CN214693181U
CN214693181U CN202121286966.8U CN202121286966U CN214693181U CN 214693181 U CN214693181 U CN 214693181U CN 202121286966 U CN202121286966 U CN 202121286966U CN 214693181 U CN214693181 U CN 214693181U
Authority
CN
China
Prior art keywords
fixedly connected
wire rope
winch
steel wire
hoist engine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121286966.8U
Other languages
Chinese (zh)
Inventor
张晓宙
王振文
马功民
徐元成
张�杰
刘薇
武宁
田浩东
刘丽莹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
North Engineering Co Ltd of China Railway Construction Electrification Bureau Group Co Ltd
Original Assignee
North Engineering Co Ltd of China Railway Construction Electrification Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by North Engineering Co Ltd of China Railway Construction Electrification Bureau Group Co Ltd filed Critical North Engineering Co Ltd of China Railway Construction Electrification Bureau Group Co Ltd
Priority to CN202121286966.8U priority Critical patent/CN214693181U/en
Application granted granted Critical
Publication of CN214693181U publication Critical patent/CN214693181U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a can be at elevating gear of tall and big pier surface construction relates to building engineering technical field, including hoist engine fixing device and the enhancement bracing piece that is located hoist engine fixing device one side, one side fixedly connected with enhancement bracing piece of hoist engine fixing device, surface fixedly connected with hoist engine under hoist engine fixing device top, inside one side fixed mounting of hoist engine has the motor, the output shaft one end fixedly connected with action wheel of motor, upper surface one side fixedly connected with fixed plate of hoist engine, the inboard swing joint of fixed plate has the rope roller, be connected through the transmission of drive belt between the one end of rope roller and the action wheel. The utility model discloses, can realize the fixed mounting to the hoist engine through hoist engine fixing device, can strengthen hoist engine fixing device's stability through strengthening the bracing piece, can realize emitting and withdrawing of hoist and mount wire rope through the motor drive action wheel via drive belt and the mutual adaptation of rope-rollers.

