CN214658693U - A fixed chassis for outer wall construction goes up and down - Google Patents

A fixed chassis for outer wall construction goes up and down Download PDF

Info

Publication number
CN214658693U
CN214658693U CN202023138426.3U CN202023138426U CN214658693U CN 214658693 U CN214658693 U CN 214658693U CN 202023138426 U CN202023138426 U CN 202023138426U CN 214658693 U CN214658693 U CN 214658693U
Authority
CN
China
Prior art keywords
fixed
welded fastening
column
horizon bar
square tube
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202023138426.3U
Other languages
Chinese (zh)
Inventor
姜兆双
杨子强
陈宝林
徐忠梅
张辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Shougang Construction Group Co Ltd
Original Assignee
Beijing Shougang Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Shougang Construction Group Co Ltd filed Critical Beijing Shougang Construction Group Co Ltd
Priority to CN202023138426.3U priority Critical patent/CN214658693U/en
Application granted granted Critical
Publication of CN214658693U publication Critical patent/CN214658693U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

A fixed chassis for lifting of outer wall construction belongs to the technical field of outer wall construction of factory buildings. Comprises a horizontal rod (1), a fixed pulley (2), a front upright post (3), an inclined strut (4), a rear upright post (5), a buried plate (6) and an anchor bolt (7); fixed pulley (2) welded fastening is in the front end of horizon bar (1), and front column (3) welded fastening is in the front portion of horizon bar (1), and two bracing (4) welding are in front column (3) lower part position both sides, and bracing (4) and front column (3) contained angle 60, and rear column (5) welded fastening is in the rear end of horizon bar (1), and two buried plate (6) welded fastening are in rear column (5) bottom position both sides, and crab-bolt (7) pass anchor plate 6 fixed. The advantage lies in, simple manufacture, and convenient operation has avoided setting up operation scaffold frame, has saved a large amount of manpowers, material resources, and the fixed chassis of demolising simultaneously can used repeatedly, has reduced construction cost.

