CN214659939U - Highway engineering construction equipment - Google Patents

Highway engineering construction equipment Download PDF

Info

Publication number
CN214659939U
CN214659939U CN202120793506.8U CN202120793506U CN214659939U CN 214659939 U CN214659939 U CN 214659939U CN 202120793506 U CN202120793506 U CN 202120793506U CN 214659939 U CN214659939 U CN 214659939U
Authority
CN
China
Prior art keywords
wall
fixedly connected
motor
engineering construction
mounting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202120793506.8U
Other languages
Chinese (zh)
Inventor
霍志强
杨征勋
杨兴胜
张政
项阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Vocational and Technical College Communications
Original Assignee
Sichuan Vocational and Technical College Communications
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Vocational and Technical College Communications filed Critical Sichuan Vocational and Technical College Communications
Priority to CN202120793506.8U priority Critical patent/CN214659939U/en
Application granted granted Critical
Publication of CN214659939U publication Critical patent/CN214659939U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model discloses a highway engineering construction equipment relates to highway engineering technical field. The base is included, the inner wall bottom fixedly connected with pneumatic cylinder of base, the inner wall sliding connection of pneumatic cylinder has the hydraulic stem, the top outer wall fixedly connected with mount pad of hydraulic stem, the first mounting disc of bottom outer wall fixedly connected with of mount pad, the inner wall of first mounting disc rotates and is connected with the rolling disc, the bottom outer wall fixedly connected with fixed block of rolling disc. Drive the hydraulic stem through starting the pneumatic cylinder and reciprocate, be convenient for adjust the height of mount pad, it is rotatory to start the second motor and drive the drill bit, the drill bit drills the road surface through first round hole when the mount pad moves down, realize piling in road surface drilling, it drives the head rod rotation to start first motor, and then it is rotatory to drive the installation piece, conveniently adjust the angle of drill bit, the effect of constructing to the road surface has been improved, the problem of can't carrying out perpendicular drilling in road surface unevenness or slope department has been solved.