Description

Lifting device capable of being constructed on surface of high and large pier
Technical Field
The utility model relates to a building engineering technical field, more specifically relate to a can be at high big pier surface construction's elevating gear.
Background
At present, the proportion of railway and highway bridge sections is getting bigger and bigger, the height is getting higher and higher, the general height of the bridge is more than 15 meters, the bridge is more than 30 meters frequently, optical cables and the like on the bridge need to be led to the ground from the bridge through piers, the optical cables led down from the bridge floor need to be fixed by a section of steel groove and water pipe, the existing 307 upper and lower bridge steel grooves of the whole line of the Jingji section special for Guangjing Shenke can ensure the on-site construction progress only by researching a safe, reliable, convenient and feasible device for installing the upper and lower bridge steel grooves of the optical cables, and further ensure that the construction task can be completed safely and smoothly according to the quality according to the construction period. Whether a device which can be conveniently lifted on the surface of a tall pier can be researched directly determines whether the construction of the upper bridge steel groove and the lower bridge steel groove of the optical cable can be smoothly finished.
Based on this problem, the device that this paper research can go up and down on big pier surface can greatly improve optical cable steel bay efficiency of construction and quality, has solved bridge section optical cable and has gone up bridge steel bay construction difficult problem down, takes precautions against unnecessary potential safety hazard and takes place.
In chinese utility model patent application no: CN202021550112.1 discloses a construction elevating gear, including the crane, transport case, motor, capstan winch line, capstan winch, connecting seat, transport the case and slide and connect the setting in the crane, the motor sets up the top at the crane, the capstan winch sets up at the top of crane and is connected with the motor, and the connecting seat is fixed to be set up and is transporting the roof portion, is provided with the capstan winch line in the capstan winch and is connected to the connecting seat, is provided with the running block group on the capstan winch line, the top of crane is provided with the pivot of angle displacement sensor and motor and is connected. This construction elevating gear still has the shortcoming that the lift distance is too short can't satisfy service condition in the use to and do not have the not high problem of using danger of protective structure factor of safety when using.
Therefore, it is necessary to provide a lifting device that can be constructed on the surface of a high pier to solve the above problems.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a: in order to solve construction elevating gear, still have the shortcoming that the lift distance can't satisfy service condition too for a short time in the use to and do not have the not high problem of using more danger of protective structure factor of safety during the use, the utility model provides a can be at the elevating gear of high big pier surface construction.
The utility model discloses a realize above-mentioned purpose and specifically adopt following technical scheme:
a lifting device capable of being constructed on the surface of a high pier comprises a winch fixing device and a reinforcing support rod positioned on one side of the winch fixing device, one side of the winch fixing device is fixedly connected with a reinforcing supporting rod, the lower surface of the top end of the winch fixing device is fixedly connected with a winch, a motor is fixedly arranged on one side inside the winch, one end of an output shaft of the motor is fixedly connected with a driving wheel, one side of the upper surface of the winch is fixedly connected with a fixed plate, the inner side of the fixed plate is movably connected with a rope roller, one end of the rope roller is in transmission connection with the driving wheel through a transmission belt, one side of the rope roller is wound with a hoisting steel wire rope, one side of the upper surface of the winch is fixedly connected with a limiting frame, one side of the limiting frame is movably connected with an auxiliary wheel, and the hoisting steel wire rope slides around the outer surface of the auxiliary wheel.
Furthermore, the bottom end of the hoisting steel wire rope is fixedly connected with a winch hanging ring, one side of the winch hanging ring is movably connected with a U-shaped connecting block, and one side of the U-shaped connecting block is movably connected with a falling protector hanging ring.
Furthermore, the bottom end of the winch is fixedly connected with a falling protector, one side of the falling protector is movably connected with a falling prevention steel wire rope, and the bottom end of the falling prevention steel wire rope is fixedly connected with a falling protector hanging ring.
Furthermore, the bottom end of the U-shaped connecting block is movably connected with a construction hanging basket steel wire rope, and the other end of the construction hanging basket steel wire rope is movably provided with a steel wire rope clamp.
Furthermore, one side of the construction hanging basket steel wire rope is movably connected with a connecting ring, and the bottom end of the connecting ring is fixedly connected with a hanging basket.
Furthermore, one side of the hanging basket is fixedly connected with a vertical angle steel and a horizontal angle steel.
Furthermore, a storage cabinet is fixedly arranged on the inner side of the hanging basket.