Description

A fixed chassis for outer wall construction goes up and down
Technical Field
The utility model belongs to the technical field of the construction of factory building outer wall, especially, a fixed chassis that is used for outer wall construction to go up and down is provided.
Background
When the plastering construction operation of the external wall of the factory building is carried out, generally, firstly, an operation scaffold is erected, a springboard platform is laid on the scaffold, then a constructor stands on the springboard platform to carry out plastering operation on the external wall, a large number of scaffold pipes are required to be used in the method, a large amount of manpower is used for erecting and dismantling the scaffold, the workload is high, and the construction cost is high.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a fixed chassis for outer wall construction goes up and down, has solved and has consumed a large amount of scaffold pipes and manpower scheduling problem.
The utility model discloses the crab-bolt that passes through the anchor plate on the rear column with fixed chassis is fixed at the factory building top, then lay the hoist engine at fixed chassis back, and pass through the fixed pulley of fixed chassis with the rope of hoist engine, the fixed operation hanging flower basket of lower extreme of hoist rope, construction operation personnel stand and plaster the operation to the factory building outer wall in the operation hanging flower basket, start the hoist engine, the operation hanging flower basket can be through the fixed pulley oscilaltion of fixed chassis, make construction operation personnel can reciprocate and plaster the operation comprehensively to the factory building outer wall.
The utility model discloses fixed chassis includes horizon bar 1, fixed pulley 2, front column 3, bracing 4, rear column 5, bury board 6, crab-bolt 7, the combined use, fixed pulley 2 welded fastening is at the front end of horizon bar 1, 3 welded fastening of front column is in the anterior position of horizon bar 1, two 4 welds in 3 lower part position both sides of front column of bracing, bracing 4 and 3 contained angles 60 of front column, rear column 5 welded fastening is in the rear end of horizon bar 1, 6 welded fastening of two board of burying are in 5 bottom position both sides of rear column, crab-bolt 7 passes anchor board 6 fixedly. (see fig. 1, 2, 3).
Wherein, the horizontal rod 1 is formed by processing a square tube with the cross section size (length and width) of 200mm by 200mm, and the length is 3000 mm; the diameter of the fixed pulley 2 is 300 mm; the front upright post 3 is formed by processing a square tube with the cross section size (length and width) of 200mm and the length of 1200 mm; the inclined strut 4 is formed by processing a square tube with the cross section size (length and width) of 100mm and 100mm, and the length is 600 mm; the rear upright post 5 is formed by processing a square tube with the cross section size (length and width) of 200mm and the length of 1200 mm; the buried plate 6 is machined from a 20mm thick steel plate and has a dimension (length and width) of 200mm by 200 mm; the anchor bolt 7 has a diameter of 20 mm.
During the use, 7 the crab-bolt that passes through anchor slab 6 on the rear column 5 with fixed chassis fixes at 8 tops in the factory building, then lay hoist engine 9 at fixed chassis back, and pass through fixed pulley 2 of fixed chassis with the rope of hoist engine 9, the fixed operation hanging flower basket 10 of lower extreme of hoist engine 9 rope, construction operation personnel stand in operation hanging flower basket 10 and plaster the operation to 8 outer walls in the factory building, start hoist engine 9, operation hanging flower basket 10 can be through 2 oscilaltions of fixed pulley of fixed chassis, make construction operation personnel can reciprocate and plaster the operation comprehensively to 8 outer walls in the factory building. After plastering of the outer wall is finished, the fixed underframe can be protectively removed and can be reused (fig. 4 and 5).
The utility model has the advantages of, simple manufacture, convenient operation has avoided setting up operation scaffold frame, has saved a large amount of manpowers, material resources, and the fixed chassis of demolising simultaneously can used repeatedly, has reduced construction cost, has gained good economic benefits.
Drawings
Fig. 1 is a front view of a fixed chassis.
Fig. 2 is a side view of a stationary chassis.
Fig. 3 is a top view of the stationary base frame.
Fig. 4 is a front view of the stationary chassis in use.
Fig. 5 is a top view of the stationary chassis in use.
In the figure, a horizontal rod 1, a fixed pulley 2, a front upright post 3, an inclined strut 4, a rear upright post 5, a buried plate 6, an anchor bolt 7, a factory building 8, a winch 9 and an operation hanging basket 10.
Detailed Description
Fig. 1-5 show a specific embodiment of the present invention. The present invention will be further explained with reference to the accompanying drawings.
The utility model discloses fixed chassis includes horizon bar 1, fixed pulley 2, front column 3, bracing 4, rear column 5, bury board 6, crab-bolt 7, the combined use, fixed pulley 2 welded fastening is at the front end of horizon bar 1, 3 welded fastening of front column is in the anterior position of horizon bar 1, two 4 welds in 3 lower part position both sides of front column of bracing, bracing 4 and 3 contained angles 60 of front column, rear column 5 welded fastening is in the rear end of horizon bar 1, 6 welded fastening of two board of burying are in 5 bottom position both sides of rear column, crab-bolt 7 passes anchor board 6 fixedly. Wherein, the horizontal rod 1 is formed by processing a square tube with the cross section size (length and width) of 200mm by 200mm, and the length is 3000 mm; the diameter of the fixed pulley 2 is 300 mm; the front upright post 3 is formed by processing a square tube with the cross section size (length and width) of 200mm and the length of 1200 mm; the inclined strut 4 is formed by processing a square tube with the cross section size (length and width) of 100mm and 100mm, and the length is 600 mm; the rear upright post 5 is formed by processing a square tube with the cross section size (length and width) of 200mm and the length of 1200 mm; the buried plate 6 is machined from a 20mm thick steel plate and has a dimension (length and width) of 200mm by 200 mm; the anchor bolt 7 has a diameter of 20 mm.
During the use, 7 the crab-bolt that passes through anchor slab 6 on the rear column 5 with fixed chassis fixes at 8 tops in the factory building, then lay hoist engine 9 at fixed chassis back, and pass through fixed pulley 2 of fixed chassis with the rope of hoist engine 9, the fixed operation hanging flower basket 10 of lower extreme of hoist engine 9 rope, construction operation personnel stand in operation hanging flower basket 10 and plaster the operation to 8 outer walls in the factory building, start hoist engine 9, operation hanging flower basket 10 can be through 2 oscilaltions of fixed pulley of fixed chassis, make construction operation personnel can reciprocate and plaster the operation comprehensively to 8 outer walls in the factory building. After the plastering of the outer wall is finished, the fixed underframe can be protectively dismantled and can be repeatedly used.
When the outer wall of the electric control factory building is plastered, a fixed underframe for outer wall construction lifting is adopted, and the hoisting is matched, so that the operation scaffold is prevented from being erected, and a better effect is obtained. This fixed chassis includes horizon bar, fixed pulley, front column, bracing, rear column, buries the board, the crab-bolt, uses in combination, and fixed pulley welded fastening is at the front end of horizon bar, and front column welded fastening is in the front portion position of horizon bar, and two bracing welds in front column lower part position both sides, and bracing and front column contained angle 60, and rear column welded fastening is in the rear end of horizon bar, and two bury board welded fastening in rear column bottom position both sides, and the crab-bolt passes the anchor slab and fixes. During the use, fix the crab-bolt that passes through the anchor plate on the rear column with fixed chassis at the factory building top, then lay the hoist engine at fixed chassis back, and pass through the fixed pulley of fixed chassis with the rope of hoist engine, the fixed operation hanging flower basket of lower extreme of hoist engine rope, construction operation personnel stand in the operation hanging flower basket to the factory building outer wall operation of plastering, start the hoist engine, the operation hanging flower basket can be through the fixed pulley oscilaltion of fixed chassis, make construction operation personnel can reciprocate and carry out the operation of plastering comprehensively to the factory building outer wall. After the plastering of the outer wall is finished, the fixed underframe can be protectively dismantled and can be repeatedly used. This fixed chassis simple manufacture, convenient operation has avoided setting up operation scaffold frame, has saved a large amount of manpowers, material resources, and the fixed chassis of demolising simultaneously can used repeatedly, has reduced construction cost, has accumulated valuable experience for similar construction in the future.