Description

Highway engineering construction equipment
Technical Field
The utility model relates to a highway engineering technical field especially relates to a highway engineering construction equipment.
Background
The highway job site usually needs to carry out mechanical drilling or form the stake hole in foundation soil through means such as crowded soil of steel pipe or manpower excavation, and place the steel reinforcement cage in it, the stake that concrete pouring made, the aperture inspection is behind stake hole pore-forming, go on before the steel reinforcement cage of lower income, though prior art can realize drilling work, nevertheless can't carry out the function of adjusting the drill bit angle, the condition that has leaded to can't carrying out vertical drilling at some oblique waves or little native dune takes place, because job site ground is unsmooth, if can't repair the road surface can lead to appearing measuring error easily and influence drilling work's condition and take place, consequently, a neotype highway engineering construction equipment is needed now.
Traditional construction equipment is when using:
1. the problem that vertical drilling cannot be carried out on uneven road surfaces or slopes is caused due to the fact that the angle of the drill bit cannot be adjusted in the construction process.
2. Because do not possess the sword tooth of wasing the repairment road surface, lead to the sword tooth to remain earth influence on long-term work the arrangement effect on the road surface and can't control the problem that washs rivers and lead to extravagant water source.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a highway engineering construction equipment has solved and can't carry out vertical drilling and conveniently wash the technical problem that the sword tooth improves the repairment efficiency in road surface unevenness or slope department.
In order to achieve the above object, the utility model provides a following technical scheme: a highway engineering construction device comprises a base, wherein a hydraulic cylinder is fixedly connected to the bottom of the inner wall of the base, a hydraulic rod is slidably connected to the inner wall of the hydraulic cylinder, a mounting seat is fixedly connected to the outer wall of the top of the hydraulic rod, a first mounting disc is fixedly connected to the outer wall of the bottom of the mounting seat, a rotating disc is rotatably connected to the inner wall of the first mounting disc, two fixing blocks are fixedly connected to the outer wall of the bottom of the rotating disc, a first motor is fixedly connected to the outer wall of one of the two fixing blocks, a first connecting rod is fixedly connected to the output end of the first motor, a mounting block is fixedly connected to the outer wall of the first connecting rod, a second motor is fixedly connected to the outer wall of the bottom of the mounting block, a drill bit is fixedly connected to the output end of the second motor, and a first round hole is formed in the inner wall of the bottom of the base, the first round hole is located right below the drill bit.
Preferably, the bottom outer wall fixedly connected with second mounting disc of mount pad, the bottom outer wall fixedly connected with third motor of second mounting disc, the output end fixedly connected with second connecting rod of third motor, the outer wall fixedly connected with installation axle of second connecting rod, the inner wall fixedly connected with sword tooth of installation axle, the second round hole has been seted up to the bottom inner wall of base, the second round hole is located the sword tooth under.
Preferably, the top outer wall fixedly connected with water tank of mount pad, the inner wall bottom fixedly connected with water pump of water tank, the output fixedly connected with water pipe of water pump.
Preferably, one end of the water pipe, which is far away from the water pump, is fixedly connected with a spray head, and the outer wall of the water pipe is fixedly connected with a valve.
Preferably, the outer wall of the bottom of the base is fixedly connected with universal wheels.
Preferably, a water injection port is formed in the outer wall of the top of the water tank, and a cap is arranged on the inner wall of the water injection port.
Compared with the prior art, the utility model provides a pair of highway engineering construction equipment has following beneficial effect:
1. the utility model provides a highway engineering construction equipment, drive the hydraulic stem through starting the pneumatic cylinder and reciprocate, be convenient for adjust the height of mount pad, it is rotatory to start the second motor and drive the drill bit, the drill bit drills the road surface through first round hole when the mount pad moves down, realize driving the pile in road surface drilling, it drives the head rod rotation to start first motor, and then it is rotatory to drive the installation piece, conveniently adjust the angle of drill bit, the effect of carrying out the construction to the road surface is improved, the problem of can't carrying out perpendicular drilling in road surface unevenness or slope department has been solved.
2. The utility model provides a highway engineering construction equipment, it rotates to drive the second connecting rod through starting the third motor, it is high-speed rotatory to make the sword tooth when the second connecting rod rotates, the sword tooth is amputated and is cleared up uneven little mound or weeds of road surface through the second round hole when the mount pad moves down, be convenient for going on that drilling work is better, the work efficiency of drilling has been improved, the water of starting water pump in with the water tank leads to pipe and extracts to shower nozzle department, wash the sword tooth through the shower nozzle, through the size of rotary valve control rivers, avoid when wasing discharge too big the condition emergence that causes the water source waste, the problem of the arrangement effect and the extravagant water source of the earth influence on the road surface of sword tooth above long-term work has been solved.
Drawings
Fig. 1 is a schematic structural view of the present invention;
fig. 2 is a schematic structural view of a first circular hole of the present invention;
FIG. 3 is a schematic structural view of the nozzle of the present invention;
fig. 4 is the structure diagram of the water pump of the present invention.
In the figure: 1. a base; 2. a hydraulic cylinder; 3. a hydraulic lever; 4. a mounting seat; 5. a first mounting plate; 6. rotating the disc; 7. a fixed block; 8. a first motor; 9. a first connecting rod; 10. mounting blocks; 11. a second motor; 12. a drill bit; 13. a first circular hole; 14. a second mounting plate; 15. a third motor; 16. a second connecting rod; 17. cutter teeth; 18. a second circular hole; 19. a water tank; 20. a water pump; 21. a water pipe; 22. a valve; 23. a spray head; 24. a universal wheel; 25. and (4) a cap.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments; based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
The first embodiment is as follows:
referring to fig. 1-3, the present invention provides a technical solution: a highway engineering construction device comprises a base 1, a hydraulic cylinder 2 is fixedly connected to the bottom of the inner wall of the base 1, a hydraulic rod 3 is slidably connected to the inner wall of the hydraulic cylinder 2, a mounting seat 4 is fixedly connected to the outer wall of the top of the hydraulic rod 3, a first mounting disc 5 is fixedly connected to the outer wall of the bottom of the mounting seat 4, a rotating disc 6 is rotatably connected to the inner wall of the first mounting disc 5, two fixing blocks 7 are fixedly connected to the outer wall of the bottom of the rotating disc 6, a first motor 8 is fixedly connected to the outer wall of one of the fixing blocks 7, a first connecting rod 9 is fixedly connected to the output end of the first motor 8, a mounting block 10 is fixedly connected to the outer wall of the first connecting rod 9, a second motor 11 is fixedly connected to the outer wall of the bottom of the mounting block 10, a drill bit 12 is fixedly connected to the output end of the second motor 11, and a first round hole 13 is formed in the inner wall of the bottom of the base 1, the first circular hole 13 is located directly below the drill bit 12.