Furthermore, interval adjusters are symmetrically and fixedly connected to one side of the hanging basket, and safety ropes are movably connected between the two interval adjusters.
The utility model has the advantages as follows:
1. the utility model discloses, can realize the fixed mounting to the hoist engine through hoist engine fixing device, can strengthen hoist engine fixing device's stability through strengthening the bracing piece, can realize emitting and withdrawing of hoist and mount wire rope via drive belt and rope roller looks adaptation through the motor drive action wheel, the auxiliary wheel of spacing one side can assist hoist and mount wire rope's removal, this hoist engine fixing device can very convenient transportation, the installation, the daily construction of being convenient for, can realize non-maintaining basically, the maintenance work load of daily construction tool has been reduced, construction safety has been guaranteed.
2. The utility model discloses, can be with hoist and mount wire rope with prevent weighing down wire rope simultaneously rather than being connected through the U-shaped connecting block, can drive when the hanging flower basket reciprocates through U-shaped connecting block and construction hanging flower basket wire rope looks adaptation and make construction hanging flower basket wire rope can prolong the U-shaped connecting block and take place slight rotation, it is more convenient when making the hanging flower basket reciprocate with this, thereby solved construction overlength consuming time, inefficiency, with high costs, the poor difficult problem of security, rational design pier hanging flower basket elevating gear, the efficiency of construction has been improved.
3. The utility model discloses, the firm degree of hanging flower basket can be strengthened with the horizontal angle steel through the perpendicular angle steel of hanging flower basket one side, can realize placing instruments such as hammer, percussion drill, electronic bolt fastening torque device through putting the thing cabinet, can make it cooperate with the bridge through interval adjuster and safety rope looks adaptation and realize the fixed of hanging flower basket position, the utility model has the advantages of reasonable design, reduced bridge section optical cable upper and lower bridge steel groove construction risk and the degree of difficulty, labour saving and time saving improves the efficiency of construction, has simple structure, convenient operation, safe high efficiency and low price advantage simultaneously, and the result of use is better.
Drawings
Fig. 1 is a schematic perspective view of the structure of the present invention;
FIG. 2 is a schematic perspective sectional view of the structure of the present invention;
FIG. 3 is an enlarged cross-sectional view of a partial structure of the present invention;
FIG. 4 is an enlarged schematic view of the structure of area A in FIG. 3 according to the present invention;
FIG. 5 is an enlarged schematic view of the structure of region B in FIG. 2 according to the present invention;
fig. 6 is an enlarged schematic view of the structure of region C in fig. 2 according to the present invention.
Reference numerals: 1. a winch fixing device; 2. reinforcing the support rod; 3. a winch; 4. a motor; 5. a driving wheel; 6. a fixing plate; 7. a rope roller; 8. a transmission belt; 9. hoisting a steel wire rope; 10. a limiting frame; 11. an auxiliary wheel; 12. a U-shaped connecting block; 13. a safety catch; 14. an anti-falling steel wire rope; 15. constructing a steel wire rope of a hanging basket; 16. clamping a steel wire rope; 17. a connecting ring; 18. a hanging basket; 19. vertical angle steel; 20. transverse angle steel; 21. a storage cabinet; 22. an interval adjuster; 23. a safety rope.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Example 1
Please refer to fig. 3 and 4, a lifting device capable of being constructed on the surface of a high pier, comprising a winch fixing device 1 and a reinforcing support rod 2 located on one side of the winch fixing device 1, one side of the winch fixing device 1 is fixedly connected with the reinforcing support rod 2, a winch 3 is fixedly connected to the lower surface of the top end of the winch fixing device 1, a motor 4 is fixedly mounted on one side of the inside of the winch 3, one end of an output shaft of the motor 4 is fixedly connected with a driving wheel 5, one side of the upper surface of the winch 3 is fixedly connected with a fixing plate 6, the inner side of the fixing plate 6 is movably connected with a rope roller 7, one end of the rope roller 7 is in transmission connection with the driving wheel 5 through a transmission belt 8, a hoisting steel wire rope 9 is wound on one side of the rope roller 7, one side of the upper surface of the winch 3 is fixedly connected with a limiting frame 10, one side of the limiting frame 10 is movably connected with an auxiliary wheel 11, and the hoisting steel wire rope 9 slides around the outer surface of the auxiliary wheel 11.
In this embodiment, can realize the fixed mounting to hoist engine 3 through hoist engine fixing device 1, can strengthen hoist engine fixing device 1's stability through strengthening bracing piece 2, can realize emitting and withdrawing of hoist and mount wire rope 9 via drive belt 8 and rope roller 7 looks adaptation through motor 4 drive action wheel 5, the auxiliary wheel 11 of spacing 10 one side can assist hoist and mount wire rope 9's removal, this hoist engine fixing device 1 can very convenient transportation, the installation, be convenient for daily construction, can realize non-maintaining basically, the maintenance work load is maintained in daily construction tool maintenance has been reduced, construction safety has been guaranteed.
Example 2