Claims (2)

1. A fixed underframe for lifting of outer wall construction is characterized by comprising a horizontal rod (1), a fixed pulley (2), a front upright post (3), an inclined strut (4), a rear upright post (5), a buried plate (6) and an anchor bolt (7); fixed pulley (2) welded fastening is in the front end of horizon bar (1), and front column (3) welded fastening is in the front portion of horizon bar (1), and two bracing (4) welding are in front column (3) lower part position both sides, and bracing (4) and front column (3) contained angle 60, and rear column (5) welded fastening is in the rear end of horizon bar (1), and two buried plate (6) welded fastening are in rear column (5) bottom position both sides, and crab-bolt (7) pass anchor plate 6 fixed.
2. The fixed underframe for external wall construction lifting according to claim 1, wherein the horizontal rod (1) is formed by processing a square tube with a cross section size of 200mm by 200mm, and the length of 3000 mm; the diameter of the fixed pulley (2) is 300 mm; the front upright post (3) is formed by processing a square tube with the cross section size of 200mm by 200mm, and the length of the square tube is 1200 mm; the inclined strut (4) is formed by processing a square tube with the cross section size of 100mm by 100mm, and the length of the square tube is 600 mm; the rear upright post (5) is formed by processing a square tube with the cross section size of 200mm by 200mm, and the length of the square tube is 1200 mm; the buried plate (6) is processed by a steel plate with the thickness of 20mm, and the length and the width of the buried plate are 200mm and 200 mm; the diameter of the anchor bolt (7) is 20 mm.
CN202023138426.3U 2020-12-22 2020-12-22 A fixed chassis for outer wall construction goes up and down Active CN214658693U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202023138426.3U CN214658693U (en) 2020-12-22 2020-12-22 A fixed chassis for outer wall construction goes up and down

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202023138426.3U CN214658693U (en) 2020-12-22 2020-12-22 A fixed chassis for outer wall construction goes up and down

Publications (1)

Publication Number Publication Date
CN214658693U true CN214658693U (en) 2021-11-09

Family

ID=78502079

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202023138426.3U Active CN214658693U (en) 2020-12-22 2020-12-22 A fixed chassis for outer wall construction goes up and down

Country Status (1)

Country Link
CN (1) CN214658693U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114411797A (en) * 2022-01-26 2022-04-29 中国电建集团贵州工程有限公司 Installation and construction method of anchor plate of anchor bolt of fan foundation

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114411797A (en) * 2022-01-26 2022-04-29 中国电建集团贵州工程有限公司 Installation and construction method of anchor plate of anchor bolt of fan foundation

Similar Documents

Publication Publication Date Title
CN215254604U (en) Template support system encorbelments
CN113931313A (en) Super high-rise core tube horizontal structure construction method
CN101624871A (en) Instrumental operation platform for shear wall formwork of elevator shaft
CN111188497A (en) Autoclaved aerated concrete wallboard mounting construction machine tool and using method thereof
CN214658693U (en) A fixed chassis for outer wall construction goes up and down
CN202945798U (en) Overhanging type scaffold corner device
CN214883827U (en) Construction elevator foundation support system device that encorbelments
CN212866793U (en) Assembled construction elevator stops layer platform
CN210738053U (en) Turnover operation platform suitable for elevator counterweight installation
CN203034799U (en) Tower hoist standard knot bearing overhead support formwork steel platform structure
CN111827648A (en) Construction device and method for down-supporting type overhanging scaffold
CN205777489U (en) A kind of support system of high and big die plate
CN106836242B (en) Deep foundation pit anchor cable tensioning assembly type operation platform
CN107381376B (en) Device and method for hoisting by utilizing curtain wall embedded part
CN209874434U (en) Simple and easy scaffold frame of encorbelmenting of building high latitude
CN213597442U (en) Elevator shaft template operation platform that encorbelments
CN108222503A (en) A kind of combined large pier stud steel form
CN111608376B (en) Comprehensive construction method for shaping component
CN111608377B (en) Comprehensive construction method for building overhanging scaffold
CN212428008U (en) Lower supporting type overhanging scaffold construction device
CN216276830U (en) Super high-rise core tube formwork lowering construction device
CN221256082U (en) Hollow high-altitude large-area overhanging cast-in-situ structure steel wire rope operating platform
CN217268946U (en) Aluminum alloy template pouring elevator in building construction floor
CN212336730U (en) Beam formwork framework
CN215889381U (en) Construction system for carrying out concrete pouring on steel pipe column in advance without dismantling sealing plate

Legal Events

Date Code Title Description
GR01 Patent grant