In this embodiment, drive hydraulic stem 3 through starting up hydraulic cylinder 2 and reciprocate, be convenient for adjust the height of mount pad 4, first mounting disc 5 through the setting provides the installation condition for rolling disc 6, the effect of installation piece 10 is installation second motor 11, it is rotatory to start second motor 11 and drive drill bit 12, drill bit 12 drills the road surface through first round hole 13 when mount pad 4 shifts down, can realize drilling the pile in the road surface, fixed block 7 through the setting provides the installation holding power for first motor 8, it rotates to start first motor 8 and drive head rod 9, and then it is rotatory to drive installation piece 10, be convenient for adjust the drilling angle of drill bit 12, avoid taking place at the condition that the road surface is uneven or slope department can't carry out vertical drilling, the effect of being under construction to the road surface has been improved.
Example two:
referring to fig. 1-4, based on the first embodiment, the present invention provides a technical solution: bottom outer wall fixedly connected with second mounting disc 14 of mount pad 4, bottom outer wall fixedly connected with third motor 15 of second mounting disc 14, the output end fixedly connected with second connecting rod 16 of third motor 15, the outer wall fixedly connected with installation axle of second connecting rod 16, the inner wall fixedly connected with sword tooth 17 of installation axle, second round hole 18 has been seted up to base 1's bottom inner wall, second round hole 18 is located sword tooth 17 under, the top outer wall fixedly connected with water tank 19 of mount pad 4, the inner wall bottom fixedly connected with water pump 20 of water tank 19, the output end fixedly connected with water pipe 21 of water pump 20, water pipe 21 keeps away from the one end fixedly connected with shower nozzle 23 of water pump 20, the outer wall fixedly connected with valve 22 of water pipe 21, the bottom outer wall fixedly connected with universal wheel 24 of base 1, the water filling port has been seted up to the top outer wall of water tank 19, the inner wall of water filling port is provided with cap 25.
In the embodiment, the second mounting disc 14 provides mounting conditions for the third motor 15, the third motor 15 is started to drive the second connecting rod 16 to rotate, the second connecting rod 16 rotates to enable the cutter teeth 17 to rotate at a high speed, when the mounting seat 4 moves downwards, the cutter teeth 17 cut and clean uneven hillocks or weeds on the road surface through the second round hole 18, so that the drilling work can be better performed, the working efficiency of drilling is improved, the water pump 20 is started to pump the water in the water tank 19 to the spray head 23 through the water pipe 21, the cutter teeth 17 are cleaned through the spray head 23, the influence of soil left on the cutter teeth 17 when the cutter teeth work for a long time on the finishing effect of the road surface is avoided, the water flow is controlled by rotating the valve 22 to avoid the waste of water due to the excessive water flow during the washing, and when the water in the water tank 19 is used up, a sufficient amount of water is injected again by opening the cap 25.
The working principle is as follows: the hydraulic cylinder 2 is started to drive the hydraulic rod 3 to move up and down, so that the height of the mounting seat 4 is convenient to adjust, mounting conditions are provided for the rotating disc 6 through the arranged first mounting disc 5, the mounting block 10 is used for mounting the second motor 11, the second motor 11 is started to drive the drill bit 12 to rotate, when the mounting seat 4 moves down, the drill bit 12 drills a road surface through the first round hole 13, so that drilling and piling on the road surface can be realized, mounting supporting force is provided for the first motor 8 through the arranged fixing block 7, the first motor 8 is started to drive the first connecting rod 9 to rotate, the mounting block 10 is further driven to rotate, so that the drilling angle of the drill bit 12 is convenient to adjust, the situation that vertical drilling cannot be performed on uneven road surfaces or slopes is avoided, the effect of constructing the road surface is improved, mounting conditions are provided for the third motor 15 through the second mounting disc 14, the third motor 15 is started to drive the second connecting rod 16 to rotate, make sword tooth 17 high-speed rotatory when second connecting rod 16 rotates, sword tooth 17 cuts off and clears up the uneven little mound of road surface or weeds through second round hole 18 when mount pad 4 moves down, be convenient for the better going on of drilling work, the work efficiency of drilling has been improved, start water pump 20 and pass through water pipe 21 in with water tank 19 and extract to shower nozzle 23 department, wash sword tooth 17 through shower nozzle 23, avoid sword tooth 17 to remain the soil influence on long-term during operation and to the arrangement effect on road surface, through the size of rotary valve 22 control rivers, avoid when wasing the too big condition that causes the water source to take place, water in water tank 19 injects the sufficient water once more through opening cap 25 when using up.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a highway engineering construction equipment, includes base (1), its characterized in that: the hydraulic cylinder (2) is fixedly connected to the bottom of the inner wall of the base (1), the hydraulic cylinder (2) is slidably connected to the inner wall of the hydraulic cylinder (3), the mounting seat (4) is fixedly connected to the outer wall of the top of the hydraulic cylinder (3), the first mounting disc (5) is fixedly connected to the outer wall of the bottom of the mounting seat (4), the rotating disc (6) is rotatably connected to the inner wall of the first mounting disc (5), the fixing block (7) is fixedly connected to the outer wall of the bottom of the rotating disc (6), the number of the fixing blocks (7) is two, the first motor (8) is fixedly connected to the outer wall of one of the fixing blocks (7), the first connecting rod (9) is fixedly connected to the output end of the first motor (8), the mounting block (10) is fixedly connected to the outer wall of the first connecting rod (9), and the second motor (11) is fixedly connected to the outer wall of the bottom of the mounting block (10), the output end of the second motor (11) is fixedly connected with a drill bit (12), a first round hole (13) is formed in the inner wall of the bottom of the base (1), and the first round hole (13) is located under the drill bit (12).
2. A road engineering construction device according to claim 1, characterised in that: the utility model discloses a mounting structure, including base (1), bottom outer wall fixedly connected with second mounting disc (14) of mount pad (4), the bottom outer wall fixedly connected with third motor (15) of second mounting disc (14), the output fixedly connected with second connecting rod (16) of third motor (15), the outer wall fixed connection installation axle of second connecting rod (16), the inner wall fixedly connected with sword tooth (17) of installation axle, second round hole (18) have been seted up to the bottom inner wall of base (1), second round hole (18) are located sword tooth (17) under.
3. A road engineering construction device according to claim 1, characterised in that: the water pump is characterized in that a water tank (19) is fixedly connected to the outer wall of the top of the mounting seat (4), a water pump (20) is fixedly connected to the bottom of the inner wall of the water tank (19), and a water pipe (21) is fixedly connected to the output end of the water pump (20).
4. A road engineering construction device according to claim 3, characterised in that: one end of the water pipe (21) far away from the water pump (20) is fixedly connected with a spray head (23), and the outer wall of the water pipe (21) is fixedly connected with a valve (22).
5. A road engineering construction device according to claim 1, characterised in that: the outer wall of the bottom of the base (1) is fixedly connected with a universal wheel (24).
6. A road engineering construction device according to claim 3, characterised in that: the water injection port is formed in the outer wall of the top of the water tank (19), and a cap (25) is arranged on the inner wall of the water injection port.
CN202120793506.8U 2021-04-16 2021-04-16 Highway engineering construction equipment Expired - Fee Related CN214659939U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120793506.8U CN214659939U (en) 2021-04-16 2021-04-16 Highway engineering construction equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120793506.8U CN214659939U (en) 2021-04-16 2021-04-16 Highway engineering construction equipment