Referring to fig. 2, 5 and 6, the embodiment is further optimized on the basis of embodiment 1, specifically, a hoisting machine hanging ring is fixedly connected to the bottom end of the hoisting steel wire rope 9, a U-shaped connecting block 12 is movably connected to one side of the hoisting machine hanging ring, and a safety hook hanging ring is movably connected to one side of the U-shaped connecting block 12.
Specifically, the bottom end of the winch 3 is fixedly connected with a falling protector 13, one side of the falling protector 13 is movably connected with a falling prevention steel wire rope 14, and the bottom end of the falling prevention steel wire rope 14 is fixedly connected with a falling protector hanging ring.
Specifically, the bottom end of the U-shaped connecting block 12 is movably connected with a construction basket steel wire rope 15, and the other end of the construction basket steel wire rope 15 is movably provided with a steel wire rope clamp 16.
Specifically, one side of the construction basket steel wire rope 15 is movably connected with a connecting ring 17, and the bottom end of the connecting ring 17 is fixedly connected with a basket 18.
In this embodiment, can be connected hoist and mount wire rope 9 and prevent weighing down wire rope 14 simultaneously through U-shaped connecting block 12, can drive the hanging flower basket 18 through U-shaped connecting block 12 and construction hanging flower basket wire rope 15 looks adaptation and make construction hanging flower basket wire rope 15 can prolong U-shaped connecting block 12 and take place slight rotation when reciprocating, it is more convenient when making hanging flower basket 18 reciprocate with this, thereby solved construction consuming time overlength, inefficiency, with high costs, the difficult problem that the security is poor, rationally design pier hanging flower basket elevating gear, construction efficiency is improved.
Example 3
Referring to fig. 1, the present embodiment is optimized based on the embodiment 1 or 2, specifically, a vertical angle steel 19 and a horizontal angle steel 20 are fixedly connected to one side of the basket 18.
Specifically, a storage cabinet 21 is fixedly mounted on the inner side of the hanging basket 18.
Specifically, one side of the hanging basket 18 is symmetrically and fixedly connected with interval adjusters 22, and a safety rope 23 is movably connected between the two interval adjusters 22.
In this embodiment, 19 vertical angle steels and the horizontal angle steels 20 through hanging flower basket 18 one side can strengthen the firm degree of hanging flower basket 18, can realize placing instruments such as hammer, percussion drill, electronic bolt fastening torque device through putting thing cabinet 21, can make it cooperate with the bridge through interval adjuster 22 and safe rope 23 looks adaptation and realize the fixed of hanging flower basket 18 position, the utility model has the advantages of reasonable design, reduced bridge steel slot construction risk and the degree of difficulty about bridge section optical cable, labour saving and time saving improves the efficiency of construction, has simple structure simultaneously, convenient operation, safe high efficiency and low price, and the result of use is better.
The utility model can realize the fixed installation of the hoist 3 through the hoist fixing device 1, can strengthen the stability of the hoist fixing device 1 through the strengthening support rod 2, can realize the emission and the withdrawal of the hoisting steel wire rope 9 through the adaptation of the driving wheel 5 and the rope roller 7 through the driving belt 8 driven by the motor 4, the auxiliary wheel 11 on one side of the limiting frame 10 can assist the movement of the hoisting steel wire rope 9, the hoist fixing device 1 can be very convenient to transport and install, is convenient for daily construction, can basically realize the maintenance-free, reduces the maintenance workload of daily construction tools, ensures the construction safety, can simultaneously connect the hoisting steel wire rope 9 and the anti-falling steel wire rope 14 through the U-shaped connecting block 12, can drive the hanging basket 18 to move up and down through the adaptation of the U-shaped connecting block 12 and the construction hanging basket steel wire rope 15 to slightly rotate along the U-shaped connecting block 12, make hanging flower basket 18 more convenient when reciprocating with this, thereby solved construction overlength consuming time, inefficiency, it is too high with costs, the poor difficult problem of security, rational design pier hanging flower basket elevating gear, the efficiency of construction is improved, vertical angle steel 19 and the firm degree that hanging flower basket 18 can be strengthened to horizontal angle steel 20 through hanging flower basket 18 one side, can realize placing instruments such as hammer, impact drill, electric bolt fastening torque device through putting thing cabinet 21, can make it cooperate with the bridge through interval adjuster 22 and safety rope 23 looks adaptation and realize the fixed of hanging flower basket 18 position, the utility model has the advantages of reasonable design, reduced bridge section optical cable upper and lower bridge steel channel construction risk and the degree of difficulty, labour saving and time saving improves the efficiency of construction, has simple structure simultaneously, convenient operation, safe high efficiency and low price's advantage, excellent in use effect.
Above, only be the preferred embodiment of the present invention, not be used for limiting the present invention, the patent protection scope of the present invention is based on the claims, all the structural changes equivalent to the content of the description and drawings of the present invention should be included in the protection scope of the present invention.

