ring 245 is larger than the inner diameter of a through hole formed in the top column 241, then, the top column 241 is automatically separated from the connecting column 243 by the spring 246 when the floating mechanism 100 is rotated downward and the bolt 141 is separated from the top column 241, so that the contact terminals 242 on both sides are separated.
The working principle is as follows:
when the device is used, the bolt 141 is adjusted according to the settlement depth of a building, the distance between the bolt 141 and the top column 241 is adjusted, the bolt 141 can be rotated through buoyancy generated when the floating ball 110 is located on the water surface in the settlement process of the building, then the bolt contacts the top column 241, when the top column 241 moves towards the connecting column 243, the contact end 242 located on the top column 241 is clamped on the contact end 242 located on the connecting column 243, then the two conducting wires 244 are communicated, the conducting wires 244 penetrate through the connecting column 243 to be connected with alarm equipment or external equipment to detect the settlement depth of the building, the outer diameter of the limiting ring 245 is larger than the inner diameter of the through hole formed in the top column 241, then the top column 241 automatically keeps away from the connecting column 243 under the action of the spring 246 after the bolt 141 is rotated downwards and is far away from the top column 241, so that the contact ends 242 located on two sides are separated, and the device can be repeatedly used.
The above is only the preferred embodiment of the present invention, and the present invention is not limited thereto, any technical solutions recorded in the foregoing embodiments are modified, and some technical features thereof are replaced with equivalent ones, and any modification, equivalent replacement, and improvement made thereby all belong to the protection scope of the present invention.

Claims (6)

1. The utility model provides an environment-friendly building settlement observation device, includes floating mechanism (100) and fixed establishment (200), its characterized in that: one side of the floating mechanism (100) is provided with a connecting rod (120), one side of the fixing mechanism (200) is provided with a sleeve (210), and one end of the connecting rod (120) is rotatably connected to one end of the sleeve (210).
2. The environment-friendly building settlement observation device according to claim 1, wherein the floating mechanism (100) comprises a floating ball (110) and an adjusting unit (140), a connecting rod (120) is fixedly connected to one side of the floating ball (110), an L-shaped frame (130) is fixedly connected to one end of the connecting rod (120) far away from the floating ball (110), and the adjusting unit (140) is fixedly connected to the top of the L-shaped frame (130).
3. The environment-friendly building settlement observation device of claim 1, wherein the fixing mechanism (200) comprises a sleeve (210) and a signal unit (240), a stud (220) is fixedly connected to one side of the sleeve (210), a fastening ring (230) is engaged with the outer cylindrical surface of the stud (220), and the sleeve (210) is movably clamped with the signal unit (240) inside the stud (220).
4. The environment-friendly building settlement observation device according to claim 2, wherein the adjusting unit (140) comprises a bolt (141) and a nut (142), the bolt (141) is engaged with the top of the L-shaped frame (130), and the bolt (141) is engaged with the nut (142) at the other side of the L-shaped frame (130).
5. The environment-friendly building settlement observation device of claim 3, wherein the signal unit (240) comprises a top pillar (241) and a wire (244), the top pillar (241) is slidably clamped in the sleeve (210), a connecting pillar (243) is arranged on one side of the top pillar (241) located in the sleeve (210) and the stud (220), two contact ends (242) are fixedly connected to the adjacent surfaces of the top pillar (241) and the connecting pillar (243), two wires (244) are fixedly connected to one end of the connecting pillar (243) far away from the top pillar (241), a limit ring (245) is fixedly connected to one end of the adjacent contact end (242) of the top pillar (241), and a spring (246) is fixedly connected to one side of the limit ring (245) and located on the outer cylindrical surface of the top pillar (241).
6. The environment-friendly building settlement observation device of claim 3, wherein an insertion rod (250) is movably inserted into the bottom of one end of the sleeve (210), the insertion rod (250) penetrates through the L-shaped frame (130), and a plug pin (260) is fixedly clamped on the other side of the L-shaped frame (130) of the insertion rod (250).
CN202120122104.5U 2021-01-18 2021-01-18 Environment-friendly building settlement observation device Expired - Fee Related CN214738317U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120122104.5U CN214738317U (en) 2021-01-18 2021-01-18 Environment-friendly building settlement observation device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120122104.5U CN214738317U (en) 2021-01-18 2021-01-18 Environment-friendly building settlement observation device

Publications (1)

Publication Number Publication Date
CN214738317U true CN214738317U (en) 2021-11-16

Family

ID=78639719

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120122104.5U Expired - Fee Related CN214738317U (en) 2021-01-18 2021-01-18 Environment-friendly building settlement observation device

Country Status (1)

Country Link
CN (1) CN214738317U (en)

Similar Documents

Publication Publication Date Title
CN211773679U (en) Reliable underwater concrete bored concrete pile elevation control early warning device
CN201903348U (en) Monitoring device for soil displacement and pore water pressure of seabed
CN203551149U (en) Soil pressure measuring device
CN214738317U (en) Environment-friendly building settlement observation device
CN211121503U (en) Water level monitoring device for hydraulic engineering
CN108678035B (en) Annular sounding device for detecting side friction force in sinking process of cylindrical foundation
CN109269597B (en) Automatic remote observing device for underground water level
CN203964985U (en) A kind of probe of dip meter
CN215952698U (en) Hydraulic engineering liquid level monitoring device convenient to installation
CN103743355B (en) A kind of Portable laser convergence gauge device
CN214061716U (en) Testing arrangement of cement soil mud lateral pressure
CN215373937U (en) Monitoring devices that road bed subsides
CN210482583U (en) Horizontal displacement measuring point device
CN211954032U (en) Foundation ditch displacement measurement device is used in construction engineering monitoring
CN206320122U (en) A kind of rotation locking elements
CN205483951U (en) Disk ring electrode strutting arrangement
CN221373669U (en) Colliery geology is measured with preventing and treating water early warning device
CN219973139U (en) Foundation filling compactness on-site detector
CN205382700U (en) Embedded nut formula is wall spare even
CN215005378U (en) Drainage device for measuring saturated water content of soil
CN219039010U (en) Chemical industry garden groundwater detection device
CN216251438U (en) Water conservancy flood prevention early warning device
CN214407693U (en) Water level real-time supervision's device among geotechnical engineering foundation ditch monitoring project
CN220226785U (en) Casing repairing device
CN211505305U (en) Detachable electrode

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211116