Publications (1)

Publication Number Publication Date
CN214659939U true CN214659939U (en) 2021-11-09

Family

ID=78464173

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120793506.8U Expired - Fee Related CN214659939U (en) 2021-04-16 2021-04-16 Highway engineering construction equipment

Country Status (1)

Country Link
CN (1) CN214659939U (en)

Similar Documents

Publication Publication Date Title
CN213267890U (en) Foundation engineering slip casting device
CN214659939U (en) Highway engineering construction equipment
CN106351272A (en) Washing device for milling wheels of slot milling machine
CN213173761U (en) Slope surface collapse prevention device for earthwork operation
CN112854239A (en) Reinforcing construction method for ultra-deep mucky soil layer triaxial mixing pile
CN106592514A (en) Construction method of old city riverway piling wall integrated vertical type retaining wall
CN115961646A (en) Foundation pit water stopping method in pebble stratum
CN217438908U (en) A high-efficient high pressure spouts stake machine soon for handling weak soil
CN206535500U (en) It is a kind of to be used for shallow-layer contaminated soil and the swinging stirring-head of underground water stir in situ
CN114000476B (en) Surface layer tamping device and ditch cleaning tamping method for farmland drainage ditch
CN106759339B (en) Pile cap concrete construction method and device without digging and removing soil between piles
CN110439475B (en) Rotary spraying drilling machine for road and bridge construction and repair
CN210342043U (en) Civil engineering foundation pit excavating device
KR100211745B1 (en) Pile driving machine and construction process of foundation pile
CN206681008U (en) Exempt from the constructing device for the pile cover concrete that inter-pile soil is excavated
CN114250761A (en) Soft foundation solidification treatment equipment based on Yangtze river flood beach geology
CN111676953A (en) Hybrid foundation treatment power method machine and working method thereof
CN209128999U (en) A kind of deep basal pit adverse construction method device
CN220888621U (en) Eleven-shaft cement soil impervious wall pile machine
CN112160333A (en) Composite curtain pile construction drilling tool and construction method thereof
CN211666631U (en) Foundation excavating device for building construction
CN112854273A (en) Excavation-free construction process and construction equipment for green urban underground structures
CN112482363A (en) Method for processing underground pipeline in urban pile foundation construction
KR100880733B1 (en) Excavation equipment of a road boundary stone back guard rear
CN212582654U (en) Hybrid foundation treatment power method machine

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211109