Claims (8)

1. The utility model provides a can be at elevating gear of big pier surface construction, includes hoist engine fixing device (1) and the enhancement bracing piece (2) that are located hoist engine fixing device (1) one side, its characterized in that: one side of the winch fixing device (1) is fixedly connected with a reinforcing support rod (2), the lower surface of the top end of the winch fixing device (1) is fixedly connected with a winch (3), one side of the inside of the winch (3) is fixedly provided with a motor (4), one end of an output shaft of the motor (4) is fixedly connected with a driving wheel (5), one side of the upper surface of the winch (3) is fixedly connected with a fixing plate (6), the inner side of the fixing plate (6) is movably connected with a rope roller (7), one end of the rope roller (7) is in transmission connection with the driving wheel (5) through a transmission belt (8), one side of the rope roller (7) is wound with a hoisting steel wire rope (9), one side of the upper surface of the winch (3) is fixedly connected with a limiting frame (10), and one side of the limiting frame (10) is movably connected with an auxiliary wheel (11), the hoisting steel wire rope (9) slides around the outer surface of the auxiliary wheel (11).
2. The lifting device capable of being constructed on the surface of a tall pier according to claim 1, wherein: the bottom end of the hoisting steel wire rope (9) is fixedly connected with a winch hanging ring, one side of the winch hanging ring is movably connected with a U-shaped connecting block (12), and one side of the U-shaped connecting block (12) is movably connected with a falling protector hanging ring.
3. The lifting device capable of being constructed on the surface of a tall pier according to claim 1, wherein: the bottom end of the winch (3) is fixedly connected with a falling protector (13), one side of the falling protector (13) is movably connected with a falling prevention steel wire rope (14), and the bottom end of the falling prevention steel wire rope (14) is fixedly connected with a falling protector hanging ring.
4. The lifting device capable of being constructed on the surface of a tall pier according to claim 2, wherein: the bottom end of the U-shaped connecting block (12) is movably connected with a construction hanging basket steel wire rope (15), and a steel wire rope clamp (16) is movably mounted at the other end of the construction hanging basket steel wire rope (15).
5. The lifting device capable of being constructed on the surface of a tall pier according to claim 4, wherein: one side of the construction hanging basket steel wire rope (15) is movably connected with a connecting ring (17), and the bottom end of the connecting ring (17) is fixedly connected with a hanging basket (18).
6. The lifting device capable of being constructed on the surface of a tall pier as claimed in claim 5, wherein: one side of the hanging basket (18) is fixedly connected with a vertical angle steel (19) and a transverse angle steel (20).
7. The lifting device capable of being constructed on the surface of a tall pier as claimed in claim 5, wherein: and a storage cabinet (21) is fixedly arranged on the inner side of the hanging basket (18).
8. The lifting device capable of being constructed on the surface of a tall pier as claimed in claim 5, wherein: one side of the hanging basket (18) is symmetrically and fixedly connected with interval adjusters (22), and a safety rope (23) is movably connected between the two interval adjusters (22).
CN202121286966.8U 2021-06-09 2021-06-09 Lifting device capable of being constructed on surface of high and large pier Active CN214693181U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121286966.8U CN214693181U (en) 2021-06-09 2021-06-09 Lifting device capable of being constructed on surface of high and large pier

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121286966.8U CN214693181U (en) 2021-06-09 2021-06-09 Lifting device capable of being constructed on surface of high and large pier

Publications (1)

Publication Number Publication Date
CN214693181U true CN214693181U (en) 2021-11-12

Family

ID=78555427

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121286966.8U Active CN214693181U (en) 2021-06-09 2021-06-09 Lifting device capable of being constructed on surface of high and large pier

Country Status (1)

Country Link
CN (1) CN214693181U (en)

Similar Documents

Publication Publication Date Title
CN111021749A (en) Simple hoisting mechanism for bare concrete exterior wall cladding and construction method thereof
CN214298989U (en) Tower crane without counter weight and capable of being turned over
CN102102365B (en) Slurry protection wall bored pile concrete casting device
CN213171204U (en) Construction equipment hoisting device
CN212374757U (en) Tower crane stable in installation
CN214693181U (en) Lifting device capable of being constructed on surface of high and large pier
CN2224191Y (en) Self-lifting tower crane capable of carrying person
CN211691536U (en) Simple lifting mechanism for bare concrete exterior wall cladding
CN210854912U (en) Device for replacing main hoisting steel wire rope of friction type hoisting machine
CN209957241U (en) Steel hanger
CN1182019C (en) Method for lifting and lowering building tower crane and its special equipment
CN218288070U (en) Scaffold platform for repairing ship convenient to install
CN2256418Y (en) Creeping formwork lifting frame for lift shaft
CN217894899U (en) Pipeline mobile device for hydraulic engineering
CN218713386U (en) Slag grabbing device for slag settling tank
CN212356327U (en) Traction device for dismounting and mounting large tower crane
CN213475194U (en) Pressing device for travelling crane guide rail
CN220976436U (en) Single track hangs track installation elevating gear
CN211871184U (en) Portal frame for architectural decoration
CN217921214U (en) Ascending-free cable guide wheel suspension device
CN210915021U (en) Large-tonnage hoisting device for bridge
CN216512496U (en) Single-boom bridge crane
CN217437589U (en) Prefabricated part hoisting device
CN210884884U (en) Top drive guide rail lifting trolley
CN221141137U (en) Underground overhaul device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant